2023-06-15 V. A. #23-003-TRC, Storm Report dtd 4/18/2023 Park Street Commerce Center Master Storm System Storm Report by AMERICAN CIVIL ENGINEERING CO. HERB c O r J�eHSE•.,: *• ! No.84698 7y▪ q' STA E OF i ..m.,,.v.o=, ...w. s`S�G�•AL Gt�" John J Herbert IV, PE #84698 4/18/2023 American Civil Engineering Co. Stormwater Summary Park Street Commerce Center 4/18/2023 SJRWMD #: Basin Size: 1.2 AC (Development area), 16.2 AC (Total Site) Special Basin Criteria: Lake Okeechobee Wetlands: #56-00002-M Bluefield Ranch Mitigation Bank Hydraulic Soils: Manatee#6 Type B/D (77%), Immokalee #11 Type B/D (23%) Impervious Area: 0.05 AC existing, 0.65 AC proposed roadway Treatment Volume Required: 0.21 AF @ 18.52 elv. Peak Design Storm: 100 Yr—72 hr Pre vs Post Discharge: 0.5 cfs/AC allowed Pond Volume: Dry Pond 0.436 AF (20 Top, 16.80 Bottom) Pond Recovery: 48 hours Seasonal High Groundwater Elevation: 14.50 elv. (See Geotech Report) FEMA: Zone X (12093C0480C- 7/16/2016) Slopes: 4:1 Dry pond Maintenance Berm: 10 ft Fencing: No fence proposed American Civil Engineering Co. , Truhevve Okeec a —T -- WetIti�c' v>•dH• ,• 1 'r swan tan'. CT,uwn co.,tk i t. Q. .•A - ks Ccmpoaltc- ` -= C ..,•. . `, . �' ri reat �• CII R_ ti t. .F f • t.A ,0 'Y h`h' s` P•,,}.— • • rr r' yr' �'-`.� ` y14;7 +;• •lanxlrsn R Ferlilait,• •`` �w'R ilk pp II ,,,,..:,t 1 ill 4' Nit ,. . MsKinnefBo .'rTf•�� lit ' k itoir _ Z." 7r."- ',-. -3_/-1111111r-'- '7,, Ilk( d' r, C11- „it; a • i -.4 r M fi4�+ `• y,.. �" '1., ,..r :.,pII! i�_541,,t � � r 1 r + ' • P* �,,. , s �k S`7� , Sant r�_ 4 'r L'';'! a .r# , - } • ,, '+ t ►, i ' r kf 11(1 r 4 Li 4. . • a . . 4 .y , I , gi A ."-r— * --' I I: movies -. . 1740 , , , , ,,,,,.. , _ tizs, . . ..i, . e*s . X ..3 .i�' 3�7 > �� @ . American Civil Engineering Co. Site Location/ Existing Conditions: The project is approximately 1.2 acres in size and located on 1000 East S.R.70 in the City of Okeechobee, Florida. The site is currently undeveloped apart from an unoccupied house in the back northeast corner. A man-made drainage swale has been cut through the center of the site emptying into Taylor Creek in the north. Several isolated wetlands are present on the property. Topography of the site flows from higher elevations in the east to lower elevations in the west, ultimately discharging north into the creek. During geotechnical investigations organic muck layers were discovered in portions of the site (approx. 27%)that correlated with higher water tables relative to the borings without muck. Proposed Conditions: Project proposes four individual commercial lots created with stormwater met on each lot individually via separate stormwater system.A proposed roadway connecting the lots to public right-of-way is also included in the storm system with 54% impervious area. Water Quality: The site requires nutrient loading be met for Lake Okeechobee basin. The program UCF BMP Trains (ver. 4.3.5) was implemented to meet pre-development levels of discharge. Nutrient loading criteria exceeds the standard SFWMD criteria of 1" over basin or 2.5" over percent impervious area (less roofs & wet ponds). The system is designed to provide 2.1" of dry retention over the basin. Water Quantity: Rainfall tables used from SFWMD regarding the 10 year—1 day(5.25"), 25 year—3 day(9") and 100 year—3 day(10") storm events were used to set the final elevations of roads and buildings via ICPR routing simulation.The simulation was ran once accounting for the 4" bleeder orifice and emergency overflow on the dry pond and again with no available outfalls. The more conservative simulation was utilized in setting design elevations. Dry Pond (elv) No Outfall—100 YR—72 Hour storm : 21.84 No Outfall—25 YR—72 Hour storm : 21.22 No Outfall—10 YR—24 Hour storm : 19.21 Min Road Elevation= 19.21 provided min. road elv= 20.56 American Civil Engineering Co. Water Discharge: The Site discharges north into Taylor Creek. A SFWMD restriction allows for 0.5cfs/AC for this region. With the basin size of 1.2AC a allowed discharge rate is 0.6cfs for the 25YR/72hr storm. The entire 16.2AC site is allowed 8.1 cfs. Post development the discharge rate from the proposed roadway is 0 cfs. The 24" central stormwater pipe connecting lots 1—4 is capable of flowing 10.99 cfs at 0.2%slope. This allows for the future lots to proportionately discharge into the pipe system System Recovery: Drawdown of the storm pond was performed using a 3 day recovery via groundwater with percolation rates at half rate given in geotech report.The pond recovers the treatment volume within 48 hours. Operation & Maintenance: Lots 1—4 will be owned and operated by separately entities.The proposed roadway,storm easement and rear pond will be owned and operated by City of Okeechobee. Pond Stage/Storage Stage (ft) Area (sf) Area (ac) Volume (ac-ft) Notes 16.8 4,040 0.093 0.000 18.0 5,252 0.121 0.133 19.0 6,568 0.151 0.269 Overflow top of outlet 19.30 20.0 7,985 0.183 0.436 TOP mirnevathin Req. Retention 0.210 ac-ft Min. Wier Elevation for req'd TV = 18.52 ft Design Wier Elevation = 18.53 ft Treatment Volume Provided = 0.210 ac-ft Treatment Volumes Basin Area 1.205 AC Impervious Area 54% 0.65 AC 1 1" over the development 1" x 1.205 AC 0.100 AC-FT 2 2.5" over% impervious area 2.5" x 54% 1.35" 1.35"x 1.205 AC 0.136 AC-FT 3 BMP 2.1"x 1.205 AC 0.21 AC-FT Development_Drainage_Basins Basin Area (AC) % impervious Cover CN Impery (AC) Roadway 1.205 54% Impervious 98 0.651 Pervious (Type B Soil) 58 Roof Sub-Total CN 80 Totals 1.205 54% 0.651 American Civil Engineering Co. PRE- BASIN MAP ''l 11 i • t -a ,ki r tie A,is 1 z II; ;t 2 1 1 i as pi ii .1/ i ,2 I sli 1 1 a! i tt !t Sg 1 I 1 li : 38 , m 1 i, Ciq I 1 r1143 5i 11 vr,' ' ' ' i i i 5 I• 'O +••••'— i ..." I ..- ' • ft 33g44 ; ,I. 0 Ee . x 1 ,,• z 1 • !fill, , . ,,,, .,_IE ;;,, P0; h - ;-• , , -;___,_„_„__,,___,,,___„,.__, ;Ai , '. Il . Trill!I Wil I i 1 1 11 I. , i • 1 0- 1 1 , 1 lg!zi 1 111 5 111 I 11 1" El i; .._ •.,- R 1" ii 2 IV .111111" I' 1` • ',' 2, . 11111; "i"; 1 IF"1"11 111.11,i, *;1_____:.---- ----' s -- ' . xa. R. .0p . Val.F ill1 '.. 1 iii Ili '1 '' . , ,, , „ im-N. xit ,1,'i 1 z;Ili I, , --- - _ s ,, 1._ . s • , ,I , 10?....-1•.'''.'i1', - \ k • Isi t f'',c.,.r.,P.••;r,'n23 3 •• e iI,IJ IL-IITItI11! s • i Li s ..: -A '.' I , air — - ' 1 ; ' ii • t ------ i: ?Hi! MI 1:111 !OP.: j 1....,„1 r 11-- --'--- __ , \ - _ _.. . . ,--, 4 .le eel go' xl 1 N lit h "9 a" ,— 'Ill= pkele. ro.1.14Z .2=1) '..,=.,o.p ` CSYMZIMP ,1 4 g 111 liA 0 0 1 il INILA 1 115 1112; I!1 !ill 1 I 1;541 1 0 Af,- 1,,i. . tan. EE:10-0 , , , , I F I 1' fil 11 eil 1 '"Vilg 1 I 1 1 1 Ipl pt e 1,11 1 NM 38 1: IN 8:911E I I 11 11 PI :1153 5 si 8 I 1 ol 1 i : 1"51114 ! Pax gl gi :19' 1%64F IF ilgl Fq Ity 0;'11 1121H1 II'ig.4181. ea't g V 11 .1. dliqd 40! 1 1 1 2 hi qi:Ig 11!1!11 0 i g 1 l ill; !Am iiii !1 ; I lei p=iill Kill 1 1 ' A 1 Ill ig'N'al 1:1 '' a 1 i 11 11 i MITI vp.. i A -; "P51 0i/lisii [WI -,, .A2P1 .-s-; 4 •• W. 11 glqi -44' Li NAgt "II 11:95 Wilillii111111:"11111; IT li I P 111111 li i 40 i PAR I 1101 iiilll 0211 0 :!'l°11 F ! 1 1 g 12 2 11 11111 1 i '''' '6 11- 11ilirAllipl: ii z Ini . Ail li i! ,,, 1110161W , :- , IIs' . _0 .. ja. lig.. ,fl I, 1 0 IA. 5 i 5 ...8 - .8. M. 4- M. 111 gi!al 3411g 111"lill 11 ii F 11'4 1 2 5 il ! 1 ''' PPP II :11 iligli les P qi 1 1le .41 I .-3 •I! -2 2 ? i 4 PA- i I RN *Al ' 11' '..) il!1111:11 111/1! Pli 1 MI g !I 1 ° Ill i i 11 'I i - . 0! ;: pFI' 2 •^• g s i ii _ m 113 lir deli tip ii. I :;i. 1 N: , . h. i ! . 1 i7,1:1 r .4.6 Ii 4k. , !, i . 10,1 1,. 101 .,1: ;a :. 1 .9 11F ";_. k g I ,;,z, I Oh ./ 41 — o = illeD211; HIP 1 ! g 1111 sh P! 1 cn 111 i 1 i ; ,f,' ,g, ;h41!! cA :i ' K .511 01151 .4.8 . t 8 -41 ;1 "2 e - 1 ! t 3 olli al . ii . t zINA,E1 '- 0 m ' z i; Ill 11111 11 1/ e i 1 4 F z I I lit :0 1 01 A 44 • 0- I 4 WWI WM) Ph 2 i 011 212 A 6 , 21 11 1; ill 6.cs x i! ," I M k 1 i i SWPP PLAN SOS Al SM.==UM OM 0 RPM Or MOM ....1 ..1 il PARK STREET AMERICAN CIVIL OIL EMMEMC.SL=II CD I s ENGINEERING CO COMMERCE CENTER 207 II KW 1,0„ 1 wvimit sum Put mos ....L.an* 1000 STATE ROAD 70 E OKEECHOBEE FLORIDA 34972 I. 4464.4 1444•4. . American Civil Engineering Co. POST- BASIN MAP k 1 Y —`_ North Y�r PRE-BASINS X,. " " lf gf I'l 1 0.246 AC \ ` •i ai g i6,• 4,1.1 .� gs W i�'Ae E I y! ' • i rtxoc ♦\: 61 1 III : - ,`i •" I 4(MINIMUM) S PRE-BASIN C :L PRE-BASINdI< . 3.220AC ,��_ J ' .. g �SWPPP INFORMATION ®m' 0.164 AC s • .•LOT 3 � LOT4 >«a.Nm..,�. .-. I..-mlr 87 • a'm ! fit: 17I PROS.-6BASINA "" '�' �'P' 20F'�STE5RM EASEMENT At6C CI .; . m \ f II nil"' R. a o • f .. U 2 sar.ncc�j - "`uuu ! QPRE•BASINB ! -1J.•. -jswr ... W0+°G t 2.297 AC • c5 10 FT SEWER EASEMENT.. ` gg€ FORCEMAIN TO SR 70 i!i. f .. -. _Cz IS ` i —J _J 11 ' ' NOTES' ]` 12 11 • ';-�� '- I OB.�K magi NU.mc�sui OM•wm a I I * I ! . _®®.�®Iron Na.r/F1.CE Ii'I .1 lOT 2 8 a- u mom, `0".`o. ..moot I -1 .111 SWPPP INFORMATION SIGN ICI - -.V•.� Z NTs EWC n . . k ` I]F ..a.— 0.11 ~W o �. li Nowa .®.Am�o...,vub>wa a.so.wu .m nos W w rrrv'caarwcml 1 W - * �OT384 cf >rm....w ..r.n®I�a.r.. Z W m .-._ - k - :'-.•mu.xroNcz coy,o......a.............. l csF'.�I- . a F-W 41 . -. .....ee...n..w..o .d Y CC ,v NW n W "" EROSION'CONTROL NOTES: .qe• 0-M .m ..K� w®o.<...�.11.11,0 0.....110.1.1.1.. .MN I..o. .m m m U SWPPP NOTES: _ __ 01.........0 ��� ...eme '� I.�s.o®.u..00.r.eromv....MONO 'o'.r�v: ®.I.a . m..m.Iomurrr.r®u �......0.s.....0 r ,...�.x...a... .. weueee .�<a.1011.�"11,..mwm.�m..... .1 e....�,,, '" .mu roe.mes .�` ... .�..ru....v..... a.u.n...m.n.000. m,m SILT BARRIER DETAIL ®.re w.r m.erm®o o we too wevwr • rr......n.e.w. n ...om NOT TO scu[ ova rep owe m `ee..edj rr.v..m.>r w..->®n wm.we, /// \\\ i.ne`Ire.earl�.r®�°.e.Ir...m.NM.r .....rrr.rr.rwa _ __ ..w,.�. ............... i`w®o...�u'in.+..� ® r I. a*v 0.0.111.100011. s."i`®w ��'�... .....n..h....�..,N create I. e2111.10.0.11111.11 MOO 0im.'"e I.ml11 .a.m e..m.e.u...s m.o.a ree.m ewa.r.ma _ _ eo...® iT ..v..rrr. `� ...c.nrr`�....�mw""n n.ml �mw'e.®®oar aa""`...n _ muel.0 um � KM 'se:M.°"°a....".n r..�.n`e�`ree'e .vmm.mr LC I WO ..e..vw.� mmo..u..e.sc mvom r.n�.s�.s w.,u...r .r..I. sw0 RAN r..m MM.a u..v.cuu.mmm mw.m sv.0 won woemu eelarinw .muo..ec rm v..a low•.®m.® roomyol.e..�... ....n .r C3,0 MI ww.e.� .�... .. ..tee • /) 1 W 77 O VI 1 I 1 � � g o -� J ti € I 1 g I II 1 1 1 , 4 1 , A I I I I 1 sI , II I :, TOP OF BANK i-J ® I ,�d,O ,i ' D • _ _s ig'R,.' 1 - PT44.2 I 4 11 1 vc ._- •�,r1'.4't.?. ',, •',r- _-TOEOF9LOP!"rt.ry r__- 111M, A N Ati it'� . 'a: L /� .. II / i. - ; / a III ,„ • 1 1 I 1 \D 1 I /� I I g1 'II 11 11 I11 /8 1 I g PIDe-(81 L ` i g III aY-� II 1 I ml ml 1 �I I , :b g I 1 '� II n. .40 I I , I 1 /� y .g 1 f II 8 P I I I V v 1 1 '� 1 4 r•/sr4 1 (� Ii':;;.> r F i ii•ii: ,(�, .:0000' %4". C A V iv — O 14 C q _ N m , n — O Z Wo D NNNN A,./ o L., LL w lO m m E i a J•' p, o ttLn I ♦\: �4 a. n i!s 3 DRY STORM POND PLAN — ,...; am„ " s$g• j$ PARK STREET AMERICAN CIVIL - _ ��"° o r COMMERCE CENTER ENGINEERING CO. we .ma esa�swat.i lTKa9 a.fNRLI:1NIa i01K'ANRra SWIM Jai _ 1000 STATE ROAD 70 E,OKEECHOBEE,FLORIDA 34972 �:OM I �-np0 ram a as American Civil Engineering Co. FEMA MAP DIV L IUD ps I JGD-LJ )BJVW H g 17FNIA ►+OG - , EnqiuzsmenEw • Ario 74 1P+i6 ' LW A N°i DA-1pFf0HEVLS) `01 r-� i r M Iusss 4 s LW WRJPBM( 41:1-11 s a 915 r'i i ,, ! Ok , . * � l 9DX0&CFHpRFf}UG$JHJ/ #. 44; R DODOO RFiIORT°YWKDA-UGH . ii r"f *`* i" ' 1' - . •! ,' * G-BNKOHNWxDFCHIRV/RJYWx ja¢ i ip �, ,� ; CUI-DJR NWOQFCHVDDJH20H,ai; ° l V yr' 4 XJHAFCCLW-RD/3DOD ` ! b �rF " PK 'e� +fi SJHJYWKSDR-f'pRTift\iN04-1W2 lithe4.... 41111. >s r." Obi 3 l*H s+11iNFV 'R n _. * a SJI DYWKpRTS�iVC#iWRFM H*CH' 1 s 1 ;of,A - � + `� j � �° � � � � 9JFDR oaw pRTE1JG �: * a a 4 ,,_,...: (IF-fW 1-IW s { ^0 it *► $JFDR8IHNHJEQ-G R� w ' _ p BUG I �� ° &CCCH) &OYl UW RJ flNRJR1EU a -- ... - !' e t- 6514 II i i i II FitH-1 IL Ni RJ p Rizzo O 1* t x BJRaNEifWLRQ/YW<Sixo MIR 1 f • `� g �' y - - - &N1ml�i R] • ---P - °OHPR�PFirDM_RQL41 4 ��441 E t` LEW R @NX3 tiPh SO « IP 1 ir t — — X1L�(3 PNLR] idC]311\ • !' ; �� +k �,nNOO 7JOQ1-RN Ias-DLCH .i_'. a I. p s.- • t f 7' — 3JRLOH°,DA-OLOi * 4 4 0 0 ,"" If 31RUC9(F}-DWXJH T ' ) R ` ♦ ♦ - f �e L'LWDD/VD$I 0 CEO H � 0* � �` • 4 t4 , itor .