2007-09-26
MINUTES OF THE
TECHNICAL REVIEW COMMITTEE
WEDNESDAY, SEPTEMBER 26, 2007, 10:00 A. M.
CITY OF OKEECHOBEE
55 Southeast 3rd Avenue
Okeechobee, Florida 34974
A. CALL TO ORDER - Chairperson
The meeting was called to order by Chairperson Brian Whitehall.
B. STAFF ATTENDANCE - Secretary
PRESENT:
Administrator Whitehall
Building Official' Schaub
Chief Davis
Chief Smith
Engineer Bermudez
**************************************
Non-Voting Ex-Officio Member
**************************************
PRESENT:
Attorney Cook
OUA Hayford
Planner Brisson
Secretary Clement
ABSENT:
Public Works Director Robertson
School Representative (no representation)
County Health Department Trent
C. Minutes - Secretary
Chief Smith moved to dispense with the reading and approve the July 25, 2007 Technical Review Committee Minutes
regular meeting; seconded by Engineer Bermudez. Motion carried (5-0).
D. New Business - Chairperson
1. Southern Trace. The application was submitted by Steven Dobbs, P.E. on behalf of applicant Curt Lundberg and
property owner Insite Development Group, LLC. The application is for site development improvements with 238
units on 37.73 acres, multi-family residential development, to be developed in two phases for property located
one Block West of Highway 441. Legal description: Lots 1-26, Block 4; Lots 1-6, Block 11; Lots 1-26, Block 12;
Lots 1-26, Block 13; Lots 1-26, Block 20, Lots 1-26, Block 21; and Lots 1-6, Block 22, City of Okeechobee
Subdivision, Okeechobee, Florida - Planning Consultant.
Bill Brisson from LaRue Planning and Management presented the LaRue Planning Staff recommendation as follows: Staff
recommends that the site plan be approved, with the following conditions:
a. The Department of Community Affairs and Florida Office of Tourism, Trade and Economic Development (OTTED)
have no objection to Small Scale Amendment #07 -005-SSA.
b. Development Agreement is executed incorporating provisions relating to the aforementioned two recreation areas
and "fair share" of transportation related improvements.
c. Design changes are made to the vehicular use areas to break-up the continuous expanse of paved areas.
Mr. Whitehall asked Mr. Dobbs, the Engineer for Southern Trace, about the developer agreement. Mr. Dobbs replied that
he has sent the agreement to the developer for comments and is waiting on his response. As soon as Mr. Dobbs receives,
he will supply to the City.
Mr. Whitehall then asked whether there were any comments from the staff? Schaub, no comment, Chief Smith, no
comment, Engineer Bermudez asked whether Mr. Dobbs received SFWMD permit? Mr. Dobbs answered he has not
received the permit yet because he has them on waiver/holding until the project was approved. He will have the permit
released and supply to the City. Attorney Cook had no comments. Chief Davis inquired on the agreement of the traffic
lights.
There being no further discussion, Chief Smith moved to approve the Southern Trace site development improvements with
238 units on 37.73 acres, multi-family residential development to be developed in two phases for property located one Block
West of Highway 441; seconded by Engineer Bermudez with the following contingencies: 1. Development agreement
executed incorporating provisions relating to the two recreation areas and "fair share" of transportation related
improvements. 2. SFWMD permit. 3. Approval of The Department of Community Affairs and Florida Office of Tourism,
Trade and Economic Development (OTTED) of Small Scale Amendment No. 07-005-SSA; seconded by Engineer
Bermudez. Motion carried (5-0).
2. Big Lake Home Health Services, Inc. The application was submitted by Mohammad Noorudin on behalf of property
owner A.M.SA Holdings. The application is for a parking lot for conducting business (No public allowed) for the
Home Health Care office for property located at 608 Northeast 2nd Avenue. Legal description: Lots 3, 4, 5, and 6,
Block 78, City of Okeechobee, according to the Plat thereof as recorded in Plat Book 5, Page 5, of the Public
Records of Okeechobee County, Florida - Planning Consultant.
Mr. Brisson stated there appears to be some conflicting information. The surveys depict the subject property as Lots 3 - 6;
the Parking Layout Plan shows only Lot 6; and the application refers to an area of 14,000 square feet. If the subject
property contains 14,000 square feet, it would have to include the combination of Lots 5 and 6. It also appears that the
existing structure intrudes into Lot 6. This is indicated by the fact that the existing front setback of 11.5 feet and the depth of
the building, 44.33 feet total more than the platted 50 foot Lot.
LaRue Staff believes that the proposed use should be attributable to the combination of Lots 5 and 6 so that the parking
could be moved Eastward sufficiently to accommodate the required 10 foot setback and buffer from Northeast 2nd Avenue.
Therefore Staff recommends the site plan be modified by moving the parking area further East to accommodate the
required 10 foot setback from Northeast 2nd Avenue, and that appropriate landscaping be provided in all required buffered
areas as set forth in Sections 90-534 and 90-335.
After discussion by the Committee is was decided the applicant must submit a new site plan for the October 24, 2007
meeting.
2
3. Bass Okeechobee Funeral Home & Crematory. The application was submitted by Paul Mitchell on behalf of
applicant and property owner Family Heritage Holdings, LLC. The application is for a proposed funeral home and
associated vehicular use. This is the second phase of previously planned two phase development. The property is
located at the Southeast corner of the intersection of US 441 and Northwest 13th Street. Phase one was
completed in 2001 which consisted of 6,661 square feet of commercial use and associated vehicular use. Legal
description: Lots 1-6 and Lots 24-26, Block 14, Okeechobee, according to the Plat thereof as recorded in Plat
Book 1, Page 10, of the Public Records of Okeechobee County, Florida - Planning Consultant.
Mr. Brisson explained the LaRue Staff recommendation is based solely on the second phase of the proposed two phase site
plan. Unless otherwise noted, the comparison of LDR requirements with the actual proposals by the Applicant relates only
to the proposed improvements associated with Phase Two. LaRue Planning Staff recommends approval of the site plan
provided that the applicant increases the setback buffer along Parrott Avenue to meet the 10-foot minimum required in the
LDRs.
Mr. Hayford stated there is ample water available for the site and there is also a privately owned lift station in the area.
Ingress and egress were discussed in length. Chief Davis expressed concern over traffic control and where the
ingress/egress was located. Mr. Cooper is requested to check with the Department of Transportation (DOT) on this matter,
and produce a letter with DOT weighing in on this matter.
Mr. Bermudez reported the first building does not meet required setbacks. Also concerned about water retention. Mr.
Cooper, engineer for the project stated the drainage system was designed seven years ago, Mr. Bermudez replied, what
was approved seven years ago, does not mean it would be approved today.
Parking issues were discussed. Mr. Conway, one of the applicants stated he spoke with Jim LaRue for parking
requirements, and was told it was one space per 300 square feet, that is what the site plan parking requirements are based
on. Mr. Cook interjected for assembly there needs to be one space per three people. Need to check and see how the
parking spaces were figured for the Buxton Funeral Home. Mr. Cook explained, if parking is an issue, it will require a major
revision of the site plan. To keep the project moving ahead, refigure the site plan to move back the extra foot and a half on
the required ten foot frontage, and give preliminary approval to the site plan based on the one per 300 square foot parking
requirements, subject to Attorney Cook reviewing the Buxton site plan.
Mr. Mitchell, one of the applicants stated there are rarely more than 100 people attending a funeral. If there is a large group
expected, it is usually held at one of the local churches. .
NOTE: Secretary Clement spoke with Jim LaRue on Thursday, October 04, 2007, and Mr. LaRue reported Buxton Funeral
Home parking requirements were based on the one per 300 square foot of building, (approx. 20,000 square foot building).
Assembly area was not taken into consideration.
Administrator Whitehall asked whether the Committee had any further questions. Chief Smith reported the nearest hydrant
available is located on Northwest 13th Street. He said he did not know the status of the hydrant. Mr. Hayford said OUA
would have to do a flow test to determine. He stated it was on a 10 inch water main. Chief Smith said the hydrant is
approximately 450 feet from the intersection of Hwy 441.
Building Official Schaub stated he did not have any comments at this time. Engineer Bermudez said he would like to have a
traffic study submitted by the applicant. Mr. Brisson had no further comment. Chief Smith was concerned regarding
ingress/egress. Mr. Whitehall expressed concern over the letter from DOT expressing approval/disapproval of the
ingress/egress and traffic flow.
"l
.)
Chief Smith made a motion to approve Bass Okeechobee Funeral Home and Crematory site plan review for developing a
funeral home and associated vehicular use for property located at the Southeast corner of the intersection of US Highway
441 and Northwest 13th Street, subject to confirming that 1. the parking ratio is correct, 2. the 10 foot setback be met, 3. the
flow test on hydrant is acceptable, 4. the project meets the proposed lighting standards recommended by the Planning
Board and approved by the City Council before breaking ground on this project, S. the letter from DOT on the Northwest
13th Street access be received, and 6. Sec. 78-36 Sidewalks, driveways, and pedestrian access. (1) All projects
constructed in zoning districts set out in Section 90-71 of the City Code, except residential districts, wherein the lands of the
owner and/or developer adjoin a collector or arterial street or city right of way, shall provide sidewalks adjacent along each
such street or right of way.; seconded by Chief Davis. Engineer Bermudez voted nay. Motion carried (4-1).
4. The Lakehouse. The application for conceptual site plan review was submitted by John D. Cassels, Jr.
on behalf of property owner 15th Street Homes, LLC. for recommendation to the Planning Board for rezoning
request of Planned Unit Development - Residential (PUD-R). The proposed Lakehouse Community comprises
approximately 50 acres in the Southwest section of the City and is made up of multiple parcels separated only by
Southwest 9th Street. Brief legal description: All that part of Section 21, Township 37 South, Range 35 East,
Okeechobee County - Planning Consultant.
Mr. Brisson stated assuming the applicant provides acceptable explanations of, or modifications to, the proposed concept
plan relative to LaRue Staff concerns over the rear yard setbacks, LaRue Staff finds the concept plan to be in conformance
with the intent, standards, and requirements of the PUD-R District.
Mr. Sumner, Engineer of Record on the project, distributed a colored neighborhood plan detail to the committee. He
commented that they want to set the bar high for future projects of this nature.
Mr. Whitehall stated that the committee was new at this process. Mr. Brisson explained to the committee, at this stage, the
committee should be looking at the layout for the general transportation circulation, road width, fire service and or protective
services, and physical attributes in the City Staff area that might cause problems. Primarily safety concerns and provision
for utilities.
Mr. Hayford stated the applicant recently submitted plans for their usage of water and wastewater. They entered into an
agreement with OUA last November for wastewater service only. There is ample water supply in the area for the project.
Currently OUA is reviewing their plans. Mr. Schaub inquired as to the type of community that is planned? Mr. Sumner
answered, no age restrictions, and community would be open to the public with the exception of the clubhouse. Mr. Schaub
expressed concern regarding the radius of turning into the garages from the street. Might be a traffic problem with residents
backing out of their driveways across from each other at the same time. Mr. Sumner explained the alley is almost as wide
as the standard road. There are nine foot drive lanes, two-way traffic in the alley, so it is not a single use, like a twelve foot
alley lane where two vehicles are trying to pull into. Similar to front loaded garages. Mr. Brisson interjected, stating that he
lives in a little subdivision that has nine foot driving lanes with aisles of trees in between, all front loading garages and
typically there are no problems. Mr. Sumner said he would measure out turning radius's for typical vehicles and make sure
there is not a problem.
Chief Smith stated, the measurements would have to made for more than typical to accommodate the fire vehicles. Chief
Smith also inquired as to the height of the trees and their clearance from the ground? The drawing shows the trees hanging
over the roadways, fire trucks may have a problem. Mr. Sumner reported not getting that far into the landscaping to
determine that aspect. If you provide us with the vertical separation criteria we will make sure the landscape meets the
criteria. Also, Chief Smith said he would provide the turn radius for the fire vehicles. The project will provide for 20 feet of
pavement for each entrance from the alley for the stabilizer for the ladder truck.
4
The alleys will be built to the City road standards. Hydrants will have to be supplied in all areas. Chief Smith asked what
the houses would be made out of. The answer was cement block.
Mr. Hayford commented on the design of the water system for the hydrants. OUA standards are very minimum, 500 gallons
per minute (gpm) from the hydrant. We rely on the design engineer to look at the emergency services required based on
density of project. It was determined 1,000 gpm would be the starting point. The project is closer to townhouses in net
density. Mr. Sumner stated they would start with 1,000 and if the City wanted anything higher to let them know.
Engineer Bermudez added the engineering department would be looking into all permitting from SFWMD, DEP and all other
agencies. Mr. Sumner replied, we will get them all. Also we will be reviewing all drainage issues.
Chief Davis asked about street lighting. Mr. Sumner replied we will be proposing street lighting.
Mr. Cassels commented, one of the advantages with this type neighborhood, is that you actually have access to all four
sides, where in the typical neighborhood you really only have access to the front.
Chief Smith made a motion to approve the Lakehouse concept plan and move it on to the Planning Board for
recommendation to City Council for rezoning request of Planned Unit Development-Residential (PUD-R) for approximately
50 acres in the Southwest section of the City; seconded by Engineer Bermudez. Motion carried (5-0).
E. Adjournment - Chairperson.
There being no further items on the agenda, Chairperson Whitehall adjourned the Technical Review Committee meeting at
11 :55 a.m.
PLEASE TAKE NOTICE AND BE ADVISED that any person desiring to appeal any decision made by the Technical Review
Committee with respect to any matter considered at this proceeding, such interested person will need a record of the
proceedings, and for such purpose may need to ensure a verbatim record of the proceedings is made, which record
includes the testimony and evidence upon which the appeal is to be bases. General Services media are for the sole
purpose of backup for official records of the Department.
;;t:
5
PAGE -1-
CITY OF OKEECHOBEE
SEPTEMBER 26, 2007
TECHNICAL REVIEW COMMITTEE
HANDWRITTEN MINUTES
I. CALL TO ORDER - Chairperson: September 26.2007 Technical Review Committee MeetinQ. 10:00 a.m.
II. STAFF ATTENDANCE - Secretary
Present
Absent
Engineer Bermudez
Public Works Director Robertson
'A (W/~
Administrator Whitehall
Building Official Schaub
Chief Davis
Chief Smith
Non-Voting Ex-Officio Member:
Attorney Cook
County Health Department Trent
Planner LaRue 81;
QUA Hayford
School Representative
Secretary Clement
14.;11.-
~/O.I{A^
III. MINUTES - Secretary.
A. Motion to dispense with the reading andapprove the Summary of Technical Review Committee Minutes for the July 25,2007
regular meeting.
W moved to dispense with the read,Wg and approve the Summary of Technical Review Committee Minutes for
the July 25, 2007 regular meeting; seconded by U~(};l; .
VOTE YEA NAY ABSTAIN ABSENT
Bermudez
Davis
Schaub
Robertson A
Sfllith "'" \'I 11
/Whitehall \
, APPROVED U DENIED I
'. ./
.,..".~ -,-
~
PAGE -2-
IV. NEW BUSINESS - Chairperson.
A. Southern Trace. The application was submitted by Steven Dobbs, P.E. on behalf of applicant Curt
Lundberg and property owner Insite Development Group, LLC. The application is for site development
improvements with 238 units on 37.73 acres, multi-family residential development, to be developed
in two phases for property located at one Block West of Highway 441. Legal description: Lots 1-26,
Block 4, Lots 1-6, Block 11, Lots 1-26, Block 12, Lots 1-26, Block 13, Lots 1-26, Block 20, Lots 1-26,
Block 21 and Lots 1-6, Block 22, City of Okeechobee Subdivision, Okeechobee,
Florida - Planning Consultant.
Recommendation:
Discussion:_Du6<-.J fit7iJ.IJ) ~ ~ ~p, rJ~ ~ &~
. UJwd
f)
{}Ii.. 0Iu-
~
Cfh tar . u
~h~/4d&v-~-
~f
{;
- ~ SC6Y'--- ~
,\) ~ tn~ .
ilit.- .'Y\D ~~
~p- O~ -t~-Jl~ .
PAGE -3-
J
~
\-
I ,-
i~'-
I I
I I
I I
I
I
I
I
I
,
~
/
:' '
u is ~
'- .r
:I) II: ,
t: 5
~ IIC
~ Z ~
~ 0 i
-
... i!i
.. E -!
dIi 1M ..
...
W IollN
-=00 Q'
D ~1
. ....
.. ~
0 ....
. IL . .
.
i i ~
I ~
: ra.
: G
. ;z
, I ~
,
'--- _-1 I!II
''\,. iii
~
-- --
~ t'; ~
0
t! . ~ ~
~ Z
~ . l ::I
I ,~ :"
.. ~lIII
('I ~t f L'!l
ill I iill
n .-.
..... ic6 ~ ....
:5 :, :5
III I ..., m
l ;] ~,,- ,
~. ,
.. ~ ~:
- --N-
DiU.
"'
(
s.
~
~
::s
\~
II.
lit
",
....
~
'"
'J
a
III
il
...
~
r --
~ .. -] ..- ! ,;
~.~.;.....,..".~-
-~
, .
I
,
I
I
I
~
it
;,;I'
,
!S
~
...
I
-~j;d
, .......
",'
, I -'T'"
O'-ft - - ..j-J
'I#- I ;;;
l
__ -.0""",_""",,,_,/ __
:g
~
I
"i;;
: i.:.!
- .-
i : L');r~'
)t091{Jt .; -11i1~
..' ,.. ~ :0
-:ni.!tf. ".... _ -I. _ _
~b..__ _ --a..---
~
~~
..o...i.O
~11
'ii
4~s~r
PAGE -4-
MotionM made a motion to,,;~:'~ Southern Trace srte development improvements with 238
units on 37.73 acres, multi-family re~ider:ltfal developme~ to be developed in two phases for property
located at one Block West of Highway441; seconded by D ~ .
c~es: ~ dw, ~ -5FwN1Q. - ()\Lb~
VOTE
YEA
NAY
ABSTAIN
ABSENT
Bermudez
Davis
Schaub
Robertson
Smith
Whitehall
MOTION:
r
" I
--- ,,--,..,..
/' V"\
(/ APPROVED )
""-:~
y.
r
DENIED
B. Big Lake Home Health Services, Inc. The application was submitted by Mohammad Noorudin on
behalf of property owner A.M.S.A. Holdings. The application is for a parking lot for conducting
business (No public allowed) for the Home Health Care office for property located at 608 Northeast
2nd Avenue. Legal description: Lots 3, 4, 5, and 6, Block 78, City of Okeechobee, according to the
Plat thereof as recorded in Plat Book 5, Page 5, of the Public Records of Okeechobee County,
Florida - Planning Consultant.
Recommendation:
PAGE -6-
't~~
~.vf---v0
IJ ' 0- "
fftJ - W~ ~\CU <-fo~- ~- ~ W
t.~ . 1
~...o ~. -' oss..U<..~ \00 +0 ~11
\?~ ~ ~ ~u;f-w"f+ f'n6Yi+!.. .
made a motion to approve/deny Big Lake Home Health Services, site plan review for
developing a parking lot for conducting business (No public allowed) for the Home Health Care office
for property located at 608 Northeast 2nd Avenue; seconded by
.
Motion:
Contingencies:
VOTE
YEA
NAY
ABSTAIN
ABSENT
Bermudez
Davis
Schaub
Robertson
Smith
Whitehall
MOTION:
APPROVED
DENIED
~k)./-7 (~ ~
'-,~~~ "'~C-6~J ,Qd-.
O~tk ~ ~~:1:N ~JoUI)_ tJ ~ /)<A-r~,
vJL~+~kJ~6L~~6\J:J _
...\ I~~~~ :~~~Q-<-,L j",W--
INl fc~ Y1)~ ~lk> I '0-) <r''-I
~ -AruJ~ ~ -
~ - ~ 1* ~ f~ '1~^"-<-- ~ ~.~ 'f .L
~~~Cj(Juc~),. .
~k. ~W-~~~ L:u /0>0./ ~~'-'- ;L, f~k76 ~ .
f~ E~~~tJ;>~h Q~(W-<..
ty(f:~ S).0w'-j .' · -~ '^f..~'-#v.-d:;1T,J! 1J:ii-~ .
(tW - ~te.~ b)'J~tfu~ ~r)<1 ~ CiL-~~~4- .
~ tW.~ ~I() ck, oJudI ,"-)if( CI-k. ~ !J:,I'~ ~
ffhl-~ ~}(J.
~~o(AJ~~ .
!Iv I)O~~
r6 J~,','/ D~M "ch Cd,
RECEIVED AUG 2 1 2007
City of Okeechobee if07-o/o.-IRL
55 Southeast 3rd Avenue
Okeechobee, Florida 34974
Phone: (863) 763-3372 Fax (863) 763-1686
Application for Site Plan Review
Name of Project: 13 ) d Uk e /Ioyy>~;;eu ( /Ii S~VI m f /IJ L- .
Applicant: /Yl/Alttf!/lVV1Yfl1J-J NU("2U())f/IJ Property Owner: lYla/l-It7lJ/77/IIJAlOtJ.//P/.JP/N (j1m.:~.J}
. rW~)1ft
Description of project: . vvth ^ PrfL. t (. I. ~
L1;-r1d1A tit
p/1/'--'1 /-/d~ !k-4r!IJ
c:..e::- .
Proposed use(s) for the entire building: ~
cf(ffC-i<-
Number/description of phases:
[JffJ: -
Location of /Directions to the project:
618 Ne :;d ~-
------
V)~(L.~dw~~el PL- -3Gt112
Existing improvements on property: ~ 1d1l--'UCf W-
Is proposed use different from existing or prior use? ( ~es) (_No) (_N/A)
Total Land area in square feet: l4o(JO 5. F
or acres:
Existing impervious surface: 1 'R fl 'f}!DfF square feet l7,oS]acres r!J1,3 % of site
Additional impervious surface:
square feet
acres
% of site
Proposed total impervious surface
square feet
acres
% of site
Source of Potable Water: GL ptj /jV ~ Method of sewage disposal: fNq5fJ? ., /t1fk
Current zoning: thJyY).(V{ u{'-cvL tP&ment Future Land Use: CoYn.T}/l/Jl(dd.
Parcel identification number: 3 -- / S-~ '5"] - 5) ~ 0 0/ ~ - DC; 7 6>D ~ D 6S."u
'." ; ,J " ' "
Application for Site Plan Review
Page 2
Name of project: IS J(r Wu- ~ ~fJJ geuJ /aU //IIC.
Applicant: m vJ\ ~ ~ IU & r) I2-U'}) D / ;..J
Address: f · 0, fn;;L l.f {..j 8 .
07iee ~I F{~
Phone: 'fl [,3.-- b ( () .-.1 [..10 C( Fax:
Other phone: ?63 - 0( t 7- c;117
Contact Person: rn /J1.//tMY7'YVl-~ fl/j)pJL.t/1 j) j) / d
Address: (l (0 . 130 J'- - vf vi g . / 1J1ue t/twb.t~ fL-3t/j?3
Phone: 163-&/0-/401::/ Fax: lJt3-165---6bl/_
Other phone: iP b 3 - ~I b 7 ,.- / C; 7 7-
Property Owner: A - m. '7 -,t' ~- t ttf(/ L-l--- L- .
Address: 10 G 5u"~~~J--zvt jtW~J?il/t!.~--_._--~
~~I1'Y1 Cfd f Fl-~ 3'191D
Phone: f 63 -/ b JIJ/' /[/0 L( Fax: ?;6 .3 ~ 76 j. {;, 6 (f
Engineer /f;wIYl4 $ It. (!1 /k !Net( :J fl. P, (; l U f pC f
Address: j') v (f/J> ~ Il.. /)
,\!~~/)U O&L P L' 3?, 0 d- :,
Cj<;"i(. P17-to31 Fax: 9r'1. q(",( - 303;
Surveyor: -, y q Ie tv) N.s." /}/} 5-.f/ /}Iud 1 /c# /# C.
,
3 t-t 715
J63-- 763-6617.
Phone:
Address: J.O cJ 'i0l ~ r-:! ;h;c.e:.. ,
{}74;J-ect1.ilu--e--<: J PL- '] '-;17l1
Phone: Kt5;, . 76.3 -,J-cf J- Fax:
PAGE -7-
c. Bass Okeechobee Funeral Home & Crematory. The application was submitted
by Paul Mitchell on behalf of applicant and property owner Family Heritage
Holdings, LLC. The application is for a proposed funeral home and associated
vehicular use. This is the second phase of previously planned two phase
development. The property is located at the Southeast corner of the
intersection of US 441 and Northwest 13th Street. Phase one was completed in
2001 which consisted of 6,661 square feet of commercial use and associated
vehicular use. Legal description: Lots 1-6 and Lots 24-26, Block 14,
Okeechobee, according to the Plat thereof as recorded in Plat Book 1, Page 10,
of the Public Records of Okeechobee County, Florida - Planning Consultant.
~
~
-
hJw-lU~5.E:~ O~ -h~c/kLLCfp,; ~S~~-
(j;~t!t1- ~ LUti4-- ~,~ - 5ZJ?o ~.~ -
PAGE -8-
t
~~
~~~~Jj
.,
tL~ -~)~ k 1~;l+cft>~
=L",,- ~- (i~~'U p c\!tL~T~~'
() VJLL I
Pt.~ ')}~v~V~~~i k..1-J~ -- '
CtnwCb- k~T - ~ ~ ' II "h~'~
~~o:tc<-~~ ~
~1?J,~l{) 11'1:1 st. ~ ~b 6~~.~ -
~ ~- .lDI~~Yl.L~~~ ~
~/L~ 1~-aa0
It ~E JVP~/~ f ~. Cftu- ~. :/t-1 (-'f-e-- - - -- - -
(;c:? jl~~ f ~ . ~oO- fJ ()vU L( ~ '
CODt, ~ucO--i1>:J <-10 - /:. I ') ':;., Ir ~ ,1_ \
)-<>ffD ~~r~i ~L4h~~l"1 s,
OS~- fa..k.~t/J.a.f! k ~~ /- 3611 v4 YloivoJ ,
CL* - ()1u4J 7J(.uj- et[J~ .u--ri~ -
-,. C ,- ~.. c0~ ~~. }0-7 ~wJL- JnL:
'r~ ~l-~ Yvt.~ c{) ..~~:7f ~~~~ fWi~.
.Vv..,)4 O~~ ck iY~~. ~ fJtY1 . . ~lAL0- - . '
~~ ~. ~~ ~ J1l-L;/ )~u<-- - D ~ )1-'oi nJ ~- CL 'N~
.f.a<u'-L- - D()~ .~.. /U@J- ~.. 1/U~4h 4 ~ !tJC'&f.~-4"cL- ~
Fe -~d!fJt~/~ L)~)A'6_~.--j ~'Uu-~~
~ w6ik. Y)l&<.--. '- ~~.
I ()" CfJocd- )~~~~-//- Cf<;()1 ~ .~ /;~-
~. vi
~..-uo- Po ~~ - AJ, ~ It> r-~'/I-N>l<...
r:3Je> - No CleU J (!{!rnL/YI~
O ' , I " .
.6(!~/V - Yl,D . .... /) ,U~
cfOt - Pl1--th'7~- JIU-..~.?fl /JA-~. tf).~~ k~, .~ft.--
!jlJl /0 ' 5J;u.;.L I~ 3 tlJ ~$v./yw- ~ ~-0 . /-r"~ 7~ -
(fro, ,P-- &-- k. ~ " lid<- ~ 61:- [,
.ff/:;- /~~ '-tUw~ Wd/,LL1/ it. tl /~A__. -f)S~1.- .1 _.-11-
p~ -uf~-rffl/' 6p--bt~(;M-f~~ 137i, /N'il/JiS- IJl r1!J w/~-!U ~
lJ)-t~
1 PAGE -9-
Motion: ~~;f ~ (hy{PA~'~Or.~ A~ <~ )~
t(0(?K-- made a motion to approve/deny Bass Okeechobee Funeral Home & Crematory, site ~
plan review for developing funeral home and associated vehicular use for property 10 ated at the~
Southeast corner of the intersection of US 441 and Northwest 13th 9treetj. se nded by ;<
'fJ "'-. ~ ~~ ~
Contingencies: ~~ ~.. \....L.- ..-i.
Ci~~~_ ~>~ ,.~
---#- ~ 4570'/J!l $7~_ ~,
VOTE YEA NAY ABSTAIN ABSENT
^-
Bermudez 'I...
Davis V
Schaub X.
Robertson K-
Smith X 7
Whitehall ....... 'X"'" ....,
-,,"".'
MOTION: / APPROVED ) DENIED
"-- ...........,.......//
D. The Lakehouse. The application for conceptual site plan review was submitted by John D. Cassels,
Jr. on behalf of property owner 15th Street Homes, LLC. for recommendation to the Planning Board for
rezoning request of Planned Unit Development - Residential (PUD-R). The proposed Lakehouse
community comprises approximately 50 acres in the Southwest section of the City and is made up of
multiple parcels separated only by Southwest 9th Street. Brief legal description: All that part of
Section 21, Township 37 South, Range 35 East, Okeechobee County - Planning Consultant.
Recommendation:
b6e~ la{~ 71 U-to q'tfytrlf- ftJo- (~ Nes-(
,
~aM~~'-J5~a~ .
~ - PdT N/r>~Y~ Js I '1'" ~ ·
~'-k> k ~- - ('
Ce:o~-~~~'~O-1f' .
~-(l~~~ -
(() "'.. . A!~~
77~.51 '1:'-&.~~r~~~ /O(J?~
PAGE -10-
:~~ 1;;:j1:/::!f~t ~ -~?/L<_ cwh4.
~ ~d WJ~? AIt ~,.~ ~~ - /flJt:':;:kr M
/
C/-.1~~~ d~~'~~":/'~:JIh~k<- ,
q/~.,b~ ' /
{ ~
//
F
~~
. )'J(~-
r
OS~-(}Jlttvw.0~ 7r::vJ~ l)€f~ ~~ ~~l~~
PAGE -11-
~fk'-~o ~
~.- ~ ~~
?o-.o ~..I.) - ~ jJ./' .
