Loading...
2024-09-11 Ex. 13, Item VIII. D. ivt 19 9/6120?d7l. L A0te,:aef, E2024 Paving Projects Range of Total Costs r a Width Minimum Midpoint Maximum Segment Lenth(ft) SqYds Miles (ft) $225,000/Mile $285,000/mile $434,000/mile SW Park Street,SW 11th Ave to SW 1 7th Ave 1,600.00 20 3,552.00 0.303 $ 68,182 $ 84,848 131,515.15 2 SW 11th Ave,Park St to SW 11th St 3,965.00 20 8,802.30 0.751 $ 168,963 $ 210,265 325,910.98 vi F] 7 SW 7th Ave,SW 6th St to SW 9th St 1,100.00 20 2,442.00 0.208 $ 46,875 $ 58,333 90,416.67 3 NW 9th Ave,SR 70 to NW 2nd st 404.47 20 897.92 0.077 $ 17,236 $ 21,449 33,246.21 • 5 NW 9th St NW 9th Ave to NW 5th Ave 1,480.90 20 3,287.60 0.280 $ 63,107 $ 78,533 121,725.49 SE 8th Ave,SR 70 to 1,300 feet south 6 of SR 70 1,300.00 20 2,886.00 0.246 $ 55,398 $ 68,939 106,856.06 4 NE 6th Ave,SR70 to NE 6th St 1,885.57 20 4,185.97 0.357 $ 80,351 $ 99,992 154,988.14 8 NE 7th St,US 441 to NE 5th Ave 1,408.00 20 3,125.76 0.267 $ 60,000 $ 74,667 115,733.33 NE 9th St from US 441 through NE 9 12th St to 12th Ave 7,800.00 20 17,316.00 1.477 $ 332,386 $ 413,636 641,136.36 0.00 Total 20,943.94 46,495.55 3.97 1,721,528.40 Grand Total- $ 892,497.44 $ 1,110,663 South West South East North East North West Min $ 284,019.89 $ 55,397.73 $ 472,737.36 $ 80,342 Quadrant Total Costs Mid $ 353,446.97 $ 68,939.39 $ 588,295.38 $ 99,982 • Max $ 547,842.80 $ 106,856.06 $ 911,857.84 $ 154,972