� lott .- . ? hQ-i3OaVDD-GFaWW1ESLVCO1;�JFI_2u�M • ;� _ + 41 ! I. P 'r + * IP SZON\ADHaMG6WQi)MUCLG(3;i/4aNUH3JFA t a _ IP ; (� s )4 ' f w • • 1 D1DW}f71LNA7WLYH31f8UW\ORiVvLFQ 714VE'SR�L14/YW<pVVVCCEDJO/IRJ W4iDA-IR i A. ► G LWO IORGFJ3/LI LW LV(FdNYR GDJC3bRJLHGHOF� `"` Aria.-� r - ~"� �. 'h4-1®k26\A1r1R�LH/YW<yov®hES "i' "� q • CFF)UCRWVC DJG/ ili • ..,>l °. 4 • �;* flit- - 'a �r �`Sit 1; ♦ ,� * M-i1ORG14TUGLORJBNLR�LVGUL`1-GaUFFWO\IUFRVFti • A 1 :WEIJL WJWLYH IFZEM-UYL Ri/SRI_G G Bp XV ES ' ` * II' 4Or i a +s.=..A 3 • mad 4 r rilF�3JW-GR) DA( $ ECG CF JC N 4 ° s ►. 4 41 11 # i. *Ya UHOH�N RO;]l-V RJ CF�N ViEkiD1-CON W V\ACV GJM-1Em ,� fir. . % "° , ' " !"` W R hH7fDMHIHWVLYHLORJBNLR�BR{DHRJ 9-Fl71ViG-U\A-43GESainINDRA-U MR * gift' � AO * XV ES L 13H L V YR_G L 1 WHKHRJ RJHR WF4-IIROOR EUSS ftfi'-.�r • 0 i * I ..' • " HJFR ANCRcRNL -W B1l-ESLBJ-11\IOFFGFCHOCH-DV ;' , ,a_ M ° +� tR �" OHHL UMHB]J 2SRJFM/LRDGDW1I RiQVNL(}WLILHJV ,;.r 4. as .�.. 1�. .... i" v :_ ., )�o-o QRiJ Ct�)9-IIHaWLYHCiVvI�06L@l-l/IRJ XE93-G Doc CR3-U(1}GuJFD/RIO NEHA.A-GIRJ - - UH)OUM7J\S4_131/U 0fl 4 86 Mt RIIO 015 VM41 RW D DUHUFM4-GFAME U American Civil Engineering Co. SOIL MAP '" APor zT � milmiNe 5th St . ill .- II ;.o.- r _ ' .e i � ",• .: ' , k'�LM+e' r. +.car,. '" �' J., , y t i i ... t w+:. r _ g� y R 'fin. t rt' } .t f. ' r 4. +3 .,i 4-4 tt, ,- - 3 tea. I /1e 41h St r* k 1 4'Y A kr A.t 6 , 11 - i ' 44 I `I ' !'" 111 rya 11 f y er d w. _._"_— —.....-.____._ _._.._...,, - -: State Road 70 E Oil USDA SOILS SURVEY 6—Manatee loamy fine sand, frequently ponded, 0 to 1 percent slopes 11—Immokalee fine sand, 0 to 2 percent slopes PROJECT: 1000 State Road 70,Okeechobee,Florida SHEET 2 OF 2 f' C1 Ar ENGINEERING DRAWN BY: C.V. PERMIT#: DESIGNED BY: C.C.C. PROJECT#: 2210339-soilsinn /J iiVAL AND TESTING SCALE:NOT TO SCALE . American Civil Engineering Co. ICPR 1 NO OUTFALL MODEL RESULTS Node Max Conditions[Scenariol] Node Name Sim Name Warning Max Stage Min/Max Max Total Max Total Max Surface Stage[ft] [ft] Delta Stage Inflow[cfs] Outflow[cfs] Area[ft2] [ftL ice_ Post Node 100YR-72HR 20.00 21.84 0.0010 3.85 0.00 7971 Post-Creek 100YR-72HR 16.00 15.00 0.0000 0.00 0.00 0 Pre-Node 100YR-72HR 16.00 15.00 0.0000 2.49 0.00 0 Pre-Creek 100YR-72HR 16.00 15.00 0.0000 0.00 0.00 0 Post Node 10YR-24HR 20.00 19.21 0.0010 2.40 0.00 6865 Post-Creek 10YR-24HR 16.00 15.00 0.0000 0.00 0.00 0 Pre-Node 10YR-24HR 16.00 15.00 0.0000 0.82 0.00 0 Pre-Creek 10YR-24HR 16.00 15.00 0.0000 0.00 0.00 0 Post Node 25YR-72HR 20.00 21.22 0.0010 3.33 0.00 7971 Post-Creek 25YR-72HR 16.00 15.00 0.0000 0.00 0.00 0 Pre-Node 25YR-72HR 16.00 15.00 0.0000 2.05 0.00 0 Pre-Creek 25YR-72HR 16.00 15.00 0.0000 0.00 0.00 0 C:\Program Files\Icpr4.07.08\ICPR4_Examples\ACE PROJECTS\Park Street OKE\ 4/18/2023 13:39 Node Max Conditions[Recover] e Rant _ = ' Warning Max Stage Min/Max Max Total Max Total Tfax Surface ge[ft] [ft] Delta Stage Inflow[cfs] Outflow[cfs] Area[ft2] _[fti Groundwater Recover 14.50 14.50 0.0000 0.41 0.00 0 Recover Recover 20.00 18.52 -0.0010 0.00 0.41 5950 Node Max Conditions[Scenariol] r''.V+ .-, I.: r Warning Max Stage Min/Max Max Total Max Total Max Surface'` Stage[ft] [ft] Delta Stage Inflow[cfs] Outflow[cfs] Area[ft2] [ft]___ Post Node 100YR-72HR 20.00 19.90 0.0010 3.85 2.35 7835 Post-Creek 100YR-72HR 16.00 15.00 0.0000 2.35 0.00 0 Pre-Node 100YR-72HR 16.00 15.00 0.0000 2.49 0.00 0 Pre-Creek 100YR-72HR 16.00 15.00 0.0000 0.00 0.00 0 Post Node 10YR-24HR 20.00 18.78 0.0010 2.40 0.11 6291 Post-Creek 10YR-24HR 16.00 15.00 0.0000 0.11 0.00 0 Pre-Node 10YR-24HR 16.00 15.00 0.0000 0.82 0.00 0 Pre-Creek 10YR-24HR 16.00 15.00 0.0000 0.00 0.00 0 Post Node 25YR-72HR 20.00 19.85 0.0010 3.33 1.38 7756 Post-Creek 25YR-72HR 16.00 15.00 0.0000 1.38 0.00 0 Pre-Node 25YR-72HR 16.00 15.00 0.0000 2.05 0.00 0 Pre-Creek 25YR-72HR 16.00 15.00 0.0000 0.00 0.00 0 • ■ Simple Basin:POST-BASIN Scenario: Scenariol Node: Post Node Hydrograph Method: NRCS Unit Hydrograph Infiltration Method: Curve Number Time of Concentration: 26.0000 min Max Allowable Q: 0.00 cfs Time Shift: 0.0000 hr Unit Hydrograph: UH323 Peaking Factor: 323.0 Area: 1.2000 ac Curve Number: 80.0 Impervious: 0.00 DCIA: 0.00 %Direct: 0.00 Rainfall Name: Comment: C:\Program Files\Icpr4.07.08tICPR4_Examples\ACE PROJECTS\Park Street OKE\ 4/18/2023 13 37 2 Simple Basin: PRE-BASIN Scenario: Scenariol Node: Pre-Node Hydrograph Method: NRCS Unit Hydrograph Infiltration Method: Curve Number Time of Concentration: 35.0000 min Max Allowable Q: 0.00 cfs Time Shift: 0.0000 hr Unit Hydrograph: UH323 Peaking Factor: 323.0 Area: 1.2000 ac Curve Number: 61.0 %Impervious: 0.00 %DCIA: 0.00 %Direct: 0.00 Rainfall Name: Comment: • ■ Percolation Link: L-0110PERC Scenario: Recover Surface Area Option: Vary Based on Stage/Area From Node: Recover Table To Node: Groundwater Vertical Flow Termination: Horizontal Flow Algorithm Link Count: 1 Perimeter 1: 366.00 ft Flow Direction: Both Perimeter 2: 680.00 ft Aquifer Base Elevation: 10.00 ft Perimeter 3: 1310.00 ft Water Table Elevation: 14.50 ft Distance P1 to P2: 50.00 ft Annual Recharge Rate: 0 ipy Distance P2 to P3: 100.00 ft Horizontal Conductivity: 7.000 fpd #of Cells P1 to P2: 10 Vertical Conductivity: 6.000 fpd #of Cells P2 to P3: 50 Fillable Porosity: 0.250 Layer Thickness: 2.30 ft Comment: 1/2 the perc rate for FS • • Drop Structure Link:CS-1 Upstream Pipe Downstream Pipe Scenario: Scenariol Invert: 16.00 ft Invert: 15.00 ft From Node: Post Node Manning's N: 0.0120 Manning's N: 0.0120 To Node: Post-Creek Geometry: Circular Geometry:Circular Link Count: 1 Max Depth: 1.50 ft Max Depth: 1.50 ft Flow Direction: Both Bottom Clip Solution: Split Default: 0.00 ft Default: 0.00 ft Pipe Count: 1 Op Table: Op Table: Damping: 0.0000 ft Ref Node: Ref Node: Length: 70.00 ft Manning's N: 0.0000 Manning's N: 0.0000 FHWA Code: 1 Top Clip' C\Program Files\Icpr4.07.08\ICPR4_Examples\ACE PROJECTS\Park Street OKE\ 4/18/2023 13:37 3 Entr Loss Coef: 0.50 Default: 0.00 ft Default: 0.00 ft Exit Loss Coef: 0.25 Op Table: Op Table: Bend Loss Coef: 0.00 Ref Node: Ref Node: Bend Location: 0.00 dec Manning's N: 0.0000 Manning's N: 0.0000 Energy Switch: Energy Pipe Comment: Weir Component Weir: 1 Bottom Clip Weir Count: 1 Default: 0.00 ft Weir Flow Direction: Both Op Table: Damping: 0.0000 ft Ref Node: Weir Type: Horizontal Top Clip Geometry Type: Rectangular Default: 0.00 ft Invert: 19.75 ft Op Table: Control Elevation: 19.75 ft Ref Node: Max Depth: 3.00 ft Discharge Coefficients Max Width: 2.00 ft Weir Default: 3.200 Fillet: 0.00 ft Weir Table: Orifice Default: 0.600 Orifice Table: Weir Comment: Weir Component Weir: 2 Bottom Clip Weir Count: 1 Default: 0.00 ft Weir Flow Direction: Both Op Table: Damping: 0.0000 ft Ref Node: Weir Type: Sharp Crested Vertical Top Clip Geometry Type: Circular Default: 0.00 ft Invert: 18.53 ft Op Table: Control Elevation: 18.53 ft Ref Node: Max Depth: 0.33 ft Discharge Coefficients Weir Default: 3.200 Weir Table: Orifice Default: 0.600 Orifice Table: Weir Comment: Drop Structure Comment: ■ • Node:Groundwater Scenario: Recover Type: Time/Stage Base Flow: 0.00 cfs Initial Stage: 14.50 ft C:\Program Files11cpr4.07.08\ICPR4_Examples\ACE PROJECTS\Park Street OKE\ 4/18/2023 13:37 4 Warning Stage: 14.50 ft Boundary Stage: Year Month _x. Day Hour 0 0 0 0.0000 14.50 0 0 0 72.0000 14.50 Comment: ■ • Node: Recover Scenario: Recover Type: Stage/Area Base Flow: 0.00 cfs Initial Stage: 18.52 ft Warning Stage: 20.00 ft Stage[ft] Area[ac] Area[ft2] 16.80 0.0930 4051 18.00 0.1210 5271 19.00 0.1510 6578 20.00 0.1830 7971 Comment: • • Node: Post Node Scenario: Scenariol Type: Stage/Area Base Flow: 0.00 cfs Initial Stage: 16.80 ft Warning Stage: 20.00 ft Stage[ft] Area[ac] Area [ft2] 16.80 0.0930 4051 18.00 0.1210 5271 19.00 0.1510 6578 20.00 0.1830 7971 Comment: Scenario: Scenariol Type: Time/Stage C:\Program Files\Icpr4.07.08\ICPR4_Examples\ACE PROJECTS\Park Street OKE\ 4/18/2023 13:37 5 Base How: 0.00 cfs Initial Stage: 15.00 ft Warning Stage: 16.00 ft Boundary Stage: 0 0 0 0.0000 15.00 0 0 0 72.0000 15.00 Comment: • • Node: Pre-Node Scenario: Scenariol Type: Time/Stage Base Flow: 0.00 cfs Initial Stage: 15.00 ft Warning Stage: 16.00 ft Boundary Stage: Year Month Day Hour ., ...„., Stage,[ft1. 0 0 0 0.0000 15.00 0 0 0 72.0000 15.00 Comment: • • Node: Pre-Creek Scenario: Scenariol Type: Time/Stage Base Flow: 0.00 cfs Initial Stage: 15.00 ft Warning Stage: 16.00 ft Boundary Stage: Year Month Day . Hour 0 0 0 0.0000 15.00 0 0 0 72.0000 15.00 Comment: C\Program Files\Icpr4.07.08UCPR4_Examples\ACE PROJECTS\Park Street OKE\ 4/18/2023 13:37 American Civil Engineering Co. BMP — Nutrient Loading Complete Report Ver 4.3.5 Project: Park Street Commerce Center Date: 4/18/2023 7:01:55 AM Site and Catchment Information Analysis: Net Improvement Catchment Name Park Street Dry Pond Rainfall Zone Florida Zone 2 Annual Mean Rainfall 51.00 Pre-Condition Landuse Information Landuse Single-Family: TN=2.070 TP=0.327 Area(acres) 1.20 Rational Coefficient(0-1) 0.03 Non DCIA Curve Number 61.00 DCIA Percent(0-100) 0.00 Nitrogen EMC (mg/1) 2.070 Phosphorus EMC (mg/I) 0.327 Runoff Volume(ac-ft/yr) 0.165 Groundwater N(kg/yr) 0.000 Groundwater P (kg/yr) 0.000 Nitrogen Loading(kg/yr) 0.422 Phosphorus Loading(kg/yr) 0.067 Post-Condition Landuse Information Landuse Highway: TN=1.520 TP=0.200 Area(acres) 1.20 Rational Coefficient(0-1) 0.45 Non DCIA Curve Number 61.00 DCIA Percent(0-100) 54.00 Wet Pond Area(ac) 0.00 Nitrogen EMC (mg/l) 1.520 Phosphorus EMC (mg/1) 0.200 Runoff Volume (ac-ft/yr) 2.306 Groundwater N(kg/yr) 0.000 Groundwater P(kg/yr) 0.000 Nitrogen Loading(kg/yr) 4.323 Phosphorus Loading(kg/yr) 0.569 Catchment Number: 1 Name: Park Street Dry Pond Project: Park Street Commerce Center Date: 4/18/2023 Retention Design Retention Depth (in) 2.100 Retention Volume (ac-ft) 0.210 Watershed Characteristics Catchment Area(acres) 1.20 Contributing Area (acres) 1.200 Non-DCIA Curve Number 61.00 DCIA Percent 54.00 Rainfall Zone Florida Zone 2 Rainfall (in) 51.00 Surface Water Discharge Required TN Treatment Efficiency (%) 90 Provided TN Treatment Efficiency (%) 96 Required TP Treatment Efficiency (%) 88 Provided TP Treatment Efficiency (%) 96 Media Mix Information Type of Media Mix Not Specified Media N Reduction(%) Media P Reduction (%) Groundwater Discharge (Stand-Alone) Treatment Rate (MG/yr) 0.000 TN Mass Load (kg/yr) 4.141 TN Concentration(mg/L) 0.000 TP Mass Load (kg/yr) 0.545 TP Concentration (mg/L) 0.000 Load Diagram for Retention (stand-alone) Load Treatment Surface Discharge N: 4.32 kg/yr —* N: 96 % —* N: 0.18 kg/yr P: 0.57 kg/yr P: 96 % P: 0.02 kg/yr Mass Reduction y N: 4.14 kg/yr P: 0.54 kg/yr Load Diagram for Retention (As Used In Routing) Load Treatment Mass Discharged Upstream Nodes N: 4.32 kg/yr o N: 0.18 kg/yr None P: 0.57 kg/yr N: 95.8�/o P: 0.02 kg/yr Q: 2.31 ac-ft P. 95.8 /o Q: 0.10 ac-ft 1 Mass Removed N: 4.14 kg/yr P: 0.54 kg/yr Summary Treatment Report Version: 4.3.5 Project: Park Street Commerce Center Date:4/18/2023 Analysis Type: Net Routing Summary Improvement Catchment 1 Routed to Outlet BMP Types: Catchment 1 - (Park Street Dry Pond) Retention Based on % removal values to the nearest percent Total nitrogen target removal met?Yes Total phosphorus target removal met?Yes Summary Report Nitrogen Surface Water Discharge Total N pre load .42 kg/yr Total N post load 4.32 kg/yr Target N load reduction 90 % Target N discharge load .42 kg/yr Percent N load reduction 96 % Provided N discharge load .18 kg/yr .4 lb/yr Provided N load removed 4.14 kg/yr 9.13 lb/yr Phosphorus Surface Water Discharge Total P pre load .067 kg/yr Total P post load .569 kg/yr Target P load reduction 88 % Target P discharge load .067 kg/yr Percent P load reduction 96 % Provided P discharge load .024 kg/yr .05 lb/yr Provided P load removed .545 kg/yr 1.201 lb/yr American Civil Engineering Co. RECOVERY 1 Perc Link: L-0110PERC (Sim: Recover)[L-0110PERC] 19.00 i -US Node Elev I Wetting Front • -GWT atX=0.00 1 ( GWT atX=2.50 i 1 GWT atX=3.09 18.00--_--------- ---- - I 1 --i---- - GWT at X=3.69 I -- GWT atX=4.28 } RECOVER @ 48 hours ! 