O~JJAdrJlf. 'f~t ~.~
PAGE -12-
Motion: A 11 A
(\J.v~ made a motion tofa;proveJ eny The Lakehouse conceptual site plan review for rezoning
request of Planned Unit Developme - idential (PUD-R). The proposed Lakehouse community
comprises approximately 50 acres in the Southwest section of the City and is made up of multiple parcels
separated only by Southwest 9th Street; seconded by ()jOfL--._ .
Contingencies:
VOTE YEA NAY ABSTAIN ABSENT
Bermudez
Davis
Schaub
Robertson Y
Smith t\ f
Whitehall /...... "d'\.
MOTION: / " APPROVED) DENIED
~ //
V. There no furtheTim"mso~ the a enda Chair erson ad'ourned the Technical Review Committee Meetin
atJl'.6~ga.m.
9
p
~
9
MEMORANDUM
GENERAL SERVICES
DEPARTMENT
TO:
FROM:
DATE:
SUB~ECT:
Brian
Betty
September 26, 2007
Health Dept.
MESSAGE:
Brian,
Eddie Trent called. He is unable to attend the TRC meeting this morning. He reported
he had no comments on an ofthe reviews.
CITY OF OKEECHOBEE
TECHNICAL REVIEW COMMITTEE
OFFICIAL AGENDA
SEPTEMBER 26, 2007
CITY HALL, COUNCIL CHAMBERS
55 SOUTHEAST 3RD AVENUE
OKEECHOBEE, FLORIDA 34974
I. CALL TO ORDER: September 26,2007, 10:00 a.m. - Chairperson.
II. STAFF ATTENDANCE - General Service Coordinator.
Voting Members:
Ray Schaub, Building Official
Denny Davis, Police Chief
Donnie Robertson, Public Works Director
Herb Smith, Fire Chief
Oscar Bermudez, Engineer
Brian Whitehall, Administrator
Non-Voting Ex-Officio Member:
Eddie Trent, Okeechobee County Health Department
Jim LaRue, LaRue Planning and Management
John Cook, City Attorney
John Hayford, Okeechobee Utility Authority
School Representative
Betty Clement, Secretary
III. MINUTES - Secretary.
A. Motion to dispense with the reading and approve the Summary of Technical
Review Committee Minutes for the July 25, 2007 regular meeting.
III. NEW BUSINESS - Chairperson.
A. Southern Trace. The application was submitted by Steven Dobbs, P.E. on
behalf of applicant Curt Lundberg and property owner Insite Development
Group, LLC. The application is for site development improvements with 238
units on 37.73 acres, multi-family residential development, to be developed in
two phases for property located at one Block West of Highway 441. Legal
description: Lots 1-26, Block 4, Lots 1-6, Block 11, Lots 1-26, Block 12, Lots 1-
26, Block 13, Lots 1-26, Block 20, Lots 1-26, Block 21 and Lots 1-6, Block 22,
City of Okeechobee Subdivision, Okeechobee, Florida - Planning Consultant.
III. NEW BUSINESS Continued.
B. Big Lake Home Health Services, Inc. The application was submitted by
Mohammad Noorudin on behalf of property owner A.M.S.A. Holdings. The
application is for a parking lot for conducting business (No public allowed) for
the Home Health Care office for property located at 608 Northeast 2nd Avenue.
Legal description: Lots 3, 4, 5, and 6, Block 78, City of Okeechobee, according
to the Plat thereof as recorded in Plat Book 5, Page 5, of the Public Records of
Okeechobee County, Florida - Planning Consultant.
c. Bass Okeechobee Funeral Home & Crematory. The application was submitted
by Paul Mitchell on behalf of applicant and property owner Family Heritage
Holdings, LLC. The application is for a proposed funeral home and associated
vehicular use. This is the second phase of previously planned two phase
development. The property is located at the Southeast corner of the
intersection of US 441 and Northwest 13th Street. Phase one was completed in
2001 which consisted of 6,661 square feet of commercial use and associated
vehicular use. Legal description: Lots 1-6 and Lots 24-26, Block 14,
Okeechobee, according to the Plat thereof as recorded in Plat Book 1, Page 10,
of the Public Records of Okeechobee County, Florida - Planning Consultant.
D. The Lakehouse. The application for conceptual site plan review was
submitted by John D. Cassels, Jr. on behalf of property owner 15th Street
Homes, LLC. for recommendation to the Planning Board for rezoning request of
Planned Unit Development - Residential (PUD-R). The proposed Lakehouse
community comprises approximately 50 acres in the Southwest section of the
City and is made up of multiple parcels separated only by Southwest 9th Street.
Brief legal description: All that part of Section 21, Township 37 South, Range
35 East, Okeechobee County - Planning Consultant.
IV. ADJOURNMENT TECHNICAL REVIEW COMMITTEE MEETING -
Chairperson.
PLEASE TAKE NOTICE AND BE ADVISED that if any person desires to appeal any decision made by the Technical
Review Committee with respect to any matter considered at this proceeding, such interested person will need a record of
the proceedings, and for such purpose may need to ensure a verbatim record of the proceedings is made, which record
includes the testimony and evidence upon which the appeal is to be based. Media is the sole purpose of backup for
official records of the Department.
2
City of Okeechobee
55 Southeast 3rd A venue
Okeechobee, Florida 34974
Phone: (863) 763-3372 Fax: (863) 763-1686
Application for Site Plan Review
Name of project:
Southern Trace
Applicant:
Curt Lundberg
Property Owner: Insite Development Group
Description of project including all proposed uses:
Owner proposes site development improvements with a 238 unit 37.73 acre multi-
family residential development
Number/description of phases: Two Phases
Location off directions to project: 1 Block West ofHWY 441
Existing improvements on property: None
Is proposed use different from existing or prior use? eX_Yes) (_No) (_N/A)
Source of potable water: OUA
Method of sewage disposal: OUA
Total project area in square feet:
or acres: 37.86
Existing impervious surface: square feet 2.5 acres 6.6 % of site
Additional impervious surface: square feet 14.53 acres 38.5 % of site
Proposed total impervious surface: square feet 17.03 acres 45.1 % of site
Current/Proposed zoning:
RSF & RMF
Future land use: RSF & RMF
Parcel Identification number: Parcel ID 3-15-37-35-0010-00040-0010, 3-15-37-35-
0010-00040-0140, 3-15-37-35-0010-00130-0010, 3-15-37-35-0010-00130-0140, 3-15-
37 -35-0010-00200-0010, 3-15-37-35-0010-00200-0140, 3-15-37-35-0010-00120-0010,
3-15-37-35-0010-00120-0170, 3-15-37-35-0010-00120-0110, 3-15-37-35-0010-00210-
0010, 3-15-37-35-0010-00210-0040, 3-15-37-35-0010-00210-0060,3-15-37-35-0010_
00210-0070, 3-15-37-35-0010-00210-0080, 3-15-37-35-0010-00210-0100, 3-15-37-35-
0010-00210-0170, 3-15-37-35-0010-00210-0110, 3-15-37-35-0010-00110-0010, and 3-
15-37 -35-0010-00220-001 0).
Application for Site Plan Review:
Name of project: Southern Trace
Applicant: Curt Lundberg
Address: 2 Niblick Lane
Columbine Valley, CO 80123
Phone: 303-909-1017 Fax: 303-795-0304
Other Phone: 321-356-1356
Contact person: Steven L. Dobbs
Address: 210 NW Park Street Suite 204
Okeechobee, FL 34972
Phone: 863-467-0076 Fax: 863-467-0091
Other Phone: 863-634-0194
Property owner: Insite Development Group, LLC
Address: 2 Niblick Lane
Columbine Valley, CO 80123
Phone: 303-909-1017 Fax: 303-795-0304
Other Phone: 321-356-1356
Engineer: Steven L. Dobbs, P.E.
Address: 210 NW Park Street Suite 204
Okeechobee, FL 34972
Phone: 863-467-0076 Fax: 863-467-0091
Surveyor:
Expedition Surveying & Mapping, Inc.
Address: P.O. Box 1610
Okeechobee, FL 34973
Phone: 863-357-6688
Fax: 863-357-6684
Project Name: Southern Trace
March 12,2007
City of Okeechobee
55 Southeast 3rd Avenue
Okeechobee, Florida 34974
Dear Reviewer:
Subject:
Southern Trace - Technical Review Committee Meeting, October 25, 2006
Okeechobee County, S 16/ T37S / R35E
In response to the Technical Review Committee Meeting on October 25, 2006 enclosed please find additional
information requested in reference to Southern Trace. The committee's comments follow in regular type and responses
to the comments are in italics.
1. Existing Site Information Required - Property and Topographic Survey, with adjacent properties within fifty (50)
feet of the project boundaries showing existing elevations, all existing utilities, easements, perimeter streets and
interceptions with Right of Way widths, one benchmark (NGVD) for each control structure with one benchmark
minimum per project.
Sheet 2 of the submitted plans shows the existing conditions as requested above.
2. Site boundaries dimensions for existing QUA lift station are not clearly determined.
Sheet 2 of the submitted plans shows the fencing and easements that exists for the existing OVA lift station.
3. Parking layouts are not indicated in the drawing.
The parking has been modified to meet the City's LDR's that do not allow access directly to a public road or
allow stacked parking. The parking layout is as follows; one car in the garage, one in front of building unit
one on either end of each unit.
4. Sidewalk along the entire sub-division will be required within the project limits. (LDR 78-36)
Sidewalks have been extended to both sides of the street throughout the project with the exception of the
northwest portion, where the land is remaining undeveloped
5. SFWMD permit for storm water management and drainage positive drainage outfall route will be required. Also
inventory of wetlands and its approval from SFWMD to be used.
A SFWMD permit application has been submitted and the response to the Request for additional information
is attached to this response.
6. Landscaping Plans were not included.
;210 MY fh1 _<i1Pd . SUire, ?.-ctr . Ck-~. ft}?ft<Tl7- . fl1L1t1t7 J63'-b,67476 . fix J63'-/!67-alJ!
Southern Trace
January 24, 2006
Page 2
Landscaping plans were submitted during the Technical Review Committee meeting.
7. Provide description of measurements to implement during construction to mitigate adverse effects to water quality
and quantity of the project and offsite areas and bodies of water.
The erosion control and sediment measures are included in the Construction Drawings.
8. Proposed Site Plan with all development information required - Location of all proposed buildings, setbacks and
separation dimensions for all structures, roads, parking, landscaping and buffer plan and details, wheel
stops/curbing, fITe hydrant locations and sidewalks.
Additional information requested has been added to the Horizontal Control Plan. Wheel stops and curbing
have not been included as these units are planned as Townhomes as shown on the enclosed typical plan with
elevations.
9. City Alleys are accounted but the Developer had not submitted applications to abandon those.
The Alley Abandonment Applications have been submitted to the City of Okeechobee, the ordinance first
reading was approved by City Counci/1-16-2007 and the second reading was approved on February 20,
2007, and the second reading was approved February 20, 2007.
10. The Technical Review Committee requested the developer extend NW 13th Street to the west into the project.
Please note the plans have been revised to tie NW 13th Street into the project as requested.
If you should have any additional questions or require additional information, please call me at 863-467-
0076.
Sincerely,
J-
Steven L. Dobbs, P. E.
Senior Project Manager
cc: Curt Lundberg
Mary Hinton
Engineer's Report
Okeechobee County Preliminary Site Plan & SFWMD ERP Approval
For
Southern Trace
City of Okeechobee, FL
September 20, 2006
Revised November 21, 2006
Revised March 6, 2007
By: Steven L. Dobbs, P.E. # 48134
Rudd Jones, P. E. & Associates, P. A.
210 Northwest Park Street, Suite 204
Okeechobee, FL 34974
~~
Steven L Dobbs, P.E.
MAR 09 2007
48134
-
Purpose: The purpose of this report is to provide the South Florida Water Management District (SFWMD)
and Okeechobee County with the calculations and documentation necessary to demonstrate the proposed
surface water management system complies with state and local criteria.
Proiect Description: The site is made up offive full blocks and two half blocks in the City ofOkeechobee
and includes Blocks 4, 11, 12, 13,20,21, and 22. This project includes all lands encompassed by NW 11th
Street, NW 3rd Avenue, NW 13th Street, and NW 7th Avenue and the two half blocks west of NW 7th
Avenue (north ofNW 11th Street and south ofNW 13th Street) and the block north ofNW 13th Street (east
ofNW 5th Avenue and west ofNW 3rd Avenue). Each full block is approximately 4.84 acres in size and
each half block is 1.08 acres in size. The entire site is approximately 37.86 acres in size (drainage basin =
37.73 acres). This project includes the construction ofNW 11th, NW 12th and NW 13th Streets (from NW
7th Avenue east to NW 3rd Avenue) and NW 3rd and 7th Avenues (from NW 11th Street to NW 13th Street)
and also a portion ofNW 5th Avenue (from NW 12th Street to NW 13th Street). This project is located in
Section 15, Township 37 South, Range 35 East - east of US Highway 441 (parcel ill 3-15-37-35-0010-
00040-0010, 3-15-37-35-0010-00040-0140, 3-15-37-35-0010-00130-001 0, 3-15-37-35-0010-00130-0140,
3-15-37-35-0010-00200-0010, 3-15-37-35-0010-00200-0140, 3-15-37-35-0010-00120-0010, 3-15-37-35-
0010-00120-0170, 3-15-37-35-0010-00120-0110, 3-15-37-35-0010-00210-0010, 3-15-37-35-0010-00210-
0040, 3-15-37-35-0010-00210-0060, 3-15-37-35-0010-00210-0070, 3-15-37-35-0010-00210-0080, 3-15-
37-35-0010-00210-0100, 3-15-37-35-0010-00210-0170, 3-15-37-35-0010-00210-0110, 3-15-37-35-0010-
00110-0010, and 3-15-37-35-0010-00220-0010). The historic and current discharge is sheet flow across
the parcels and into previously constructed road Right of Ways then to the north into the City Line ditch
east to Taylor Creek. The owner proposes to construct residential buildings and a parking area to support a
condominium complex with dry detention areas and a wet detention area with drainage offsite to Taylor
Creek. The drainage calculations and routing will cover water quality and quantity for the proposed site
improvements.
The Soils Map for Okeechobee County indicates that this parcel's soil is made up ofImmokalee soil, which
is very poorly drained in the natural state. However, the drainage system in this area has been improved as
it is a part ofOkeechobee County's drainage system and the Immokalee soil's characteristics are improved
with a drainage system and the drainage system is sized accordingly by incorporating the poorly drained
soils.
The site is currently partially developed with road right of ways developed and NW 5th A venue constructed
between NW 11th and 12th Streets and NW 12th Street constructed between NW 5th Avenue and NW 7th
Avenue with 4 houses constructed on the existing portion ofNW 12th Street. It is located in the S-133
Basin.
Proposed Use: The owner proposes construction of238 multi-family residences. Storm water runoff from
the proposed development will be collected by a series of interconnected inlets and conveyed to 8 separate
dry detention areas within the project. The dry detention areas will then convey the runoff to the proposed
1.78 acre lake located in the northeast sector of the project. Runoff shall discharge through a control
structure located in the proposed lake to the existing City Line ditch which runs along the northern
boundary of the project site. Water quality treatment and attenuation will be provided for the site prior to
discharge.
Draina2e Considerations: To attenuate the increased run off generated by the proposed improvements
and to insure that water quality standards are met, we propose to pass all drainage through the dry detention
areas and lake. The high water table is set at elevation 26.00 ft-NGVD based on the attached geotechnical
report prepared by Universal Engineering. The control elevation for the proposed lake has been established
at 26.00 ft-NGVD, and the bottom elevations for the proposed dry detention areas have been set a foot
above control at 27.00 ft-NGVD.
Allowable discharge for the S-133 basin is 15.6 csm for the 25 year - 3 day storm event:
Q= 15.6 csm / 640 acres * A
A discharge rate of 0.92 cfs is calculated for the project using the above equation. However, a conservative
pre-development run off analysis performed over the site using ICPR shows the run off generated for the
pre-developed site to be 36 cfs (see attached pre-development run off analysis). Considering this
information, we are proposing to use 2.35 cfs as a discharge rate for the developed site. This discharge rate
will allow the control structure bleeder to be adequately sized to allow for recovery of the run off volume
associated with the 25 year, 72 hour storm event within 12 days as required by Section 6.9 of the SFWMD
Basis of Review (see attached ICPR recovery graph).
Technical Data
Basin area breakdown:
Land Use Category
Total
Impervious
Building
Lake @ control
Pavement
Pervious
Dry Det. Area (TOB)
Green Area
18.81 acres
6.76 acres
1.78 acres
10.27 acres
18.92 acres
2.52 acres
16.40 acres
Total Basin Area
37.73 acres
Determine Curve Number: The following curve numbers will be used in the storm routing: 70 for the
hydrologic group B soils of which all pervious areas are designated in accordance with SCS TR-55 and 98
for the impervious areas, and as recommended by SCS TR-55.
Weighted Curve # = CN = [(70 x (I 8.92/37.73)) + (98 x (I 8.81/37.73))] = 83.96
Water Ouality
Water quality treatment is provided in the form of dry and wet detention for the project drainage area.
Water quality calculations are provided as follows:
Req. WQ Volume = 1" * (37.73) * (1 '/12") = 3.14 Ac-Ft; or
2.5" x % impervious x WQ area/12 = 2.5" x ((10.27 acres/29.19 acres) x 35.95 acres)/12 = 2.64 acre-feet.
. One inch over the site is the controlling equation for this project. The control structure bleeder has been
sized at 7" (circular) to allow for proper recovery and treatment of the required water quality volume. The
bleeder shall be set at the control elevation of 26.00 ft-NGVD. The control structure grate has been set at
30.00 ft-NGVD, which is above the routed 25 year, 72 hour design storm elevation. Due to the low
allowable discharge rate, the only control structure orifice provided for storm water discharge below the 25
year, 72 hour design elevation is the proposed 7" circular bleeder.
Water Ouantity
This project is located in the Taylor Creek Basin which gravity discharges into Lake Okeechobee. As
previously noted, the discharge rate to be utilized for this project is 2.35 cfs. The stormwater management
system for the proposed site has been designed to operate using the above discharge rate.
The 10 year, 24 hour storm (5.0") wldischarge, the 25 year, 72 hour storm (9.0") wldischarge, and the 100
year, 72 hour storm (10.0") wlo discharge has been evaluated based on the proposed plan. Please refer to
the attached AdlCPR flood routing input/output parameters.
2
A summary of the flood routings is provided as follows:
10 Year Storm (5.0")
Peak Stage Peak Rate
'(ft-NGVD) (cfs)
25 Year Storm (9.0")
Peak Stage Peak Rate
(ft-NGVD) (cfs)
100 Year Storm (10.0")
Peak Stage (no discharge)
(ft-NGVD)
28.80
2.04
29.63
2.35
30.09
Environmental: There are no South Florida Water Management District or Corps jurisdictional wetlands
on-site.
Construction Recommendations: Run-off and any water generated by short-term dewatering during
construction shall be contained on-site. However, there is some potential for transport of sediment to off-
site areas should heavy rainfall occur. We therefore recommend installation of temporary silt fence around
the entire construction area during site work to reduce the potential of any off-site transport of sediment or
turbidity.
Conclusions: In my professional opinion, the proposed construction should have no impact to existing
drainage patterns off-site and should have no impact on off-site areas. The recommendations above should
be followed during and after the site work until such time as the ground surface has been adequately
stabilized to prevent the off-site transport of any soil or suspended solids. The proposed design and
construction will meet all local, state and federal requirements.
3
W
NZ
wF3Q
Uu,""
<(0:5
a:O=>
I-~U
ZO-'
a:Z<(
W,...U
~&1~
=>-,<(
OOZ
Wa:-
o.(i
o
..
..
.l!
~
s;
t:I
:z:
,,!.
...
s;
t:I
:z:
~
....
....
CO;
....
..
'"
CO;
....
4;= ~ ct;:
.5 g .5 g .5 g
~ t"! ~ re
\/"; :: c-: ~
I~, "II:'
~Nr:CN~r-
M M .-
.- .- M
~ ~ ~
,- ,- ~..
~ ~ --
r-
=
.c
y
'"
is
o
r-
~
N
~
~
'"
il;>;:;'>'
~~-9
- <:> ,.,
~ g ~
~~~
u
'"
~
r'=
,..,
'l)
....
=
...
~
-
;:
<l.l
~
,z
i.:
o
~
=
.E
-
=
S
r-
oe
=
-
=
.r;;
=
=
"
~
"
u;
'"
<;
E-
~
~ 2
'" -
~ ~
~~~
'9 I 0
g M ci
g [ -
II I II
> ~ >
s;
t:I
:z:
,,!.
...
~
~
c
.S!
-=
"
:g
8l
,.;
..,
s
~~~
~~~'7~
~ I I I C) t,) ~
u4::4::=cotGo
0-
~~
~s:;g~lI"'i~
~1~~~~~f"-i
II II II U II II II
=
.r;;
~
Q
~
.e~
y~
Eo
OO:s
Q ~
r-oS!
i:<
Uo ~
::;;
"
:a
.~ 5 ~ ~
~.~~ DO
=ti3~~~~
'~e~~~]
liUu~~~
~ 1)'0 i 8 ii
g~~:!;!-o~
5g-ee]~
u"'...a.CQ-o(
u
"
..,
t.
,:
..,
c
.58
0(,)(,) u u U
tl:I ClS tl:I as <<I r:u
~-~~:~~
..,.
r-l "t" 0,
['--;co
o ci
c,
II II It n II II II II II II
..
~
.~
CQ
~
"
~
"
:z
~ ~ cc ~ ~ ~ .9
<<I~ cCl)~5l5U~
~ ;5 a en 8.9 ; -~ ~ f3 B
::I g~~ ~ ~.9 e~~ug
o iX~,..J~ ~~-"'O u
.~ - ~ C .B .:! 1:;
Q. sseijs
.5 ~~~<uf=
..
<;
E-
~
.
on
~
'"
~
~ ~
o ~
os. 0
l) &: ~
il:e ;r
a ~ 0
i5 ~ :S~
?:~~
OX' ": F
:tG i p.
C!.:S;
~-5;i
\0 .$ ~
eMg.
o ~~
;-- -" e!-
N :;.
II en N
o<~
~
.g
c
.S!
.. 1;
= "1 ::I
.;' ~ g-
" * "
Q*bD~
~ C!,..o
= * ..
;g::~
~ bO
.. 0 C
..!! II .S
t o~
u
=
.E
-
=
-;
y
-=
U
u
C
;{!.
.><
,,~
~e
r- - 0
~Sr.;:
-= ~ ~
~ :...~
.g
"
:E
"
g
~
.g
~
.5
.-.:
c
~l%f
" "
.. "
~ 1
:!~
r-1N
:!;~:z
~ M
II II
II II II
.~
.~
~
~
,..
lZl
"
E
"
'0
>
e .~
" '"
'0 8-
> ~ ~
~~ ~
~~~
~~]
! 5 50
~ .'a ~
"'CB"'C
.g C {;
go~
<>::~<
~
"
o
E
&.
.s
]
"
:;. :.00:
..c ~.
.- ~
~~
?:~
Z .~
.;:
""
C J:
;{ e
J:
.;: -
~ ~
'iI ~
~~
~ ...
.::~
...= ::
~~
e _
'"
r-..: C
g ~
E ;::
~ .~
-,~
-E
~
y
=
,.,
~
=
r-
~
.c
-
=
o
"(IJ
.s
'"
=
=
r-
oe
'"
=
cccco
>>>>;::
~~~~.s
c6~=~e
-=
u
.!:i
"
-::c ~
* 0
.....l-o
. ..
,., "
.<:
rrita
II ..c
0' :5
""T C ." ~
~~~O
~ ~ ;; ;?,
~1
E 0
! -= u
.a ~ f:'
~~~
1. ~.~
.,,'"
;: M e
"i ] :=
i e ~
~-~
w E ~
i ~ ~
i~i;
ri3 "'C E I[;I;j
~~!~
::I 0" 0" c-
O' ~ ~ ~
..1'i:"'1'i:
~ = = ;:
~ ~ ~ ~
<l:
~o-
c2~
,,0
l
o
~
~
,.,
ti
.,
>,> .
~5'
" <
~~
~"';
~ r-
~'1
~~
- '"
. ....
,., ~
~ <<
CY~
II d.
.....lUl
...
...iN
~~
..,
.5
;>-
]
II II II =
-
"(IJ
0 00 ~ ~ ,., N :; on -
00 '" on .... .... ..
'" .-.: <i ..; -0 r-: .... ,...: 00 ~
0 - - '" 00 -
'" ....
..,
N ,., 0 00 '" .... .... .... '"
0 0 '" N .... N ....
0 -0 <i .... vi r-: .,; :! vi ~
'" - - on '" ~
vi
..,
.... .. 0 '" '" '" ~ C!; !
N on .... 0 '" 0
g <i ..; ,.; vi -0 r-: ..;
~ - - .... on :!l
..,
'" ,., 0 .... N 00 .., on 0
.... 0 00 .... ,., '" ,., 00
0 ~ ..; 00 <i -0 ~ .-.: ..... ~
'" ,.,
..;
..,
'~ 00 .. 0 N on 0 '" .... ..
'" .... N N .... "": .... ,.,
g ci .... r-: ..; -0 ..,: ,.; -0
... - N ,., ""
:~ ...
;! ..,
CI
.. ~ ,., 0 0 00 N 0- 0 -
.2 ~ '" ,., 0 "! 0 on
~ '" 00 vi .... :2 ~ - ci wi
~ ~ on
.l! ..,
~
..
;>- N 00 0 00 0: .... 0 0 ~
;c ""! 0 ,., ,., 0 0
CI g .-.: <i vi -0 ci ,.; -0
:; ....
E d
" ..,
U
.... ,., 0 N ~ 0 0 0 ~
,., 00 .... on 0 0 0
0 vi ci .... ci ci ci ci ci co;
0
co;
....
'" .... 0 '" 0 0 0 0 ""
on ,., 00 0 0 0 0 0 ....
g ..; ci ci ci ci ci ci ci ..,:
00
....
00 0- 8 0 0 0 0 0 ....
"": 0 0 0 <:> 0 0 ~
0 - ci ,.; ci ci ci ci ci
0
,.:
....
<:> C <:> <:> 0 0 0 0 <:>
0 0 0 0 0 0 0 0 0
0 ci ci ci ci ci ci ci ci ,.;
0
-,;
....
Vi
iii
,; 0 0 0 0 0 0 15
"
iil 0 on <:> 00 "'! I-
a> a> 0 o~ :t
~ '" '" M M M
t 0 '"
iil 00 00 '" 0
00.... .... 00 00 "!
E tDtDr--: ,.: cO ole;:) ~
.. N N N N N NM M
~
-:
...
.!! to lD ON r-- to r-- <D ...,
r--lD '" '" '" <D r-- ....
.. """;0 ~Q ci N M cO .-.:
.. ~ ...,
.(
.. '" - -
a a ~ a a a <:!
~ ~! CI "
.2 o.~ ., ., " " " ~
~~~ .5 C C C .5
.2f- .....l ;:; ;:; ;:; .....l
~
~ 12 ~
...
Iii Iii
~ CQ
:! C C C "
CI .2.2 .g .S!
u
.. c c c c -
; 22 22 C - ",I ~
., ., " ., "
'" cc CC E C C :2
" 0: 0: Ic3l~ ., " "
~ e " .5
CI ~~ c'5
...l ... 0 ~
..
)(
N
."
:g
"
..
a:
~
,...
E
,E
"
o
'!J
'"
."
:g
.>
..
a:
..
iil'
e
.f!
o
E
..
E
a.
.s!
~
..
o
.!!
.;;;
.5
N
;
~
Ii:
.-
o
o
~
'"
'"
:r:
u
E-t
H
t:l
E-t
/"--
p::
E-t
(J)
H
0
p::
E-t
Z
0 Q
u ~
>-
0 '"
(l)
.51
0
"0
~
..c
u
(l)
~
(l)
.5
/ "-- E
o:l
(l)
....
00
N
0
0
N
<QJ
2
p..
u
-
'--"
-0
"0
0
::;s
I:lO
.5
::i
~ ~ 0
E-t E-t p::::
H H "0
(J) (J) ~
.0: :::> 0
p..
"0
~
o:l
~
~
~
o:l
..s::
U
"0
B
u
(l)
~
~
0
u
....
(l)
c
-
'"
u '"
'" -" E
H.r-i m
E-<UO"
'"
c: '0 '"
l-l aJ.,...,
" ~ Cl
.c: 0
-" a."
"0'0
0" 0
UOA.Z
'"
E
"''' '"
" rl '"
" 0 '"
,:(>+JQJ
......... -..... Ul .....-i
ID a> '- 0
01 01 QJ.t:
"'I'" '" E c:
Q.l+J .jJ-r-t ro
"OUlUlE-o~
o
z.:e>f-t::i:
o
:<... '"
0'0 "
rl >, '"
"''''.0
"
-0-"'"
J::.,;1:!:l
'" c:
rl"''''
~I ~ Ul ~
.~I:> u '"
ooou.>tr.l
'"
ooO~UJ
'"
...
" '"
-" :>
u ...
" "
" U
rl-"
([) lJ) Q) O"..c
c tJ> c: u
Q.lO-.lco.-Oo""'t't1
"'I o.-rl ttI 0 -rl .jJ Q)
~....... Q.l..c J4 lo-l ro H
c:c..3:uClmcr:aJ
.....