1 -GWT at X=5.47 i -GWT atX=6.96 • GWT atX=8.44 17.00 _-_-- _._ __ -GWT at X=11.41 __ _ -GWT atX=14.38 X �- i -GWT at X=20.32 -----c GWT at X=26.26 GWT atX=32.20 16.00 GWT at X=38.14 fA I I - - GWT atX=50.02 j -GWT at X=61.90 I -GWT atX=76.75 I GWT atX=91.60 _ -GWT atX=106.45 15.00 f - -;- -- -1 =---+ - -GWT at X=121.30 -GWT atX=136.15 _�_, ___ rt GWT at X=151.00 14.00 f--- 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 Time[hrs] C:\Program Files\Icpr4.07.08\ICPR4_Examples\ACE PROJECTS\Park Street OKE\ 4/18/2023 12:54 American Civil Engineering Co. GEOTECH REPORT Headquarters el I t ENGINEERING Mailing P.O. Box 7 11345 U.S. Highway 1 8-1377 E58 Sebastian FL. 32978 jinh AnAND TESTING Press Way C.A.#5693 Sanford, FL. 32771 KSMengineering.net Workspace Collective December 30, 2022 Adam Ramsay 603 E. Fort King Street Ocala, FL 34471 Re: 1000 State Road 70 Okeechobee, Florida KSM Project#: 2210339-b&p Dear Mr. Ramsay: As requested, KSM Engineering & Testing has performed a preliminary subsurface investigation at the referenced site. The purpose of this investigation was to determine the general nature of the subsurface conditions at the subject property and to offer preliminary guidance on the development of the property for its intended use. Presentation of the data gathered during the investigation, together with our geotechnical related opinions, are included in this report. Scope of Work and Professional Service Agreement. The scope of work and the agreement to perform a geotechnical exploration was provided by KSM's October 27, 2022, proposal to Workspace Collective, in care of Mr. Adam Ramsay. The agreement was signed by Mr. Ramsay on November 4, 2022 and was returned to KSM thereafter. Summary of Findings and Conclusions: The following is a summary of the principal findings and conclusions that are contained in this report, based on the results of KSM's subsurface exploration and analytical laboratory testing: • Within the depth of exploration, the property was underlain by generally weak (very loose to loose) near surface layer of granular material with an organic content varying from less than 5%, which is the typically accepted limit before a soil is considered problematic for construction, to 10.9%. When inherently problematic soils were encountered they were typically at the surface with an estimated thickness of 1 foot however several borings encountered problematic soil deposits to depths ranging from 1 to 6 feet below grade. Below the organic layer deposits of loose to medium dense cohesionless fine sand underlain by loose to medium dense clayey/silty fine sand were discovered. • The recorded depth to the surface of the groundwater body was very shallow and KSM expects that the surface of the wet season groundwater body will be at or near to the altitude of the existing land surface. Page 1 of 11 1000 State Road 70 Tr' C�1 I ENGINEERING Okeechobee, Florida �7Ma AND TESTING KSM Project#: 2210339-b&p • The discovered subsurface conditions are expected to negatively impact the development of this property in that creation of a stable subgrade for support of the proposed dwellings and roadways will be difficult due to the combined effect of the expected shallow position of the groundwater surface, the excessive organic content and weak nature of the upper zones of soil. Specifically, we anticipate that the excavation and backfill of near surface organic deposits and the compaction of very loose subgrade soils may be difficult due to the shallow water table position. Consideration should also be given to scheduling the earthwork operations to be performed during the seasonally dry winter and spring months to decrease the amount of anticipated dewatering that will be required. O The installation of buried utility lines (i.e., stormwater piping, water supply lines, power lines, and telecommunication lines) are likely to involve excavation of trenches below the groundwater surface. Accordingly, dewatering of the trench excavations is likely to be necessary to enable the installation to be performed in dry conditions. o Given the existing weak nature of the subgrade soils, the foundations that support the new structures on this property should bear at elevations that are as shallow as practical, in order to contain the stress transmitted by the foundations within the compacted engineered fill soils that will be placed during the mass grading operations. Monolithic slab foundation systems are generally better suited to this situation than are conventional shallow spread footings and a separate slab-on-grade systems. The nature and extent of earthwork methods that would best suit this property will depend to a great extent on the details of the proposed grading and drainage plan. The development of the land into a retail development would benefit from the raising the land surface above the existing landform, by installation of structural fill, in order to enable the streets and structures to be supported above the seasonal groundwater levels, upon engineered fill materials. This report offers preliminary recommendations that assume that the landform will be raised a height of not less than 5 feet above the existing land surface. Site Description Location & Physiography — The project site was located in Okeechobee, Florida, on State Route (SR) 70. At the time of the investigation, the site was found to have a generally flat topography. Vegetation on the site consisted mostly of light ground surface cover vegetation and many trees. Project Description: The following information is based, in part, on our review of the Conceptual Sizing Plans for "Park Prime Retail (22.10.10)" and "Plan Park Street Commerce Center (12.14.22)" by American Civil Engineering Co. Due to the preliminary nature of this project, it is our understanding that the development site plan has not been finalized. Please contact KSM to provide the most recent plans, so we can make any adjustments and review this report accordingly. Overall Development — It is our understanding that the proposed site may be developed with a typical low rise three-story commercial hotel structure, a one-story car wash building, a one- story commercial restaurant building and various one-story storage structures/canopies constructed on the property. As part of the overall development, two (2) ponds are proposed Page 2 of 11 1000 State Road 70 ENGINEERING Okeechobee, Florida inkI IY>L AND TESTING KSM Project#: 2210339-b&p for the purpose of stormwater management on the site. Typical pavement areas will consist of driveways and parking areas. The Scope of KSM's Study Included: 1. Performed soil borings within the approximate limits of the proposed structures and pavement areas, as well as in the proposed pond locations. 2. Measured the encountered groundwater level at each boring. 3. Reviewed the soil samples and field soil boring logs (by a geotechnical engineer) in our laboratory and assigned analytical laboratory testing to selected samples. 4. Performed the assigned analytical laboratory tests on the selected soil samples. 5. Evaluated the discovered subsurface conditions with respect to the construction of the proposed structures and roadways. 6. Prepared this preliminary report to document the data that was gathered, to present our findings and to present our preliminary recommendations. Site Investigation: Limitations — The preliminary opinions and recommendations are based on the discovered subsurface conditions in the locations of the performed tests. Subsurface Testing — KSM's site investigation program consisted of performing the following tests: • Twenty-nine (29) Standard Penetration Test (SPT) Borings, terminated at approximate depths ranging from 10 to 15 feet below the existing ground surface, were performed within the limits of the site. • Fifteen (15) Hand Auger (HA) Borings with corresponding Static Cone Penetrometer (SCP) Soundings, terminated at an approximate depth of 6 feet below the existing ground surface, were performed within the limits of the proposed pavement areas. • Two (2) SPT borings, denoted as PB, terminated at an approximate depth of 20 feet below the existing ground surface, were performed within the limits of the proposed stormwater management areas. SPT Borings — The SPT borings were performed in general accordance with procedures described in ASTM D1586. HA Borings — The HA borings were performed using a bucket auger tool to advance the borehole and to return disturbed samples of the soils. The drilling was performed in general accordance with the procedures delineated in ASTM D1452. SCP Soundings — Execution of a SCP sounding consists of pushing a thin steel shaft, with an attached 60°-conical point, by hand through the soil. The capacity of this tool to measure the relative density of the soil is directly related to the weight that is applied on the shaft by the technician that operates the tool. The thrust required to push the cone tip is measured by an Page 3 of 11 1000 State Road 70 I C 1 t ENGINEERING Okeechobee, Florida £ i 1VL AND TESTING KSM Project#. 2210339-b&p attached proving ring with a calibrated gauge. The value of the bearing pressure exerted by the cone point has been correlated with the relative soil density. The relationship of the SCP reading to the relative density is listed in the table below: Static Cone Penetrometer Relative Density Static Penetrometer Reading Very Loose or Soft <15 _ Loose 15-40 Medium Dense 40-70 Dense >70 Soil Classification — The field soil boring logs and recovered soil samples were transported to KSM's office from the project site. Following the completion of the field exploration activities, visual and tactile examination of the soil samples was performed by a geotechnical engineer to identify the engineering classification of the soil samples that were obtained in the field exploration. The visual classification of the samples was performed in general accordance with the current United Soil Classification System (ASTM D2487). General Subsurface Soil Classification Summary — The following table outlines the general subsurface conditions encountered during our investigation. Refer to the boring logs and location map for specific information regarding our interpretation of the field boring logs. Generalized Soil Profile Approximate Depth Discovered Subsurface Conditions Below Grade (Feet) Variable near surface soil conditions include: • Very loose sand with organic material (problematic soil 0 to 5 deposits) generally within 1 foot of the surface however some borings revealed problematic soil deposits to depths of 5 feet below grade; • Very loose to medium dense fine sand 6 to 15 Loose to medium-dense fine sand, slightly clayey/slightly silty sand, and clayey sand Observed Groundwater Table — Following the completion of each soil boring, the groundwater was allowed to attain an equilibrium level and the approximate depth to the surface of the groundwater was measured from existing ground elevation and recorded in the field log. The typical observed water table was encountered at approximate depths ranging from at or above the existing grade to depths of 5.3 feet below existing grade. These values were recorded at the time of investigation, which took place between the dates of November 21, 2022, and December 15, 2022. Page 4 of 11 1000 State Road 70 I' CA I ENGINEERING Okeechobee, Florida AIL l.7IVA. AND TESTING KSM Project#. 2210339-b&p Analytical Laboratory Testing: Natural Moisture Content — Testing was performed in general accordance with procedures described in ASTM D2216-19. Fines Content Testing was performed in general accordance with procedures described in ASTM D1140-17. Organic Content Tests — Testing was performed in general accordance with procedures described in ASTM D2974-20e1. Analytical Laboratory Testing Results Sample Moisture Fines Organic Boring Depth Soil Description o Content o (ft) �o /o y�o B-1 2 Gray Clayey Sand 19% 24% B-3 13 Brown Clayey Sand 22% 29% B-9 6 Dark Gray Slightly Clayey Sand 26% 5.2% B-10 2 Dark Brown Sand with Organics 34% B-11 6 Light Gray Sand 24% 1.2% B-19 6 Gray Slightly Silty Sand 35% 5.5% B-19 13 Gray Clayey Sand 25% 23% B-22 2 Gray Sand 17% 3.1% B-24 2 Dark Gray Sand 34% 3.7% B-24 13 Brown Clayey Sand 2% 33% B-25 4 Brown Sand 31% 4.9% B-26 1 Dark Gray Sand with Traces of 27% Roots B-29 2 Brown Sand 22% 2.5% B-29 13 Brown Slightly Clayey Sand 29% 11 HA 2 1 Dark Gray Silty Sand with 47% 7 9% Organics HA-9 1 Dark Gray Silty Sand with 45% 12% 8.0% Organics HA-12 1 Dark Gray Sand, Slightly Silty 49% 10.9% with Organics Page 5 of 11 1000 State Road 70 1P 011 I ENGINEERING Okeechobee, Florida Jam 0 IVi AND TESTING KSM Project#: 2210339-b&p Analytical Laboratory Testing Results (Continued) Sample Moisture Fines Organic Boring Depth Soil Description Content (ft) PB-1 3 Light Gray Slightly Silty Sand 27% 5.8% PB-1 5 Grayish Brown Sand 24% 3.7% PB-1 10 Grayish Brown Sand 25% 2.2% PB-1 12 Gray Slightly Clayey Sand 23% 9.8% PB-2 3 Light Gray Sand 25% 2.0% PB-2 5 Dark Gray Sand, Slightly Silty 24% 11% PB-2 7 Light Gray Sand 25% 0.6% PB-2 12 Gray Clayey Sand 22% 33% PB-2 16 Light Brown Clayey Sand 27% 19% PB-2 18 Light Gray Clayey Sand with 13% 12% Shell Engineering Evaluation: Based on the information obtained from this site investigation, we are pleased to offer the following evaluation: Limitations — Due to the preliminary nature of this project, KSM recommends that additional testing is performed within the development features once the final locations are known. The following information is preliminary and based on the initial conceptual site layout and may not correspond to the final design site layout. Seasonal Groundwater Fluctuation —The following table indicates the recorded measurement taken from the existing grade to the encountered groundwater table for each test location along with our estimated depth normal wet season water table and normal dry season water table depths (below existing grade) for the test locations. The measurements were taken after the borings were performed and the groundwater table was allowed to stabilize. Estimated Normal Season Groundwater Table Fluctuation Test Location Depth (feet,') Below Existing Grade (See Location Measured Estimated Estimated Plan) Encountered Normal Wet Season Normal Dry Season Groundwater Table Water Table Water Table PB-1 1.0' •0.3' 3.3' PB-2 2.4' 1.0' 4.0' Absent land surface elevation measurements at the boring locations, and assuming that the surface of the groundwater table is not steeply inclined, KSM has concluded that borings that Page 6 of 11 1000 State Road 70 V C 1 I ENGINEERING Okeechobee, Florida 1.7 MIL AND TESTING KSM Project#: 2210339-b&p featured deeper groundwater surface depths were likely to have been drilled at locations where the land surface altitude was above boring locations that featured shallower groundwater surface depth measurements, or that the range and depth of the water table elevation may be affected by the proximity of man-made or natural drainage features. Accordingly, as part of the design phase geotechnical studies, KSM recommends that the land surface elevation of the borings be surveyed to determine the approximate altitude of the groundwater surface, at the time that the measurements were made. Using that data, KSM can provide a more precise estimate of seasonal groundwater levels. Dewaterinq — Given the normal wet season groundwater surface level estimates, and assuming that KSM's estimates of the height of the fill stated in the "Project Description" section is accurate, it is KSM's preliminary opinion that the position of the groundwater table is unlikely to affect either the design or the installation of the shallow foundations that will support the dwellings constructed on this property. Conversely, KSM anticipates that the earthwork stage of site development will require the compaction and/or excavation of soils located below the groundwater surface. Additionally, excavations that are made to install buried utility lines could also require excavations below the groundwater surface. Accordingly, the earthwork contractor should recognize that temporary dewatering of excavations that penetrate below the prevailing groundwater surface will be necessary to allow the earthwork operations to be performed in dry conditions and plan his operations accordingly. Analysis and Opinions: Fill Suitability — Based on the discovered soils in the locations of PB-1 and PB-2, KSM offers the following recommendations on the suitability of fill deposits that will be used to rough grade the property in preparation for the installation of the roadway and utility networks and for the construction of the individual dwellings. • Fine sands deposits, which feature less than 5 percent "fines", are considered to be best suited as a structural fill source because they drain freely when excavated below the water table and are not as moisture sensitive as material that contains higher fines. • The slightly clayey/silty fine sands containing between 5 and 12 percent fines, are suitable as structural fill, but may require extra effort to be properly moisture conditioned and compacted. These soil deposits drain fairly well but will require more effort than the fine sand deposits above to create optimum moisture conditions in order to avoid compaction issues. Thinner lifts not exceeding 6 inches in loose thickness may be required for placement and compaction of these soils. • Clayey and/or silty fine sand deposits, (i.e., sand deposits that contain more than 12 percent fines, by weight) are typically not considered desirable for structural fill, due to their poor workability characteristics in comparison with sand deposits that feature fewer fines. Due to the moisture sensitive nature of these materials a substantial amount of time and effort would be required in order to improve their workability. The discovered clayey sand deposits may be more suitable for use as fill material in non- structural areas outside the building pad and within the pavement area footprint, and potentially as a stabilized subgrade component in the roadway pavement cross section. KSM recommends that the earthwork contractor use there materials selectively. Properly compacted, such materials can be used as structural fill, provided that the earthwork contractor is prepared to contend with the effort that will be Page 7 of 11 1000 State Road 70 Ire C 1 t ENGINEERING Okeechobee. Florida £IJ jVA. AND TESTING KSM Project#: 2210339-b&p necessary to moisture condition and densify such soil deposits. Such efforts could include draining/drying of saturated soils before attempting compaction, reduction in the thickness of lifts that are compacted, and the use of non-vibratory compaction machinery. • Soil deposits that featured organic contents greater than 5 percent should not be considered suitable soils for structural fill. Borrow Source Suitability Opinions — KSM assumes that the soil that is excavated to create the stormwater management basin will be used as a source of fill in creating the landform of the developed property. Based on the results of the field investigation, together with the analytical laboratory testing of the selected soil samples, KSM offers the following opinions: • From the surface to an approximate depth of 10 feet below existing grade — Deposits of fine sand and slightly clayey/silty sand were discovered. These granular, low fines content deposits can be considered suitable for structural fill. • From a depth of approximately 10 to 15 feet below existing grade — Deposits of clayey/silty sand were discovered. We anticipate that most of the excavated soils within this depth interval will feature fines contents that exceed 12 percent. These soil deposits are expected to be moisture sensitive soils, given their elevated fines content and the estimated shallow position of the surface of the wet season groundwater table. To avoid compaction-related issues during construction, it is KSM's opinion that excavated soils with elevated fines content should not be considered suitable as structural fill for building pads or in pavement areas. In no case should these materials be used in areas that are expected to contain septic drain fields, due to their expected low internal permeability. • From a depth of approximately 15 to 20 feet below existing grade — Deposits of fine sand with shell and slightly silty/clayey sand were encountered. These granular, low fines content deposits can be considered suitable for structural fill. The contractor and civil engineer should coordinate to determine the appropriate methods for borrow source excavation. It is important to segregate the low-fines soil deposits from the near-surface clayey and silty sand deposits. Preliminary Utility and Storm Sewer Opinions — Due to the expected very shallow seasonal depth to the surface of the groundwater, we believe that difficulties may arise when installing any utility that will require trenching and/or that will rely on gravity flow. Trench excavations that encounter very loose subsurface materials may require over-excavation, typically to a depth of 1 foot below the utility subgrade elevation, backfilled with %-inch stone compacted to produce a firm, unyielding surface. Any excavated materials with elevated fines content will likely prove to be problematic if intended to be used as backfill. Blending of the excavated material with dry, clean fine sand may be necessary, but due to the time and effort required to properly blend these materials, for ease of construction and scheduling considerations, it may be advantageous to import clean, free-draining fine sand for use as utility trench backfill. Additionally, dewatering operations may be required in order to achieve proper backfill compaction requirements. Page 8 of 11 1000 • ENGINEERING Okeechobee, FloridaState d 70 i11�7jVL AND TESTING KSM Project#: 2210339-b&p Analysis and Opinions : Preliminary Subqrade Opinions — Based on our experience in the area, the results of the borings, and KSM's understanding of the project, we believe that the current conditions of the near surface soils are problematic for development due to the high degree of variation between borings, elevated organic content, to the elevated fines content, to the very loose to loose condition of the near-surface soil deposits, and to the anticipated shallow depth to the groundwater table. Excavation of problematic soils and backfill of the exposed areas to create a stable platform for the expected fill deposits will require that temporary dewatering systems be installed to depress the groundwater level. Please note that estimating the vertical and horizontal limits of any problematic material was as part of our scope for this investigation. KSM recommends that a design level geotechnical investigation is performed on this site to aid in the development of design plans. Preliminary Minimum Roadway Opinions — It is our preliminary opinion that the discovered subsurface conditions are generally problematic to support a roadway subgrade. It appears that prior to the installation of the proposed roadway section, improvement of the existing subgrade can be achieved using a proper excavation and backfilling techniques. Additionally, the cost of dewatering should be considered. Provided that the subgrade is properly prepared and that the building pads are properly installed, it is KSM's opinion that the improved subgrade can support the proposed roadway section. The pavement should be designed for the anticipated axle weights, vehicle velocities, traffic mix and frequencies. Please refer to the following table for the minimum recommended pavement section. A minimum of 16 inches of separation should be maintained between the bottom of the base and the high-season water table. Minimum Pavement Section Pavement Layer Thickness (in) Type Material Standard Duty Heavy Duty Florida DOT Asphalt Type 3 1 .5 2.5 Flexible Base Course* (Min. LBR of 100) 6 10 Cemented Coquina Rock Stabilized Subgrade* (Min. LBR of 40) 12 12 * Compacted to minimum 98 percent of its modified dry Proctor value (AASHTO T180) Preliminary Foundation Opinions — In order for a