Hn.3:UCl(Q~::r::
Southern Trace
Proposed Site
Input Report
==== Basins ==================================================================--==-========
====================================-=====================================================
=================================================================================-========
Name: SITE
Group: BASE
Node: SITE
Type: SCS Unit Hydrograph
Status: Onsite
Unit Hydrograph: Uh256
Rainfall File: Sfwmd72
Rainfall Amount (in) : 9.000
Area (ac) : 37.730
Curve Number: 84.00
DCIA(%): 0.00
Peaking Factor: 256.0
Storm Duration (hrs) : 72.00
Time of Conc(min): 20.00
Time Shift (hrs) : 0.00
Max Allowable Q(cfs): 999999.000
Southern Trace
Proposed Model
==========================================================================================
==========================================================================================
==== Nodes ===================================================================- __========
Name: DITCH
Group: BASE
Type: Time/Stage
Base Flow (cfs) : 0.000
Init Stage (ft) : 26.000
Warn Stage (ft) : 30.000
Node for Tailwater
Time (hrs)
Stage (ft)
0.00
100.00
26.000
26.000
------------------------------------------------------------------------------------------
Name: SITE
Group: BASE
Type: Stage/Area
Base Flow(cfs): 0.000
Init Stage (ft) : 26.000
Warn Stage (ft) : 30.000
Southern Trace
Proposed Model
Stage (ft)
Area (ac)
26.000
27.000
28.000
29.000
30.000
1.7800
1.9600
3.8600
4.9400
28.9400
==== Drop Structures =====================================================================
==========================================================================================
==========================================================================================
Name: CONTROL STR From Node: SITE Length (ft) : 55.00
Group: BASE To Node: DITCH Count: 1
UPSTREAM DOWNSTREAM Friction Equation: Average Conveyance
Geometry: Circular Circular Solution Algorithm: Automatic
Span (in) : 24.00 24.00 Flow: Both
Rise (in) : 24.00 24.00 Entrance Loss Coef: 0.500
Invert (ft) : 17.500 17.500 Exit Loss Coef: 1.000
Manning's N: 0.012000 0.012000 Outlet Ctrl Spec: Use dc or tw
Top Clip (in) : 0.000 0.000 Inlet Ctrl Spec: Use dn
Bot Clip (in) : 0.000 0.000 Solution Incs: 10
Upstream FHWA Inlet Edge Description:
Circular Concrete: Square edge w/ headwall
Downstream FHWA Inlet Edge Description:
Circular Concrete: Square edge wI headwall
Control Structure
7" circular bleeder @ 26.00 ft-NGVD
Grate @ 30.00 ft-NGVD
.., Weir 1 of 2 for Drop Structure CONTROL STR
Count: 1
Type: Vertical: Mavis
Flow: Both
Geometry: Circular
Span (in) : 7.00
Rise (in) : 7.00
.., Weir 2 of 2 for Drop Structure CONTROL STR
Bottom Clip(in): 0.000
Top Clip(in): 0.000
Weir Disc Caef: 3.130
Orifice Disc Coef: 0.600
TABLE
Invert (ft) : 26.000
Control Elev(ft): 26.000
Interconnected Channel and Pond Routing Model (ICPR) @2002 Streamline Technologies, Inc.
Page 1 00
-
Southern Trace
Proposed Site
Input Report
TABLE
Count: 1
Type: Horizontal
Flow: Both
Geometry: Rectangular
Bottom Clip (in) : 0.000
Top Clip (in) : 0.000
Weir Disc Coef: 3.130
Orifice Disc Coef: 0.600
Span(in): 54.00
Rise(in): 36.00
Invert (ft): 30.000
Control E1ev(ft): 30.000
==========================================================================================
==== Hydrology Simulations ==~~~===~======~~======~~==================~~========~~=====
==========================================================================================
Name: 100Y3D
Filename: P:\2006-202 Insite Deve1opment\Drainage Revised 2\ICPR3\100Y3D.R32
Override Defaults: Yes
Storm Duration (hrs) : 72.00
Rainfall File: Sfwmd72
Rainfall Amount(in): 10.00
Time (hrs) Print Inc(min)
80.000 5.00
----------------------------------------------------------------------------------------------------
Name: 10YID
Filename: P:\2006-202 Insite Development\Drainage Revised 2\ICPR3\10YID.R32
Override Defaults: Yes
Storm Duration (hrs) : 24.00
Rainfall File: Flmod
Rainfall Amount (in) : 5.00
Time (hrs) Print Inc(min)
40.000 5.00
----------------------------------------------------------------------------------------------------
Name: 25Y3D
Filename: P:\2006-202 Insite Development\Drainage Revised 2\ICPR3\25Y3D.R32
Override Defaults: Yes
Storm Duration(hrs): 72.00
Rainfall File: Sfwmd72
Rainfall Amount (in) : 9.00
Time (hrs) Print Inc(min)
360.000 5.00
==============================================================================--===========
==== Routing Simulations =================================================================
==========================================================================================
Name: 100YR3D Hydrology Sim: 100Y3D
Filename: P:\2006-202 Insite Development\Drainage Revised 2\ICPR3\100YR3D.I32
Execute: Yes
Alternative: No
Restart: No
Patch: No
Max Delta Z(ft):
Time Step Optimizer:
Start Time (hrs) :
Min Calc Time (sec) :
Boundary Stages:
1.00
10.000
0.000
1. 0000
Delta Z Factor: 0.01000
End Time (hrs) : 80.00
Max Calc Time(sec): 60.0000
Boundary Flows:
Southern Trace
Proposed Model
Time (hrs)
Print Inc(min)
56.000
64.000
68.000
90.000
15.000
5.000
15.000
60.000
Group
Run
BASE
Yes
----------------------------------------------------------------------------------------------------
Name: 10YRID Hydrology Sim: 10YID
Filename: P:\2006-202 Insite Development\Drainage Revised 2\ICPR3\10YRID.I32
Interconnected Channel and Pond Routing Model (ICPR) <<;)2002 Streamline Technologies, Inc.
Page 2 on
Southern Trace
Proposed Site
Input Report
Execute: Yes
Alternative: No
Restart: No
Patch: No
Max Delta Z(ft):
Time Step Optimizer:
Start Time (hrs) :
Min Calc Time (sec) :
Boundary Stages:
1.00
10.000
0.000
1.0000
Delta Z Factor: 0.01000
End Time(hrs) 40.00
Max Calc Time(sec) 60.0000
Boundary Flows
Southern Trace
Proposed Model
Time (hrs)
Print Inc(min)
8.000
20.000
40.000
15.000
5.000
15.000
Group
Run
BASE
Yes
----------------------------------------------------------------------------------------------------
Name: 25YR3D Hydrology Sim: 25Y3D
Filename: P:\2006-202 Insite Development\Drainage Revised 2\ICPR3\25YR3D.I32
Execute: Yes
Alternative: No
Restart: No
Patch: No
Max Delta Z(ft):
Time Step Optimizer:
Start Time (hrs) :
Min Calc Time (sec) :
Boundary Stages:
1.00
10.000
0.000
1. 0000
Delta Z Factor: 0.01000
End Time (hrs) : 360.00
Max Calc Time (sec) : 60.0000
Boundary Flows:
Southern Trace
Proposed Model
Time (hrs)
Print Inc (min)
56.000
64.000
68.000
90.000
360.000
15.000
5.000
15.000
60.000
300.000
Group
Run
BASE
Yes
===============================================--==========================================
==========================================================================================
~==~ Boundary Conditions ==~==~~===~~=~_==~===~_==__=~~~_=====~==~~==~==_~==_~~=====~===
Interconnected Channel and Pond Routing Model (ICPR) <!J2002 Streamline Technologies, Inc.
Page 3 on
-
"'"'
o
\l)
bIl
0:1
~
" " Ul 00 ".,'"
'"0'" 00 M",
:>:.-to 00 OM
...
..... 00 NN
"
0
'" " Ul 00 NO'>
~ 0 ... 00 I"- .-t
.r-i.....t...c:
...... 00 MN
... N I"-
" "
,"0
:>:
" " Ul ".,'" ....'"
'"0'" M", roO'>
:>:.-to OM M'"
...
c: M I"-
..... "'0
.-t
'" " Ul NO> I"-ro
~ 0 ... 1"-..... ....0
-rl .-i .c
...... MN NO
c: N I"- .....'"
".....
'"
:E
... "'N 00 I"-N
... "'..... N I"-
"...... "'''''
Ul4; "., ro <3
01"-
X Nro .5
'"
:E
ui'
'" "'... 00 00 \l)
... "'... 00 00 -50
rl '" 00 ......... .s2
(I)'" 00 00
OUl 0
00 00 C
X ..c
'"
:E U
\l)
"''''..... 00 00 F-
e: "'... 00 00 \l)
-n '" 00 00
e:..... _S
",Ul 00 00
'" """" M"" "8
3:
0:1
\l)
X"'..... 00 I"- ", .!::
'" "'... 00 0'>"" UJ
:E '" 00 1"-'" N
...
Ul "'''' "'0> 0
NN NN 0
N
iQ)
(I) (I) Ul 00 NO> 2
~ "'... 00 1"-.....
-.-i tG...c:
...... 00 MN ~
Ul NI"- U
"
'" ......
:E '-'
ai
c: 010 010 -c:l
0 ....."" ...."" 0
-n r>:r>: r>:r>: ::;E
..... ><>< ><><
'" 0", 0", bIl
.-t .....N .....N
" _S
~
-rl "Ei
Ul 0
p:::
-c:l
0. "'"' "'"' C
0
" UlUl UlUl ~
0 4;4; 4;4;
'-' "'''' "'''' -c:l
'" C
0:1
ai
c
C
0:1
..c
"'''' "'"' U
'" -c:l
'" ~ uu ......
0'" I/) '" ~~ HH \l)
"'... " z UlUl '0
'-'-rl " DOl
",Ul ~ \l)
-n C
c:'O X C
... '" '" 0
"'''':E U
.c: 0 .....
... 0. (I) \l)
"0'0 .5
0'" 0
Ulo..Z
"""
o
~
<IS
&:l..
""..... 00
'" "'.... 00
:>: '" 00
.....
'" "''''
NN
'"
0
"" '" 00
e "'... 00
-.-I 1Q..c
E-<..... 00
'"
"
"''''
:>:0
"" ..... .....,.
'" "'.... "''''
:>: '" ....'"
..... U
'" "''''
NN t::
'" ......
:> "'~
<U
QJ QJ '" N'" .50
E '" ... .... ~
-.-j m.J::. 0
,....... MN 0
'" N....
X .E
"''''
:>::> <..)
<U
"0'" "'''' E-
'" .... .-<0 <U
:>: '" u 00
..... .5
.-< 00 8
"
0 <IS
<U
....
" :< '" "'''' U5
"'0.... M.,.
:>:.-< U OM N
"' 0
0
N
(Ql
" :< '" N'" 2'
eO'" .....-<
..-l..........c
E-<", MN &:l..
Nr-- U
" ......
'" .........
:>: ~
" 00 "'0
0 '-<M 0
.... <>:<>: ::;;
..... ,.,,.,
'" a", bIl
.-< '-<N
:l .5
E ~
....
'" 0
p:::
"0
"'"' t::
0. 0
:l "'''' &:l..
0 ..;..;
... "'''' "0
'" t::
<IS
~
t::
t::
<IS
...r:::
" <>:<>: U
" e E-<E-< "0
U QJ '" '" "'''' .s
"'..... e :z
~ -r-! ::J ..>.., <..)
E-<"'E 00 <U
.... <>:<>: t::
""0 " E-<E-< t::
..." '" :z:z 0
""':>: 00 <..)
.<: 0 00 ....
..... 0.-" <U
:l 0 " "E
o j,..,j-.....
"''''..:> ......
-
OJ
I "
;J
OOrl
.rl 0
00 >
OJ '"
U (11""; s::
~~100
H -,...; C-r-!
E-o Uh=( J,.J
"
C 1:J >. III
~Q.lkJ,.J
III UllD Q.l
..cO:>'O
+'0.0
:SOON
OJ...lQ,l.........
Ulo..j:G..-t
-
.....
o
Q,)
Cll
~
~
~~~ ON~~~mONq~~mONM~WOOO~M~W~OO
rn :s m .........................
J-JO OOOOaOr-irlr-ir-ir-irlNNNNNNMMMMMMM
o
"'rl
o
:>
rlC~ 0000000000000000000000000
IG H m .........................
J,.J 0000000000000000000000000
Orl
,.. 0
:>
rl~m WNOO~OWr-i~N~N~N~r-iWO~OON~mN~m
IGO~ rlOOO~W~Mr-iOro~~~Nr-imOO~~Mr-imOOW~
J-JrlU r-irlOOOOOOommmmmmoooooooooooo~~~~
o \i-.I . . . . . . . . . . . . . . . . . . . . . . . . .
~J,.J NNNNNNNNNr-ir-ir-irlr-ir-ir-ir-irlr-ir-ir-ir-ir-ir-ir-i
;J
o
rl~Ul 0000000000000000000000000
mO~ 0000000000000000000000000
J,JrlU 0000000000000000000000000
o 4-l . . . . . . . . . . . . . . . . . . . . . . . . .
~C 0000000000000000000000000
H
(l} raN
U Q) +'
'" H.....
.....'"
"
;J
UJ
"'OJ+'
" "'.....
-rl '"
,,+'
"UJ
'"
~
00
H
;J
o
.<:
'"
N
"
-rl
OJ
"
;J
rl
o
>
,,+'
0.....
-rl I
+' U
" '"
OJ
+,,,,
OJ'"
-0-
'"
N
~ D
rl
~M~~rl~rlM7MOWOM~WW~N~WN~MW
oomN~OOOM~~mrlNq~w~oornOOr-iNNMW
rl~rorl~OOrl~~O~~OM~mNmmNmOOrl~~
~~~OOOW~MrlOOO~~Mrlmro~~Mrlmro~~
rlrl~rlOOODoom~m~mrorororororo~~~~
NNNNNNNNNNrlrlrlrlrlrlrl~rl~rl~rl~~
u
t::
-
'"
Q,)
-So
o
"0
t::
...c:
u
Q,)
E-
Q,)
t::
]
~
Q,)
....
en
C"l
o
o
C"l
Q)
2
~
u
-
'-'
'0
"0
o
:::E
Cll
t::
-g
o
p:::
"0
t::
o
~
"0
;;
'0
t::
t::
~
...c:
U
"0
.B
u
Q,)
t::
t::
o
u
ii3
1::
-
0000000000000000000000000
0000000000000000000000000
0000000000000000000000000
0000000000000000000000000
MMMMMMMMMMMMMMMMMMMMMMMMM
OJ
'" +'
.. ""
+'
UJ
O~~M~N~rl~mMroN~o~roN~O~OONWrl
O~Nm~NOO~rl~~O~Mo~Nm~Nro~rl~~
ommoorooo~~~~~~~~~~~MMMNNNrlrl
mrooorororooooooorororooooororooorororororomooro
NNNNNNNNNNNNNNNNNNNNNNNNN
OJ 00
" "
-rl .<:
,..
ONNNNNNNNNNNNNNNNNNNNNNNrl
0000000000000000000000000
OrlNM~~~~oomO~NM~~~~OOmOrlNM~
r"'irlr"'irlrlrlr-ir-irlrlNNNNN
0.
;J
o
"
'"
ww~~~~~~~~~~w~~w~w~~~~w~~
wwwwoow~oo~oowoooo~oooowrooooowoowoooo
~~"'~~~~~~~~~"'~~~~"'~~"'~~~~
oooo~~~moomoooom~~~oomoooomoooooooomm
OJ
-0
o
:z
~~~w~~~~~~w~w~w~w~~www~~w
~~8~~~~~8~8~~~~88888~888~
HHHHHHHHHHHHHHHHHHHHHHHHH
oooooooooooooo~oooooo~oo~oooooooooooooooooooooo
"
o
-rl
+'
'"
....
;J
"
-rl
UJ
aaoaaoaaoaaaoaaooaaoaoooo
33~3~~~~~~~~3333333333333
I
Ow
1-1-
oen
II
c
CO')
0:
> Ul Q
I.t) L. s::
N .c ....
l: Q:) '"
0 E II)
;; 0 i= 05iJ
~ 0 .2
:l N 0
s::
E ...c::
en u
II)
E-<
II)
oS
e
<IS
II)
....
tI5
('oj
0
0
('oj
\Q)
,-,
~
~
u
0 ....
0 '-'
..... "0
"'0
0
~
b.O
.5
-S
0
~
"'0
s::
0
~
"'0
s::
<IS
"0
QJ ..c: E
OQJP' <IS
Cll-i-JCll ...c::
l-l.rl l-l U
E-<CJ)('J 0 "0
II)
~ Ll :>, 0 CD co r- eo U
'" N N N N
l-l QJ l-l II)
QJ tIl QJ s::
..c:o~ s::
0
-i-Jp'O u
;:l o 0 ....
II)
o l-l QJ (u)afielS .5
CJ)o..~
o
o
...,.
o
o
'"
-
St>~e\~ ~<..<.
?r~ - ~....lop f-"\c.f\+ '(Z...t..t(l ~.q~ J\.{SiS
DO
Advanced Interconnected Channel & Pond Routing (ICPR Ver 2.20)
Copyright 1995, Streamline Technologies, Inc.
[ 1]
********** Basin Summary - DEHAYS **********************************************
--------------------------------------------------------------------------------
***
Basin Name:
Group Name:
Node Name:
Hydrograph Type:
Spec Time Inc (min):
Comp Time rnc (min):
Rainfall File:
Rainfall Amount (in):
storm Duration (hr):
status:
Time of Cone. (min):
Lag Time (hr):
Sub
Ele
Area
(Ac)
Curve
Number
----------------------------------------------------------------
DCIA
(%)
STRACEl
BASE
STRACEl
OV
2.00
2.00
SFWMD72
9.00
72.00
ONSITE
N/A
0.00
Length
(ft)
Time Max (hrs):
Flow Max (cfs):
Runoff Volume (in):
Runoff Volume (cf):
60.33
36.14
5.33
733048
Mannings
N
Slope
(%)
1 6.37 70.00 144.00 0.35 0.00 0.14
2 6.37 70.00 144.00 0.35 0.00 0.14
3 6.37 70.00 144.00 0.35 0.00 0.14
4 6.37 70.00 144.00 0.35 0.00 0.14
5 6.37 70.00 144.00 0.35 0.00 0.14
6 1.20 70.00 72.00 0.35 0.00 1.40
7 1.20 70.00 72.00 0.35 0.00 1.40
8 1.20 70.00 72.00 0.35 0.00 1.40
9 1.20 70.00 72.00 0.35 0.00 1.40
10 1.20 70.00 72.00 0.35 0.00 1.40
Sub Max Time Max Flow Max Vel Elem Rain Excess
Ele (hrs) (cfs) ( fps ) (in)
----------------------------------------------------------
I 59.97 14.00 0.046 5.33
2 60.03 20.53 0.054 5.33
3 60.47 26.40 0.060 5.33
4 60.70 29.00 0.062 5.33
5 60.93 31.76 0.110 5.33
6 60.07 32.61 0.191 5.33
7 60.17 33.52 0.193 5.33
8 60.23 34.33 0.195 5.33
9 60.30 35.25 0.197 5.33
10 60.33 36.14 0.199 5.33
, -
Engineer's Report
Okeechobee County Preliminary Site Plan & SFWMD ERP Approval
For
Southern Trace
City of Okeechobee, FL
September 20, 2006
Revised November 21,2006
Revised March 6, 2007
By: Steven L. Dobbs, P.E. # 48134
Rudd Jones, P. E. & Associates, P. A.
210 Northwest Park Street, Suite 204
Okeechobee,FL 34974
~~
Steven L Dobbs, P.E.
MAR 09 2007
48134
Puroose: The purpose of this report is to provide the South Florida Water Management District (SFWMD)
and Okeechobee County with the calculations and documentation necessary to demonstrate the proposed
surface water management system complies with state and local criteria.
Proiect Description: The site is made up offive full blocks and two half blocks in the City ofOkeechobee
and includes Blocks 4, 11, 12, 13, 20, 21, and 22. This project includes all lands encompassed by NW 11th
Street, NW 3n1 Avenue, NW 13th Street, and NW 7th Avenue and the two half blocks west of NW 7th
Avenue (north ofNW 11th Street and south ofNW 13th Street) and the block north ofNW 13th Street (east
ofNW 5th Avenue and west ofNW 3n1 Avenue). Each full block is approximately 4.84 acres in size and
each half block is 1.08 acres in size. The entire site is approximately 37.86 acres in size (drainage basin =
37.73 acres). This project includes the construction ofNW 11th, NW 12th and NW 13th Streets (from NW
7th Avenue east to NW 3n1 Avenue) and NW 3n1 and 7th Avenues (from NW 11th Street to NW 13th Street)
and also a portion ofNW 5th Avenue (from NW 12th Street to NW 13th Street). This project is located in
Section 15, Township 37 South, Range 35 East - east of US Highway 441 (parcel ill 3-15-37-35-0010-
00040-0010, 3-15-37-35-0010-00040-0140, 3-15-37-35-0010-00130-0010, 3-15-37-35-0010-00130-0140,
3-15-37-35-0010-00200-0010, 3-15-37-35-0010-00200-0140, 3-15-37-35-0010-00120-0010, 3-15-37-35-
0010-00120-0170, 3-15-37-35-0010-00120-0110, 3-15-37-35-0010-00210-0010, 3-15-37-35-0010-00210-
0040, 3-15-37-35-0010-00210-0060, 3-15-37-35-0010-00210-0070, 3-15-37-35-0010-00210-0080, 3-15-
37-35-0010-00210-0100, 3-15-37-35-0010-00210-0170, 3-15-37-35-0010-00210-0110, 3-15-37-35-0010-
00110-0010, and 3-15-37-35-0010-00220-0010). The historic and current discharge is sheet flow across
the parcels and into previously constructed road Right of Ways then to the north into the City Line ditch
east to Taylor Creek. The owner proposes to construct residential buildings and a parking area to support a
condominium complex with dry detention areas and a wet detention area with drainage ofIsite to Taylor
Creek. The drainage calculations and routing will cover water quality and quantity for the proposed site
improvements.
The Soils Map for Okeechobee County indicates that this parcel's soil is made up of lmmokalee soil, which
is very poorly drained in the natural state. However, the drainage system in this area has been improved as
it is a part ofOkeechobee County's drainage system and the lmmokalee soil's characteristics are improved
with a drainage system and the drainage system is sized accordingly by incorporating the poorly drained
soils.
The site is currently partially developed with road right of ways developed and NW 5th A venue constructed
between NW 11th and 12th Streets and NW 12th Street constructed between NW 5th Avenue and NW 7th
A venue with 4 houses constructed on the existing portion of NW 12th Street. It is located in the S-13 3
Basin.
Proposed Use: The owner proposes construction of238 multi-family residences. Storm water runoff from
the proposed development will be collected by a series of interconnected inlets and conveyed to 8 separate
dry detention areas within the project. The dry detention areas will then convey the runoff to the proposed
1.78 acre lake located in the northeast sector of the project. Runoff shall discharge through a control
structure located in the proposed lake to the existing City Line ditch which runs along the northern
boundary of the project site. Water quality treatment and attenuation will be provided for the site prior to
discharge.
Draina!!e Considerations: To attenuate the increased run off generated by the proposed improvements
and to insure that water quality standards are met, we propose to pass all drainage through the dry detention
areas and lake. The high water table is set at elevation 26.00 ft-NGVD based on the attached geotechnical
report prepared by Universal Engineering. The control elevation for the proposed lake has been established
at 26.00 ft-NGVD, and the bottom elevations for the proposed dry detention areas have been set a foot
above control at 27.00 ft-NGVD.
Allowable discharge for the S-133 basin is 15.6 csm for the 25 year - 3 day storm event:
Q= 15.6 csm / 640 acres * A
A discharge rate of 0.92 cfs is calculated for the project using the above equation. However, a conservative
pre-development run off analysis performed over the site using ICPR shows the run off generated for the
pre-developed site to be 36 cfs (see attached pre-development run off analysis). Considering this
information, we are proposing to use 2.35 cfs as a discharge rate for the developed site. This discharge rate
will allow the control structure bleeder to be adequately sized to allow for recovery of the run off volume
associated with the 25 year, 72 hour storm event within 12 days as required by Section 6.9 of the SFWMD
Basis of Review (see attached ICPR recovery graph).
Technical Data
Basin area breakdown:
Land Use Category
Total
Impervious
Building
Lake @ control
Pavement
Pervious
Dry Det. Area (TOB)
Green Area
18.81 acres
6.76 acres
1.78 acres
10.27 acres
18.92 acres
2.52 acres
16.40 acres
Total Basin Area
37.73 acres
Determine Curve Number: The following curve numbers will be used in the storm routing: 70 for the
hydrologic group B soils of which all pervious areas are designated in accordance with SCS TR-55 and 98
for the impervious areas, and as recommended by SCS TR-55.
Weighted Curve # = CN = [(70 x (18.92/37.73)) + (98 x (J 8.8 l/37.73))] = 83.96
Water Ouality
Water quality treatment is provided in the form of dry and wet detention for the project drainage area.
Water quality calculations are provided as follows:
Req. WQ Volume = 1" * (37.73) * (1'/12") = 3.14 Ac-Ft; or
2.5" x % impervious x WQ areaJI2 = 2.5" x ((10.27 acres/29.19 acres) x 35.95 acres)/12 = 2.64 acre-feet.
One inch over the site is the controlling equation for this project. The control structure bleeder has been
sized at 7" (circular) to allow for proper recovery and treatment of the required water quality volume. The
bleeder shall be set at the control elevation of 26.00 ft-NGVD. The control structure grate has been set at
30.00 ft-NGVD, which is above the routed 25 year, 72 hour design storm elevation. Due to the low
allowable discharge rate, the only control structure orifice provided for storm water discharge below the 25
year, 72 hour design elevation is the proposed 7" circular bleeder.
Water Ouantity
This project is located in the Taylor Creek Basin which gravity discharges into Lake Okeechobee. As
previously noted, the discharge rate to be utilized for this project is 2.35 cfs. The stormwater management
system for the proposed site has been designed to operate using the above discharge rate. .
The 10 year, 24 hour storm (5.0") w/discharge, the 25 year, 72 hour storm (9.0") w/discharge, and the 100
year, 72 hour storm (10.0") w/o discharge has been evaluated based on the proposed plan. Please refer to
the attached AdICPR flood routing input/output parameters.
2
A summary of the flood routings is provided as follows:
10YearStorm (5.0")
Peak Stage Peak Rate
'(ft-NGVD) (cfs)
25 Year Storm (9.0")
Peak Stage Peak Rate
(ft-NGVD) (cfs)
100 Year Storm 00.0")
Peak Stage (no discharge)
(ft-NGVD)
28.80
2.04
29.63
2.35
30.09
Environmental: There are no South Florida Water Management District or Corps jurisdictional wetlands
on-site.
Construction Recommendations: Run-off and any water generated by short-term dewatering during
construction shall be contained on-site. However, there is some potential for transport of sediment to off-
site areas should heavy rainfall occur. We therefore recommend installation oftemporary silt fence around
the entire construction area during site work to reduce the potential of any off-site transport of sediment or
turbidity.
Conclusions: In my professional opinion, the proposed construction should have no impact to existing
drainage patterns off-site and should have no impact on off-site areas. The recommendations above should
be followed during and after the site work until such time as the ground surface has been adequately
stabilized to prevent the off-site transport of any soil or suspended solids. The proposed design and
construction will meet all local, state and federal requirements.
3
(J)
w~~
0';>-
""'8:5
~N::>
zdg
IX:z"'"
~t;~
~~~
Ooz
U)g:~
c
u
..
s
'"
<=
.5 g .5
~
;z
=
~
o
;z
=
....
..
.,;
..
..
'"
.,;
..
~
;z
c
e
"
~
"
.2
;:
I>
:g
S
<= <=
g .5 g
g~!5re~~
v:~~~g~
Uo" II II :..
c;N~N~~
~ ~: r-.....""N_-
...~..; ~...' ~
~
~ ~ ~
9 e>
~ Q
~
~
~
~
~
e>
~
-t~~
- '=! C"'i
ligif
~~.t
2 N
'"
~
e ~
~ l'
g M 0
~ ~
'jj' ::-- I
> ~ >
~
o
...
QQQ
>>>
~~~<=c::;
"5ca!:==gg~
!::l
.
'"
~
~
!::l
~
:5
.0
l
. 8~
:~:~ ~
=x.~ ~
~-2e
. is:r
~~~
!.s ~
OMe
~ :p ~
~'g ~
II gJ N
Q<~
"
..
'"
'"
,~
,..,
~
~
=-
""
f-a
-
;:
~
.....
-
~
i.:
o
~
=
.S:
-
<=
S
...
~
=
-
=
'r;;
<=
=
II
-<
..
~
s
o
!-
~g:;~~:\Ri
f"'i~~~~~""-i
II II II U II II II
w
-0
"il
os:.
~ &:
u :s
~ ~
is
..
.g
g
i:i "'l !
-!1tg-
U .. I>
= .. >
8 ~.g
!@~.s
0" -
~ ~ .f
'ii n ~
~ O'.,}l
t:3
=
~
Q
C) ~
- 0 c: c
=~ .25~-=
't-= os"i"! .~
::s~ ~iioer:
.co c:ClJrii_-s 0
17J..!!'~ UJ fnB~"i
.g .. e e:!! .!!
F ~ ;;uu> ~Ill
-~iii'iiiii8:S
=.('g~~:2-o ~
o i;l"tTl>.o~g.2
U::E8~==a..iii<
g
'"
...
'"
'"
"
.5 .s
r-1 ~ 0
"''''0
ci ci
N
gggggg
~o~~~~~
~ci .c~~c\
~
II II II II /I II II II II
..
~
.~
..
III
=i>
-0
~
.. "
~ ~
g ~
.E
"
l
I>
or>
E
"
;z
~ ~ e.~
c-Jg~8~
E .9 .,'~ tI) tI} 8
~i:g8.'s~g
3!. ~ -~ .5 ~ ] ::
-c:L'E_.!!o
--I)~=o
~~G~~.5
!-!-""~UE-
=
o
;:
lIS
:;
y
~
U
...,
"
.. w
";i~
:3:..J
s
o
!-
Ii
il
I>
:0
I>
"
o
<2
~
.5
!::
'"
Q
==
~ ~
.. ..
=
~
:!~
~.
~5~
D D
1/ U II
.~
2
..
"
Q
::E
~
...
'"
e
"
"0
>
I> .e
5 ..
"0 &
> .. ..
.~=i ~
...:~
6:;-0
.... ~.g
~.~ [
~=~
"'C.!:!"O
,g ~!
g. 'O.s
.:!~~
w
=
o
.E
8.
..5
<=
.,;
;.
=
::01: ~
.:: ~.
"
'i ;;
Q":
;.. ~
,,-=
~ .i
rS~
1>0
I
e
s
-t
...
Q C
~ B
"
.~ ;;
~ ~
~~
-""
"
if
~ .
~WT
Ii <'
=~
~~
~ ...
--:c:i;
~ ~
_ 0-
. ..
t!.~
0.:2
uti
..JVI
- "!
..J..
.. .
<2.,)
..
"
.;;:
a
Ii
'" '"
].E
.c :::
- -,,::"..
]
<= .-
~ ~
~ i
i:! 15
.s ''-:'
" .
!! ,..
r=E
<=
~
..
cu
y
<=
a..
E-<
=
a..
~
-=
-
=
o
tI.)
=
'r;;
=
=
a..
~
'"
=
QQQQ.S:
>>>>-
~~~~.s
ct: = = ~ ~
~
u
~~~~C)
~ ~ ~;?
.;
-il
:c ~
.. 0
.,)-0
.. ..
... ..
- .c:
Me;
. .::
0' :s
II II D .s
tI.)
11
SS
. .
~ .= ~
~{:!.:
I ~~
::~e
"B:!::
:; i :.
!-=-;;
&1 E L
" II ...
~ l .. g
.e5-e=..
'" .... E I>i
~~!~
= r:r r:r C"
O'uou
.. ..:..:..:
-; .5 .5 .5
~ '" '" '"
~~:a~:;:~:::~
Qr-:~M\()r-..:Nr-:oO
Q- - \000-
..
...
NMlOoo.\O.r--_
O-OOlNt--N"It'
g~.ti.n&:;~:!.....
on
...
~~~8g:8:2~
=."j.roio.no.::ir-..:"';f""i
=- - "It'.,..-
..r
..,
\OMlO<ll:t'NCOfl"lV'l
"It'OOO-t--MO\r"I
g~rioci~~~r-:....
..;
...
~Q~~~~:~~~
.!~- NM
~...
l!
.e g~~~ooS~8
"=oci -"';N\()O\"';O
~~ --
'"
U
~ ~~8~~~gg
-agr--:....;.....;.n..ooo
Eo
='"
u
~~~~oggg
g"';oNociooo
.,;
..
~~~88gg8
grorioocicicioci
..;
..
~g:ggggg8
0"';0000000
o
,..:
....
00000000.
00000000.
ocicicicicicioo
o
'"
....
-.:
..
w
"
E-
0000,,"
1.00000
cD 0 o..,.:-r=
N("')C'?\"?~
o
<:>
0;
'"
t
~QOOOII)OOO
-OQIDIn,OOOOO
EtDui"":"':cOoici~
eMN<"fNNNMM
100
...,
u
.!!lX)IDON~m.......U)
~IO~Q) . .T""'.......
II . . . .0 N . .
D--O~O__MCD
..(
i.~]i]!fiiigi
.. 1:1:1: =cc:c:
~ ~ ".- 1>.5._._ ._ ._
",~>..J>..J..J..J..J..J
5 i 1
~ c ~ c: ~
u.g.g .g.g
~!.!g5c I~
=UOUUO-Ns:::
"Cf~eOO Ii Ii 5:2
~~~55.fdd~
'"
...
~
'"
<:!
~
..
:!
..
.
1i
'"
."
D
.!!
>
D
IX:
l
E
D
,6
"
"
!9
'"
-:
">
..
IX:
i
c:
!
2
~
Q.
.2
D
>
D
C
.!!
;;
oS
'"
;
!:I
Ii:
'"
...
..r
~
~
:i
Q
..
:!
..
'"
..
:;;
iii
on
:::l
'"
...
~
.,;
..
...
..r
...
~
<:>
Q
o
..!i
.l!l
~
r--
8
~
~
'"
u '"
"'""E
lo.I-rl ItS
E-"" ...
'"
,,-0 '"
..."'...
"',,'"
.<: 0
"" a. '"
:30'0
0"'0
UJ<4Z
'"
E
"':3 '"
"'.... '"
... 0 '"
o<:C:>+JQJ
..................t/)~
Q) Q,I........ 0
tflD'>cP.c
"I'" '" E "
4) ...., +J..-4 lIS
'OOO[/)e-.X
o
za:>f-r:E
o
"... '"
0'01-<
.... :>.'"
"':C.!l
I-<
'0'-''''
"...",
'" "
'"I'>:: => :'l
C lllCt) C
...... > u rtI
mOtl)tl)
'"
000=>00
'"
I-<
:3 '"
"" :>
u ...
:3 :3
... U
....""
Q)t1)Q)0'.c
C C'lCU
QJlo.ICQ."'O....1U
ClJlO'....... ItS 0......-1 +-' lD
"'t'rl Q).c 1-1 ~ IQ ~
~a..3:UOt:Q.x;tIl
~n.~UOt:Qj:G::r:
:I::
U
8
H
o
8
/
p:;
8
Ul
H
0
p:;
8
Z
0 e,j
u .5
0 '"
(l)
'00
0
"0
l:
..<:
u
(l)
r--
(l)
.5
E
o:l
(l)
..
Vi
("'l
0
0
("'l
@
;;2'
p..
U
c
Qi
-0
0
~
Oll
.5
~
ril ril 0
8 8 ~
H H -0
Ul Ul l:
.0: ::> 0
p..
-0
l:
o:l
Qi
l:
l:
o:l
..<:
U
-0
B
u
(I)
l:
l:
0
u
..
CD
.5
Southern Trace
Proposed Site
Input Report
----===--=-="""'=-=-
=-=- Basins
-=~=--=~----=-=--=-=-=
====_==-.======~
-=-======---=-==--==-=-=-...=-~-=-
Name: SITE
Group: BASE
Node: SITE
Type: SCS Unit Hydrograph
Status: Onsite
Unit Hydrograph: Uh256
Rainfall File: Sfwmd72
Rainfall Amount (in) : 9.000
Area (ac) : 37.730
Curve Number: 84.00
DCIA(%): 0.00
Peaking Factor: 256.0
Storm Duration(hrs): 72.00
Time of Cone (min) : 20.00
Time Shift(hrs): 0.00
Max Allowable Q(cfs): 999999.000
Southern Trace
Proposed Model
===-=-==-==--=--==-==--=-=-
=-~--==--=-==....===-~-=-==-
=- Nodes =======
==>=====~-==-=========-o:..:=-=
=---==-==--==--=-===-==--=-===_===o:====~====-========-=-==-"'"=~====
Name: DITCH
Group: BASE
Type: Time/Stage
Base Flow (cfs) : 0.000
Init Stage (ft) : 26.000
Warn Stage (ft) : 30.000
Node for Tailwater
Time (hrs) Stage (ft)
0.00 26.000
100.00 26.000
------------------------------------------------------------------------------------------
Name: SITE
Group: BASE
Type: Stage/Area
Base Flow(cfs): 0.000
Init Stage (ft) : 26.000
Warn Stage (ft) : 30.000
Southern Trace
Proposed Model
Stage (ft)
Area (ac)
26.000
27.000
28.000
29.000
30.000
1.7800
1.9600
3.8600
4.9400
28.9400
==:z.==Z:==""""'"""==:z::=====-==-=-_-=--=-
==- Drop Structures -===:&==-===_=-=--=-~_=-==-=--==-===-=-==-_
==--=-=--===--======--=-===-=-= =-=-==~=-_....=--==-=-=--===<
Name: CONTROL STR From Node: SITE Length(ft): 55.00
Group: BASE To Node: DITCH Count: 1
UPSTREAM DOWNSTREAM Friction Equation: Average Conveyance
Geometry: Circular Circular Solution Algorithm: Automatic
Span(in): 24.00 24.00 Flow: Both
Rise(in): 24.00 24.00 Entrance Loss Coef: 0.500
Invert (ft) : 17.500 17.500 Exit Loss Coef: 1.000
Manning's N: 0.012000 0.012000 Outlet Ctrl Spec: Use dc or tw
Top Clip (in) : 0.000 0.000 Inlet Ctrl Spec: Use dn
Bot Clip (in) : 0.000 0.000 Solution Ines: 10
Upstream FHWA Inlet Edge Description:
Circular Concrete: Square edge w/ headwall
Downstream FHWA Inlet Edge Description:
Circular Concrete: Square edge w/ headwall
Control Structure
7" circular bleeder @ 26.00 ft-NGVD
Grate @ 30.00 ft-NGVD
... Weir 1 of 2 for Drop Structure CONTROL STR
Count: 1
Type: Vertical: Mavis
Flow: Both
Geometry: Circular
Bottom C1ip(in): 0.000
Top Clip(in): 0.000
Weir Disc Coef: 3.130
Orifice Disc Coef: 0.600
TABLE
Span (in) : 7.00
Rise (in): 7.00
Invert(ft): 26.000
Control Elev(ft): 26.000
... Weir 2 of 2 for Drop Structure CONTROL STR
Interconnected Channel and Pond Routing Model (ICPR) @2002 Streamline Technologies, Inc.
Page I oB
Southern Trace
Proposed Site
Input Report
TABLE
Count: 1
Type: Horizontal
Flow: Both
Geometry: Rectangular
Bottom Clip(in): 0.000
Top Clip (in) : 0.000
Weir Disc Coef: 3.130
Orifice Disc Coef: 0.600
Span (in) : 54.00
Rise (in) : 36.00
Invert (ft) : 30.000
Control Elev(ft): 30.000
== Hydrology Simulations ~==~~=--=~=
====-====--===-======-=======-00:===-=-=====-===--=====--=====-====
Name: 100Y3D
Filename: P:\2006-202 Insite Development\Drainage Revised 2\ICPR3\100Y3D.R32
Override Defaults: Yes
Storm Duration (hrs) : 72.00
Rainfall File: Sfwmd72
Rainfall Amount(in): 10.00
Time (hrs) Print Inc(min)
80.000 5.00
Name: 10YlD
Filename: P:\2006-202 Insite Development\Drainage Revised 2\ICPR3\10YlD.R32
override Defaults: Yes
Storm Duration (hrs) : 24.00
Rainfall File: Flmod
Rainfall Amount(in): 5.00
Time (hrs) Print Inc(min)
40.000 5.00
Name: 25Y3D
Filename: P:\2006-202 Insite Development\Drainage Revised 2\ICPR3\25Y3D.R32
Override Defaults: Yes
Storm Durarion(hrs): 72.00
Rainfall File: Sfwmd72
Rainfall Amount (in) : 9.00
Time (hrs) Print Inc(min)
360.000 5.00
==== Routing Simulations
Name: 100YR3D Hydrology Sim: 100Y3D
Filename: P:\2006-202 Insite Development\Drainage Revised 2\ICPR3\100YR3D.I32
Execute: Yes
Alternative: No
Restart: No
Patch: No
Max Delta Z (ft) :
Time Step Optimizer:
Start Time (hrs) :
Min Calc Time(sec):
Boundary Stages:
1.00
10.000
0.000
1. 0000
Delta Z Factor: 0.01000
End Time (hrs) : 80.00
Max Calc Time (sec) : 60.0000
Boundary Flows:
Southern Trace
Proposed Model
Time (hrs)
Print Inc(min)
56.000
64.000
68.000
90.000
15.000
5.000
15.000
60.000
Group
Run
BASE
Yes
----------------------------------------------------------------------------------------------------
Name: 10YRlD Hydrology Sim: 10YlD
Filename: P:\2006-202 Insite Development\Drainage Revised 2\ICPR3\10YRlD.I32
Interconnected Channel and Pond Routing Model (ICPR) <<;l2002 Streamline Technologies, Inc.
Page 2 oB
Southern Trace
Proposed Si te
Input Report
Execute: Yes
Alternative: No
Restart: No
Patch: No
Max Delta Z(ft):
Time Step Optimizer:
Start Timelhrs):
Min Calc Timelsec):
Boundary Stages:
1.00
10.000
0.000
1.0000
Delta Z Factor: 0.01000
End Timelhrs): 40.00
Max Calc Timelsec): 60.0000
Boundary Flows:
Southern Trace
Proposed Model
Time lhrs)
Print Inclmin)
8.000
20.000
40.000
15.000
5.000
15.000
Group
Run
BASE
Yes
----------------------------------------------------------------------------------------------------
Name: 25YR3D Hydrology Sim: 25Y3D
Filename: P:\2006-202 Insite Development\Drainage Revised 2\ICPR3\25YR3D.I32
Execute: Yes
Alternative: No
Restart: No
Patch: No
Max Delta Z(ft):
Time Step Optimizer:
Start Timelhrs):
Min Calc Time (sec) :
Boundary Stages:
1.00
10.000
0.000
1.0000
Delta Z Factor: 0.01000
End Time(hrs): 360.00
Max Calc Timelsec): 60.0000
Boundary Flows:
Southern Trace
Proposed Model
Time (hrs)
Print Inc(min)
56.000
64.000
68.000
90.000
360.000
15.000
5.000
15.000
60.000
300.000
Group
Run
BASE
Yes
=-=-==-=-=-===--==""'========-c:c::=--=-=-=-=-==--=_==========="==
= Boundary Conditions =====--=====-==-=-=_=~..._======""====_=-==-_
--=---=--==--====---==--=-==-=---=--==--==---==--==-=--=--=--==-=====
Interconnected Channel and Pond Routing Model (ICPR) ~2002 Streamline Technologies, Inc.
Page 3 of3
-
....
o
u
bO
'"
!:l...
" ~., 00 "''''
"' 0.... 00 M ..
::;:....U 00 OM
....
... 00 NN
:l
0
'" ~ .. 00 N'"
eo" 00 ........
..........c
...... 00 MN
... N....
" :l
",0
::;:
" ~ ., "'''' rl'"
"' 0.... M.. <Xl'"
::;:....u OM M ..
....
" "I'" M....
H wo
....
'" ~ ., "I'" ....<Xl
e 0" ........ rlO
.........c
....... M'" NO
" "I.... rl'"
"H
"'
::;:
..... "'''' 00 ....'"
" "'... N....
:l "..... .oM
cno< "'<Xl c.)
0....
" "'''' t::
'" -
::;: '"
'" "... 00 00 u
.., "'.... 00 00 -So
... '" 00 rl rl 0
"... 00 00 (3
0'"
00 00 t::
" .:::
'" <.)
::;: u
"''''... 00 00 f-o
" "'.... 00 00 u
..... "' 00 00
"... -=
"'" 00 00
'" MM MM "8
~
'"
u
..
" "'... 00 .... .. -
'" "'.... 00 "'M tI.l
::;: '" 00 .....o N
...
'" ",.o "'''' 0
N'" NN 0
N
@
" '" ., 00 N'" 2
e "''' 00 ....rl
..... ",.c
...... 00 MN !:l...
'" N.... U
" -
'" '-'
::;: -0
" 00 00 "0
0 rl M rlM 0
-... 0:0: 0:0: ::;E
.... ><>< ><><
'" 0'" 0'" bO
.... rl '" rlN
:l t::
e -€
-....
'" 0
~
"0
t::
0. "'.., "'''' 0
:l cncn cnen !:l...
0 ..;..; ..;0<
" "'''' "'''' "0
'" t::
'"
-0
t::
t::
<Il
.:::
U
" xx "'''' "0
" e ()U ....
U QJ '" '" ~~ H H U
"'... " :z en en ti
"-rl :l 00
E--t co .5 u
t::
"'0 " t::
" " '" 0
",.,::;: <.)
.co ..
... 0. " U
:l0'O .5
o " 0
"'''':z
-
....
o
II)
~
j:l..,
""... 00
<II "'.... 00
:;:<11 00
...
00 """
NN
00
0
QJ QJ OJ 00
!: "'... 00
.....<II..c
...... 00
00
"
<1100
:;:0
""... .......
<II "'.... "',..,
:;: <II ....'"
., c,)
00 CD '"
NN c::
00 ......
:> '"
QJ QJ rn N'" II)
!: [p'" .... ..... .00
....."'..c 0
...., ....'" '0
00 "'....
X ..2
<UCI)
:;::> (.)
II)
"oorn "'''' E-<
<U .... .....0 II)
:;: <II U 00
... .5
.... 00
" E
0
<II
II)
....
" :> rn "'''' U)
<110.... .......
:;:....u 0.... N
r..
"'''' 0
0
N
@
QJ :> rn Nen 2
Eo... ........
...........c
...r.. MN j:l..,
N.... U
"
<U ......
:;: '-'
a>
c 00 "'0
0 ........ 0
..... ,.;,.; ;:";E
... ><><
<U 0'" bI)
.... ....N
::l .5
!:
..... =
00 0
~
"'0
0. "'''' c::
::l 0000 0
0 .c.c j:l..,
... "'''' "'0
(!) l::
<II
a>
l::
l::
<II
..<:
" "'''' U
QJ !: ...... "'0
U QJ '" '" 0000 II)
<II... !: Z '0
"..... ::l "''''
"'CI)E 00 II)
..... "'''' l::
C'tl X ...... l::
" " <U ZZ 0
QJOJ:;: 00
..c 0 uu e
... 0.-" II)
::l 0 C .5
o ~."""
C1)o.,..J
-
"
e
:;l
.....
o
:>
"...
0'"
.... I
... U
" ..
"
......
"'"
't:l-
...
N
::;'
"
1 E
:;l
"'.....
.rl 0
'" :>
" '"
U Q).-t C
ru.wnso
J..a..... C-ri
f-!OOoe(..tJ
"
C"c>,OJ
"'l!J~+J
CD rIJ lEI GJ
,cO>"t1
... a. 0
;:IOUN
OkQJ.........
U)o..,x.......
'-
o
II.)
bO
<<l
p...
.-t+J~ ON~~~mON~~~mONM~~OOO~M~W~OO
rts::s rtS ......................................
~O OOOOOO~"~rlrl~NNNNNNMMMMMMM
o
........
o
:>
.-tC~ 0000000000000000000000000
IOH 10 ..................................
+J 0000000000000000000000000
0.....
... 0
:>
.-t~~ WNOO~O~~~N~N~N~~~O~OON~~N~m
ruo~ .-tOm~W~MrlOOO~~~N~mm~~M"mOOWq
U.-tO rlrlOOooooommmmmm~oooooooooo~~~~
o ~ .. .. .. .. . .. .. . . .. . . . .. . .. .. . . .. .. . . . .
~+J NNNNNNNNNrlrlrlrlrlrlrlrlrlrlrlrlrlrlrlrl
:;l
o
.-t3~ 0000000000000000000000000
ruo~ 0000000000000000000000000
~.-tO 0000000000000000000000000
o 4-l . . . . . .. . . .. .. .. . . . .. .. .. . . . . . .. . .
E-tC 0000000000000000000000000
H
" nlN
UW'"
nl k'"
........;
k
:;l
rJl
"'W+>
" "'...
... ..
"...
ktl)
nl
~
'"
k
:;l
o
.c
...
N
"
.rl
WM~~rl~rlM~MOWOM~WWVNm~N~MW
OOmN~OOOM~~mrlN~~W~OOmOOrlNNM~
rl~OOrl~OOrl~~O~~OM~~N~~N~ro~~~
~MrlOOO~~MrlOOO~~M~~OO~VMrlmro~~
rlrlrlrlOOOOOO~mm~moooooorororo~~~~
NNNNNNNNNNrl~~rlrlrlrlrlrl~~rl~rlrl
u
..::
'"
<1>
.EO
o
o
s::
...c:
u
II.)
E-<
.S
E
<IS
<1>
....
00
N
>:::>
>:::>
N
@
2
p...
u
.......
'-"
U
"'0
o
::;E
bO
.5
"S
o
~
"'0
s::
o
p...
"'0
s::
<IS
Q)
s::
s::
<IS
...c:
U
"'0
2
u
II.)
s::
s::
o
u
....
II.)
;g
0000000000000000000000000
0000000000000000000000000
0000000000000000000000000
0000000000000000000000000
MMMMMMMMMMMMMMMMMMMMMMMMM
'"
'" +>
nl ...
+>
tI)
O~~M~N~rl~~MroN~OVOONWO~OON~rl
O~Nm~NOO~rl~~O~MO~Nm~NOO~rl~V
o~~roooro~~~W~~~~~~~MMMNNNrlrl
m 00 0000 oom oomro 0000 ro 00 000000 00 0000000000 ro ro 00
NNNNNNNNNNNNNNNNNNNNNNNNN
W '"
E k
... .c
...
ONNNNNNNNNNNNNNNNNNNNNNNri
0000000000000000000000000
OrlNM~~~~oomO~NM~~w~romOrlNM~
.-l~rl.-trl.-trl..-f.-lrlNNNNN
a.
:;l
o
k
"
W~~~~~M~~~~~~~~~~~~~~~~~~
~oom~oo~oooooooooooooooooooooooooowoooomoooo
...;~...;~~~...;...;...;~...;...;...;...;...;...;~...;...;~...;~~...;...;
~~~~~~~mm~m~~~~mmmm~m~~mm
W
'0
o
Z
~~W~WW~~~~M~~M~W~~~W~WWWW
8888~~88888~~8~8888888888
HHHHHHHHHHHHHHHHHHHHHHHHH
oooooooooo~oooooooooooooooooooomoooooooooooooooo
"
o
....
...
'"
....
:;l
E
....
tI)
0000000000000000000000000
~~~~3~~3~3~~~~~33~~~~3~3~
::I:
Uw
1-1-
000
, I
c
C")
0:
>- (j) <.)
It) .... s::
N .r; -
c: W ,,;
0 E (I)
:;:: 0 i= "So
III 0 ..9
~ N 0
s::
E ..s::
en (.)
(I)
f-<
(I)
.5
E
<ll
Q
....
tli
N
0
0
N
@
..-.
~
p.,
C,)
0 ......
'-'
0 Q
~
"'0
0
::?;
bIl
.5
"S
0
~
"'0
s::
0
p.,
"'0
s::
<ll
Q
.G s::
(I) s::
0(1)0. <ll
co+'co ..s::
J...I .rl J...I C,)
E-<Ull!J 0 ]
c: 'tl >, 0 0> co to-- 10
(') N N N N (.)
J...I Q) lo-l (I)
(I) CIl (I) s::
s::
.GO:> 0
+'0.0 (.)
;:l 0 0 ....
(I)
0 J...I (I) (u)a6eIS 1::
Ulp..o:: ......
o
o
..,.
o
o
(')
S~e\(\. ~<.:c.
iJr~ -c:k..c..9...1op I-'\U\+ ~4(l ~ ~~J"fSjS
[]J
Advanced Interconnected Channel & Pond Routing (ICPR Ver 2.20)
Copyright 1995, Streamline Technologies, Inc.
[1]
********** Basin Summary - DEHAYS **********************************************
***
Basin Name:
Group Name:
Node Name:
Hydrograph Type:
Spec Time Inc (min):
Comp Time Inc (min):
Rainfall File:
Rainfall Amount (in):
Storm Duration (hr):
status:
Time of Conc. (min):
Lag Time (hr):
Sub
Ele
Area
(Ac)
Curve
Number
STRACE1
BASE
STRACE1
OV
2.00
2.00
SFWMD72
9.00
12.00
ONSITE
N/A
0.00
Length
(ft)
Time Max (hrsl:
Flow Max (cfs):
Runoff Volmne (in):
Runoff Volmne (cf):
60.33
36.14
5.33
733048
Mannings
N
DCIA
(%)
Slope
(%)
1 6.37 70.00 144.00 0.35 0_00 0.14
2 6.37 70.00 144.00 0.35 0.00 0.14
3 6.37 70.00 144.00 0.35 0.00 0.14
4 6.37 70.00 144.00 0.35 0.00 0.14
5 6.37 70.00 144.00 0.35 0.00 0.14
6 1.20 10.00 72.00 0.35 0.00 1.40
7 1.20 70.00 72.00 0.35 0.00 1.40
8 1.20 70.00 72.00 0.35 0.00 1.40
9 1.20 70.00 72.00 0.35 0.00 1.40
10 1.20 70.00 72.00 0.35 0.00 1.40
Sub Max Time Max Flow Max Vel Elem Rain Excess
Ele (hrs) (cfs) (fps) (in)
----------------------------------------------------------
I 59.97 14.00 0.046 5.33
2 60.03 20.53 0.054 5.33
3 60.47 26.40 0.060 5.33
4 60.70 29.00 0.062 5.33
5 60.93 31. 76 0.110 5.33
6 60.07 32.61 O~191 5.33
7 60.17 33.52 0.193 5.33
8 60.23 34.33 0.195 5.33
9 60.30 35.25 0.197 5.33
10 60.33 36.14 0.199 5.33
, -
InSite Development, LLC
Request for Comprehensive Plan Amendment
Future Land Use Change from Single-Family Residential to Multi-Family
Residential
Comnliance with Okeechobee County Comnrehensive Plan
The proposed amendment is consistent with the following objectives and policies of the Comprehensive
Plan which are relevant to the subject request. As the CGMP has been found to be internally
consistent as required by State statutes, the proposed amendment is thus also consistent with the
remainder of the Comprehensive Plan.
Future Land Use Element
Objective 1 - The location of future development in the City of Okeechobee shall continue to be guided
by the availability and efficient use of public facilities and services as well as site characteristics such as
soil conditions and topography. With public water and wastewater already onsite, this site is most
advantageous for the change of future land use from Residential Single Family to Residential Multi-
family. While the soils are not the most advantageous for urban development according to the Soil
Survey of Okeechobee County, the two concerns for this soil type are wetness and high water table.
With improved drainage, which this site will benefit from and the existing public sewer system these
items will not be a concern for this development. The topography of this site has been partially
developed due to road beds in the City Right of Way being prepared and is well suited for this level of
development. This site is perfectly located to provide attainable multi-family housing for the resident of
the City of Okeechobee due to its strategic location just blocks from downtown, an elementary school,
middle school, freshman campus and senior high school. This site meets and exceeds this objective.
Policy 2.1.a/b - The primary purpose of these categories is to manage future growth. Since the current
future land use on this parcel is Single-Family Residential and land to the south and east is multi family,
it is reasonable to change this area to a higher density classification to help curtail urban sprawl. This
project will help manage the future growth by providing higher density housing.
Transportation Element
Objective 7 - Calls for the City to establish levels of service standards that are acceptable for existing
and future conditions. Please refer to the traffic statement prepared by McMahon Associates, Inc.
Housing Element
Policy 1.1 - The City is to permit new residential development only where facilities such as roads,
sanitary sewer, and potable water are available and adequate. There is an adequate road system
available as seen in the traffic statement prepared by McMahon Associates, Inc., adequate water and
sanitary sewer service is available onsite and capacity exist at the plants to serve this project refer to
water and sewer statement prepared by Rudd Jones, P. E. & Associates.
Sanitary Sewer, Solid Waste, Drainage, Potable Water, and Natural Groundwater Recharge
Element
Page 1
InSite Development, LLC
Request for Comprehensive Plan Amendment
Future Land Use Change from Single-Family Residential to Multi-Family
Residential
Objective 1 - The City determine availability of service capacity based on the minimum level of service
and the demand generated by development. Please refer to Sanitary Sewer and Potable Water and
the Drainage statement prepared by Rudd Jones, P. E. & Associates for compliance with this objective.
Conservation Element
Goal- The City is committed to conserve, protect, and appropriately manage the natural resources to
promote the highest environmental Conversion to the Multi-Family Residential designation will allow
for a development program to be brought forward that will be sensitive to natural systems of the area.
Recreation Element .
Objective R.1 - Requires that recreation facilities meet the existing and future needs of the County's
population through the planning period. Please refer to the Adequate Public Facilities Analysis section
of this report for a specific analysis of the additional demand for public facilities caused by this request.
Objective R.2 - Requires the County to coordinate with the private sector to provide recreational
facilities. The proposed project can easily accommodate the recreation needs of its anticipated
population through the provision of on-site facilties. In addition, through a fair-share cost basis, the
proposed project, at time of development application, can also provide for its required recreation needs.
Compliance with State Growth ManaQement Requirements.
Florida's Department of Community Affairs evaluates local plan amendments for consistency with Rule
9-J5, Florida Administrative Code, which sets out criteria for determining whether a proposed plan
amendment demonstrates consistency with the mandates of the Local Government Comprehensive
Planning and Land Development Regulation Act and the State Comprehensive Plan. The applicant
must demonstrate that the proposed plan amendment is consistent with all state requirements.
Since the City of Okeechobee's Comprehensive Plan has been found to be consistent with all state
requirements, a demonstration of compliance of the proposed amendment with the City of Okeechobee
Comprehensive Plan in turn demonstrates compliance with all state requirements. Please refer to the
section titled Compliance with City of Okeechobee Comprehensive Plan for the applicant's
demonstration of compliance.
The proposed future land use must also not encourage urban sprawl as outlined in Sections 9J5-
006.(5)(g) through (5)(j) of the Florida Administrative Code. The noted regulations set forth the
major components of a methodology to determine the presence of urban sprawl. Paragraph (5)(g)
identifies 13 primary indicators of urban sprawl which are to be applied and analyzed as set forth
in the rule. Paragraph (5)(h) describes how land use aspects of a plan shall be analyzed. The land
use element, including both the future land use map and associated objectives and policies,
represents the focal point ofthe local government's planning effort. Paragraph (5)(i) describes the
unique features and characteristics of each jurisdiction which provide the context of the analysis
and which are needed to evaluate the extent, amount or frequency of an indicator and the
significance of an indicator for a specific jurisdiction. Paragraph (5)(j) recognizes that land use
plans generally may be significantly affected by other development policies in a plan which may
serve to mitigate the presence of urban sprawl indicators based on the land use plan alone.
Page 2
InSite Development, LLC
Request for Comprehensive Plan Amendment
Future Land Use Change from Single-Family Residential to Multi-Family
Residential
Paragraph (5)(j) describes development controls which may be used by a local government to
mitigate the presence of sprawl.
In general, Section 9J-5.006(5)(l) states that provision of innovative planning such as urban
villages, new towns, satellite communities, area-based allocations, clustering and open space
provisions, mixed-use development and sector planning that allow the conversion of rural and
agricultural lands to other uses will be recognized as methods of discouraging urban sprawl and
will be determined consistent with the provisions of the state comprehensive plan, regional policy
plans, Chapter 163, Part II, F.S., and the Florida Administrative Code regarding discouraging the
proliferation of urban sprawl. As such, the proposed future land use amendment to the MULTI-
FAMILY RESIDENTIAL district, which allows the creation of mixed-use development, urban
villages, and open space, is thus consistent with the requirements for discouraging urban sprawl.