shallow foundation to perform satisfactorily, it must be able to support the structural loads while limiting both total and differential settlement to tolerable values. It is our preliminary opinion that the discovered subsurface conditions are generally problematic to support a building pad subgrade. It appears that prior to the installation of the proposed buildings pads, improvement of the existing subgrade can be achieved using a proper excavation and backfilling techniques. Additionally, the cost of dewatering should be considered. Provided that the subgrade is properly prepared and that the building pads are properly installed, it is KSM's opinion that conventional shallow foundation systems are feasible to support the expected low-rise (3-story maximum) structures. Page 9 of 11 Fr, 1000 State Road 70 C 1 Al ENGINEERING Okeechobee, Florida nIJ1VA AND TESTING KSM Project#: 2210339-b&p For more precise building area site and roadway preparation recommendations, as well as recommendations pertaining to foundation design and settlement calculations, we recommend performing a design level investigation. KSM should be provided with the civil construction drawing set as well as the structural plans for review. Please see the section titled "Future Studies" for additional information. Estimated Aquifer Parameters: Limitations — Due to the preliminary nature of this project, KSM recommends that additional testing is performed within the proposed stormwater management features once the locations and elevations are better defined. The following information is preliminary and based on the initial stormwater management layout and may not correspond to the proposed stormwater management layout. Factor of Safety — KSM has not applied a factor of safety to the estimated aquifer parameters within this report. The Engineer of Record is responsible for applying the appropriate factor(s) of safety to the estimated aquifer parameters contained within this report for use in their design. For any stratum where the estimated flow rate exceeds 10 inches per hour (20 feet per day), we recommend that a design flow rate equal to 10 in/hr (20 ft/day) is used. In-Field Testing — At the test location, Usual Condition Test was performed in general conformance with the South Florida Water Management District described procedures for the `Usual Open-Hole Test' method. Estimated Aquifer Parameters — In-Field Testing Test Location Estimated Hydraulic Conductivity (CFS/SF- Ft Head) P-1 2.5 x 10-5 P-2 7.6 x 10-5 Laboratory Testing and Professional Judgement — Selected samples obtained from our site investigation were tested in our laboratory in general accordance with ASTM D2434, ASTM D1140-17 and ASTM C136. Estimated Aquifer Parameters — Laboratory Testing Stratum Depth Horizontal Vertical Test Location Range Saturated Flow Saturated Flow (ft) Rate (in/hr) Rate (in/hr) 0.8 — 1 .8 1.9 0.9 P-1 1.8 — 4.2 3.2 2.2 t P-2 0.0 — 4.5 7.0 5.8 t Estimation; reduction of estimated horizontal saturated flow rate applied. Page 10 of 11 1000 State Road 70 Tie et I ENGINEERING Okeechobee, Florida �iivi AND TESTING KSM Project#: 2210339-b&p Restrictive Stratum — Based on the results of our soil borings and the laboratory testing, in boring PB-1 we encountered a stratum which we estimate exhibit restrictive flow rates relative to the overlying stratum, and are described below: • Deposits of Dark Gray Silty Sand with Organics encountered at an approximate depth range from the surface to 0.8 feet below grade. Future Studies: Design Phase Geotechnical Explorations — KSM recommends that a design-phase geotechnical exploration be performed to determine whether individual structures are underlain by any organic soil deposits or inherently problematic soils and to generate the subsurface data that is necessary to provide site specific foundation design and earthwork recommendations. Upon request, KSM will provide a detailed scope of work and cost proposal to address these features, based on the preliminary plan documents. Closure. Based upon KSM's subsurface investigation at the above-mentioned project location, the reliance of the preliminary opinions and recommendations presented within this signed and sealed report is predicated on KSM being engaged to perform design-basis geotechnical explorations and testing. The opinions and recommendations given in this report are preliminary and should not be used to create final plan documents and specifications. This report has been prepared in accordance with generally accepted soil and foundation engineering practices based on the results of the borings and the assumed loading conditions. No warranties, either expressed or implied, are intended or made. This report does not reflect any variations which may occur between the borings. If variations appear evident during construction, it will be necessary for you or your representative to engage KSM to perform any supplementary studies and to re-evaluate the recommendations made in this report. Environmental conditions, wetland delineation, karst activity, water quality, and municipal requirements were not a part of this study. KSM is pleased to have been of assistance to you on this phase of your project. When we may be of further service to you or should you have any questions, please contact us. Respectfully, \\\ CLgw 11,, O.••oc,ENS . Oy . f 'Zt. . No. 91598 * * Christopher S. LeBrun, E.I. O '• STATE OF .•• 4,_7 Cody C. Clawson, P.E. Geotechnical Engineer %t�` Geotechnical Engineer Florida Lic. No. 1100022858 �"/"ONAL•�?G' Florida Lic. No. 91598 CCC/cv Email to: adam@workspace-collective.com Page 11 of 11 KSM Engineering&Testing BORING NUMBER B-01 KSMSebastian,FL 32978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax:(772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee,Florida DATE STARTED 12/15/22 COMPLETED 12/15/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample E.AT TIME OF DRILLING 2.0 ft LOGGED BY DC/CW CHECKED BY CCC AT END OF DRILLING — NOTES See Attached Location Plan AFTER DRILLING — A SPT N VALUE A U r rn w w 20 40 60 80 °O MATERIAL DESCRIPTION J p Q O 1- PI L • 'L ax v a O m O> n 20 40 60 80 (� Q z 0 W U Z z ❑FINES CONTENT(%)0 rn a W ❑ 0 a 20 40 60 80 Gray Slightly Clayey Sand 1-2-2 - XSS 2) - Gray Clayey Sand - •• X SS 3(8)4 8 a Brown Sand 4-4-4 X SS (8) X SS 3-2-2 h- Dark Brown Slightly Silty Sand (4) z • 10 X SS 3 8>- - z o ) N l7 N Brown Sand 8-8-8 E 15 x SS (16) > Bottom of borehole at 15.0 feet. Lu lL 2 ) N 0 0 ❑ 0) Li W LL U) rn N c m a0 N N N z N F O a x m x U W H O W O KSM Engineering&Testing BORING NUMBER B-02 KSM Sebastian, FL 32978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax:(772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee,Florida DATE STARTED 12/14/22 COMPLETED 12/14/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample V.AT TIME OF DRILLING 0.9 ft LOGGED BY DC/CW CHECKED BY CCC AT END OF DRILLING — NOTES See Attached Location Plan AFTER DRILLING -- w o w • •SPTN VALUE A U ° �j w 20 40 60 80 H O L MATERIAL DESCRIPTION CO > O Q O z PI •MC I dD OS mO> D n 20 40 60 80 _ U >- <z 0W U z w o D FINES CONTENT(%)0 0 0- 20 40 60 80 Dark Gray Sand _ )( SS 3-4-6 1-1-1a\)/s' _ _ Gray Sand X SS (10) 5 Light Gray Sand 7-7-8 m - SS (15) _ Dark Gray Sand SS• (5) (10) SS 4-5-4 A 10 (9) cn Bottom of borehole at 10.0 feet. • z_ O N m 0 O Ui w > Ui W U) 0 0 0 N 0 (n w W 2 N N 0 N N 0 F- 0 (0 U) D ❑ U) F- z Z U) F- 0 a x m x 0 w F- O w O KSM Engineering&Testing BORING NUMBER B-03 KSM P.O.Box 78-1377 Sebastian,FL 32978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax:(772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee,Florida DATE STARTED 12/15/22 COMPLETED 12/15/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample a AT TIME OF DRILLING 1.2 ft LOGGED BY DC/CW CHECKED BY CCC AT END OF DRILLING — NOTES See Attached Location Plan AFTER DRILLING -- ♦SPTN VALUE A U o cn w 20 40 60 80 w -O MATERIAL DESCRIPTION woo >a O m Q p Z a PL MC IL p � o-D aoO> i— D 20 40 60 80 C7 <Z L 0O? W ❑FINES CONTENT(%)❑ 0 _ a_ 20 40 60 80 Dark Gray Sand _ X SS 112 (3) Light Gray Sand- - SS 6 4 7-7 X (1 ) 5 a \/ X SS 6136 th X SS (6) 10 Dark Gray Sand XSS 4(9j5 rn 0 O)— l+1 - >' Brown Clayey Sand 3-4-3 15 SS (7) ` > Bottom of borehole at 15.0 feet. w N 0 0 N U) N W LL 2 O) h 0 ❑ 0 m U) ❑ U) F- z Z 0 U) 0 J m 0 U W 0 O 0 0 KSM Engineering&Testing BORING NUMBER B-04 KSMP.O. Box 78-1377 PAGE 1 OF 1 Sebastian,FL 32978 Tel:(772)-589-0712 Fax:(772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee, Florida DATE STARTED 12/12/22 COMPLETED 12/12/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample V AT TIME OF DRILLING 1.0 ft LOGGED BY DC/CW CHECKED BY CCC AT END OF DRILLING -- NOTES See Attached Location Plan AFTER DRILLING — w a ♦SPT N VALUE A U r cn w w 20 40 60 80 a 0 MATERIAL DESCRIPTION J 2 >0 9 D Q p z a I MC IL p �—' o O . m0> °v 20 40 60 80 0 <z U Z w Q ❑FINES CONTENT(%)ct ❑ 0 0- 20 40 60 80 Dark Gray Sand with Organics X SS 113 (4) • X • Dark Gray Slightly Clayey Sand 4-5-6 SS (11) 5 • Dark Gray Sand 4-5-5 • a? SS (10) S X SS 5-7-7 ry_ (14) • 10 • XsS (11) O p _ ih _ Gray Sand 5-5-8 E 15 x SS (13) > Bottom of borehole at 15.0 feet. cc w f co h U 0 O U) N w J LT_ 2 cO N 0) N N 0 0 17 am N 0 N U) H z C7 N H O J 0- CD x U w 0 0 w O KSM Engineering&Testing BORING NUMBER B-05 KSMP.O.Box 78-1377 PAGE 1 OF 1 Sebastian,FL 32978 Tel:(772)-589-0712 Fax:(772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee,Florida DATE STARTED 12/15/22 COMPLETED 12/15/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample a AT TIME OF DRILLING 2.1 ft LOGGED BY DC/CW CHECKED BY CCC AT END OF DRILLING — NOTES See Attached Location Plan AFTER DRILLING — o: A SPT N VALUE A w o w U } cn w w 20 40 60 80 o_ a L 0 MATERIAL DESCRIPTION w co Ill 0 O z p Z 0 PI L •MC I o`� � a O . El/O> — 20 40 60 80 0 <z U z Lu z Q ❑FINES CONTENT(%)❑ 0 0- 20 40 60 80 Light Gray Sand X SZ SS2-2-3 (5) - Gray Sand X SS 4-5-5 (10) 4-5-5 m • X SS (10) Light Gray Sand SS 8-9-9 (18) SS 7-8-8 10 (16) Bottom of borehole at 10.0 feet. > z 0 lh h Ui > > W N co U) U O ci N W LL N N rn N 0 m 5 0 U) z Z O N H O a x m x O W H O w KSM Engineering&Testing BORING NUMBER B-06 KSM P.O.S bas ianx 78-1377?FL 32978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax:(772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee,Florida DATE STARTED 12/12/22 COMPLETED 12/12/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample a AT TIME OF DRILLING 2.1 ft LOGGED BY DC/CW CHECKED BY CCC AT END OF DRILLING — NOTES See Attached Location Plan AFTER DRILLING — W o w • ASPTNVALUEA U o r w w 20 40 60 80 —~ LL O MATERIAL DESCRIPTION w m w a Z< 0 z 0 PL MC o x pv J dD OW m0> �8 201 40 60 I 60 80 z U z w Q El FINES CONTENT(%)❑ 0 0- 20 40 60 80 .2 Dark Gray Silty Sand with Organics(Muck) J SS 1-1-1 sz X (2) • _ X - Brown Sand with Traces of Organics SS 1-1-2 (3) 5 _ - — SS 6-6-5 0 m — X (11) Brown Sand,Slightly Silty 5-5-6 z X SS (11) 6• 10 • X SS 6-7-7 N (14) W J_ _ - - Brown Sand 5-4-4 SS 15 X (8) > Bottom of borehole at 15.0 feet. Ui W N U 0 0 W 0 LL U) F- 0 m U F- U F z U F 0 a m U W 0 0 W ❑ KSM Engineering&Testing BORING NUMBER B-07 KSM P.O. Box 78-1377 Sebastian,FL 32978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax:(772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee, Florida DATE STARTED 12/13/22 COMPLETED 12/13/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample AT TIME OF DRILLING 1.2 ft LOGGED BY DC/CW CHECKED BY CCC AT END OF DRILLING — NOTES See Attached Location Plan AFTER DRILLING — w o w • A SPT N VALUE A U r >- w a- w 20 40 60 80 ~ <O MATERIAL DESCRIPTION J >a p D Q p Z n PI L MC LL p a O m 0> - D-- 20 40 60 80 < w w ❑FINES CONTENT(%)El 0 20 40 60 80 Dark Gray Sand XSS1-1-2 _ (3) Light Gray Sand X SS 4-4-7 3-4-5 m_ XSS (9) XSS4-4-4 _ io X SS 4-5 5 J_ _ Gray Sand \J SS 9-5-4 E 15 .' . 