Nevertheless, a detailed urban sprawl analysis is provided below. Our analysis of consistency is
provided within a text block following each indicator.
Analysis of primary indicators
1. Promotes, allows or designates for development substantial areas of the jurisdiction to develop as
low-intensity, low-density, or single-use development or uses in excess of demonstrated need.
The proposed request to Multi-Family Residential will actually increase densities within the urban
area of the City in close proximity to the urban center while also ensuring a balanced mix of uses
and their intended benefits.
2. Promotes, allows or designates significant amounts of urban development to occur in rural areas at
substantial distances from existing urban areas while leaping over undeveloped lands which are
available and suitable for development.
The proposed request to Multi-Family Residential will actually increase densities within the City
in close proximity to the urban center. The proposed request is also adjacent to an existing
designation of Multi-Family Residential on the future land use map.
3. Promotes, allows or designates urban development in radial, strip, isolated or ribbon patterns
generally emanating from existing urban developments.
The location of the proposed future land use amendment is not in a radial, strip, isolated or ribbon
pattern generally emanating from existing urban developments.
4. As a result of premature or poorly planned conversion of rural land to other uses, fails adequately to
protect and conserve natural resources, such as wetlands, floodplains, native vegetation,
environmentally sensitive areas, natural groundwater aquifer recharge areas, lakes, rivers, shorelines,
beaches, bays, estuarine systems, and other significant natural systems.
The proposed request to a Multi-Family Residential future land use will not result in the
premature or poorly planned conversion of undeveloped land to other uses. Adequate site design
techiques will be employed to adequately to protect and conserve natural resources, such as
wetlands, floodplains, native vegetation, environmentally sensitive areas, natural groundwater
aquifer recharge areas, lakes, rivers, shorelines, beaches, bays, estuarine systems, and other
Page 3
InSite Development, LLC
Request for Comprehensive Plan Amendment
Future Land Use Change from Single-Family Residential to Multi-Family
Residential
significant natural systems.
5. Fails adequately to protect adjacent agricultural areas and activities, including silviculture, and
including active agricultural and silvicultural activities as well as passive agricultural activities and
dormant, unique and prime farmlands and soils.
The location of the proposed future land use amendment is within a future land use of Single-
Family Residential and will not impact agricultural operations to the west. From the SCS Soil
Survey of Okeechobee County designated the soil in this area as not productive for Agriculture.
6. Fails to maximize use of existing public facilities and services.
The proposed site will be served by a full complement of existing urban services.
7. Fails to maximize use of future public facilities and services.
A higher utilization of this site will ensure that future pubIc services are minimized within
outlining areas.
8. Allows for land use patterns or timing which disproportionately increase the cost in time, money and
energy, of providing and maintaining facilities and services, including roads, potable water, sanitary
sewer, storm water management, law enforcement, education, health care, fire and emergency
response, and general government.
The proposed site will be served by a full complement of existing urban services. Because the
property is within the public facility service area, it will enable public facilities and services to be
extended in an orderly manner without disproportionate increases in cost.
9. Fails to provide a clear separation between rural and urban uses.
The proposed site is adjacent to other lands within the City ofOkeechobee with a Multi-Family
Residential future land use designation and thereby maintains clear separation between urban
and rural uses.
10. Discourages or inhibits infill development or the redevelopment of existing neighborhoods and
communities.
This project is iOOll of existing lands designated for housing and only looks to increase the density
allowed by changing the Future Land Use Classification from Single-Family Residential to Multi-
Family Residential.
11. Fails to encourage an attractive and functional mix of uses.
The proposed site being adjacent to other lands designated Multi-Family Residential, Public and
Single-Family Residential allows for an attractive and functional mix of uses.
12. Results in poor accessibility among linked or related land uses.
Page 4
InSite Development, LLC
Request for Comprehensive Plan Amendment
Future Land Use Change from Single-Family Residential to Multi-Family
Residential
The proposed project will provide for reasonable connections to surrounding development to ensure
among linked or related land uses.
13. The proposed change will not result in the loss of significant amounts of functional open space.
The proposed change will not result in the loss of significant amounts of functional open space.
The existing use does not provide functional open space. With the conversion to a Multi-Family
Residential future land use, the proposed land use will provide significant amounts of functional
open space that will be planned for active and passive recreation by residents of the new
community and others.
Page 5
InSite Development, LLC
Request for Comprehensive Plan Amendment
Future Land Use Change from Single-Family Residential to Multi-Family
Residential
Encroachment of Incompatible development
As the City of Okeechobee experiences development, a mix of uses has evolved such as residential,
hotels, restaurants, and service businesses, repair shops and retail stores. The residential uses in the
area though have remained largely the same stock that has been in place for a number of years. This
project will bring to fruition many failed attempts to bring housing to this area.
The subject site is bound on the west by a cattle stockyard with an Agricultural future land use
designation, to the south by a DOT maintenance yard with a Public future land use designation, to the
east by undeveloped land with a Multi-Family Residential future land use designation and to the north
by undeveloped land with a Single-Family Residential future land use designation.
Given the adjacent existing and future land uses, the proposed request for Multi-Family Residential
future land use will not result in the encroachment of incompatible development but will actually
complement the existing and planned uses and provide a balanced mix of uses in a well planned
development.
Natural resource protection
The site is currently devoid of native vegetation or wetlands. A full environmental assessment will be
conducted for the entire property as part of any future development application.
Adequate Public Facilities Analvsis
The following analysis demonstrates that adequate facilities are present or planned to accommodate
the incremental demand that may be generated by the proposed future land use. The analysis
determines the net incremental demand from a worst-case development scenario of the existing and
proposed future land use categories. The net demand is then compared to the existing and planned
capacity. The current demand from the existing future land use is assumed to be addressed within the
background growth assumptions of the City's local concurrency management system and the long term
planning horizon of the capital Improvement Element. The later analysis has previously been
determined by the Department of Community Affairs to be internally consistent based upon the current
future land use maps.
Transportation
Please refer to the enclosed traffic statement.
Schools
Currently, the Okeechobee County School District has adequate capacity at the middle and upper
school levels; however, the elementary school system is currently at capacity. The School Board has
programmed additional elementary school capacity through the State's Rural Schools Program.
Funding has been requested through the legislative delegation. Appropriation is expected in FY2007
with construction to commence by 2008. The Okeechobee School District has utilized this funding
source for expansion to the school system in the past.
Page 6
InSite Development, LLC
Request for Comprehensive Plan Amendment
Future Land Use Change from Single-Family Residential to Multi-Family
Residential
The timing is concurrent with the expected timeframe of proposed project. The request for a future land
use amendment is expected to be transmitted to the State Department of Community Affairs in 2007
with final adoption expected by mid-2007. With the State's new requirements for public school
concurrency passed during the 2005 legislative session, the proposed project is expected to meet the
concurrency requirements through mitigation proportionate to the demand for capacity as allowed by
State statutes. As the local government application for site plan approval is not expected to be
submitted untillate-2007, with approval granted in early-2008, the certainty of the funding program for
the additional capacity will be in place. Site construction would then commence with the first certificate
of occupancy in late-2008 - the expected timeline for the construction of the new elementary SChool.
Please refer to the enclosed letter of Okeechobee County School Board for confirmation.
The closest elementary school, Central Elementary, is located at 610 SW 5th Avenue and is
approximately 2 miles from the site. The closest middle school is Yearling Middle located at 925 NW
23rd Lane and is approximately 2 miles from the site. The closest high school, Okeechobee High, is
located at 2800 N.W. Highway 441 North and is approximately 2 miles from the site.. The closest
Freshman Campus is located at 610 SW 2nd Avenue and is approximately 2 miles from the site.
Water & Wastewater
The water and wastewater service for this project is provided by the Okeechobee Utility Authority.
Application for capacity reservation has been submitted to ~UA.
Existing Conditions
Under the current Single-Family Residential future land use, the property would be served by a central
Water and Sewer System.
Proposed Conditions
The following is an analysis of the water and wastewater flows for the property with the proposed future
land use designation allowing up to 4 units per acre. The analysis is based upon maximum
development scenario of 130 units. The estimated water and wastewater flows are as follows:
Use Measure Rate Gallons per
day
Multi Family 118 units 114 GPO - water 13,452 water
Residential 130 GPO - sewer 15,340 sewer
*Reference: HRS 100-6
Water and Wastewater Treatment Plants
Based on information obtained from the Okeechobee Utility Authority, the permitted capacity of the
surface water treatment plant is 5.0 mgd with the ground water treatment plant rated at 1.0 mgd. The
wastewater treatment plant permitted capacity is currently 1.0 mgd.
Page 7
InSite Development, LLC
Request for Comprehensive Plan Amendment
Future Land Use Change from Single-Family Residential to Multi-Family
Residential
The Okeechobee Utility Authority is currently in the construction phase of additional filters which will
bring the wastewater treatment plant to a temporary capacity of 1.23 mgd. This work should be
completed by June 2006. Additionally, the wastewater treatment plant is under a design/permitting
phase for an expansion of 3.0 mgd that will bring the total treatment plant capacity to 4.0 mgd and
should be operational by June 2008.
The average daily flow of the combined water treatment plant finished water production is 1.93 mgd for
the period of January 2005 through December 2005. The average daily flow of the wastewater
treatment plant is 0.89 mgd for the same time period. The Okeechobee Utility Authority reports an
outstanding water treatment plant flow commitment of approximately 0.25 mgd with an outstanding
wastewater treatment plant flow commitment of approximately 0.1 mgd.
Sewer
4.00 m d
0.89 m d
0.10 m d
3.01 md
Based upon these figures, the Okeechobee Utility Authority will have on or before June 2008 adequate
capacity to serve the proposed demand created by the increased density of the proposed future land
use amendment.
Police
The nearest police station is located at 55 SE 3rd Avenue. No additional police stations are scheduled.
The existing police station should be able to maintain its level of service standard with the proposed
amendment given that the project is immediately adjacent to other land designated for urban
development, is within the public service area, and is approximately 3 miles from the site.
Fire
The nearest fire station is located at 55 SE 3rd Avenue. No additional fire stations are scheduled. The
existing fire station should be able to maintain its level of service standard with the proposed
amendment given that the project is immediately adjacent to other land designated for urban
development, is within the public service area, and is approximately 3 miles from the site.
Solid Waste
The Okeechobee County solid waste level of service is 4.1 pounds per capita per day and a three year
availability of landfill capacity. Given the 100 maximum number of potential units with 2.5 person per
dwelling, the maximum demand for the project would be approximately 1,025 punds per day.
Okeechobee County operates the regional solid waste landfill. A letter from the solid waste service
provider, Waste Management, pertaining to solid waste service was not available. However,
confirmation was provided by Joe Fazula, Solid Waste Manager, that 50 years capacity is available.
Consequently, the existing landfill has surplus capacity in excess of three years.
Page 8
InSite Development, LLC
Request for Comprehensive Plan Amendment
Future Land Use Change from Single-Family Residential to Multi-Family
Residential
Stormwater Management
The project is located in the City of Okeechobee and FEMA FIRM Panels do not include the City of
Okeechobee, however, this site is adjacent to the City Limits Ditch to the north that has a bottom
elevation of 17.0 NGVD and discharges in to Taylor Creek to the east, which is controlled at elevation
13.5 NGVD. There are currently no known flooding or erosion control problems associated with the
project site. No 100-year flood prone areas exist on site, therefore no structures, roadways or utilities
are proposed within any 1 DO-year flood prone areas.
There are no existing wellfields located within two miles of the project site.
Potential adverse impacts to ground and surface waters will be minimized by implementation of
appropriate erosion control measures during construction in accordance with the NPDES Generic
Permit for Stormwater Discharge from Large and Small Construction Activities. Erosion control
measures that may be implemented include stabilization practices such as temporary seeding,
permanent seeding, mulching, geotextiles, or sod stabilization; structural practices such as silt fences,
earth dikes, diversions, swales, sediment traps, check dams, or storm drain inlet protection; and
sediment basins.
Stormwater runoff quantity and quality are strictly regulated by the City and the SFWMD to
ensure that pre-development drainage conditions are maintained. The proposed rate of discharge
from the site will be less than or equal to the existing discharge rate from the site. The discharges
off-site will be minimized by on-site detention within the stormwater management system. The
drainage system will be owned, operated and maintained by a public entity or a responsible
property owners association acceptable to the City and the SFWMD. The Stormwater
Management System will employ, wherever practical, a variety of Best Management Practices
(BMP). The following are a list of potential BMP that could be integrated into the Water
Management System during the final design and permitting stage:
· Oil and grease skimmers;
· Environmental swales;
· Minimize "short-circuiting" of pond flow patterns;
· Raised storm inlets in grassed swales;
· Utilize stormwater retention where feasible; and
· Street cleaning and general site maintenance.
Parks and Recreation
The project will be designed to provide residents with a variety of recreational facilities and open
spaces to ensure the community's quality of life. No land will be removed that was previously used by
residents of the region for any recreational use. No existing recreational trail is designated across the
property. Therefore,'~the project doesn't have the potential for impacting a recreational trail designated
pursuant to Chapter 260, F.S. and Chapter 160-7, F.A.C.
The City's adopted level of service standard for recreation and parks is 3 acres per 1,000 people.
Based on the estimated population of 325 people (130 units x 2.5 ppd), the project's minimum acreage
requirement for recreation and park space is approxmately 0.975 acres. The project will meet the park
Page 9
InSite Development, LLC
Request for Comprehensive Plan Amendment
Future Land Use Change from Single-Family Residential to Multi-Family
Residential
and open space mandates through on-site facilites and provision of fair-share contribution. The planned
system of parks and open spaces is consistent with the City of Okeechobee's Comprehensive Plan.
HistoricaV Archeological Resources
There are no known archeological or historical sites within the project boundaries. A request has been
sent to the Florida Division of Historic Resources. Given the improvements made to date (improved
pasture), the likelihood of the presence of a historic or archeological site regarded as potentially eligible
for listing on the National Register of Historic Sites to occur on the parcel is limited.
Hurricane Preparedness
According to information in the Treasure Coast Transportation Analysis Hurricane Evacuation Study
Update 2003, dated November 2003, the property is not located in any storm surge zone. The property
is not within the Category 3 Hurricane Evacuation Area.
It is estimated that the majority of people will remain in their homes within the project during a hurricane
event, due to the project location relative to the Atlantic coastline. However, in the event of a significant
hurricane, the County Emergency Operations Center (EOC) may activate evacuation shelters
throughout the County as it deems necessary. The evacuation shelters are typically opened in areas
within the hurricane's 100-mile path. Many of the public schools in Okeechobee County serve as
evacuation shelters.
US-441, east of the project site, is the closest evacuation route. Additionally, SR-lO, approximately 2
miles to the south will assist in evacuation of the area by providing additional evacuation routes. All
traffic control devices will utilize hurricane tested mast arms and street lights further minimizing service
interruptions and enhancing safety prior to, during, and after a major hurricane.
It should also be noted that due to recent changes to the Florida Building Code, specifically, Chapter
16, Structural Design, as well as the construction methods to be used in the project, the residential
homes will provide shelter for residents during hurricane events. As a result of the changes in the
construction process, residents will have safer and more secure homes, thereby reducing evacuation
volumes and shelter space requirements. In addition, underground utilities will be used throughout the
development reducing potential service interruptions. Finally, additional mitigation measures for special
needs populations will be determined through the local government approval process of the Planned
Unit Development.
Page 10
InSite Development, LLC
Request for Comprehensive Plan Amendment
Future Land Use Change from Single-Family Residential to Multi-Family
Residential
Miscellaneous Data
Legal Description
Please refer to the attached legal and sketches that comprise this application for future land use
amendment.
Maximum Allowable Development
Existing Future Land Use - Single-Family Residential allowing up to 4 units per acre
Proposed Future Land Use - Multi-Family Residential allowing up to 10 units per acre
11.29 x 10 = 113 units
The following Blocks make up the total future land use change requested
Block Number
Block 11
Block 12
Block 21
Block 22
Acreage
11.29
Existing FLU Propose FLU
Single-Family Residential Multi-Family Residential
Page 11
-
Southern Trace Site
Section 15, Township 37S, Range 35E, Block 11, 12,21, and 22
Preliminary Water & Sewer Statement
Prepared 9/29/2006
By:
Rudd Jones, P.E. & Associates, P.A. (#8303)
1905 S. 25th Street, Suite 200
Fort Pierce, FL 34947
772-461-6997
I. Project Description:
The referenced project is a 11.29 acre +/- site located in The City of Okeechobee; west
of Highway 441 N, just south of the City Limits Ditch on blocks 11, 12, 21, and 22.
II. Description of Available Utilities:
Potable water and sewer service will be provided to the site by Okeechobee Utility
Authority. There is an existing gravity sewer collection system with a liftstation in the
area that have to be extended to provide service to this project. The sewer 1iftstation will
require an additional pump to provide adequate service once this project is added to the
system.
There are watermains that run through this project that will again have to be extended to
provide service to this proect
III. Proposed Utility Construction:
The proposed site improvements will require extension of water and sewer services
onsite. The water main extensions will be sized to provide adequate fire suppression
flow throughout the site.
A gravity sewer connection will be all that is required since the liftstation is already in
place and with the addition of a pump will have adequate capacity to serve this project.
The utilities will be placed in the road right of ways which will provide access to these
proposed utilities for operation and maintenance by Okeechobee Utility Authority. The
system will be designed to meet the requirements of the Okeechobee Utility Authority
and the Florida Department of Environmental Protection.
IV. Required Capacity
Based on Okeechobee Utility Authority's policy of 250 gallons per ERC, this project
would require 111 ERCs or 27, 750 gallons per day.
V. Water and Wastewater Treatment Plants
Based on information obtained from the Okeechobee Utility Authority, the permitted
capacity of the surface water treatment plant is 5.0 mgd with the ground water treatment
plant rated at 1.0 mgd. The wastewater treatment plant permitted capacity is currently
1.0 mgd.
The Okeechobee Utility Authority is currently permitted to treat 1.232 MGD or
wastewater at their current facility; however, while the plant is permitted they are
currently in the construction phase of additional filters which will bring the wastewater
treatment plant to that capacity of 1.23 mgd. This work should be completed by June
2006. The current capacity of the plant is used up as the current plant is permitted for 1.0
MGD and the average daily flow is approximately 0.89 MGD and they currently have 0.1
MGD of Executed Developer agreements. This portion of the plant has no excess
capacity, but once the expansion as described above is complete, there will be sufficient
capacity to serve this project.
Additionally, the wastewater treatment plant is under a design/permitting phase for an
expansion of 3.0 mgd that will bring the total treatment plant capacity to 4.0 mgd and
should be operational by June 2008.
The average daily flow of the combined water treatment plant finished water production
is 1.93 mgd for the period of January 2005 through December 2005. The average daily
flow of the wastewater treatment plant is 0.89 mgd for the same time period. The
Okeechobee Utility Authority reports an outstanding water treatment plant flow
commitment of approximately 0.25 mgd with an outstanding wastewater treatment plant
flow commitment of approximately 0.1 mgd.
Water Sewer
Plant Capacity 6.00 mgd 1.232 mgd
A vg. Daily Flow 1.93 mgd 0.890 mgd
Committed Capacity 0.25 mgd 0.100 mgd
Excess Capacity 3.82 mgd 0.242 mdg
Based upon these figures, the Okeechobee Utility Authority will have on or before
December 2006 adequate capacity to serve the proposed demand created by the increased
density of the proposed future land use amendment.
Southern Trace Site
Section 15, Township 37S, Range 35E, Block 11, 12, 21, and 22
City of Okeechobee, FL
Preliminary Storm-water Statement
Prepared 9/29/06
By:
Rudd Jones, P.E. & Associates, P.A.
1905 S. 25th Street, Suite 200
Fort Pierce, FL 34947
772-461-6997
I. Proiect Description:
The referenced project is a 11.29 acre +/- site located in The City of Okeechobee; west
of Highway 441 N, just south of the City Limits Ditch on blocks 11, 12,21, and 22.
II. Soil Conditionsffopography:
According to the USDA Soil Survey of Okeechobee County, the site is made up of only
one soil classification that is hnmokalee Fine Sand.
In natural conditions, Immoka1ee Fine is described as smooth slopes that are slightly
concave or convex and range from 0 to 2% slope and poorly drained sand with a depth to
water table of 0.5 to 1.5 feet from June to September and below 1.5 to 3.5 feet for the
remainder of the year.
Historic improvements in the general vicinity include single family residences to the east,
commercial property to the north, multifamily and agricultural to the west and a FDOT
maintenance yard to the south. Just to the north of this parcel is the City line ditch that
drains to the east into Taylor Creek that is maintained at elevation 13.5. The bottom
elevation of the City Line Ditch is approximately 17.0 which remains dry after rain
events while the average elevation of this parcel is approximately 28.0. We have
obtained soil borings to determine depth to water table and hydraulic conductivity rates.
The soil conditions contained in the report are very similar to the above stated Soil
Survey information.
III. Existing Drainage:
The site currently drains to City Line Ditch via direct sheet-flow and via existing ditches.
These ditches are in the City Right of Way on all sides of these parcels and drain throught
the adjacent ditches to the north into the City Line Ditch.
IV. Proposed Drainage:
The proposed drainage system will be designed to meet all of the applicable water quality
and discharge rate requirements of the City of Okeechobee and the South Florida Water
Management District. These requirements will be met by a combination of wet and/or
dry detention areas designed to meet these requirements. The design of this storm-water
management system will be typical for project's of this type, in this area of the State.
v. Conclusions:
The proposed project will be designed to meet the storm-water requirements of all local,
state and federal agencies with authority to regulate the proposed improvements. Based
on my preliminary evaluation of the site, and in my professional opinion, I find no
unusual circumstances that would preclude the development of this site in such a fashion
as to meet these requirements.
-
.
.
-
.
-
.
.
1375 Jackson Street, Suite 206
Fort Myers, Florida 33901-2845
Phone: 239-334-3366 Fax: 239-334-6384
513ff Report - Site Plan Review
Prepared for
Applicant:
City ofOkeechobee
Curt LundbergfOr InSite Development
Group/Southern Trace
Staff Report
Site Plan Review
Applicant's Name: Curt Lundberg for In Site Development Group
General Information
Owner: InSite Development Group/Curt
Lundberg
Owner Address: Contact: Steve Dobbs, PE
210 NW Park Street; Ste 204
Okeechobee, FL 34972
Owner Phone Number: 863-467-0076
Legal Description of Subject Property:
1. CITY OF OKEECHOBEE LOTS I TO 13 BLOCK 4
2. CITY OF OKEECHOBEE LOTS 14 - 26 BLOCK 4
3. CITY OF OKEECHOBEE LOTS I TO 13 INC BLOCK 13
4. CITY OF OKEECHOBEE LOTS 14 - 26 INC BLOCK 13
5. CITY OF OKEECHOBEE LOTS 1 TO 13 INC BLOCK 20
6. CITY OF OKEECHOBEE LOTS 14 TO 26 BLOCK 20
7. CITY OF OKEECHOBEE LOTS 1 TO 10 INC BLOCK 12
8. CITY OF OKEECHOBEE LOTS 17 TO 26 INC BLOCK 12
9. CITY OF OKEECHOBEE LOTS 11 - 16 BLOCK 12
10. CITY OF OKEECHOBEE LOTS 1 23 BLOCK 21
II. CITY OF OKEECHOBEE LOT 4 & E 25 FT OF LOT 5 BLOCK 21
12. CITY OF OKEECHOBEE LOT 6 & W 25 FT OF LOT 5 BLOCK 2 I
13. CITY OF OKEECHOBEE LOT 7 & E 5 FT OF LOT 8 BLOCK 21
14. CITY OF OKEECHOBEE W 42.5 FT OF I DT 8 & E 32.5 FT OF LOT 9 BLOCK 2 I
15. CITY OF OKEECHOBEE W 15' LOT 9 ALL OF LOT 10 BLOCK 21
16. CITY OF OKEECHOBEE LOTS 17 - 26 BLOCK 21
17. CITY OF OKEECHOBEE LOTS II, 12, 13, 14, 15, & 16 BLOCK 21
18. CITY OF OKEECHOBEE LOTS 1 TO 6 INC BLOCK 11
19. CITY OF OKEECHOBEE LOTS I TO 6 INC BLOCK 22
Discussion:
This is a site plan review of improvements proposed for the Southern Trace project involving
230 multi-family units on 37.73 acres, which is to be developed in two phases.
General Comments:
1. Sec. 82-32 of the LDC requires development proposals to be accompanied by evidence that
environmental studies/inventories have been completed or are not relevant to the property as
pertain to wetlands, soils, unique habitat, endangered species and floodprone areas.
The Applicant has submitted letters from Environmental Services, Inc., the COE and SFWMD
substantiating that there are no jurisdictional wetlands or unique habitat or endangered species on
the site or floodprone area on the site.
2. The Applicant has submitted a "blow-up" of a typical building and its associated access, buffer,
and parking, including dimensions that allows for a better assessment of the proposed design. A
copy of this illustration is attached at the end of this Report.
Staff Report
Site Plan Review
Applicant's Name: Curt Lundberg for InSite Development Group
3. Staff had requested that the Applicant include information as to the distribution of units by
number of bedrooms. This information has not been provided. However, Staff assumes that all
dwelling units will have three or more bedrooms because the number of required parking spaces
shown in the plans has been based on 2.25 spaces per unit.
Public Facilities Concurrency
According to the U.S. Census, the City of Okeechobee averages approximately 2.7 persons per
household (Pph). Thus, the development of this property will include up to 114 dwelling units in Phase
1 and 116 in Phase 2, indicating a potential population of 308 persons in Phase 1, and 313 in Phase 2
for a total population of 621 at build-out.
Potable Water: The adopted LOSS for potable water is 114 gpcpd. The impact for the proposed
development is as follows:
Phase 1: 114 units X 2.7 pph x 114 gpcpd = 35,089 gpd
Phase 2: 116 units x 2.7 pph x 114 gpcpd = 35,705 gpd
Total both phases 70,794 gpd
Sanitary Sewer: The adopted LOSS for sanitary sewer is 130 gpcpd. The impact for the proposed
development is as follows:
Phase 1: 114 units X 2.7 pph x 130 gpcpd = 40,014 gpd
Phase 2: 120 units x 2.7 pph x 130 gpcpd = 40,716 gpd
Total both phases 80,730 gpd
Solid Waste: The adopted LOSS for solid waste is 13 Ibs/person/day. The impacts for the
proposed development is as follows
Phase 1: 114 units X 2.7 pph x 13 lbs/person/day = 4,001 ppd
Phase 2: 116 units x 2.7 pph x 13 Ibs/person/day = 4,072 ppd
Total both phases = 8,073 ppd
Drainage: The proposed development will be required to meet all standards required by the City
ofOkeechobee and the South Florida Water Management District.
Parks & Recreation: The adopted LOSS for parks and recreation is 3 acres/1 ,000 persons. Based
on the estimated population, the minimum acreage requirement for parks and recreation
would be approximately 0.92 acres of recreation for Phase 1 and 0.94 acres for Phase 2, for
a total of 1.86 acres. The Applicant has identified the following areas to be designated for
recreation use:
1. Four small recreation areas in the centers of Blocks 12, 13, 20 and 21, totaling 0.487
acres. In addition, two other larger recreation areas are indicated in the plans:
2. A 0.445 acre parcel located in the northeast part of the project, just north ofNW 13th
Street adjacent to the southwest corner of the propose lake.
2
Staff Report
Site Plan Review
Applicant's Name: Curl Lundberg for InSite Development Group
3. A 0.837 acres parcel located just outside the project on the south side of NW 11 th
Street.
The Applicant has agreed to designate the latter two parcels as dedicated to open
space/recreation in perpetuity. These two areas will be will be maintained by the Applicant,
until the project s turned over to the homeowner/condominium association, at which time
maintenance responsibility will be transferred to homeowner/condominium association.
Provisions guaranteeing the continued availability of these two areas and their maintenance
in a visually pleasing and safe condition are included in the Development Agreement in the
Appendix to this Staff Report.
State Roadways: The Applicant has prepared Traffic Impact Statements that have shown that the
level of traffic on SR 70 and US 441 will not be significant by FDOT standards (i.e., the
traffic added will not exceed 100/0 of that associated with the LOS "C" on these roadways).
The Applicant has agreed, however, to contribute a ""fair share" towards the cost of a traffic
signal at the intersection of US 441 and NW 9th Street. A provision guaranteeing
contribution of said '"fair share" is contained in the Development Agreement in the
Appendix to this Report
Local Roadways: The Applicant will be conducting traffic counts and an assessment of the
impact development of the project will have upon the intersection of NW 9th Street and
NW 9th Avenue. The Applicant has agreed to contribute a '"fair share" towards the cost of
a traffic signal at this intersection. A provision guaranteeing contribution of said "fair
share" is contained in the Developer's Agreement in the Appendix to this Report.
Specific Comparison of Requirements with Applicant's Proposal:
The following table provides a comparison of the applicable standards and requirements of the City's
LDRs and the Applicant's proposal. Deficiencies are highlighted.
COMPARISON OF REQUIREMENTS AND STANDARDS WITH APPLICANT'S PROPOSAL
PHASE 1 PHASE 2
EXISTING PROPOSED EXISTIN G PROPOSED
Land Use MF MF SF MF
Zoning RMF RMF RSFl MF
Existing Uses Vacant Vacant except for 4 single-family units
in block 21
...,
-'
Staff Report
Site Plan Review
Applicant's Name: Curt Lundberg for InSite Development Group
PHASE I PHASE 2
STANDARD REQUIRED/ALLOWED PROPOSED REQUIRED/ALLOWED PROPOSED
Density lO/ac. (4,356 sf/unit)
Block 4 4.845 acres = 48 units 18
Block 13 4.846 acres = 48 units 48
Block 20 4.847 acres = 48 units 48
Block 11 1.085 acres = 10 units 10
Block 12 4.845 acres = 48 units 48
Block 21 4.844 acres = 48 units 48
Block 22 1.085 acres = 10 units 10
Min. Lot Area 10,000 sf 211,050 sf 10,000 sf Smallest is
47,250 sf
Min. Lot Width 100' 670' 100' 315'
Setback
Requirements
Front 25' 53' 25' 53'
Street Side 25' 25-29' 25' 26-28'
Side 20' 28' 20' 23'
Rear 20' NA 20' 36'
: Water Body 20' (block 4) 20' NA NA
Min. Between 40' 40 - 71 ' 40' 40 - 71 '
Buildings
4
Staff Report
Site Plan Review
Applicant's Name: Curt Lundberg for InSite Development Group
PHASE I PHASE 2
STANDARD REQUIRED/ALLOWED PROPOSED REQUIRED/ALLOWED PROPOSED
Max. Lot
Coverage
Block 4 40% 10.6%
Block 13 40% 28.2%
Block 20 40% 28.2%
Block 11 40% 26.0%
Block 12 40% 28.2%
Block 21 40% 28.2%
Block 22 40% 26.0%
Max. Impervious
Area
Block 4 60% 59.6%
Block 13 60% 59.6%
Block 20 60% 59.5%
Block 11 60% 58.7%
Block 12 60% 59.6%
--
Block 21 60% 59.6%
.~ I
Block 22 I 60% 57.9%
~------ -.- _._----~-- - t----- .....- -. .--- --~-- --"-------i
i I
Max. Height 45' 2 stories/25' 45' 2 stories/25' 1
5
Staff Report
Site Plan Review
Applicant's Name: Curt Lundberg for InSite Development Group
PHASE 1 PHASE 2
STANDARD REQUIRED/ALLOWED PROPOSED REQUIRED/ALLOWED PROPOSED
Off-street Parking
Block 4 (18 du's) 41 43
Block 13 (48 du's) 108 116
Block 20 (48 du's) 108 116
Block 11 (10 du's) 23 26
Block 12 (48 du's) 108 116
Block 21 (48 du's) 108 116
Block 22 (10 du's) 23 27
Access Aisle 24' 24' 24' 24'
Off-street Loading
Block 4 0 1
Block 13 1 2
Block 20 1 2
Block 11 0 2
Block 12 1 2
Block 2] ] 12
Block 22 0 0
Buffer 10' along street 10' 10' along street 10'
Sidewalks, Lighting and Landscaping:
Sidewalks: The site plan shows six-foot sidewalks along all public roadways and interconnecting each
of the blocks within the development. What appear to be four-foot sidewalks are also shown connect-
ing parking areas with the residential buildings and connecting these areas with the sidewalks along the
street.
Lighting Plan: The Applicant has submitted a lighting plan.
Landscape Plan: The Applicant has submitted a landscape plan that meets the residential tree
planting requirement of three trees per multi-family dwelling unit with two or more
bedrooms.
Despite the fact that it appears that there will be grass and ground cover in the areas
between the street pavement and the parking areas, the vehicular use areas associated with
the multi-family dwellings will appear as virtually uninterrupted "sea of asphalt". This is in
part due to the fact that the Applicant is providing an excessive amount of parking and
loading spaces. The LDRs require 518 parking spaces, but the site plan shows 560. In
order to break up the expanse of pavement, the Staff suggests that the areas where the
6
Staff Report
Site Plan Review
Applicant's Name: Curl Lundberg for InSite Development Group
Applicant shows six adjacent parking spaces, the number of spaces could be reduced by at
least one, and even possibly two and be replaced with a landscape island with a tree or two.
Further, it would appear that one space on each side of the loading zones could be
converted to landscape islands, thereby assisting in breaking up the expanse of asphalt.
Finally, unless the loading spaces are to be used in association with garbage or trash pickup,
it is unlikely they will be used on a frequent basis and could be paved with grass blocks that
could withstand occasional use without killing the grass.
RECOMMENDATION
Staff recommends that the site plan be approved, with the following conditions:
1. The Department of Community Affairs and Florida Office of Tourism, Trade and Economic
Development (OTTED) have no objection to Small Scale Amendment #07-005-SSA.
2. A Development Agreement is executed incorporating provisions relating to the aforementioned
two recreation areas and "fair share" of transportation related improvements.
3. Design changes are made to the vehicular use areas to break-up the continuous expanse of
paved areas.
Submitted by:
James G. LaRue, AICP
Planning Consultant
September 18, 2007
Technical Review Committee Meeting - September 20,2007
Attachments
7
Staff Report
Site Plan Review
Applicant's Name: Curt Lundberg for InSite Development Group
12 n tt U .f,. ,* t t~ "
21 ZJ :{1 ~~
, ~ :: I
:ti !:i 11 lJ) . il
li&'1~1
tJt44.~~
. ~$ ~n Uti:Jl Z~ zt.2tA~'4
ttW. t3iH STl'tEn
11
!>
1& 1$ ," Iii
;''',1 ~''J-;;
~,4 ;''iJ ~$
~i
. l:t
~ t:"
1 ....
I;:
t:
Q n I~ 9
~ n
j 14
.1
I w
~::~
'~ 1~~i m :.4 :M
i.:J ..<! ;~.
fi
.( r"n~"~~ .' " <~ ~>
\.'"-
"'.,_..:=~.;::;'^_.~~,~ ;f. _.~
8
I
I
I
I
I
L
-..........';
oil E! & I
l~~~~i~
ji.t,d_~.
h11l~m~1
I'" {E j
\"1 \2-1
, C f
!II "I
~ t) {I{
I j
i..~ l
. If j
l ,,;~
i 4,JJJJ~J:
~~ll111~11}
I;HHi1~
i
!
I
5 vl'tlT 1IU1~IIlNG PAllK11'IG CI,l.e..~
3 8~GItOOllt$ PElt IIN1T
5 \/NfTS X 2.25 PARKING SPACES I UNIT
. 12 PARKING Sl"ACES REQUIRED
. 13 PARKING SPACH I'RDI/IOED
6 UNIT BIJI~()IIIG PAIUllllG CALes
3 BEDROOMS nit UNIT
6 UNITS X 2.25 PARKIJW SPACES I UNIT
. 14 PAll.IIInG SPAeaI REQUIIIED
. 14 PARKING SPACES PROVlII1!D
151 0; 151 3D.
~~
GRAPHIC SCALE
I.'~
........--..."\-
~t-
V;.,
;
~'},..~
.
j,~.~
.
;;v
.
I
!
II
I'
,
"
i
i
I
WII DI~IC 3Ul'llfS A-r
p.r.E.31.00
BUIL.DING. UNITS M
>'.F.E.31.CO
," " BOB 0 ~ B B =' .~/ j a "' ~ B B - - B B ". ..
~;4.~ ",....-:"."-:'~'^,..,''''':'',....:'.-.-.,...-;.''''_. "^~:'~"pV""'?:'~~i"::~~"'~:~ $',:',. , l'I'..... ,....._,~l:-~r-~"'~'~...1-~:-1f:'~~~. Xl$
.li" . .'" '"~;,,!,, ":f;;'-fii-~.L.~.:t~;' ;i'lit~~ iq-i\o;l.P~'i-"j;$.J~~ jto!:~.t" r::'.""'~ ....!'Sl1.1~ .<!'t'w~>""~-I"'~~t\~~:! .".~ M'It '~~"", ~~lc':~:~~Wl':'t " K
]'"0 ~ 0')i B B "BB'~; ,clB'~":TI B'fe6~B;~~'"'6'wi'
'---I . ,_I 1- ' '1
.. t 1~ 1"P. t. ..,"r .,.,., ."" I
j (. I ~! .. , ,'1 ,< "I" 't " ,
~" ''''I JI :~ - . <I T 1:-1
~,"~~WLft':0J2-;::Z:~j' ::t------='7';7;':'.,~O;= J:'l'f
,,~;;:.
i !1
1 ji
10
". I Ml:Y,\,J\~'N,': t~'.H ~!. t~ ~""".
11 ..._.......,~
~ 11 d 1tlis
-- :tM~ I
Bj " .~
i~ l~t,\
~'~:T:~;Z;<}::<;.'?;: :: ~ it!{
I!
:~:),42 si
~I
i~l
......................-.,~ d~1 ;l
101)/
~9~1 <(
. Iii
~ts.tw irE ~I Q
1M< !Qal i
x llI>i !2
.. t. o! II:
iff! C
..
.Zt
~61
i'il
...~
~l
"",1b.;~
iUr
, "..1....
.... ...,..
~ ,:,4
:>~>,,;~.)
:..ll<'"
l"i,fI;"'l
...'V'-
.
(-..,w
_.~V"..
,.--v.....
...-........''-w
,
...,11
:.""...':;1";
.
i;',."..
"U"U_'~R'_~'_'~",~""~C'''''''-''--'. ....,
"" -"\
\,
.
:r..W
"::..: ................mri'H""~..
TYPICAL LAYOUT AND GRADING DETAIL
"".,m,,,_._,_,'__~"'''''''''''''''''''''' .. '.'."m_'.._._..__"__....,,'~"'.........,,....~_.._.~...............""""'............,.....~'----
APPENDIX -
DRAFT DEVELOPMENT AGREEMENT
Following is a draft development agreement for incorporating the
applicant's fair share contribution for transportation improvements and
open space/recreation obligations associated with the project. The
sections that address the substance of the above topics have been
highligl1ted. The balance of the agreement contains the more or less
standard provisions of such an agreement. Of course, the entirety of the
agreement will need to be reviewed for legal sufficiency.
~ldll 1"\t::I-'Ull
Site Plan Review
Applicant's Name: Curt Lundberg for InSite Development Group
SOUTHERN TRACE DEVELOPMENT AGREEMENT
This Development Agreement is entered into this day of _, 2007 by and between the
City of Okeechobee, a municipal corporation under the laws of the State of Florida, having its principal
office at 55 S.E. 3rd Avenue, Okeechobee, Florida 34974 hereinafter ("City"); and InSite Development
Group/Curt Lundsberg, a Florida Corporation, hereinafter ("Developer"), a Florida corporation, whose
address is
WHEREAS, the City of Okeechobee is authorized to enter into a Development Agreement
to promote certainty in the development approval process, strengthen the public planning process,
encourage sound capital improvement planning and financing, assist in ensuring that there are adequate
capital facilities for the development, encourage private participation in comprehensive planning, and
reduce the economic costs of development; and
WHEREAS, the Developer owns a 37.73 acre development located in [insert Section,
Township, and Range in Okeechobee, Florida, legally described on the attached Exhibit <<A", on which
the developer intends to develop a multi-family residential project known as Southern Trace
(hereinafter '<Property"); and
WHEREAS, the City acknowledges that the proposed development of the property will
benefit the City's residents and is an appropriate use of the property; and
WHEREAS, the Parties wish to establish by agreement the terms under which the property
may be developed; and
NOW, THEREFORE, in consideration of the covenants and conditions contained herein and
of benefits accrued to each party, the City and Developer agree as follows:
I. Recitals. The foregoing recitals are assumed correct and are hereby incorporated herein by
reference. All exhibits to this Agreement are hereby deemed a part hereof.
2. Property Subject to this Agreement. The property described on the attached Exhibit <<A" is
subject to this Agreement.
3. Ownership. InSite Development Group/Curt Lundberg, a Florida Corporation, represents that it
is the fee owner of the property and as such may lawfully enter into this Agreement.
4. Consistency with the City's Comprehensive Plan. Concurrent with the effective date of this
Agreement, the property is proceeding through a Future Land Use Map Amendment to
redesignate the Property from Single Family to Multi-Family. Subject to and upon adoption of
said Amendment by the City, the development permitted by this Agreement will be consistent
with the City's comprehensive plan.
5. Consistency with the City's Land Development Regulations. The property is currently zoned
RSFl. Upon the effective adoption of the rezoning to RMF, this Agreement shall entitle the
Developer to develop on the property all uses permitted by right in the RMF Zoning District.
6. Development of the Property. The Developer has prepared site plan which demonstrates the
1
Staff Report
Site Plan Review
Applicant's Name: Curt Lundberg for InSite Development Group
Developer's design of the overall project and which has been approved by the Technical
Review Committee (TRC) Developer agrees that final development will be in substantial
compliance with the approved site plan as attached hereto as Exhibit "B".
7. Development Obligations. In consideration of this Development Agreementandtoassure that
the change in the Comprehensive Plan.. classification is suitable, the Developer hereby
volunt(trily contributes and the. City of Okeechobee accepts, the following terms for
development.
a. Transportation Obligations. To miti
the City's transportation network,
transportation network by making a voluntary.
cts of the development of the property on
agreed to enhance the City's
n to the City.
(1) Prior. to the issuance of building permits, at the rate in.effectatthat time, the
Developer shall pay to the City within sixty (60) days.oLthe appr(}valand complete
execution of this Agreement, a VplUlltary.coIltributionmi]l an amQunt equal to its
proportional share of all c(}stsassQciatedwiththe installatiQn ofa traffic signal.ateach
ofthe following intersections:
'NW 9th Street and US 441
NW 9th Street and NW 9th Avenue.
(a) The amount of this monetary contribution for each traffic signal shall be
computed in the following manner:
The Developer's "fair share" shall be equal to the percentage of the estimated
cost of the traffic signal that results from traffic volume generated by the
development at build-out being<divided by the total traffic volume deemed
necessary to warrant the need for a traffic signal at the intersection.
(b) The City shall deposit the calculated "fair share" monetary contribution into an
interest bearing account until such time as the need for the signal is warranted.
(c) If a signal is determined to be not warranted, or the signal is not installed by the
City, within "X" years of the build-out of the project, the monetary contribution
and all accrued interest will be returned to the developer.
b. Open SpacelRecreation Obligations.
(1) The Developer shall ensure that the two park areas shown on the site plan shall be, in
perpetuity, dedicated to open space/recreation use available for use by the general
public and that there shall be no signs posted limiting accessibility to said parks to
residents of the project.
(2) The Developer shall maintain said parks in a clean, visually pleasing and safe
condition until such time as the maintenance responsibility is transferred to the
homeowner/condominium association with.a provision in the. agreement requiring the
continued maintenance by the homeowner/condominium association in perpetuity.
2
Staff Report
Site Plan Review
Applicant's Name: Curt Lundberg for In Site Development Group
8. Vested Rights. If the Developer fulfills its obligations for the voluntary contribution for
transportation impacts and voluntary allocation and continued maintenance of open
space/recreation lands, the project shall be deemed concurrent as to transportation and recrea-
tion/open space and shall have no other obligations under the City's Concurrency Management
Plan as to transportation facilities or recreation/open space facilities.
9. Applicable Land Use Regulations. Pursuant to Florida Statutes S163.3223, development within
the property shall be subject to the City's land development regulations and policies governing
development at the time the Agreement is executed by the City, except as may be modified by
the Agreement. The City may apply subsequently adopted regulations and policies only in
accordance with that Statute. The failure of this Agreement to address a particular permit,
condition, term or restriction shall not relieve the Developer of the necessity of complying with
the law governing said permitting requirements, conditions, terms or restriction.
10. Duration of Agreement. This Agreement shall remain in full force and effect for ten (10) years
from its effective date unless terminated earlier as provided in this Agreement. The duration of
this Agreement may be extended with the Party's mutual consent in accordance with Florida
Statutes SI63.3229. However, the termination of this Developer's Agreement shall not affect
the zoning or uses on those portions of the Property if any portion of the Property has been
improved or if any portion of the Development has been constructed.
11. Amendments and Termination. This Agreement may only be amended or terminated with the
Party's mutual consent.
12. Notices. All notices required are permitted under this Agreement shall be in writing and shall
be mailed by certified mail, return receipt requested to the following addresses or to other such
persons or addresses as any Party may designate from time-to-time in writing.
If to the Developer:
If to the City:
City of Okeechobee
13. Remedies. Any material breach of this Agreement may be enforced by either Party as against
the other in an appropriate action in law or equity filed in a Court of competent jurisdiction;
provided, however, no such action may be brought until the defaulting Party has been given
notice and thirty (30) days in which to cure the default. If the default cannot be reasonably
cured within the thirty (30) day period, such period shall be extended if the cure is commenced
within such thirty (30) days and the defaulting Party is proceeding with due diligence for such
period of time reasonably required to complete the cure.
14. Governing Law. This Agreement shall be construed and interpreted according to the laws of
the State of Florida, and venue with respect to any litigation between the Parties related to this
Agreement shall be exclusively in Okeechobee County, Florida.
15. Severability. If any part, term, or provision of this Agreement is held to be illegal, void, or
..,
.)
Staff Report
Site Plan Review
Applicant's Name: Curt Lundberg for InSite Development Group
unenforceable, the remaining portions or provisions of this Agreement shall not be affected or
impaired. Each remaining provision shall remain in full force and effect and the rights and
obligations of the Parties shall be construed and enforced as if the Agreement did not contain
the particular part, term or provision held to be invalid.
16. Entire Agreement. This Agreement embodies the whole Agreement of the Parties. There are
no promises, terms, conditions, or obligations other than those contained herein; and this
Agreement shall supersede all previous communications, representations, or agreements, either
verbal or written, regarding the development of the property between the Parties.
17. Conflicts of Law. If State or Federal laws are enacted subsequent to the execution of this
Agreement which are applicable to and preclude either Party's compliance with the terms of
this Agreement, this Agreement shall be modified as is necessary to comply with the relevant
state or federal laws.
18. Covenants Running with the Land, its Successors and Assigns. The obligations imposed and
entitlements created pursuant to this Agreement shall run with and bind the property as
covenants running with the land, and this Agreement shall be binding upon and enforceable by
and against the Parties hereto, their personal representatives, heirs, successors, grantees and
assIgns.
19. Effective Date. This Agreement shall become effective upon the effective date of the City's
comprehensive plan amendment designating the property as Multi-Family on the City's Future
Land Use Map of the City's comprehensive plan.
IN WITNESS WHEREOF, the Parties hereto have hereunto set their hands and seals the day
and year first above written.
4
City of Okeechobee
55 Southeast 3rd Avenue
Okeechobee, Florida 34974
Phone: (863) 763-3372 Fax (863) 763-1686
RECEIVED AUG 2 1 2007
#lJ1-ol{J-/!l~
Application for Site Plan Review
Name of Project: -g) d Lt1Jk e .I-km~ (.t:?u f /Jf c5~VI 'aJ 1/lJ ( .
Applicant: MIA~ ll1VVV'nv-7 N/J (2M())/;V Property Owner: rrJii/!:ttzJJmiftJ AI~),h<! &:;;;;ft'
Description of project: . "vfh1 ^ PrIL- t. ~ I - -~
tJll/L-i IftJrr1It- fl::-e#/IJ
~-
Proposed use(s) for the entire building: ~
6{jpC-i<-
Number/description of phases:
plY t5 -
Location of/Directions to the project: b f 8 tV IS :J~ ~ .
01,( e..~ dw b~t I PC - '3 (.,'/ q 1 2
Existing improvements on property: ~ 1~IUd w-.
Is proposed use different from existing or prior use? ( ~es) (_No) (_N/A)
Total Land area in square feet: 14 O{JOS i F
or acres:
Existing impervious surface: 1 'R 8 f} 9ffF square feet [J,0'67acres (J1. 3 % of site
Additional impervious surface:
square feet
acres
% of site
Proposed total impervious surface
square feet
acres
% of site
Source of Potable Water: e.;, J-rJ wtJii Method of sewage disposal: fJeffJl-- lttdk
Current zoning: tvYnM (/(<..cv( tP&rrent Future Land Use: C-bY1J.rrlJ2I(?f4~.
Parcel identification number:
3 -- /5-.- '3 7 - 3 $""", 00/ t1 - tJd 76>0.- D G :>"0
RE CEJVED AUG 2 1 2007
-# D7 -01 D~ rife-
Application for Site Plan Review Page 2
Name of project: ~ '0 Ui{,~ /-frIwIR..- !/e?J;% geuJ r'cVl /#C
Applicant: m/;Jtt:;.~ fJJ-'lt:J I2-U1> D I,LJ
Address: _~~X'-- L1 L1 8 .
of Lee ~I F[~. 3?ftJ15
Phone: l1b3> --- /:;(0 --/l/o L( Fax: J63 - 763 - (; 617.
Other phone: ?63 ~ l/f 6 7- CP117
Contact Person: rn 1,/I//lR//lY77Vl~ ~P/LkllJ j) / d
Address: Ie 0 /30 Y- - vI lrl g- . / NG.e-~ t4--rb.e:-.e: R--3t/j?j
Phone: ~6?- &/0- /LloC--( Fax: !Jb3 -1-63--6&//_
Other phone: il b 3> ~ Lf b 7 ---- / C;; 7 7-
Property Owner: It ~ m. '5 - It jfH-; tire! L-L- L- .
Address' _~~&5"J L;<.j..1:t.t !Vih~ hilh/-€-. 'UUq.
~ 111-- rW) C'< f if t F L- - 3 '1'110
Phone: f 63 -- b !()/ jCjo L( Fax: ~6.3.- 76 j - 0> G 17-
Engineer: /T;urmtt5 Jr' ()1/f-K'ytJet( ,Ill. p, f [upper
Address: i3 Vi l(lp 1vld il /)
"';.f){(~ /)V OOZe P L ~ 3 3 D ,)- 3 _
Phone: ()<;I(- r'11-&o31 Fax: 7fLf- qG.! - 303)
- /1 .~ ' ,/,1.-"
Surveyor: I yq/A,e~)/Vs.:; 1'/(.-\ i 5-.f/rt-udV.-hv/Cc.d" /A-'2:::.
/
Address: 3-0?! '.Y 01 ~ t'~ M~,
{JT~?c-t'1.-(,~ I PL. J i-? 17[;
Phone: f.:& 3. 76'3 -;L['[> J-- Fax:
I~_J
I--
I
I
r~
, I
I 1
I
CONSULTING ENGINEER
THOMAS H. MAXWELL JR., P.E.
lE
116
[~~-
--i- - ~--
I
~
...v. f. ~: r:::;'[ E ~
~~j
.'
C'~
~
i~ ,.
u ~~
~~ d
~~n i~
8~~11 ;,
HI! !j
~"'! I,
...:111 .;
r.,..... ! It..
~:1.i ,I
t:~..l !!l~
i:~ I~
liB 1l
J:\
::i
i...i
<:
1-1--
I
w
0..:
NI
LOCATION MAP
NTS
PARKING PLAN
BIG LAKE HOME HEALTH OFFICE
608 N.E. 2 AVENUE
OKEECHOBEE, FLORIDA
LEGAL DESCRIPTION:
LOTS 3. 4. 5 AND 5. 5LOCK 16, CITY OF DKEECIlOBEE.
ACCORDING TOlIjE PlAT THEREOF AS RECORIlED IN
PlATBOOK5, PAGf 5. OF THE PUSUC RECORDS OF
DKEECHOBEE COUNlY, R.DRIDA
w
0 5
z [
~ 0 ~
.. ~ ~
f- ~w~
:J
~ r:>~
~aiw
CI ~~~
z ~~6
"
[( 2W
<( m;~
..
-
~_ SItI[lQJl
tC:ll
~~O1
1/4
Urban Planner * Design Consultant. Inc.
CONSULTANT AND DRAfTING SERVICES
13l1RaMlldRolll,/ioIt:fllIOcld.A.3X123
F'l'rra~Fu:954-B613l3&
---
C
L_ '
___ _ _____ _ ___ - r-- - r- -
\
~------~-- ~---
~ ___n__ ---- ~--_.- -,- - ---- --
~
SIO ~
Y'~ F
~: z
, '3
$.10 '9\
~~
=l~ ,..-.:
'i~ (tlOi.
~;; t:
00;: '!."
~~ ~;
M;;\ ..,~
~~ ~'t
t~ 0
~c: <;l
:J ~
~.'" 'i'
\
I
\~~;
\:>1
\<5
\~~
\~
\ffi
\1!::
\~
\ \~
\ \
;;
%~ g~ ~~ 3o~
~~
t;! g~ ~~~
'i'" ~~ ';;0':'
> It'"
o~ ~@'&
~ b ~--,-
c.QZ~ ~~~
~~ . "$,<p,~ .,..'i';.
~~ ;e% ~~~ ~~n
"'" 'i~ t~,\
'" ~~'"
~" "g ~~~ ,\,02
~~ ~;,~ ag~
'i'A~ ~~~
il\li "'~ ~~~
~~ ;ij~ 1\
cl'Y'V' l\
W,% ~~~ ~'<
~J '!'t-:1';;o, , >~
~..\::C €.~
~~ ,,'-" -, ~~
~<; ~ ~~
~1 g~ '$~
0 \1 '"
'" , , '&~
-~-_.- - -- -----------------
Ci;o"\U; ;~;:;-;~::~'\
\1 ;~ \~ ~~~ ~\t "3 \
\0 IS,OP~ \'i".<;.~\
\ ~~ Is:: ~ ",,% 9> \
%~ \~ t1~~ ?"; I
\ ~f: \~ '2,f:~ \
\ ~~ IG'> "'"Q.h \
I % ~~g \
\ @ :~$ \
\;:; ~~~ \
\ ~ ~;;:;.-g \
'I 'I :~ ~,,~ \
\ \l 't'"~" \
\! ~~ j;F.~ \
\" "'~ >~ \
I ~ ~% \~t
\ ~ ~~ \
\ ~ \
L---------------~.-~
-0
~
'="
-
-z.
G")
(/)
n
ffi
~
-0
,
\~
\
\
\
\~
\ ul
\'"
\ .
\ n
,,' ,'_ _____ _----- ___ _---' ______ - _' _________----------- /_______ ___ - __-1,-
\-\\\\i\
\ \111," \
\ 't\\ \
I J;;t I
\~j
,--- - '
\ \::~~~~.::'~\
~o \, "N 2i3;.~~':1
.. \'" II" _ \ -\ ,- ---- -- ,--.-- \1 1
"'I~ 1\ \<- ~'0' \1\---'\\ - Qtr-\~ --1\\\1
\g '\ '" ':,~ I \ II .\' ~\ \\1
I~ I' ",' < __,,, ' '\\---",,---,,- ,)1./ .,1
~ I \ -,,1\ ii" '"," ' <-- ,-,~--~----- '\
II:'. \ ~\0'r '1 \\".:>-- --, \
'" \' ,'ii' I, \ \ - "- -~,-------:--- --------- - , '
\! \ ,~'~L, I <..\~!F\='\~ :.~~\\ :;1~~~ -~~,~\
\'i ' ,"" --,- /A ,-' \\\\~\
\~ ' \ <90",-.. ~,< <i\\.,L""",lJ,,<~ ~l\
_\. ~~~c-'-------------\\ \
~ ,----- --<---'" -- -----------'\ \
__...____n \_-
\
!'
\
\
\
\
\
\ ~
\\\
,,\~
\ \~
\ \i
\ \0
\ \~
\
I
\
I
\
I
\
\--
-,,~.--'. ----
- -------------.. -- --------- .------------.-
j\ i
,\i
..
..
\------------------- -------"-
\
\ --- - ~----
\ '"
\ (:
\
\ -
\ \"0
I'"
If
I~
\'"
if
I;;:'
\m
\~
\ \t
I~
\
\
\ ----
\
~~
\!r"";o~J:.~ .~.f'~.?.r~t.;'~ .n'"
~~
CONSUL T\NG ENGINEER
THOMe.s H. MMV'lELL JR.. p.E.
,J.~k1*:
.'-W!t~~
...-..-...
~ ~ ~ \,~~'i& 'l
-\> .\"~\
~ \
"ARKING LA'<OU' "LAN
-~>!:'!:!'.':""'....~
~:';;'-fUlI'II"'.-n
\~
----
......oou,.._""",.,.fc>!"e......,....,""".......""OI"t.."'Ofmf'
".P,"'<<'\' ""'" ""MoO""...w ~" .,.. "'~ ..,. "E_"'~<>
-
l~---
k
-...J
':f
::t
~
Vj
"{
wpP
\;
~,
~
if)
------ --~
I WOOD FRAM[ ~ ' I
i ~/~ ~\ \
I
~
, I
CJl
\Cii
llj I
L
:-:::-- \
TO BE I
ABANDONED i I' \
~~~Ji
35.0' --~~~7'
i I~l
.. \\~\
LJ
..
.... i
I
-t
_L/- ,-
....
-------_.~
1. Tap par/ion of lip 25 &: 26 sholl hove reflective plue
background with white renective symbOJ and btJrder,
2. Bottom portion shoji hove 0 reflective white background with
bJoclc: opaque legend and bord~r_
J FTP 25 &: 26 moy be fabricated on Me pane! or two.
4. Height shall be 7' measured from the ground or sidewalk to
the bat/am of "permit onJy" sign or 6' tothe bottom of
~.s250 fine ~ sign.
SIGN
CONCRm
"'r STOr 1
I i
:1 i
Ii.
j ! ~
\ \ J
\ I
\ i i
1-12'-+ i
, I I
<t
A.D.A. PARKiNG DETAIL
-~--~.~-
I ~- -~~~---!
: I
""""",,__:"'ONC.\
~HoP ;'"ASPflAl!-. s:,,~Pt'~ \
SUlfr~CE :::DtlR~E \ ~
~~--A-;1
~=Till'i,ill~~llI~ill~~ill~ \ U~Ul~m~1
I \
PROP_ 5' LIJ./EROCK IlASE
a.uRSfAT9d%COMPACTlOI; 1
._,_-~,---~J
ASPHALT PAVING DETAIL
N.T.S.
-,
I~-.--
,
I
I
Site Data:
.~~,",-~~~.._--=-,--,--.,-------,=.,~
TctIlSleAnl
14,oouS.F. OJ11G 100'10
--"" 3,393s.F. ,""1<.
- ......, Q.rn2JG
....- 1,G55S.F, ....71<.
..... 3125.F ....1<.
TatlIlJIeMaUIInI lG,6G1S.F. ..,.1<.
Eldllllnt zonlnt: Commercial
Future Land Ute: Commercial
c---I
Build!!:1JLQ.at~~~~_~~
Hame HIIIth 0I'b sp.: 916 Sol'.
T"'_
_S.F.
Par~!!'.9:
tfcIIMHlllthOlbspKr.