1 (9) > Bottom of borehole at 15.0 feet. w N U U 0 0 tO Ui W w U) (V 0 Q1 5 0 F- 1- 1- 0 a x m x U W h- O w U KSM Engineering&Testing BORING NUMBER B-08 KSM P.O. Box 78-1377 Sebastian,FL 32978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax:(772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee, Florida DATE STARTED 12/13/22 COMPLETED 12/13/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample V.AT TIME OF DRILLING 1.1 ft LOGGED BY DC/CW CHECKED BY CCC AT END OF DRILLING — NOTES See Attached Location Plan AFTER DRILLING — ASPTNVALUEA o ILL 20 40 60 80 xO �m wo z �� PL MC LL O MATERIAL DESCRIPTION _1 2 >0 OJ D Q cc --�Z n I I p _�o ow m o> _ — 20 40 60 80 O0z I U Z ZcLi Q ❑FINES CONTENT(%)❑ 0 a 20 40 60 80 Dark Gray Sand _ X SS 1-1-2 Gray Sand (3) _ x SS 4-4-5 // vv (9) • ro- X SS 4-7-3 ) Ch 2-2-4 SS - - (6) 4-5-6 10 SS (11) Bottom of borehole at 10.0 feet. O U) 0) M In N 0 W > W U) N N 0 0 N 0 U) W LL fn Y 0) f0 F- ❑ 0 m 0 Ul N N h z U) H O J a x m U W r 0 w O KSM Engineering&Testing BORING NUMBER B-09 KSMS ox 78-1377 basBti n,FL 32978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax:(772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee, Florida DATE STARTED 12/15/22 COMPLETED 12/15/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample V AT TIME OF DRILLING 1.1 ft LOGGED BY DC/CW CHECKED BY CCC AT END OF DRILLING -- NOTES See Attached Location Plan AFTER DRILLING — w o w • ASPTNVALUE• v o cn w w 20 40 60 80 d °O MATERIAL DESCRIPTION J >0 p n Q z Q PL • LLMC Q O� mO> w }" 20 40 60 80 < L W ❑FINES CONTENT(%)❑ 0 0- 20 40 60 80 Dark Gray Sand •_• X SS 1(1)3 (4) X SS 3-4-4 /` (8) 5 0 4-4-5 Dark Gray Slightly Silty Sand SS (9) Light Gray Sand x 10 XSS (12) J_ _ U) N rn_ f7 ry- -v ,::. Dark Gray Sand with Traces of Gravel XSS 5-5-5 A E 15 po:{A (10) Bottom of borehole at 15.0 feet. cc U) N U O N 0 N w LL U) rn N N Ot I- 0 m N ❑ I- U) z 0 U) I- 0 a m w Ill 0 O 0 KSM Engineering&Testing BORING NUMBER B-10 KSMS ox 78-1377 basBti n,FL 32978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax:(772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee, Florida DATE STARTED 12/15/22 COMPLETED 12/15/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample AT TIME OF DRILLING —Ground Level LOGGED BY DC/CW CHECKED BY CCC AT END OF DRILLING -- NOTES See Attached Location Plan AFTER DRILLING — w o w • ASPTNVALUEA } IC w w 20 40 60 80 a a 0 MATERIAL DESCRIPTION w m > o z p Z PL MC LL w Q �� >0 �DQ n I • �Z O . co O> w } 20 40 60 80 • W ❑FINES CONTENT(%)❑ 0 n 20 40 60 80 Dark Brown Sand with Organics X SS • 1-1-1 (2) _ Dark Brown Silty Sand with Organics X SS 1(3)2 5 Light Gray Sand O X 4-5-5 m SS (10) Dark Gray Sand X SS (4-1505 ) 41.\ k 5-6-6 6 10 ` X SS (12) m_ lh N- Gray Sand \/ 3-4-4 w 15 x SS (8) Bottom of borehole at 15.0 feet. // �` w U) U) 0 0 0 N 0 U) w LL 2 i0 m 0 m CO 0 CO CO C- z 0 CO F- 0 a m 0 w 0 O w KSM Engineering&Testing BORING NUMBER B-11 KSM P.O.Box 78-1377 Sebastian,FL 32978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax:(772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee, Florida DATE STARTED 12/15/22 COMPLETED 12/15/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample Q AT TIME OF DRILLING 0.8 ft LOGGED BY DC/CW CHECKED BY CCC AT END OF DRILLING -- NOTES See Attached Location Plan AFTER DRILLING - w a w • A SPT N VALUE• _ r a >- w 20 40 60 80 F — _0 w o o ~� 2 Ic PL MC LL w Q O MATERIAL DESCRIPTION g >0 O D< z Q JI • I w o co0> ~ 20 40 60 80 <Z L Z w O ❑FINES CONTENT(%)0 0 0_ 20 40 60 80 Dark Gray Slightly Silty Sand X SS 1-1-2 A (3) - -a.:".::: Dark Gray Sand with Traces of Roots )( ss 5 SS (3) a Gray Sand XSS 4-5-5 (1 0) g_ Light Gray Sand 5-9-9 _ _ X SS (18) 6 10 Dark Gray Sand X SS b) - ••_`_. Light Gray Slightly Clayey Sand SS 2-2-2 E 15 . _ X (4) Bottom of borehole at 15.0 feet. w 2 U) 0 0 0 0 N 0 N w 2 N N N N 0 QI U) 0 I- U) 0 z U) 0 m w w 0 O 0 0 KSM Engineering&Testing BORING NUMBER B-12 KSMP.O.Box 78-1377 PAGE 1 OF 1 Sebastian, FL 32978 Tel: (772)-589-0712 Fax: (772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee, Florida DATE STARTED 12/15/22 COMPLETED 12/15/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample Q AT TIME OF DRILLING 1.8 ft LOGGED BY DC/CW CHECKED BY CCC AT END OF DRILLING — NOTES See Attached Location Plan AFTER DRILLING — w a w • ASPTNVALUEA ULc5 } cn w w 20 40 60 80 w a-O MATERIAL DESCRIPTION J >0 p p Q Z PL � LL Z O co Z w } 20 40 60 80 Q w Z d ❑FINES CONTENT(%)❑ 0 a 20 40 60 80 Dark Gray Sand X SS 1-2-3 (5) J: •. Dark Gray Slightly Silty Sand X- - SS 4(10) 5 Dark Gray Sand X 4-4-4 SS (8) m- - SS 4-5-7 (12) o_ Gray Sand I- 6-7-7 •10 SS (14) 17- Bottom of borehole at 10.0 feet. w z 0 N O) lh 0 O N 0 Ui W > U) W U, N Cl) 0 0 0 N 0 U) w LL 2 O) N N 0 m U) 0 I- U) F- z U) F- O a x m x 0 W F- O w O KSM Engineering&Testing BORING NUMBER B-13 KSM P.O.S ox 78-1377 basBti n,FL 32978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax:(772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee,Florida DATE STARTED 12/15/22 COMPLETED 12/15/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample Q AT TIME OF DRILLING 1.2 ft LOGGED BY DC/CW CHECKED BY CCC AT END OF DRILLING — NOTES See Attached Location Plan AFTER DRILLING -- H A SPT N VALUE A U r cn w • w 20 40 60 80 H a 0 MATERIAL DESCRIPTION w m w a z< p Z 8 PL MC LL pv xJ dD O . m0> H n 201 40 60 80 O Q Z w U z Z a ❑FINES CONTENT(%)❑ c4 W 0 0 0- 20 40 60 80 Light Gray Sand - 57 XSS _ 1-1-3 Xss (1 5 0) 4-5-5 XSS (10) Gray Sand X SS 6-7-7 • " ' (14) 0 10 XSS (13) J_ _ OI_ i Gray Slightly Clayey Sand X 3-3-4 Pe15 // SS (7) > Bottom of borehole at 15.0 feet. uJ w U) N U) 0 0 0 V) UI W LL U) rn i0 N I- c� m U) 0 U) Z a) I- O a x m x 0 w 0 O w 0 KSM Engineering&Testing BORING NUMBER B-14 KSM P.O. Box 78-1377 Sebastian,FL 3 978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax:(772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee,Florida DATE STARTED 12/13/22 COMPLETED 12/13/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample Q AT TIME OF DRILLING 2.0 ft LOGGED BY DC/CW CHECKED BY CCC AT END OF DRILLING --- NOTES See Attached Location Plan AFTER DRILLING --- w o w ASPTN VALUE A U } cn w w 20 40 60 80 wQ 0 MATERIAL DESCRIPTION >0 O D Q z n PL MC LL o O .cr m O> 20 40 60 80 O 2Z w OZ W > Lu O < Z ❑FINES CONTENT(%)0 _ 20 40 60 80 Light Gray Sand X SS 224 (6) - Brown Sand x SS 6-7-7 ( \ (14) _ _ Light Gray Sand X SS 7-10-10 m \ (20) N_ • Gray Sand SS 3-4-4 (8) ° 6-6-7 10 SS (13) Bottom of borehole at 10.0 feet. W z 0 a) rn 0 0 LU LU > LU W 2 N V) 0 0 0 N U) W LT. LU N 0 0 0 U) a) 0 V) I- O m O w 0 O w O KSM Engineering&Testing BORING NUMBER B-15 KSM P.O.Sebastian,x 78-1377 F L 32978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax:(772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee,Florida DATE STARTED 12/14/22 COMPLETED 12/14/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample EZ.AT TIME OF DRILLING 2.3 ft LOGGED BY DC/CW CHECKED BY CCC AT END OF DRILLING — NOTES See Attached Location Plan AFTER DRILLING — w o w • ASPTNVALUEA 0 r cn w w 20 40 60 80 F- _� LU �~ 0 - PL MC LL w Q 0 MATERIAL DESCRIPTION _1 2 j 0 O D Q z a I • m Z OO O z w } — 20 40 60 80 < 0 co 0 d O FINES CONTENT(%)❑20 40 60 80 Light Gray Sand X SS 1(6)5 ) 5-8-10 - Dark Brown Sand SS (18) a 5 7-7-9 X SS (16) co / 8-6-5 •Z_ _ X SS (11) 10 Light Gray Sand X SS 5-4-6 ) o rn_ Gray Slightly Silty Sand 6-5-4 X 2 15 • SS (9) Bottom of borehole at 15.0 feet. w U) 0 0 0 0 N Cl) U) U) Co N m 0 0 0 Q1 5 U) 0 F- z E.6 0 0 a. x co x 0 W 0 0 w 0 KSM Engineering&Testing BORING NUMBER B-16 KSM P.O. 1377 Sebastian,Bx F FL 32978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax: (772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee, Florida DATE STARTED 12/13/22 COMPLETED 12/13/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample AT TIME OF DRILLING — LOGGED BY DC/CW CHECKED BY CCC AT END OF DRILLING -- NOTES See Attached Location Plan AFTER DRILLING -- w o W tt• A SPT N VALUE A U >- o w w 5 20 40 60 80 H� =O W Luo �~� 0 H� PL MC LL - Q 0 MATERIAL DESCRIPTION w >d O D< Z a I • I 0 o O m O> F- 20 40 60 80 U 2 z 0 O? Z ❑FINES CONTENT(%)❑ 0 0 20 40 60 80 Gray Sand Xss �I (3) 41\ • _ Light Gray Sand X s 5-6-6 (12) X Gray Sand,Slightly Silty SS 7-8-10 CO (18) d, 4-8-7 X SS (15) 1110 X SS 653 // 11. jGray Clayey Sand SS 5-5-5 A E 15 :. ; X (10) Bottom of borehole at 15.0 feet. cc U) U) N to 0 0 0 U) Ui W LL U) N 6 N N 0 0 U) 0 F U) H z O U) 0 O a m 0 W 0 O w KSM Engineering&Testing BORING NUMBER B-17 KSM P.O. Box 78-1377 Sebastian,FL 32978 PAGE 1 OF 1 Tel: (772)-589-0712 Fax:(772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee, Florida DATE STARTED 12/15/22 COMPLETED 12/15/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample V AT TIME OF DRILLING 2.0 ft LOGGED BY DC/CW CHECKED BY CCC AT END OF DRILLING -- NOTES See Attached Location Plan AFTER DRILLING -- w o IT, • ♦SPTN VALUE A O 1- cn w w 20 40 60 80 -x a 0 MATERIAL DESCRIPTION w m > O z< p Z 0 PL MC LL w� � �D >0ctQ> H 0_ I • 1 o_D O� op O> t- �" 20 40 60 80 O QZ w Oz z ❑FINES CONTENT(%)❑ cn w 0 0- 20 40 60 80 Dark Gray Sand - X SS 1-2-2 (4) Gray Sand Xss _ 4-5-5 5 a m / 4-3-3 XX SS (6) o- Light Gray Sand X 6 8 8 SS (16) 10X SS 7-8-8 (16) 0 cn rn_ SS 8-9-8 2 15 X A (17) > Bottom of borehole at 15.0 feet. W a) 0 0 O N a) w W LL a) N N ❑ am J a) 7 ❑ N N Z a) 0 O a x x O w H O w KSM Engineering&Testing BORING NUMBER B-18 KSMP.O. Box 78-1377 Sebastian,FL 32978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax: (772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee, Florida DATE STARTED 12/15/22 COMPLETED 12/15/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample Q AT TIME OF DRILLING 1.8 ft LOGGED BY DC/CW CHECKED BY CCC AT END OF DRILLING — NOTES See Attached Location Plan AFTER DRILLING — w o w •tt ASPTNVALUEA o > IT w w 5 20 40 60 80 wO MATERIAL DESCRIPTION J >0 p D Q z a PL • LL o-D O lY m O> i- 20 40 60 80 0 2 Z W O Z W } < o w ❑FINES CONTENT(%)❑ 0 a 20 40 60 80 Dark Gray Slightly Silty Sand X SZ SS- - 1-2-2 X (4) SS 3-4-4 5 • Dark Gray Sand ' • (8) 4-5-7 coLight Gray Sand SS (12) m SS 5-6-7 X (13) 2- Dark Gray Sand 10 X SS 3-4-6 (10) W _ O - Light Gray Slightly Clayey Sand with Shell Fragments X SS4-5-6 E 15 // (11) Bottom of borehole at 15.0 feet. CC 2 N 0 0 Ui W LL 2 Cl) 0, Co ip N m H Co C- N F Z U' N H O a m x U W H O W U KSM Engineering&Testing BORING NUMBER B-19 KSM P.O. Box 78-1377 Sebastian,FL 32978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax: (772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee, Florida DATE STARTED 12/15/22 COMPLETED 12/15/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample AT TIME OF DRILLING 1.8 ft LOGGED BY DC/CW CHECKED BY CCC AT END OF DRILLING — NOTES See Attached Location Plan AFTER DRILLING — w o w • ASPTN VALUE A U > w w 20 40 60 80 w- a-J MATERIAL DESCRIPTION J 2 >0U' O < tx PL z I • LL p o O . m O> H 20 40 60 80 U' 2 z W U Z W > Z ❑FINES CONTENT(%)0 Lu 0 0- 20 40 60 80 Light Gray Sand Gray Slightly Silty Sand X 1-2-2 SS (4) - - )( ss 4-5-5 (10) \k 4-4-5 m_ X SS (9) 6-7-7 N_ _/� SS Gray Sand 1 (14) ZS 10 Xs5 5(10) OI (7 _• : Gray Clayey Sand 6-4-5 15 SS (9) > Bottom of borehole at 15.0 feet. w U) 0 0 O 0 0 U) w L U) (n rn Co N Of N O C7 Qm U) 0 0 U) F- a_ x m 0 w 0 0 w 0 KSM Engineering&Testing BORING NUMBER B-20 KSM P.O.Box 78-1377 Sebastian, FL 3 978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax: (772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee,Florida DATE STARTED 12/15/22 COMPLETED 12/15/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample AT TIME OF DRILLING 2.0 ft LOGGED BY DC/CW CHECKED BY CCC AT END OF DRILLING -- NOTES See Attached Location Plan AFTER DRILLING -- A SPT N VALUE A r cn aj u~.1 20 40 60 80 a a 0 MATERIAL DESCRIPTION w m w o z 0 z PL MC LL W Q _1g >0J�Q a I • I w aJ o-D oI cc > i— 20 40 60 80 C7 Q Z 0 w U z Z ❑FINES CONTENT(%)❑ cn cK w 0 0 0_ 20 40 60 80 Dark Gray Sand X SS 1 12 - X (3) _ - SS 3-4-5 (9) 5 X SS 537 Light Gray SandX ( ) • SS (8) 16 6 106-6-7 Xss (13) h- -' a Gray Sand,Slightly Silty with Traces of Shell 4-4-4 A F 15 ) _ X SS (8) > Bottom of borehole at 15.0 feet. W 2 0 0 0 U) N W LL U) N 0, U) Co N am 0 U) D F U) H z 0 N r 0 a CO x 0 W 0 0 W KSM Engineering&Testing BORING NUMBER B-21 KSM P.O. Box 78-1377 Sebastian, FL 32978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax: (772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee,Florida DATE STARTED 12/14/22 COMPLETED 