966S.F. X lSpppe300S.f.rltIoor~ .4~
TotII NuI!lWrAP\Ir'dIlII Sf*8~: ~
TablNul\IIW~~ScJIce5i'l'lWkW:5
Nc:iI:1SJ*11tllMAJ)J..QlmIlIIIrtln~wltbA.DA~i
\
L---..------.-- ..-.j
l_
~_.~---_..- ~~--- ~ _.~----. ---------
PARKING PLAN
:5/16' 0:"
,.".
1.0....
I'
,: "
.
Gl
.'"
1.....
,....
"'...
U
E
..;11 '0
h :1
~~ll 11
inU i~
U lIt "
~~Jh i;
~~Ri II
~~r i~
~B i:
.e ~~
:>
UJ
0..
o:::ci
UJ,
UJ...l
~...l
~UJ
Z3
UJ)(
~<1
zI: ..
-I- . "~~lfil
...lX-I: Ei'
~(/) ~,!
(/)<1 !
ZI:
00
Ux
I-
z I i
5
D. i I
...
:J
~ III
C)
z ~;
;z
'"
'" II
D.
-
',,,"","
~-
""
!IIl-\l-IIJ
...'"
3/4
Ii
I I
i I
I I
I I
I
I
I
I
I
I
'-
~
~
~
'is
~
S
l
I
~----
I
fDGE iJL ASPHALT
. '-' ~' -;
~
;;
235'
;.,
"
"
'"
~
WOOD
rRAM[
SHED
WPP
I
~ i CONCRf"c ~
J : ~
(1 '~~ ~I
~ [1' :, '~,:,' 'Yf~,
(; ONrr?ET.
~ ' ~
!
I
25.9
__ .. f
235'
~~-<
DRilt[ I
~
35.0' -~--
I
CONC/?t TF
WATEH~ (
M[Tf~ ~\ 1
t~__~
if
~
Q
'"'
"
G
~
S
--~
---~I
I
I
I
I
I
I ",I
I .,~ I
I
I
I
I
I
I
I
I
SEPTIC
rANK
-~<!J ;
"
"
"
co
...i
-I
C,
\ci
'"
J.9'
"
''i
'")
v
DEMOLITION PLAN
3/3Z':I'
l, THE D'Effi1\T1CH COlmu.tTO!l. SKlLL toMPlY Wl1ll TIE FLflRlOA BulLDlMG CODE.
COOl AND All OTHER API'l.ICABlf Hl.tlIClPAL, STATE AtfJ FEOEJW. RE6l.UTIC.NS.
li..'!!i~~~~,~"t.'meANYfi!1!!l\I,T'1Ir,
til~E~!M~~~Vlb:L9fcifiM?T1~BE~i'iD'~
~~t2.~w~I~!F~1:l~~~~~~,RESlllfHT
~r~~~CTRllli""CES, UGtmNG, ClIICIUIT, Eft. """"HOlT,
~m'!L~~~T"G""AlRC"""''''''
~~?' w.""""" U>ES."'THE INrulOR""
fNJlmllH~~~HTll M PHASED NEW CONSTRUCTIOH AS
~'4.Dlf'!l""c'IiII'lill'fli.N'~""T"""
~~I~mf~lTItN ACTlYlTJES TO MAINTAIN THE 'PRV-lN" aJrIDITllli OF M
~~Jf~~iIR"iIi"lWJM""'';!ll~~'i~~G
'-
-.0
~
i:\
,
'is
~
S
l_lJ
'" ., I
'--..J
<: I
L-l1 i~'
, ,
-- :::
~ i~
Q;
'-
~
~ ~
i~ 1:
Q
;:. IJ-,
"
C
()
d
j
I
I
L-
I
I
I
I
SITE PLAN
3/3,':/'
WPP
'0
fD(f_QC,ASPHAl T
"l
"
"I
='0 ~I
I '^i) 6-
i~
... ...
.. ..
iiiJ
I,
I,
_~._._1l..___.__.____
SITE PLAN NOTES:
1] SUBJECT TO CUENT AND PERMITTlNG AGENCY APPROVAL
2) CONTRACTOR IS TO VERIFY SETBACKSINJ LOCATI().I OF
EXISTINGUTlLITIES
:>) HO\lSE. OlhlENSIONS SHOWN MAY BE. APPROXlMllTE REFER TO
~PROVED BUILDING PlANS FOR CONSlRl.ICTKlol DIMENSIONS
4) THE ElEVATlONS SHOWN ARE 6AS&l ON.o.N ASSUMED OA.11.JM
OF 100-00 FEET.
4) THE B...EVATIONS SHOWN ARE &t.5EO ON THE NATIONAL
GEOOETlCVERTlCI\l DATUM OF 1929 [NGVO 1929)
5)PUBlICWATERSUPPLVISAVAlLABLE.
c,
'"
"'
PROJECi SPECIFIC NOTES:
1) UNLESS SHOWN 0T1iERWISE. All DIMENSIONS ARE PlAT(p)AND
MEASUREO(M).
2} SI1EAOlJRESS: lllIIl N.E. 2N>AVENUE.
3jPAACELIO::).-15-31-36-QQ1lJ..OO18l-Oll5ll.
4) THE DESCRIPTION SHOWN ~RECHWASPROVIOEDBYTHE
CUENTORTHE CLJENT'S REPRESENTATIVE.
~) IlEAAING REFERENCE( PROVIDED ay SURVEYOR HIRED BY
OYl"lER~ THE t<<lRTH UNE CI' BLOCK 78 IS TAKEN TO BOO
NORTH 89'4TJ8" EAST.
8} F .1.1iM. ZONE.: ZONE UNOE'TERMINED, PARCEl lies wmllN nle
OKEECHOBEE CfT'( UMITS.
1jnllSPLANISNOfINTENOEOTQOEPlCT JURISDICTIONAL
AREAS OR011iERAAEASOf lOCAI.~.
8} THE PLMl DEPICTEO HERE IS NOT COVERED ay PROFESSIONAl.
LIABJUTY IWSUJiANCE. ADOn-1ONS OR DE1.ETIONS TO PlAN OR
REPORTS BY aTHER 1HAH THE SJGNING PARTY OR PAlUIES IS
PROHIBITED WI1liOUT WRITTEN CONSENT 01' THl:; SIGNING PARTY
DRPARTlES.
I
[]
Ii
E
i!11 .
-Q ;~
4!~ /:!
!~111 I:
~ol' .!
., I is
,I
~~Il !:
~~!I ,I
,,~ I~
iL~ i~
:iB ,;
.n
~
W
c...
oc~
W"J
W...J
~...J ~
e"W
Z~
Wx
e,,<(
Z~
j:::'
...JI
=>(J)
(J)<(
Z~
00
UI
I-
w
o 1!
~ ~ ~
~ i!: ~
:) ~w~
50)- J:,,~
Wili~
::E):ui
(!) ~<>>l
Z wNO
~ ~~@
0: mg~
-
u. ~ aul
""'"
-1_~
..n
~,IJJ
2/4
LaRue Planning &
Mana ement Services, Inc.
1375 Jackson Street, Suite 206
Fort Myers, Florida 33901-2845
Phone: 239-334-3366 Fax: 239-334-6384
Staff Report - Site Plan Review
';",'.
Prepared for: City of Okeechobee
Applicant: 07-010- TRC Big Lake Home Health Services,
Inc. Muhammad Nooruddin (AMSA Holdings)
City of Okeechobee
Site Plan Review
Applicant: 07-01Q-TRC Big Lake Home Health Services
--
Appl'iq~~!~ai;m:~mlDef~;".
il_.~"~';t"'i+",'",
A.rvI;S.A,HPI~if1Q~~;,bI4C '
Ownet,~;ph<>rf~NprnQar: '
Legal Description:
Lots 5 and 6, Block 78, City of Okeechobee, Okeechobee County,
Florida.
Discussion:
This is a site plan review for a parking lot for a 966 square foot home health care office at
608 NE 2nd Avenue (lots 5 and 6 of the above referenced property). This property was
recently approved for a Small Plan Amendment from Single-Family to Commercial and a
rezoning from RSF-l to CPO.
Findings:
Existing Proposed
-
Land Use S ingle- famil y residence Home Health Care Office
Future Land Use Map Commercial Commercial
Zoning CPO CPO
IX ,.., X ',; :R~quired Pro "d d
.:.,:Yle
. :.,-- "". ,
Density NA NA
Min Lot Area 6,250 sf 14,000 sf
Min Lot Width 50 feet 100 feet
Setback Requirements
Front 20 feet to buildings, 10 feet The setback of the existing
to parking building from NE 2nd A venue is
12' and is nonconforming.
The first parking space is set
back only about 2.5 feet.
Sides 8 feet, 20 feet abutting Existing setbacks exceed
residential. requirements.
Rear 10 feet, 20 feet abutting Existing setbacks exceed
residential. requirements.
Max Lot Coverage 50% 9.5%%
2
City of Okeechobee
Site Plan Review
Applicant: 07-010- TRC Big Lake Home Health Services
Max Imperv. Surface
Maximum Height
Parking
Number of spaces
Landscaping
Parking Area
60%
45 feet
24.2%
I-story building
1 per 300 sf = 4
4 including one handicapped
18 sf feet! space = 72 sf
150 sf landscaped island.
1 tree/72 sf landscaped
area = 1 tree
3 trees
Buffer
10 feet along street frontage
2 feet on other property lines
Required buffers are as
follows:
NE 2nd Av. buffer =
NE 7th 51. buffer =
South buffer =
East buffer =
Total buffers =
1,400 sf
1,000 sf
200 sf
280 sf
2,880 sf
10 trees and 29 shrubs are
needed on the basis of 1 tree
and 3 shrubs per 300 sf of
re uired buffer area.
Comments:
There appears to be some conflicting information. The surveys depict the subject
property as lots 3 - 6; the Parking Layout Plan shows only lot 6; and the application
refers to an area of 14,000 square feet. If the subject property contains 14,000 square
feet, it would have to include the combination of lots 5 and 6. It also appears that the
existing structure intrudes into lot 6. This is indicated by the fact that the existing front
setback of 11.5 feet and the depth of the building (44.33 feet) total to more than the
platted 50 foot lot.
Staff believes that the proposed use should be attributable to the combination of lots 5
and 6 so that the parking could be moved eastward sufficiently to accommodate the
required 10' setback and buffer from NE 2nd A venue.
3
Glty ot OKeechobee
Site Plan Review
Applicant: 07-010-TRC Big Lake Home Health Services
Recommendations:
Staff recommends that the site plan be modified by moving the parking area further east
to accommodate the required 10- foot setback from NE 2nd Avenue, and that appropriate
landscaping be provided in all required buffers as set forth in Sections 90-534 and 90-
535.
Submitted by:
James G. LaRue, AICP
Planning Consultant
September 19, 2007
Technical Review Committee Meeting of September 20,2007
Attachments
4
BIG LJl..KE HOME HEALTH CARE SITE
AND SURROUNDING ZONING
a:::
,._-">>>>>>->>>>>>,-_.....<iJ,._,,,-
.~
ZONING
_CHV
CLT
_CPO
INO
RMF
RSF1
["'->>>"'1
'.
200
I
({)
o
200
400 Feet
I
CIty ot UKeecnot:>ee
Site Plan Review
Applicant: 07-010-TRC Big Lake Home Health Services
Okeechobee County Property Appraiser
\il/,C, ';B~!!" ShEerm3n. erA, Okee('hobee" FiOfid.;. 863,7EG-4422
ARCE L: 3-15-31-35-0010-tJ0180-tJ050 HX - SINGLE FAM
CITY OF Ol<EECHb13EELotS3 4 5 &6 BLOCK78
Name:WELDER WILUAM S LandVal
Site: !"O8 NE2ND AVE. Okeechobee 81dgVal
%A M SA HOLDIN GS LLC .ApprVal
Mail: 005 SIl\f UGHTHOU SE DRIVE J""tVal
PALM CITY, FL34:loo Assd
S al es 2/1612]07 $160.000.0011 Q Exm pt
lofO 11/1/1994 $0.0011 U Ta><able
1CV1/1991 ro,OOl1 U
$72.000 .00
$41,101,00
$118,219,00
$118,219,00
$56.691 .00
$25.000.00
$41,691.00
\'-TI
;",,:,,1'i
~#
-. f~~<,," !
This informaiioo. Last U pdaiEd: 9/1012]07. ",,1>> derived from data which was compile,d by the 0< eechobee Count.; Property Appraisefs
Office solely for the governmental purpose of properllt assessment, This information should not be relied upon by anyone as a
determination of the ownership of property or market value, No warr anties. expressed or implted. are provided for the accuracy at the data
herein. ifs use, or ifs interpretation, Although itis periodically updated, thts: infOrmation ma>f not reflectthe data currently on tile in the
Property Apprats: er's office. The assessed v..lues are NOT certified values an d therefore are subject to change before being finalized for ad
valorem ass essment purposes,
6
City of 0 keechobee
General Services Department
55 SE 3rd Avenue
Okeechobee, FL 34974
Phone: 863-763-3372 ext. 218
Fax: 863-763-1686
e-mail: .bcIement@cityofokeechobee.com
Date:
Application No. (j 1-()09'~mL-.
,
Fee Paid: <( 30 . Lf)
Hearing Date:
APPLICATION FOR SITE PLAN REVIEW
Name of Project: Bass Okeechobee Funeral Home & Crematory
ApplicantFamily Heritage Holdings. LLC Property Qwner:Family Heritage
Holdings. LLC
Description of project including all proposed uses: Proiect consists of a proposed
Funeral Home and associated vehicular use
Number/description of phases: This is phase 2 of a previously planned 2 phase
development
Location of/Directions to the project: Proiect is on the southeast corner of the
intersection of U.S. 441 and NW 13th Street
Existing improvements on property: Phase 1 was completed in 2001 which
consisted of 6.661 sqft of commercial use and associated vehicular use.
Is proposed use different from existing or prior use? L Yes) QtNo) LN/A)
Total Land area in square feet: 67.554 sqft or acres:1.55 Acres
Existing impervious surface: 22.968 square feet 0.53 acres 34% of site
Additional impervious surface: 23.898 square feet 0.54 acres 35.38% of site
Proposed total impervious surface 46.866 square feet 1.08 acres 69.38% of site
Source of Potable Water: QUA Method of sewage disposal: QUA via Existing LS
Current zoning: CL T Current Future Land Use: Commercial
Parcel Identification number: See Attached Deed (Numerous IDs)
Application for Site Plan Review
Name of project: Bass Okeechobee Funeral Home & Crematory
Applicant: Family Heritage Holdings. LLC
Address: 205 N E 2nd Street. Okeechobee. FL 34990
Phone: 863-763-2111 Fax: 863-467-6671
Other phone:
Contact Person: Tom Conwav/Paul Mitchell
Address: Same As Applicant
Phone: Fax:
Other phone:
Property Owner: Same As Applicant
Address:
Phone: Fax:
Engineer: Stephen Cooper. P.E. & Associates, Inc.
Address: 209 N.E. Sagamore Terrace. Port St. Lucie. FL 34983
Phone:772-879-7779 Fax: 772-878-5151
Surveyor: DeHays DesiQn
Address: 606 West North Park Street. Okeechobee, FL 34972
Phone: 863-467-8889 Fax: 863-467-8111
Page 2
1375 Jackson Street, Suite 206
Fort Myers, Florida 33901-2845
Phone: 239-334-3366 Fax: 239-334-6384
LaRue Planning &
Mana ement Services, Inc.
Staff Report - Site Plan Review
Prepared for: City of Okeechobee
Applicant: 07-009- TRC Bass Okeechobee Funeral Horne
& Crematory
Staff Report
Site Plan Review
Application No.: 07-0~ TRC
Applicant's Name: Family Heritage Holdings, LLC
General Information
Owner:
Owner Address:
Owner Phone Number:
Family Heritage Holdings, LLC
205 NE 2nd Street, Okeechobee, FL 34990
863-763-2111, FX: 863-467-6671
Legal Description of Subject Property:
Lots 1 - 6 and Lots 24 - 26, Block 14, Okeechobee, according to the Plat thereof as
recorded in Plat Book 1, Page 10.
Discussion:
This is a site plan review for phase tow of a previously planned two-phase development.
Project consists of a proposed Funeral Home and associated vehicular use. Unless
otherwise noted, the comparison of LDR requirements with the actual proposals by the
Applicant relates only to the proposed improvements associated with Phase 2.
Findings:
Existing Proposed
Land Use One-story commercial One-story commercial building,
building funeral home and associated
vehicular use area
Future Land Use Map Commercial Commercial
Zoning CLT CLT
....... Required ... ..)~ilJ1~tJ;
Density NA NA
Min. Lot Area (Ph. 1 & 2) 6,250 sf 67,554 sf (1.55 acres)
Min. Lot Width (ph. 1 & 2) 50 feet 300 feet
Setback Requirements
Front 20 feet to buildings, 10 feet Along NE 2nd street the parking
to parking, 75% thereof for is set back only 8.5 feet, along
side street yards 13th Street it is set back 10.61
feet. The building is set back
64+ feet from NE 2nd St., and
15 feet from 13 th Street.
Sides 8 feet, 20 feet abutting NA
residential.
Rear 10 feet, 20 feet abutting IS'
residential.
2
Staff Report
Site Plan Review
Application No.: 07-009- TRC
Applicant's Name: Family Heritage Holdings, LLC
Okeechobee County Property Appraiser
'1ft' C "8lW ~3hdr:3re,CFi;- Ok~HJII:,tH;;";. Fl;.Hicia~f63-753.4122
PARCE l: 3-15-37 -35.0010-00140-0010 - VACANT COM
CITYOF OKEECHOBEE LOTS 1, 2, 3AND 4, BLOCK 14,
OKEECHOBEE ACC.ORDIN <? TO. TH.E
Name, FAMILY HERITAGE HOLDINGS LLC LandVal
S~e: 1211 N PARR OTT AVE, Okeechobee BldgVa'
Mail 205 NE 2ND STREET ApprVal
OKEEC HOBEE, FL3'll72 JustVal
~9I2007$1,3roDOO,OOI I U Assd
Sales 311=01 $12.00000 VI Exmpl
Info U T""able
712''l12000 $70,00000 Vd
$162,77600
$0,00
$162,77600
$162,77600
$162 ,77800
$0,00
$162,77800
"
,,~" .
This information. Last Updated: 9/1012007. was derived from data which was compiled by the (l< eechobee Countv Property Appraise(s
Office solety for the governmental purpose of proper'bj" assessment. This information should not be relied upon by anyone as a
determination of the olA'oership of property or market value. No wan anties. expressed or implied. are provided for the accuracy of "the data
hereIn, Irs use, or irs interpretation. Although it is: periodically updated. this information may not: re11ectthe data curren1ly on 'file in the
Property Appr ais e~s- office. The assessed values are NOT certi'fied values and therefore are subject to change be10re being finalized for ad
valorem ass essment purposes
5
Staff Report
Site Plan Review
Application No.: 07-009- TRC
Applicant's Name: Family Heritage Holdings, LLC
50%
Max. Lot Coverage
(ph. 1 & 2)
Max Impervious Surface
(ph. 1 & 2)
Maximum Height
Parking
Number of spaces
85%
45 feet
1 per 300 sf = 24
(7,250/300)
Landscaping
Parking Area
18 sf feet per required
parking space = 432 sf.
One tree per 72 sf of required
landscaped area = 6 trees
Buffer 10 feet along street frontage;
2 feet on other property lines.
Required buffers are as
follows:
N. Parrot A v.:::: 2,050 sf
NE ] 3 Street = ] ,450 sf
Alley (NA)
Total buffers:::: 3,500 sf
12 trees and 35 shrubs are
needed on the basis of 1 tree
and 3 shrubs per 300 sf of
re uired buffer area
Sidewalks and Lighting Lighting is required, but the
LDRs contain no specific
standards. However, the City
is now considering a standard
of one horizontal foot candle.
21.3%, 14381 sf
69.4%,46,866 sf
I-story building
34 including two handicapped,
Std. = 10' x 20'
.. h~cJdstreetbutf~r;ls
t.
It appears that 19 trees are
located in association with
Phase 2 and the number of
shrubs provided is considerably
in excess of the 35 required.
The landscape plan should be
reviewed in light of the entirety
of both phases, but it appears
that the landscaping plan meets
the requirements in the LDRs.
Staff suspects that the single
light shown in the front may not
be adequate.
There is a sidewalk in front of
the property along Parrot Av.
3
Staff Report
Site Plan Review
Application No.: 07-009- TRC
Applicant's Name: Family Heritage Holdingsy LLC
Recommendation:
Staff recommends approval of the site plan provided that the Applicant increases the
setback/buffer along Parrot Avenue to meet the 10-foot minimum required in the LDRs.
Submitted by:
James G. LaRue, AICP
Planning Consultant
September 20, 2007
TRC Hearing date: September 26, 2007
4
CITY OF OKEECHOBEE
TECHNICAL REVIEW COMMITTEE
CONSEPTUAL SITE PLAN REVIEW
DATE: September 26, 2007
TITLE OF PROJECT: The Lakehouse
NAME OF DEVELOPER: LBFH Inc.
PROPERTY OWNER: 15th Street Homes LLC
AUTHORIZED AGENTS: John D. Cassels, Jr.
TRC PROCESSING NUMBER: 07-011-TRC
[4107-70848.WPD]
Exhibit A.3 - Conceptual Site Plan
I!2!:b.
CONSULTING CIVIL ENGINEERS,
SURVEYORS & MAPPERS
CIVIL
AGRICULTURAL
WATER RESOURCES
WATER & WASTEWATER
TRANSPORTATION
SURVFYING & MAPPING
CIS
"Partners for Results
Value by Design"
421 N.W,3"'Street
Okeechobep, H 34972
(863) 763-89CJ'I
FAX: (863) 76{-6G92
Project No. 05-0260
ADDITIONAL PROJECT STATEMENTS
THE LAKEHOUSE
OKEECHOBEE~FLORIDA
Proiect Descrintion:
The Lakehouse is a planned urban development proposed on 50::1:: acres located in the
City of Okeechobee. The proposed project is bound by SW 9th Street to the north,
SW 15th Street to the south, existing single family residential and SW 10th Avenue to
the west, and existing single family residential and SW 7th A venue to the east. The
proposed development will include all of the essential stormwater management
facilities, roadways, utilities, and preserve area. The utilities proposed include
underground power, central water & wastewater service, phone, and cable.
Areas to be Dedicated for Public Use:
The areas to be dedicated for public use for the Lakehouse will include sidewalks
and other infrastructure throughout the project located within the right of way of the
arterial roadway.
Phasine: Plan and Time Frame for Completion of the Entire
Develonment:
The project is proposed to be built in one phase and construction for the project is
expected to be completed by 2009.
Descrintion of Environmentallv Sensitive Areas:
Environmentally sensitive areas located within the project include an eagle's nest
with 100' primary protection zone and a 492' eagle buffer zone. There are also 3
wetlands located within the project all with 25' wetland buffers and upland preserve
areas surrounding them. Please refer to the attached construction plans for the size
and location of each of these environmentally sensitive areas.
List of Required Re~ionat State. and Federal Permits:
. Environmental Resource Permit - South Florida Water Management District
. Water Use Permit - South Florida Water Management District (requirement
pending)
. Consumptive Use Permit (Dewatering Permit) - South Florida Water
Management District
. Wastewater Collection/Transmission Permit - Florida Department of
Environmental Protection
. Construction of Water Main Extensions for Public Water Systems - Florida
Department of Environmental Protection
ro
E
:i
<{
~
~
-
...
~
'"
i
j
o
"'
~
"Q
,..:
<ii
J:
x
LU
>-
'"
(!j
Z
:J
o
"'
W
Cl
<{
z
~
o
o
:J
~
B
E
x
~
y
E
;;;
~
~
@2007l.1lFHlnc
DA.TE BY
I _}~L-__
~{'~,,-~- --~-~
fS:w, 7th AVENUE
OaIe'~
VERIFY SCALE
BAR IS t::QUAl TO ONE
INCH ON ORIGINAL ORA'NlNG
0_'
ADJUST ALL SCAlED
OI~ENSIONS ACCOROINGI Y
.Jt~~
CONSULTING CIVIL ENGINEERS.
SURVEYORS &; IlIAPPERS
"Fanners }'OT Restdts,
Value By Design"
DosignElyc___
lJr""nEly:
Ch..dll)L__
421 N.W. 3rd Street, Ok~chobe..., FI 34972
(863) 763.8999 Fox: (863) 763-669:(
BPR & FBPE license No: 959 www.lbfh.com
REVISIONS
:11-----
~====1i tc-:~~ ji L;"J, rq~,~~~ i
II.. 'Ii. I~.I ill' \ill.~" :,.1 ~..,. I 1-1
c= .,el: I V ~~: .~ "
lll: ::1 1,'-----' , i
I.C~kJj 'till Iii J' . .L Ii
. 1 'j " .~. .....r- C--. _0':: . I 1'1
- - - - - - ~----------- -:~
-- ., i
I
I
Ii
-.J!
I
i
i
I
i
I
LEGEND
C3
~
~,;>::-/;/;:,:;
:, -r.. ..,'_,-../,.':_,....
':~,{.;?;?>-;;,-
e
SCALE: 1"=100'
BOUNDARY LINE
WETLAND
WETLAND BUFFER
1 THE liKE HOU"
CITY OF OKEECHOBEE
EXHIBIT B
PROJECT BOUNDARY, STREETS, BUIlDINGS, . LAKES
05 0260
SHEET
1 of 1
1
~+-
I
I
-+-----
d
_.. .._~r"du~~__
p_l__5:_~t.r~~ _)~J~
.'.".tlo, '"'
^" 10" ,.
,~,-
"~'-',-~~~.~L~ __~~!n~.~___ __~O_~~ __.~__
,,,,,:,,,,, .." ..
_~~.t~~e-:__,_~ .... -S~-_._.. -~~ "
.._1~.~: 1~ ~~t __ :~!~~_
I
+-
r
-+~
I
~
:
"~-- ,
&lObI=
~ ,
"
. _e.~l~.1n9..~vel!:?p':~.. I"ront. $etbs"k, ~rde e.l!ltb8~k
~n-It.& (Y'tJdth X t::;;e-",1h) prlmar-u/porc;.h &II/". III Inhr!"," POl'''"
"ear i!etbac.k
Interior L.ot ~d/Corner L.ot
riil.'h, ".~h) iiildth "".ahi ~
"'..
Hslaht.
~~~~h_.
c;.f"c ;;~"
~&5'~''''''
mLotl
~ ",
.... ''''"'
, ;.c;;;;;a,.,e/
8uIIdlM
..' &'
'"
""/""~,
,I.
"'''00'
~rd lonal
. ",,'~x.." .--.'-"'--
10
i.:i'L:.;H
..'. .' '0
~ ii.,;;>j
sa.., '0
(.,.Lotl
..'
&~. "'d;~"'";"" . ":'~~:I ',~'~~',,": I. .....&&..100' .... '; ""
no .-- ~_._.--- -"" ~d or: lanai
>> .-.. '" " 10' ,I. .1, 100'
,I.
,~, . "","IId!"
,I. &' '0' "'. S' ~WMo/ ..' ,oa'
"...M...... '.. _..^"~ "',II',""~
51" 10.'
""'"
"C8,
I
---~+-
,",,' .,,,,,,
-'-'~IT
I '[' I I I
I I I I
I I I I
"C8r
-+
I
I
-+
'. ";,.,
!-~te:-ijI~~_~~~~I~~~~L~~~~:~:~1I&i;;\;~ren[~1~::P!~~:~:~~:~:~~I~~#;:fe:~~~~~~:_~~~;;.:~e.n~ij~~"EC;;;i~~~2~:~~~~I~i~-:..~~-_~==:: .. . .... ..... -...-
,-~~~:,...~.}9'_~~!'~,.!'.l;:1::~.~~jIl.~~~rTle:~~,i~.~P.~i~.~_~: l~"",.,." _. _.~,,,..,,____,.. f' , ,.,,,.........,
The Lal~ehous~.
A Walkablc, Community Focuscd Development
Total Site Area.
.orlJnltlit:
O\Ierall ~ross 1iee.identld Dene-i IPVJ-",,);
lite Ired Per Pro &ed LDC ~e ~:
Mwimum AIIowa,le Lot; CCNe (40%):
Max. Allow<:ble: 1m rvious 5urrac:.a Area (bO%):
Min. n ;;. e ~ ired (40%),
t-fln. 1m oved ~reation A~el1 Re ired (15 5.f /du),
Pro osed Pe~ Currel"t Plans:
__ _ ~d.5__c.cpng~'2E~11 5pa::.e Provic.led
,-- per(.~tiiCe '-..30dsc; ir. I ei"l S ace Pr"cviaed
P;3rl;./Su,ferOllen SplICe
i..<l<.e-:rNl_~jME fl:!c.inll:!.t
U 11I'1a;~;5tin ~tlll'1aIY'li:.l1jn leClr,"I~)
1m rvioos suriaGe calGulctians'
Total Lot COver e:
Lot Cover e ~rc:.ent e:
I'll r~k::I.-l& Hea (f1ri8tlon Let).
"'*1.:*,5;
." eNo.ISA:::r~5i!!1ite
mpe'rvbJ~ ).rea Mil 8 Let}
#aFlot;5:
n rviac.e""-rosIOSita:
rn ervlC\l~ ....,..e. ('I).J alc:w L..c;t):
.oflo\:!i:
_l'npervk::u!lA:::!:95~ell:e:
hi rv!C\ls,;,rea(CGtt I..clt):
- "dlot&.
m rvIoulO""-ra=.105Its:
-+
I
- + -~-
l
are I"eet. AGree
.2;!i9,O'15.68 ~,e1
15&
'.6.
MS,25O.21 .20.5.2 F'..e rremert5 Met
1.62j,a.45.41 ~_4~ fte uirement5 ~et
f,l}$,2:%"..21 .:i!0.a.:i! Rei irement.e. Met
:2040 005 4&'>0:46' PI round
"1&& ~.~ 1.00_1 .22.13
....
.209 "lIe> 00 i
409,$<'>.001
~,2S5.00
~.:i!S."l:5O.53 12.0'7
..'"
6.21<1.1:2
,.
&1,a-re.,O&
4,&605T
"
&"1~.41
,.~.""
..
1'!'T,9'T2.00
- S.1e5,e.+
56
1~.2"l5.04
I
I
! !
i-I I
I I
I
I ,
f-~
-nr--n'i
: i
I P06QS<'i,OO
-+
~T'4,200'1
-----.j--
P
III
......-<
0...
Prepared for:
STRAA T Real Estate
fH=69(~
i9NVIROSCAP9
I LAND PLANNING & LANflSCAPE ARCillTECTURE.
A DrvlSJON OF THE IoVANSGROUP
1(lIIIN,OItA>J(l'EAV'Ec
OlU.lI'OO.FLOaIOhJ~1
mllmrn
F.u.oo~Jl1
ill
+'
.....
ill
1
,......,
+-
I
.-
1k
eVANS~
ARCHITECTURE & PLANNING
OlllAAIlO,rLO~fl:lAllllll
r.u401~))1
0' S0'100'
2m
300'
400
Nurth
-+
J
-
NEIGHBORHOOD PLAN DETAIL
,
Prepared or:
STRAAT Real Estate
fH=hA(~
(J 5" ur 2ft 311 40' NOftb
The Lakehouse
"
A Walkable, Community Focused Development
"
+-
. .:''''' '. ~
bi~
.~..~~~~~~ ~-I
I;'
I eVANS pafJ
! ARCfUTECTIJR.E A PLANNING
-----~-
I
_.._n_ +_
~,,-~,~ I
OIl..II.NDO.PUlUlADIIll
WllilU110
FA.lIl'I~ll
,-
I
-.
1
~-
J
,
~+-
I
~'.;TOF~""
-"~~~':" _ _ _ _ _ _ _ _ _ ----r- - - - - - - - - - - - - - - - - - - - - - - - - - --
,-- ""--!~~, --
/// .
I
NEIGHBORHOOD PLAN DETAIL.
The Lal<ehouse
Prepared for:
STRAAT Real Estate
fH=bfl(~
~ 10 W ~ 00 W Nooh
I Fa60~,OO
-.
'9NVIROSCAP9
I. LAND PLA~NING & LAl"DSCAPE ARCHITECTURE
A mV[SION OF THE EVANS GROUP
-+
I
-I eVANSRUI
ARCHITECTURE & PLAI>.'NrN(]
-+-
I
A walkable, Community Focused Development
~ptel'r'berle,:;lOO'lI
1
-+-
I
"
.....-.
.~
cO
-i-l
Il)
o
~
cO
0::
(l)
-i-l
,~
en
I
M
-.-
,
--
P'roduGt end L.ol de~jgn ~tandarde. tor ~8sid8ntial Prod UGh "6 Unit!!! tohl 6/:26/:001
Frodu(.t Pi~triGt Mix . 6ulding ~n't'elop~ I"'ront setbac:.k. !lda ~etbllGk. Max fIlur 5e:tbsGk. Int$rior l.ot !nd/Goorner 1.01:. Sarage
Unih (VIlidth)( o. th) prlrTllr IPorGh .slrl e InterIor ParGh Hal hl (~Idth)( DI!l th) (riidth x t?e th) 1.0adln
Porte
Plantallon "0' .. 10% 14 b!5'x 2>6' 10 2. .' 10' ,I. ..;'~ara:lel ii x 100' 61'x 100' cochere
2.4CO -;!cOO ~.f'. e..tilte (rr !..Ct.) e,d/Corner euilding 2 ,car
9rd" ionsl
~orte
Villa9" L.ot "' 10% ,. ~'xeb' 10' ,,"' .' 10' ,I. 4'Gara;el 62' x 100' be" x 100' COGhere
1'100 - 2400 d. Village (62' I..ot) 61r:Uo::'orner eullding :2 -Ci!r
;lrd" ianel
Sung.low I..ot. Sf '0% " '" x e1 10' n/. .' 10 ,I. 9'Gollrage/ 41' J( 1080' S1'x 10E>' L.ao'
1600 - 1"100 sJ. S\.ingalow (.4.1' Lot) 51d/Corner euildin9 .2 ~ Cer
cottage OF 42% SO SO' x e" 10' ,VOl .' 10' n/. 5' Garaae/ 4::' x 10e' 46' x 108' L.ao,
1900 -1E:rOO d. cotta.;!e (4.:l'l..ot) ~J:j/Go~nel" Sl.oilJ:jin.; : -Cer
I
r-
I
50 ;:rel"eet Acre..
:l:,:l:19,Ci"1Sbf> 50.e1
1>.
2>6
Note: rris matrix is believed to be LlJithirr current Ci~ of Okeecl1obee aral't 1.0"- for ~-R, ~ current~ ~howr per b!5/0i meetin;l.
Note: A 10' l"'rorrt 'fa-a utilit~ easement i.. Mt"cipated
~
~
I
I
I
,_ I
""""':""-'_ L
,------
I
I
The Labehouse
I
-,
~are FootagelPsta calculations
iotal s:te Area
lIof'~nib,
OIerall ~ross Re~idertl!ll ='e~6i (~~)AcJ:
lte uired I"er I"'ro o~eel LDC!i.e !!;
~;;l)(im~m Alloweble I..ot CCver e (4C%);
Max. ,t.,llow2t:le 1m ervicui Surfs<::e"'~ea (60%)
Mn,O en!!> ea:;ef'e ired(~%);
;;.lln, 'I'" - rOV6d ReG~estion Are' Re ired (15 sVdu).
Pro o..eel Per Current PISi!!:
l..a'Ide n 10 nSOace Provided'
Perce1t el.6ld!G in /0 nSpa::e Provided:
I"dr~6ilfltr n t;
l.$;.e ,l,re~(~itr-i" I!lllec.ir::,'e):
U"llir~~~iit n ~~11t1d ~tri" Ie <::-1":::.",
1m e-.,.;oue e",rlaGe c3~u:ation6'
'-"tGover e"'e'.:.ent e
'II r~io.JS ""U (PIM~i~" LOt)
~ of 101;&
l're~i=,I,(;rOis..<te
l"'er'i~"'ree(Vill&lei.at)
~ 01' lets
IT erviQ.lIl ""rC'&'i~ite
ml.'ler~i~s Ar"U Ie,n el.:\li ;.c::t~
=oPlcts
Itr e~iO.Jsk;ross~ite
1m '~i-::l'SNell(Got t..'-'*t
=oflotl;
I'" erviCI.Is ",~'os$l!ita
c.lubhouse GOVer e rcent e
~aaLll ",\fer e ~r';e1t e
44.~' ~ 'l$' "',o,~, F'd\le"'ent
llO'~.O."".Alla''''''''a''''ant
Merc,ove- It er,et1t. e'
Impervious &urPS(.8 PaI"C1'1
-,
I
I
I
I
I
~L~~L
e.e~,:~o':,
1.SZ"I,e415.41
e.e~.2S0':'
>040
20.~: ~ :rement~ Met
50.048 Re u:rement~ Met
20.92 ~ ;rement~ M~
0,05 046',.;46' ,",' :"a~n.:l
"lbb,le1.00 ':2:e
44%
Xl~,"If>OO 4.66
"O~.~,OC "1%7
S!i&,:!50=, &Z1
5.2$,"190.5$ 1.2.0-r
24%
6.21'1.,:/
"
e.'.o~6.oe
".abO!l~
"
bll,le,..l
!I,,:l4X
"
1,"~~.2X
',li>e.9..:l
"
l'Il,~O..:l
2!!>,"'e.S.OO O.SS
1,08%
.25'1,4'6
11,12%
',e.,'~' "':0
W,'O'l HI!
4_C2a.,"Se..OO _ "'.21
le.,.2!%
1.:15.504'1.59 21.85
~
'1
!)ep~embe' ", 2c::7i I
,-
1001 'i,ORA!\'GE~\'E. I
O~LASDO,I'LORlll^3"UL
,Q', ~;o.1j77{l
'AX,oj'6JO.!"
I F'Ob05~.OO
-,
Prepared for: 19NVIROSCAP9
STRAAT R 1 E t t 'AND'C^,"N<.&C''''''^,URClUHCTURC
1"-100'11" ea s at l:d _, A DrVISIONOFTHEEVA",OROUF
fY=bA \ vi ~l!~~~~
~
fil
..........
P-<
~
4->
.....
m
I
,......,
0' 50' H)I}
,-
I
,-
"",,,00,,,,,,,,"'1
<(" t~Il-!,1(l
HXlD.,~SCI-II~71
--t-
I
A walkable, Community Focused Development
200'
3(~j'
4lfl
i\OIth
LaRue Planning & Managelllent
Services, Inc.
,
Fort Myers, Florida 33901-2845
Phone: 239-334-3366 Fax: 239-334-6384
Staff Report
Concept Site Plan Review
Prepared for: City of Okeechobee
Applicant: 07-011- TRC The Lakehouse
Staff Report
Site Plan Review
Application No.: 07-Q11-TRC
Applicant's Name: The Lakehouse
General Information
Applicant: .
Applicant Address:
Jose Rasco, CFO for Owners
701 Brickell Avenue, Suite 1740
Miami, FL 33131
Owner Address:
15 Street Homes LLClMontebello
13 LLC, Joint Venture
701 Brickell Avenue, Suite 1740
Miami, FL 33131
Legal Description of Subject Property:
PARCEL I:
All that part of Section 21. Township 37 South, Range 35 East, Okeechooee County. Florida, lying West of
Blocks 24R and 249, and Southerly extension thereof. "FIRST i\DDlTION TO OKEECHOBFE Fl"ORII)l\.',
as recorded in Plat Book 5, Page &. Okeechobee Count} Puhllc Records: South of Southwest 9th SlIce!.
North of Southwest 15th Street; and East of Block 202, and Southerly extension thereof, "OKEECHOBEE"
as recorded in Plat Book 5, Page 5, Okeechobee County Public Records; and East of Southwest 10th Avenue,
within the City Limits of Okeechobee, Florida.
LESS AND EXCEPT FROM THE ABOVE DESCRIBED PARCEL:
Beginning at the Intersection of Hopkins Meander Line and the South boundary line of Section 21, Township
37 South, Range 35 East, and run Northeasterly along said Hopkins Meander Line 28.6 feet for a POINT OF
BEGINNING; thence East paraJJeling said South line of Section 21, aforesaid 56.6 feet; thence North 175
feet; thence West 240 feet; thence South 175 feet; thence East 183.4 feet to the POINT OF BEGINNING;
said land lying in and comprising a part of Government Lots 3 and 5 of Section 21, Township 37 South,
Range 35 East.
ALSO LESS AND EXCEYI FROM THE ABOVE DESCRIBED PARCEL:
A 30' wide strip of land as described in Official Records Book 351, Page 618, Okeechobee County Public
Records.
Parcel ID#: 2-21 -37-35-0AOO-00006-BOOO
PARCEL II:
Beginning at the intersection of Hopkins Meander Line and the South boundary line of Section 21, Township
37 South, Range 35 East, and run Northeasterly along said Hopkins Meander Line 28.6 feet for a POINT OF
BEGINNING; thence East paralleling said South line of Section 21, aforesaid 56.6 feet; thence North 175
feet; thence West 240 feet; thence South175 feet; thence East 183.4 feet to the POINT OF BEGINNING.
Said land lying in and comprising a part of Government Lots 3 and 5 of Section 2 l,
2
Staff Report
Site Plan Review
Application No.: 07-011-TRC
Applicant's Name: The Lakehouse
Township 37 South, Range 35 East.
LESS AND EXCEPT the East 160 feet.
Parcel ID#: 2-21 -37-35-0AOO-00027-BooO
PARCEL ill:
A parcel ofland lying in Section 21, Townslllp 37 South, Range 35 East, Okeechobee County, Florida. Being
more particularly described as follows:
Commencing at the intersection of Hopkins Meander Line and the South line of Section 21, bear
Northeasterly along the said Hopkins Meander Line, a distance of 28.6 feet; thence bear East parallel to the
said South line of Section 21, a distance of 56.6 feet; thence bear North 175.00 feet; thence bear West, a
distance of 80.00 feet to the POINT OF BEGINNING; thence continue West, a distance of 80.00 feet; thence
bear South, a distance of 175.00 feet; thence bear East, a distance of 80.00 feet; thence bear North a distance
of 175.00 feet to the POINT OF BEGINNING.
Parcel ID#: 2-2l-37-35-0AOO-00027-0000
PARCEL IV:
Beginning at the intersection of Hopkins Meander Line and the South boundary line of Section 21, Township
37 South, Range 35 East, and run Northeasterly along said Hopkins Meander Line 28.6 feet for a POINT OF
BEGINNING; thence East paralleling said South line of Section 21 aforesaid, a distance of 56.6 feet; thence
North 175.00 feet; thence West 80.00 feet; thence South 175.00 feet; thence East 23.4 feet to the POINT OF
BEGINNING. Said land lying in and comprising a part of Government Lots 3 and 5 of Section 21. Township
37 Sourh. Range 35 Ea~t. Okeechobee Counry, Florida,
ParcellD#: 2,21.37,35 OAOO-00027,AOOO
PARCEL V:
A parcel ofJand lying in Section 21, Township 37 South, Range 35 East, Okeechobee County, Florida, being
more particularly described as follows:
For a POINT OF REFERENCE, commence at the intersection of the Hopkins Meander Line and the South
line of Section 21; thence bear Northeasterly along said Hopkins Meander Line a distance of 28.6 feet to the
North right-of-way line of Southwest 15th Street; thence bear North 89036'23" East along said right-of-way
line (also being 25 feet North of and parallel to the said South line of Section 21) a distance of 56.43 feet to
the Southeast comer of the lands described in Official Records Book 153, Page 803 and the POINT OF
BEGINNING;
Thence departing said right-of-way line. bear North 00018'09" West along the East line of those lands
described in Official Records Book 153, Page 803 a distance of 97.24 feet to the Southwest comer of the
lands referred to as "Parcel 2" in Official Records Book 581, Page 401; thence bear North 89036'39" East
along the South line of said "Parcel 2" a distance of 99.49 feet to the Northwest corner of the lands referred to
as "Parcell "in Official Records Book 581, Page 401; thence South 00039'46" East along the West line of
said "Parcell" a distance of 97.23 feet to the North right-of-way line of said Southwest 15th Street; thence
bear South 89036'23" West along said right-of-way line a distance of 100.10 feet to the POINT OF
BEGINNING.
Parcel ID#: 221,37-35,OAOO-00028-AOOO
3
Staff Report
Site Plan Review
Application No.: 07-011-TRC
Applicant's Name: The Lakehouse
PARCEL VI:
From the Southwest corner of Government Lot 5, Section 21, Township 37 South, Range 35 East, thence East
along the South boundary line of said Government Lots to the intersection with the West right-of-way line of
Okeechobee Avenue extended South, thence North along said right-of-way line of Okeechobee Avenue 25
feet for the POINT OF BEGINNING; thence North along West right-of-way line of Okeechobee Avenue
97.3 feet; thence West parallel to South boundary line of Government Lot 5,99.6 feet; thence South parallel
to East line of Tract, 97.5 feet; thence East parallel to North line of Tract, 99.6 feet, to the POINT OF
BEGINNING; being a part of Government Lot 5, Section 21, Township 37 South, Range 35 East,
Okeechobee County, Florida.
AND
From the Southwest comer of Government Lot 5, Section 21, Township 37 South, Range 35 East, run thence
East along South boundary line of said Government Lot 5 a distance of 336.7 feet to the intersection with the
West right-of-way line of Okeechobee Avenue extended South; thence North along the West right-of-way
line of Okeechobee Avenue a distance of 122.3 feet for POINT OF BEGINNING; thence West parallel to
South boundary of Government Lot 5 for a distance of 199.7 feet to the intersection with the West boundary
line of Government Lot 5; thence Northeasterly along West boundary line of Government Lot 5 a distance of
89:73 feet; thence East parallel to South line of Tract a distance of 154.76 feet to the West right-of-way line
of Okeechobee Avenue; thence South along said West right-of-way line a distance of 77.7 feet to the POINT
OF BEGINNING. Being a part of Government Lot 5, Section 21, Township 37 South, Range 35 East,
Okeechobee County, Florida.
Parcel ID#: 2-21-37-35-0AOO-00028-0000
General Description:
This is a conceptual site plan review for a residential planned unit development encom-
passing approximately 50 acres in the southern part of the City.
Existing Proposed
Future Land Use Map Single-Family: maxnnum Single-Family
Classification allowable density is four
d.u.lacre; up to 201 dwelling
units are allowed.
Zoning District RSF1 PUD-R
Use of Property Three single- family homes; two Planned residential devel-
are occupied and one is vacant. opment 136 detached
The balance of the property is single-family residences
undeveloped. in a variety of lot sizes.
Acreage Approximately 50 acres Approximately 50 acres
4
Staff Report
Site Plan Review
Application No.: 07-011-TRC
Applicant's Name: The Lakehouse
Adjacent Future Land Use Map classifications and Zoning Districts:
North: Future Land Use Map Classification: Single-Family
Zoning District: RSFl
Existing Land Use: Vacant with church to the
northeast.
East: Future Land Use Map Classification: Single-Family
Zoning District: RSFl
Existing Land Use: Single-family
South: Future Land Use Map Classification: Urban Residential Mixed Use
(URMU. Unincorporated
Okeechobee County Plan)
Zoning District: Unincorporated
Existing Land Use: Single-family
West: Future Land Use Map Classification: Single-Family
Zoning District: RSFl
Existing Land Use; Single- family
5
Staff Report
Site Plan Review
Application No.: 07~011~TRC
Applicant's Name: The Lakehouse
Comparison of Proposal with Dimensional Standards (Sec. 90-418)
Required Provided
Minimum Parcel Size 5 acres 50+ acres
Maximum Density 4 d.u./acre 2.7 d.u.lacre
Maximum Dwelling Units 201 136
Minimum Perimeter Setback 20 feet 20 - 25 feet
Minimum Building Separation 12 feet 12 feet
Maximum Lot Coverage @ 40% = 20.32 acres 12.62 acres (24.8%)
Maximum Lot Coverage and @ 60% = 30.48 acres 27.85 acres (54.8%)
Other Impervious Surfaces
Minimum Open Space @ 40% = 20.32 acres 22.18 acres (43.7%)
Maximum Water Bodies as @ 50% = 10.16 acres 9.27 acres
Percent of Required Open Space
Minimum Active Recreation Area @15 sf/d.li. = 2,040 sf 2,116 sf
Comments:
The proposed concept plan meets all of the above dimensional standards. Staff recognizes
that the pun does not set minimum standards for lot size, width or setbacks, other than the
minimum separation uf buildings. However. we initially had some concerns with a rear
yard setback of only three to four feel. The Applicant subsequently submitted a graphic
and explanation of how the small rear yard setback is part of the overall ''Traditional
Neighborhood Development" approach to the project and has alleviated our concerns.
Concurrency of Adequate Public Facilities
According to the U.S. Census, the City of Okeechobee averages approximately 2.7 persons
per household (pph). Thus, the development of this property could generate approximately
367 additional residents (2.7 pph x 136 d.u.)
Potable Water: The adopted LOSS for potable water is 114 gpcpd. The impact for the
proposed development is as follows 136 units X 2.7 pph x 114 gpcpd = 41,838 gpd. The
Applicant has submitted a copy of the developer's agreement indicating the ability of OUA
to provide the needed potable water to the project.
Sanitary Sewer: The adopted LOSS for sanitary sewer is 130 gpcpd. The impact for the
proposed development is as follows: 136 units X 2.7 pph x 130 gpcpd = 47,710 gpd. The
Applicant has submitted a copy of the developer's agreement indicating the ability of OUA
to provide the needed sanitary sewer services to the project.
6
Staff Report
Site Plan Review
Application No.: 07-011-TRC
Applicant's Name: The Lakehouse
Solid Waste: The adopted LOSS for solid waste is 13 lbs/person/day. The impact for the
proposed development is as follows: 136 units X 2.7 pph x 13 pounds per person per day =
4,771 ppd. The County has recently commned a considerable level of excess capacity
available to serve the solid waste disposal needs of other major developments in the City.
It appears reasonable that the volume of solid waste associated with a development of this
size can also be accommodated within the capacity of the County's Solid Waste Facility.
Drainage: The proposed development will be required to meet all standards required by
the City of Okeechobee and the South Florida Water Management District.
Parks & Recreation: The adopted LOSS for parks and recreation is 3 acres/l,OOO
persons. Based on the estimated population, the minimum acreage requirement for parks
and recreation would be approximately 1.1 acres of recreation/open space. The Applicant
has identified park areas in the concept plan in excess of this requirement.
Traffic: The Applicant has submitted a Traffic Analysis that will be reviewed in greater
detail in the Staff Report for the proposed rezoning to PUD-R. The findings of the
Applicant's Traffic Analysis are summarized as follows:
The proposed project is primarily served by local roads, with access provided by SE
9th and 15th Streets. The overall impact of the project is minimal on local streets and
neither will level of service be reduced or nor will turn lanes be necessary. Traffic
impacts on hoth SR 70 and US 441/98 will be insignificant. Traffic congestion will
continue on SR 70 with or without the project and the impact of the project on this
roadway does not reach the level of significance normally acknowledged by the
FDOT as being 10% of the volume associated with level of service "C".
General Development Review Standards
(1) Physical characteristics of the site. The type and pattern of use proposed in the
concept plan appears suited to the physical characteristics of the site.
(2) Compatibility and relationship to adjacent property. The proposed single-family
development, while employing smaller lot sizes than the surrounding area, is of
similar density, height and intensity with surrounding development, limits the points
access to the surrounding road network, provides for recreational and open spaces for
the intended residents and should not materially affect surrounding properties.
(3/4) Access and internal circulation. The principal access points are located in a manner
that reduces potential conflicts between traffic entering and leaving residences within
the project and exterior traffic on the roadways serving the surrounding area. Internal
circulation allows for vehicular and pedestrian movement within and among the
various residential, recreational and open space areas.
7
Staff Report
Site Plan Review
Application No.: 07-011-TRC
Applicant's Name: The Lakehouse
5. Natural and historic features. The development is designed in a manner to preserve
the existing eagle's nest from adverse influences and to preserve. and in some
instances, enhance existing natural wetland areas.
6. Density. The proposed gross density of four dwelling units per acre is consistent with
the limitations imposed in the City's Comprehensive Plan.
7. Screen and trash and refuse containers. This standard will be addressed in the final
site plan approval stage.
Conclusion:
Assuming the Applicant provides acceptable explanations of, or modifications to, the
proposed concept plan relative to the Staff's concerns over the rear yard setbacks, Staff
rmds that the concept plan to be in conformance with the intent, standards, and require-
ments of the PUD- R District.
Submitted by:
James G. LaRue, AICP
Planning Consultant
September] 8, 2007
TRC Hearing date: September 26, 2007
Attachments
8
Staff Report
Site Plan Review
Application No.: 07-011-TRC
Applicant's Name: The Lakehouse
Subject Property
City of Okeech bee Future Land Use Map
> .. 3'
f~T::1
_.....L-._~)
.~ _""~"'-_'''u.
:1 ~-l
.Ii
. .".
'-1.
_.'~~_.-
.. . ~ ;
., " ., ;
"m_,_,_,
I
.,.
2~8
;
,l :i
~ ,
~ :.. ~
II> ~rlli'Er ...
~ ! ...
[' r:
II : I
. ~... ~ i .. 1
~ ~ t
"&.W~-tlTl-&TllE"ET;'---'--" { .~ ~ 0
111~l#t1.IJ~
u 1 ; TO i ;f..:. !. 10 I'
. [~~:fJ !j;~" ~>>>T~F\:fr:'T:r:=
L::.l-_
5
i ] ~ .
~ _:__ .'" row"j- --~-]
~ .~.rn r-'-i, I
I_ ~!, t.dJ \ ] 't. at ___ _._1
9
C
....-4
AFFIDAVIT OF PUBLISHER
OKEECHOBEE TIMES
106 5.E. 51h 51., Okeechobee, FL 34974
(863) 763-7283
Published Weekly
STATE OF FLORIDA
COUNTY OF OKEECHOBEE:
Before the undersigned authority personally appeared James A.
Hughes, Jr., who on oath says that he is publisher ofthe Okeechobee
Times, a newspaper published weekly at Okeechobee in Okeechobee,
Florida:
Affiant further says that the said Okeechobee Times is a newspaper
published at Okeechobee, in said Okeechobee County, Florida, and
that said newspaper has heretofore been continuously published in
said Okeechobee, Florida as a daily, weekly, or bi-weekly and has
been entered as second class mail matter at the post office in
Okeechobee, in said Okeechobee County, Florida, for a period of one
year next preceding the first publication of the attached copy of
advertisement; and affiant further says that he has neither paid nor
promised any person, firm or corporation any discount, rebate,
commission or refund for the purpose of securing this advertisement
for publication in the said newspaper.
,. "--,m'OOiNicALREVmw'h'h'_' ,
COMMITTEE MEETING NOTICE
NOTICE IS HEREBYGIVEN that the
TechnicuJ Review Conunittee Qf the City of
Okeechobee will meet: in Regular Session on
Wednesday, September 26, 2007, at
, 111:00 LID., City HIIII. 55 SE 3rd Ave,
Rm 200, OIceechobee, Florida The public is in.
vi"" llIId e1lCOuraged to ottend. For a copy of
the "llenda COli'laCe the General Setvices Deport.
ment (863) 163-3372 x 218,
PLEASE TAKE NOTICE AND BEAD-
VISED chat if any person desi.... to appeal any
decision made by the T..haicaJ Review Commie.
tee with respect to any mallei considered at dlis
meeting. sudt in......... person will n<od arecool
of the proceedings, llIId for such pwpose may
need to ens= a verbatim re<ord of theproceed,
jogs is_.which r=rd incllUlesthe _ny
and evideDce upon which the "I'I'"aI is ro be based.
~-: ~=::~'::ciri-::" of back,up .
In accordance 'wilh the Americans wilh
Disabilitie~,Act .(AOA):and- Aorida 51atole
286.26. pirioos wilh disabilities needing special
accommodation to participate in Ibis proceeding
should contac' Lane 6tuWotea. DO laler than two
(2) working days prior to the proceeding ar 863.
163.3312 x 214; if you ~ bearing or voice im-
paired. call roo 1.800-222.3448 (voice) or I,
888,447.5620 (TIY).
by: Brian Whitehall. City Administraror
Betty Clement,
General Services Coordinaror
Published 0012012007
\. ~_~~~.~.li'~~"'h___......'mn.'..__nnm./
that the attached copy of advertisement,
being a Technical Review Committee PO#13501
in the matter of City of Okeechobee
City of Okeechobee
55 SE Third Avenue
Okeechobee. FL 34974-2932
In the Court,
was published in said newspaper in the issues of 09/20/2007
~t1~.
Jam A. Hughes, Jr., (Publishe '
Sworn to and subscribed before me
2~
~.
this
day of
~0~
~
A.D.
2007
(SEAL)
;f/~
Notary Public
fA
", '" Rosealee A Brennan
" ""yp". " 8483
_"'-;'O-;';';":,:"<k':Commission #DD) 1
~ *: \~i: ''. Expires: lun 25, 2008
~/~~" 'I.,~ . Bonded Thru
",,;,~~,.~~,, Atlantic Bonding Co" Inc.
AFFIDAVIT OF PUBLISHER
OKEECHOBEE TIMES
106 S.E. 5th St., Okeechobee, FL 34974
(863) 763-7283
Published Weekly
STATE OF FLORIDA CCo MITTEE MEETINGG NOTICE
COUNTY OF OKEECHOBEE: NOTICE IS HEREBY GIVEN that the
Technical Review Committee of the City of
Okeechobee has been cancelled. The next
regularly scheduled fleeting will he Wednesday,
Before the undersigned authority personally appeared James A. September 26.2007.10:00 a.m.,City Hall,55
Hughes,Jr., who on oath says that he is publisher of the Okeechobee SE 3nl Avn,Rm2ndenc encouraged Okeechobee, attend.The
public is invited and encouraged to attend.For
Times,a newspaper published weekly at Okeechobee in Okeechobee, a copy of the agenda contact the General
Florida: Services Department(863)763-3372 x 218.
PLEASE TAKE NOTICE AND BE
ADVISED that if any person desires to appeal
any decision made by the Technical Review
that the attached copy of advertisement, considered this respect meeting,to any matter
Ny considered at this nnee[ing,such interested
being a Cancelled TRC Meeting Notice PO#013391 person will need a recofi of the proceedings,
and for such purpose may need to ensure a
in the matter of City of Okeechobee verbatim record of the proceedings is made,
which record includes the testimony and
City of Okeechobee evidence upon which the appeal is to be based
55 S E Third Avenue Media is used for the sole purpose of back-up
for the General Services Department.
Okeechobee,FL 34974-2932 it Disabilities Act(A A)and Americans tote
Disabilities Act(ADA)and Florida Statute
286.26,persons withdisabilities needing special
accommodation to participate in this proceeding
should contact Betty Clement,no later than two
(2)working days prior to the proceeding at 863-
In the Court, 763-3372 x 214;if you are hearing or voice
impaired, (voice)aired,call TDD 1-800-222-3448 voice)or
was published in said newspaper in the issues of 08/16/2007 1 by: Brian Whitehall,City Administrator
Betty Clement,
General Services Coordinator
Publish:08/1612007
Okeechobee Times
Affiant further says that the said Okeechobee Times is a newspaper
published at Okeechobee,in said Okeechobee County, Florida,and
that said newspaper has heretofore been continuously published in
said Okeechobee, Florida as a daily, weekly, or bi-weekly and has
been entered as second class mail matter at the post office in
Okeechobee,in said Okeechobee County, Florida,for a period of one
year next preceding the first publication of the attached copy of
advertisement; and affiant further says that he has neither paid nor
promised any person, firm or corporation any discount, rebate,
commission or refund for the purpose of securing this advertisement
for publication in the said newspaper.
/7,9
James. Hughes,Jr., (Publisher)
Sworn to and subscribed before me
this /6 ' � day of
A.D. 2007
(SEAL) Notary Public ,a sealer A, Brennan
Commission#DD318483
Expires:Jun 25,2008
'724.0F , Bonded Thru
Atlantic Bonding Co.,Inc.