12/14/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample Q AT TIME OF DRILLING 2.3 ft LOGGED BY DC/CW CHECKED BY CCC AT END OF DRILLING -- NOTES See Attached Location Plan AFTER DRILLING — w o w ASPTNVALUEA r_ cn w w 20 40 60 80 a =O m w— �zS ~� PL MC LL w` -O MATERIAL DESCRIPTION _j g >0 O Q z a I • I ot D O cc m 0> F 20 40 60 80 0 2z W Uz w >- < Z El FINES CONTENT(%)0 0 0- 20 40 60 80 Dark Gray Sand • 1-1-2 X SS (3) - Xss4-5-5 5 5-6-6 m- Dark Brown Sand SS (12) ry_ Light Gray Sand X SS (178) X11101 g m_ Gray Sand,Slightly Silty X 5-3-4 2 15 SS (7) Bottom of borehole at 15.0 feet. W 2 N 0 0 0 0 U) w U) rn CD ci 1- 0 aC J U) F 0 F z U` U) F O 0 a m x U W H O w KSM Engineering&Testing BORING NUMBER B-22 KSM P.O. Box 78-1377 Sebastian,FL 32978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax:(772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee, Florida DATE STARTED 12/14/22 COMPLETED 12/14/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample V AT TIME OF DRILLING 2.0 ft LOGGED BY DC/CW CHECKED BY CCC AT END OF DRILLING -- NOTES See Attached Location Plan AFTER DRILLING --- w o w A SPT N VALUE A U >- > w w 20 40 60 80 o ° O MATERIAL DESCRIPTION _1 2 >O 9 D< O Z a PL MC IL pv �� o-D O1 mO> Dv 20 40 60 80 C7 <z W U z w Q El CONTENT(%)ID 0 0- 20 40 60 80 Gray Sand X SS 1-1-2 (3) Dark Brown Sand X SS 4-5-5 (10) 0_ 4-5-6 X SS (11) 4-3-4 z X SS (7) 0- - Brown Sand \J 10 X SS 3-3-3 (6) w z_ J_- N M N_ Gray Slightly Silty Sand \ 6-6-7 / 15 X SS (13) > Bottom of borehole at 15.0 feet. /\ W 2 0) 0 O 0 N 0) Ui W LL 2 U) m U) i0 0 7 0 0) F- z z 0 v) 0 0 a x m 0 0 W 0 O w KSM Engineering&Testing BORING NUMBER B-23 KSM P.O. Box 78-1377 Sebastian,F L 32978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax: (772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee, Florida DATE STARTED 12/14/22 COMPLETED 12/14/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample V AT TIME OF DRILLING 2.4 ft LOGGED BY DC/CW CHECKED BY CCC AT END OF DRILLING -- NOTES See Attached Location Plan AFTER DRILLING — w o w • ♦SPT N VALUE _U � r_ co CC] w 20 40 60 80 O m wo �Z-= 0 ~� PL MC LL o-x 0 O MATERIAL DESCRIPTION _1 g >0 O Q O Z n I • I o`er J o O . mO> " 20 40 60 80 Q z w O z Z ❑FINES CONTENT(%)0 cn w 0 0 0- 20 40 60 80 Dark Gray Sand XX SS 1(12)1 - SS (4)2-2-2 5 Light Gray Sand 0 X 4-6-6 0: SS (12) X SS (10) 0 10 X SS 7-9-8 T_ - Gray Slightly Clayey Sand SS 4-3-3 15 (6) 0 Bottom of borehole at 15.0 feet. w ti a) 0 0 0 0 a) Ui W LL 2 N rn io 0) 0 0) U) a 0 F- a) I- z 0 F- 0 a x m x 0 W 0 O al KSM Engineering&Testing BORING NUMBER B-24 KSMP.O.Box 78-1377 Sebastian,FL 32978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax: (772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee, Florida DATE STARTED 11/22/22 COMPLETED 11/22/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample SZ.AT TIME OF DRILLING 2.7 ft LOGGED BY SH/NV CHECKED BY CCC AT END OF DRILLING -- NOTES See Attached Location Plan AFTER DRILLING w o w • ♦SPTN VALUE A U r cow w 20 40 60 80 O MATERIAL DESCRIPTION J >d p Q O Z u PL IL � o-D O m O> - - 20 40 60 80 0 z U z w Q ❑FINES CONTENT(%)❑ 0 0- 20 40 60 80 Gray Sand with Root X _ _`i SS 1(1)1 Q Brown Sand X SS 1-0-0 a_ xl SS 0-0-3 - XSS v (3) 4-5-6 z • 0 XSS 78-10 (18) W _ Brown Clayey Sand �l ,r N- - SS 4-4-3 •E 15 :. (7) > Bottom of borehole at 15.0 feet. w W U) ) N U 0 0 N N W LL U) c)rn 0 QI N O H N Z 0 N O d m U W 0 O w C7 KSM Engineering&Testing BORING NUMBER B-25 KSM P.O. Box 78-1377 Sebastian,FL 32978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax:(772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee, Florida DATE STARTED 11/21/22 COMPLETED 11/21/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample . AT TIME OF DRILLING 3.3 ft LOGGED BY NV/MH CHECKED BY CCC AT END OF DRILLING -- NOTES See Attached Location Plan AFTER DRILLING -- w o w • ASPTNVALUEA U °m >- cn w w 20 40 60 80 � 0 m Tiro �zE, 2 �� PL MC LL o Z Q O MATERIAL DESCRIPTION J 2 >a O < z a �� o O� mO> � - 20 40 60 80 NZ 11-1 U z W Q El FINES CONTENT(%)0 0 0- 20 40 60 80 Brown Sand _ X SS1 1 1(2) X _ SS 211 (2) 1 \L a _ \/X SS 2-2-3 / \ (5) Xss 346 Light Brown Sand (10) a 1 0 X SS 4-4-4 J_ _ Brown Clayey Sand 3-3-4 E 15 : `[% X SS (7) 1 > Bottom of borehole at 15.0 feet. Ui cn U) 0 0 0 N w w U. rn N CC ❑ CC ❑ F- U) F. 0) F- 0 a x co x U w F— O w 0 KSM Engineering&Testing BORING NUMBER B-26 KSM P.O. Box 78-1377 Sebastian,FL 32978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax:(772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee,Florida DATE STARTED 12/14/22 COMPLETED 12/14/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample _ V AT TIME OF DRILLING 1.3 ft LOGGED BY DC/CW CHECKED BY CCC AT END OF DRILLING -- NOTES See Attached Location Plan AFTER DRILLING — w o w • ASPTNVALUEA _o }_ cn w w 20 40 60 80 I--. 10 m wo z. 2 t , PL MC LL w v Q O MATERIAL DESCRIPTION _1 2 >C7 O p< O z " ► • 1 n-D O .cr co O> II D - 20 40 60 80 O Q z w O z z ❑FINES CONTENT(%)0 co (Y w o 0 0- 20 40 60 80 o.:•".:: Dark Gray Sand with Roots \/ - -: s.a.. — X SS 1-1-1 (2) \/ SS 1-2-2 - - Gray Sand A (4) a. • 5 o X a SS 3-4-4 (8) 03 X SS 5-6-6 (12) z _ 6-6-8 10 Dark Gray Sand SS (14) . .K w z - 0 co Gray Slightly Clayey Sand SS 1 2 1 X w 15 rc J'• O O _tr. Light Gray Sand with Shell SS 9-10-10 w 20 :o'.' . (20) Bottom of borehole at 20.0 feet. 0 m 6 N N m N N 0 0 0 ¢m J CO 7 0 I— to r- z 0 u) 1- 0 J a I I 0 w F 0 w 0 KSM Engineering&Testing BORING NUMBER B-27 KSM S Box 78-1377 basstian,FL 3 978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax: (772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee, Florida DATE STARTED 11/21/22 COMPLETED 11/21/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample AT TIME OF DRILLING 3.3 ft LOGGED BY NV/MH CHECKED BY CCC AT END OF DRILLING --- NOTES See Attached Location Plan AFTER DRILLING -- w o w ASPTNVALUEA O >- w w 20 40 60 80 r� =O ~m wo z 2 ~� PL MC LL 0 MATERIAL DESCRIPTION >O 0 D¢ O Z Q o o cc • -D OS m0> �" 20 40 60 80 <Z U z Z Q O FINES CONTENT(%)❑ 0 20 40 60 80 Gray Sand X - - — SS 1-2-3 Brown Sand (5) SZ XSS 222 (4) a X SS 2-3-4 co / \ (7) X SS4-5-5z Light Brown Sand (10) •Q X 4-4-4 10 SS (8) cn o ` Brown Clayey Sand SS 3-4-4 A E 15 (8) > Bottom of borehole at 15.0 feet. CO w CO N O O ❑ CO N W w CO rn N CO ❑ F- CO Z CO F- 0 a m x O W 0 O w KSM Engineering&Testing BORING NUMBER B-28 KSM P.O. Box 78-1377 Sebastian,FL 32978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax:(772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee,Florida DATE STARTED 11/21/22 COMPLETED 11/21/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample sz AT TIME OF DRILLING 4.2 ft LOGGED BY NV/MH CHECKED BY CCC AT END OF DRILLING — NOTES See Attached Location Plan AFTER DRILLING — w o w • ASPTNVALUEA = U > _ cn w w 20 40 60 80 wo z� H� PL MC LL 0 -0 MATERIAL DESCRIPTION _1 g >0 O Q O z a I • I o �� o O� m O> � - 20 40 60 80 Q z w ? z ❑FINES CONTENT(%)❑ Cn w o 0 0- 20 40 60 80 Dark Gray Sand X SS 1-1-1 • Brown Sand (2) \/ 2-4-4 - - Q X SS (8) 5 /\\ SS 3-4-5 X (9) • X SS8-89 (17) 10 X SS 8-9-10 F (19) w z J O N Brown Clayey Sand X SS 2-3-3 E 15 (6) > Bottom of borehole at 15.0 feet. Ui w ti N U 0 ❑ N N W LL rn C0 N T N U 7 F- U) F- z Co C- O a m U W 0 O w 0 KSM Engineering&Testing BORING NUMBER B-29 KSMP.O. Box 78-1377 Sebastian,FL 32978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax:(772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee, Florida DATE STARTED 11/21/22 COMPLETED 11/21/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample Q AT TIME OF DRILLING 5.3 ft LOGGED BY NV/MH CHECKED BY CCC AT END OF DRILLING -- NOTES See Attached Location Plan AFTER DRILLING -- o • A SPT N VALUE A w .e.g U o o r cn w w 20 40 60 80 o-O MATERIAL DESCRIPTION CO ILI>a 0 Q 0 z 0- PL • LL pv �— o-� O . al F- 20 40 60 80 0 <Z 1-1-10? w ❑FINES CONTENT(%)❑ 0 , o_ 20 40 60 80 Gray Sand X SS 2-3-3 Brown Sand X (6) _ SS 2-2-2 (4) X _ • • SS 2-3-4 X SS 4-4-5 /y (9) 11101 XSS 44/ \ ( )• ffBrown Clayey Sand • 4-4-4Xss (8) Bottom of borehole at 15.0 feet. cc W m CI) Y_ U) 0 0 U) w W LL 2 LU Y Oo co CO N N N m U) 0 C- U) F- z c0 U) 0 0 a m U W 0 O w KSM Engineering&Testing BORING NUMBER HA-01 KSMP.O. Box 78-1377 PAGE 1 OF Sebastian,FL 32978 Tel:(772)-589-0712 Fax:(772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee, Florida DATE STARTED 11/23/22 COMPLETED 11/23/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD AT TIME OF DRILLING ---4"of Standing Water LOGGED BY RC/MH CHECKED BY CCC AT END OF DRILLING — NOTES See Attached Location Plan AFTER DRILLING -- • A SPT N VALUE A o > co Cu- w 20 40 60 80 d a 0 MATERIAL DESCRIPTION m � p Z< O z 0 PL MC LL pv �-' o-� O� co> a 20l 40 60 I80 0 <z I U Z w 0 ❑FINES CONTENT(%)❑ 0 a 20 40 60 80 Dark Gray Slightly Silty Sand with Organics(Muck) 7 Light Gray Sand 30 - - 30 35 40 5 0 Brown Sand 40 CO Bottom of borehole at 6.0 feet. oh N O 6 K LU W O O ry LL se Y rn N N ❑ O a CO W O KSM Engineering&Testing BORING NUMBER HA-02 KSMP.O. Box 78-1377 Sebastian,FL 32978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax:(772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee, Florida DATE STARTED 11/23/22 COMPLETED 11/23/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD SL AT TIME OF DRILLING 1.3 ft LOGGED BY RC/MH CHECKED BY CCC AT END OF DRILLING — NOTES See Attached Location Plan AFTER DRILLING — w o w • ASPTNVALUEA = U r cn w w 20 40 60 80 ~a a L 0 MATERIAL DESCRIPTION J >0 O < p Z PL • I pv �J �z O . mOZ w }g 20 40 60 80 < v w ❑FINES CONTENT(%)❑ 0 0 20 40 60 80 Dark Gray Silty Sand with Organics 8 AAA Light Gray Sand 30 - - 30 35 35 5 Brown Slightly Silty Sand 39 Bottom of borehole at 6.0 feet. z 0 0 c- 0) w w 0 U) rn cn N ci > > w W N U) N 0 0 0 ❑ N ci N W LL 2 N W N NN N m U) F- U) I- z V) F- 0 a m 0 U w 0 O w C7 KSM Engineering&Testing BORING NUMBER HA-03 KSM P.O. Box 78-1377 Sebastian,FL 32978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax: (772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee,Florida DATE STARTED 11/23/22 COMPLETED 11/23/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD SZ AT TIME OF DRILLING 1.7 ft LOGGED BY RC/MH CHECKED BY CCC AT END OF DRILLING — NOTES See Attached Location Plan AFTER DRILLING — w o w • ASPTNVALUEA } cn w ALL' 20 40 60 80 wO MATERIAL DESCRIPTION L j 0 Q z n I MC PL I O z O s 0,0 Z w } 20 40 60 80 Q w Z Ct ❑FINES CONTENT(%)❑ cq w 0 0 0 20 40 60 80 Dark Gray Silty Sand with Organics - 29 Light Gray Sand 30 •- 30 Brown Slightly Silty Sand 25 a' S • 35 a CO Bottom of borehole at 6.0 feet. Z Q w W 1 Z 0 U) 0) a. W 1 a W N N a 0 0 0 a) Ui W LL 2 N O) N N N 0 0 0 m 5 a) a I- U) Z a) 0 a CO x 0 W 0 O w KSM Engineering&Testing BORING NUMBER HA-04 KSMP.O. Box 78-1377 Sebastian,FL 32978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax:(772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee, Florida DATE STARTED 11/23/22 COMPLETED 11/23/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD AT TIME OF DRILLING 1.6 ft LOGGED BY RC/MH CHECKED BY CCC AT END OF DRILLING — NOTES See Attached Location Plan AFTER DRILLING — w o w ASPTNVALUEA a. v > cn w w 3 20 40 60 80 ~ o_O MATERIAL DESCRIPTION w m >C01 O Q O z chi PL • IL tch �J Q-D O� m O> � 20 40 60 80 0 z W UZ w >- 0 < d ❑FINES CONTENT(%)ci) ❑ 20 40 60 80 Dark Gray Slightly Silty Sand with Some Organics- Light Gray Sand 30 - - 35 35 35 5 0 Brown Slightly Silty Sand 35 Bottom of borehole at 6.0 feet. N 0 0 F- w w z 0 N N W 1 W U, fn N 0 O 0 Ui w 2 co CO F 0 0 m co 0 0 H U) H H 0 a In F- 0 W 0 O w KSM Engineering&Testing BORING NUMBER HA-05 KSM SebaBoan,F L 32978 1377 PAGE 1 OF 1 Tel:(772)-589-0712 Fax: (772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee, Florida DATE STARTED 11/23/22 COMPLETED 11/23/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD SZ AT TIME OF DRILLING 1.4 ft LOGGED BY RC/MH CHECKED BY CCC AT END OF DRILLING -- NOTES See Attached Location Plan AFTER DRILLING --- w a w • ASPTNVALUEA v r cn w w 20 40 60 80 wQ O MATERIAL DESCRIPTION >0 O D< z Q I • I p o-D O . mO> F D'-' 20 40 60 80 c_O z W O Z w >- 0 < aZw. ❑FINES CONTENT(%)❑ o ,� 20 40 60 80 Dark GraySiltySand with Traces of Roots 8 - ` n 32 Light Gray Sand - 43 46 - • Brown Slightly Silty Sand 44 a. 49 Bottom of borehole at 6.0 feet. N ry z 0 H 0 U) Ui w z_ 0 Ui W 1 W N U) N Co O 0 0 N C) N W T. U) fD H 0 0 m N 0 H U) H z v) H 0 a m O w H O 0 O KSM Engineering&Testing BORING NUMBER HA-06 KSM P.O.SebaB�an,F L 32978 1377 PAGE 1 OF 1 Tel:(772)-589-0712 Fax:(772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee,Florida DATE STARTED 11/23/22 COMPLETED 11/23/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD SZ AT TIME OF DRILLING 1.2 ft LOGGED BY RC/MH CHECKED BY CCC AT END OF DRILLING -- NOTES See Attached Location Plan AFTER DRILLING --- w a w • ASPTN VALUE A U o r cn w w 20 40 60 80 a a 0 MATERIAL DESCRIPTION w m w z< p — PL MC LL w o QJ > Jam¢ n I • p - 0 m O> F- 20 40 60 80 O 2z W Oz W )- < W ❑FINES CONTENT(%)❑ 0 a. 20 40 60 80 ° Dark Gray Silty Sand with Traces of Roots 8 e f'1.P SZ 34 Light Gray Sand 40 40 Brown Slightly Silty Sand 43 5 47 m Bottom of borehole at 6.0 feet. rycN O LU W 1 rn LU W Ui W U) N U) O 0 0 N ci 0) LL 2 rn N H 0 ci [L U) D D F- CI) H Z N F O J a x m 0 w 0 O w U KSM Engineering&Testing BORING NUMBER HA-07 KSMP.O. Box 78-1377 Sebastian, FL 32978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax:(772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee, Florida DATE STARTED 11/23/22 COMPLETED 11/23/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD VAT TIME OF DRILLING 2.8 ft LOGGED BY RC/MH CHECKED BY CCC AT END OF DRILLING --- NOTES See Attached Location Plan AFTER DRILLING -- W o w ASPTNVALUEA O } cn 1-1w 20 40 60 80 Q a 0 MATERIAL DESCRIPTION J >a p Q p z PL � LL ICI o_D Ocr mo> - D n 20 40 60 80 U <z W U z W Q CI CONTENT(%)❑ 0 a 20 40 60 80 Dark Gray Silty Sand with Organics(Muck) 6 - Light Gray Sand 34 37 SZ - - 39 - 42 5 Brown Silty Sand 46 a Bottom of borehole at 6.0 feet. z z O 0 C- U) N W z_ O U) O1 M O_ W W 2 U) 0 0 N W W co co rn CD io 0 m 5 U) 0 U) F- z v) C- 0 a x co x O W f O w KSM Engineering&Testing BORING NUMBER HA-08 KSMP.O.Box 78-1377 Sebastian, FL 32978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax:(772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee,Florida DATE STARTED 11/23/22 COMPLETED 11/23/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD -V.AT TIME OF DRILLING 2.8 ft LOGGED BY RC/MH CHECKED BY CCC AT END OF DRILLING -- NOTES See Attached Location Plan AFTER DRILLING --- w o w ASPTNVALUEA v r o w w 20 40 60 80 L 0-E 0 MATERIAL DESCRIPTION w CO w 0 9 z< p z I MC I w— Q �2 > >Q n I • I 0 c- Q— O� o 0>z w ---- 20 40 60 80 0 < d o ❑FINES CONTENT(%)0 c.n20 40 60 80 Dark Gray Slightly Silty Sand with Some Organics 8 _ `° 29 Brown Sand 30 35 • Light Brown Sand — 35 c 5 35 a m Bottom of borehole at 6.0 feet. 0 N z z O 0 U f Co w z_ 0 N O) l7 f7 N 0 iC w w U) ti N 0 O 0 h Ui w LL U) N N 0 m U) 0 H U) F- z U) H 0 a x m x O w 0 O w 0 KSM Engineering&Testing BORING NUMBER HA-09 KSM P.O. Box Sebasst an78 L 32978 1377 PAGE 1 OF 1 Tel:(772)-589-0712 Fax:(772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee, Florida DATE STARTED 11/23/22 COMPLETED 11/23/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD SZ AT TIME OF DRILLING 1.2 ft LOGGED BY RC/MH CHECKED BY CCC AT END OF DRILLING -- NOTES See Attached Location Plan AFTER DRILLING -- w o w • ASPTNVALUEA U } w w 20 40 60 80 1— —0w �o ~❑ z PL MC LL w -O MATERIAL DESCRIPTION _1 2 >Cl O Q Q I • o 0-0 O . m0> 1— ❑� 20 40 60 80 C0 2z 0 Oz w r < w El FINES CONTENT(%)co fx ❑ 0 0- 20 40 60 80 Dark Gray Silty Sand with Some Organics 8 - =-SZ 8 - ___ 9 n Dark Gray Sand with Organic Debris 29 A e.4 30 Brown Sand,Slightly Silty 5 31 0 Bottom of borehole at 6.0 feet. N 0 z O 0 U) a) W N W > K W U) U) O O 0 U) U) 0 0 0 m V) 0 co co v) F- 0 a CO 0 U W 0 0 W O KSM Engineering&Testing BORING NUMBER HA-10 KSM P.O. Box 78-1377 Sebastian,F L 32978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax: (772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee,Florida DATE STARTED 11/23/22 COMPLETED 11/23/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD a AT TIME OF DRILLING 2.3 ft LOGGED BY RC/MH CHECKED BY CCC AT END OF DRILLING --- NOTES See Attached Location Plan AFTER DRILLING — w o w ASPTNVALUEA v r cn w w 20 40 60 80 — =C� w o p ~� �� PL MC LL w Z o-O MATERIAL DESCRIPTION 03 >a O Q z a I • I o-D O rr m O> D v 20 40 60 80 C5 2Z W OZ W > 0 < Z 0 FINES CONTENT(%)❑ 20 40 60 80 Dark Brown Sand with Root 2U 30 20 45 Light Gray Sand 45 50 a m Bottom of borehole at 6.0 feet. m O 01 W N U) U) U O 0 ry w LL 2 csi N m Z 0 O c7 KSM Engineering&Testing BORING NUMBER HA-11 KSM P.O. 1377 Sebastian,Bx F FL 32978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax:(772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee, Florida DATE STARTED 11/23/22 COMPLETED 11/23/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD SZ AT TIME OF DRILLING 5.2 ft LOGGED BY RC/MH CHECKED BY CCC AT END OF DRILLING — NOTES See Attached Location Plan AFTER DRILLING -- w o w • ASPTNVALUEA o r IC/2 w w 20 40 60 80 o-x °-O MATERIAL DESCRIPTION w m w a o z< z PL MC LL o � LL.z OS MO> I- >- 20 40 60 80 Q w z 0 FINES CONTENT(%)❑ 0 cn a o 20 40 60 80 Gray Sand ' lb 21 29 33 5 Brown Sand — 40 o Q Light Brown Sand 40 a m Bottom of borehole at 6.0 feet. Z O O U) UI > _J B O l+I O LU > > W U) N N 0 0 0 U) W LL 2 to O O H ❑ 0 m 7 V) U) F- z B v) F- a m U w 0 O w KSM Engineering&Testing BORING NUMBER HA-12 KSM P.O. Box 78-1377 Sebastian,FL 32978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax:(772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee, Florida DATE STARTED 11/23/22 COMPLETED 11/23/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD SZ AT TIME OF DRILLING 2.3 ft LOGGED BY RC/MH CHECKED BY CCC AT END OF DRILLING -- NOTES See Attached Location Plan AFTER DRILLING -- w o w • ASPTN VALUE A O o > w w > 20 40 60 80 w Q m O MATERIAL DESCRIPTION ± >0 O lcz I I o- O cc O> F- 20 40 60 80 rn <z w O z Z ❑FINES CONTENT(%)❑ cn D Lu 0 0- 20 40 60 80 Dark Gray Sand,Slightly Silty with Organics(Muck) 8 - 10 A• .A.SZ Light Gray Sand — 30 - - 35 - 50 a 5 50 0 a Bottom of borehole at 6.0 feet. 0 N 0 Z 0 C7 Ui W J O U) O Ui W 1 CC W U) U) U) 0 0 0 N 7 U) U) 0 O r N F- 0 0 am fn 0 H Z_ C7 (n N O x O w I- O w O KSM Engineering&Testing BORING NUMBER HA-13 KSM P.O. Box 78-1377 Sebastian, FL 32978 PAGE 1 OF 1 Tel: (772)-589-0712 Fax:(772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee, Florida DATE STARTED 11/23/22 COMPLETED 11/23/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD SZ AT TIME OF DRILLING 2.0 ft LOGGED BY RC/MH CHECKED BY CCC AT END OF DRILLING — NOTES See Attached Location Plan AFTER DRILLING -- w o w • ASPTN VALUE A U ° w w 20 40 60 80 ifJ Q O MATERIAL DESCRIPTION CO >O 0 D< 0 Z PL MC IL p� J o O . m 0> � 20 40 60 80 Z LIJ w ? Z ❑FINES CONTENT(%)❑ cn w 0 0- 20 40 60 80 Dark Gray Silty Sand with Organics(Muck) 8 Brown Sand- 28 30 35 - - 35 5 0 Light Brown Sand 35 n • Bottom of borehole at 6.0 feet. z Z ❑ H I- F Ui > J Z J ❑ N O' NJ 0 N 0 W 1 W N 5 U) 0 0 0 0 0 U) W LL 2 U) Y ti 0) N N 0 CD m U) a N N F Z CD F 0 a m 0 w 0 O w (7 KSM Engineering&Testing BORING NUMBER HA-14 KSM P.O. Box 78-1377 Sebastian, FL 32978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax:(772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee,Florida DATE STARTED 11/23/22 COMPLETED 11/23/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD SZ AT TIME OF DRILLING 4.5 ft LOGGED BY RC/MH CHECKED BY CCC AT END OF DRILLING — NOTES See Attached Location Plan AFTER DRILLING — LIJ cC A SPT N VALUE A U > o w ij 20 40 60 80 Q O MATERIAL DESCRIPTION 11.103 >0 p D Q p Z a PI L MC IL p LLD O� mO> F- �" 20 40 60 80 <z U U z w 0 ❑FINES CONTENT(%)❑ 0 d 20 40 60 80 "::: Gray Sand with Traces of Root 78 29 �:. 30 P Brown Sand 37 40 • SZ Light Brown Sand 0 5 40 a Bottom of borehole at 6.0 feet. 0 O O Co Ui w _ Ui > > K W N 2 N 0 0 ❑ Co N LL 2 O O N H m Co H Co N z N F- 2 J a m U w 0 O w 0 KSM Engineering&Testing BORING NUMBER HA-15 KSM S bas ian FL 32978 8-1377 PAGE 1 OF 1 Tel:(772)-589-0712 Fax: (772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee, Florida DATE STARTED 11/23/22 COMPLETED 11/23/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD 2 AT TIME OF DRILLING 5.2 ft LOGGED BY RC/MH CHECKED BY CCC AT END OF DRILLING — NOTES See Attached Location Plan AFTER DRILLING — w o w A SPT N VALUE A _U r_ <n w w 20 40 60 80 � =�7 m wo zD �� PL MC LL o- O MATERIAL DESCRIPTION >C7 O < O Z n I • Lu J o D O� mO> 20 40 60 80 Q z w ? Z ❑FINES CONTENT(%)❑ cn w o 0 0_ 20 40 60 80 c. 1. Gray Sand with Buried Debris 41 J :1a 40 �' • ' 38 Dark Brown Sand - 43 Brown Sand 46 'a 5 SZ 47 o Bottom of borehole at 6.0 feet. 0 0 Z F- H 0 H N > > Z Q LU 0 O N 0 LU w LU w 0) N O 0 0 N 0 N W LL LU O O N N N 0 m N 0 H N H Z 0 co H 0 a m U w F- O w KSM Engineering&Testing BORING NUMBER PB-1 KSM P.O. Box8-1377 Sebastian,FL 32978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax:(772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee,Florida DATE STARTED 12/13/22 COMPLETED 12/13/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample Q AT TIME OF DRILLING 1.0 ft LOGGED BY DC/CW CHECKED BY CCC AT END OF DRILLING -- NOTES See Attached Location Plan AFTER DRILLING — w o w A SPT N VALUE A a. U cn w w 3 20 40 60 80 0 0 MATERIAL DESCRIPTION J >0 p Q Z PL • LL ov � MOO� mO> 20 40 60 80 O Q Z U? w ❑FINES CONTENT(%)D 0 a. 20 40 60 80 Dark Gray Silty Sand with Organics(Muck) - Gray Sand,Slightly Silty 1-1-2 XSS1)4 Light Gray Sand (3) - .. X SS 6-9-5 (14) Grayish Brown Silty Sand \/ ax SS 4-3-3 / ` (6) • X SS33-4 (7) - \ , 10 .: X SS 3-3-3 (6) - Gray Slightly Clayey Sand X SS 4(7)3 A XSS3���415 Light Gray Slightly Silty Sand \� cc X I SS 3-4-3 A - - /V (7) 2 _ U - SS 4(5)2 SS 338 W 20 Gray Sand with Shell ( ) LL Bottom of borehole at 20.0 feet. 2 N OI N 0 m 0 I Z 0 0 a U W 0 O w c� KSM Engineering&Testing BORING NUMBER PB-2 KSMS Box 78-1377 basstian, FL 32978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax: (772)-589-6469 CLIENT Workspace Collective PROJECT NAME 1000 State Road 70 PROJECT NUMBER 2210339-b&p PROJECT LOCATION Okeechobee, Florida DATE STARTED 12/15/22 COMPLETED 12/15/22 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample -V AT TIME OF DRILLING 2.4 ft LOGGED BY DC/CW CHECKED BY CCC AT END OF DRILLING — NOTES See Attached Location Plan AFTER DRILLING — w o w A SPT N VALUE A 0 o r u w w 20 40 60 80 ~ o O MATERIAL DESCRIPTION _1 2 >0 9 m< z n PL MC IL ox w v — o-D 030> ._ — 20 40 60 80 O Q z w U? Z ❑FINES CONTENT(%)0 cn w o 0 0- 20 40 60 80 Light Gray Sand • 5-7-8 X SS (15) • X SS 10-12-10 / (22) 5 Dark Gray Sand,Slightly Silty 4k)h. a_ X SS 8-5-5 Light Gray Sand (10) ry XSS 5-6-6 (12) 6 10 X 6-7-8 SS /\ (15) X o_ SS 5-2-2 `.: Gray Clayey Sand SS 8 15 -2-2 X (4) 15 Gray Slightly Clayey Sand X 2-2-2 re SS (4) _ 0 Light Gray Clayey Sand with Shell SS 1-1-1 8-12-29 co20 SS (41) LL Bottom of borehole at 20.0 feet. 0 0 F- 0 m 5 0, ❑ F- F- z F- 0 a- a m x U W F- O w O Cgp: • TRAIL..1. -tMt %7M li r- _ .. II: . 71 • .. aLwuj -�4 i I n t } it7h:.T 11 - .;_1_OPM ; ae 4. ; I}g I i: � ` r111• ! — L HOTELLOT 3 r... 1 —L It2g -AO --L,__r 0.4 r.o. rN! • T t • Ii t I OF I . n c . ..__—u .- - i t ► _— { r r I e LOCATION OF SOIL TESTING PROJECT: 1000 State Road 70, Okeechobee, Florida DRAWNSHEET 1 OF 2 PERMIT#: '�' C 1 ENGINEERING DESIGNED C.V. C.C.C.PROJECT#: 2210339-b&p £1 I £VA AND TESTING DATE: 20221228 SCALE: NOT 22TO SCALE 'o, No 5thSt fir4 i' Al f i Fyn. glil; i' € ii5 1,. r , ' , .V t A a .....In` • ti a, , Ne 4th St am _, 6 ' , Oj ' •:` .1.. t 4 1 ''' 'Jr . , . _.„ . ..„, ::,.. ,, , „,.. , ,„,.. . ., t .... ,., ..; „.., ..„...„.. . , , , , , ... , , ,,.... .0' 11 z • - 7nra^ I � y ' ° � � Sy mac'-• i. Y • 1 mo. fit._ _.__, _ _ _ .- State Road 70 E -- - , R _.� x....,....� ..,..n... -� __ .._.___...._. ____' a..- 7# 0,r 7.-'A _ ... .„: ., ' _... ,' aid; 1.1-11; RI 7 d • ! ,{�t y r .'.urn tiallii USDA SOILS SURVEY 6—Manatee loamy fine sand, frequently ponded, 0 to 1 percent slopes 11—Immokalee fine sand, 0 to 2 percent slopes PROJECT: 1000 State Road 70,Okeechobee, Florida Ille.SHEET 2 OF 2 401k AN ENGINEERING DES GN BY. C.C.C, PERMIT#: PROJECT#: 2210339 soilslinkil i. .11.Vili AN D TEST1 N G SCALE:NOT TO SCALE