Loading...
2023-02 Building Permit Fees FAILED ADOPTION FAILED RESOLUTION NO. 2023-02 A RESOLUTION OF THE CITY OF OKEECHOBEE, FLORIDA, REVISING AND AMENDING THE SCHEDULE OF RATES, FEES, AND CHARGES FOR CONSTRUCTION PLANS, BUILDING CONSTRUCTION SERVICES AND OTHER MISCELLANEOUS SERVICES BY THE GENERAL SERVICES DEPARTMENT; AMENDING TABLE 4 WITHIN THE CODE OF ORDINANCES APPENDIX G; PROVIDING FOR CONFLICT; PROVIDING FOR CODIFICATION; PROVIDING FOR SEVERABILITY; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City of Okeechobee, Florida, finds that it is in the best interest of the citizens to establish a schedule of rates, fees, and charges for construction plans, building construction, and other miscellaneous services by the General Services Department. Such Schedule of Fees shall be charged, and collected to obtain permits and/or services; and WHEREAS, in the interest of expedience, and ease of amendment as necessary, it is in the best interest of the City to adopt the schedule of fees by resolution, and that such fee schedule has been codified as Table 4 in Appendix G of the City of Okeechobee, Code of Ordinances. NOW, THEREFORE, be it resolved before the City Council for the City of Okeechobee, Florida; presented at a duly advertised public meeting; and passed by majority vote of the City Council; and properly executed by the Mayor or designee, as Chief Presiding Officer for the City: SECTION 1: The foregoing "WHEREAS" clauses are ratified and confirmed as being true and correct and are made a specific part of this Resolution. SECTION 2: That the City Council for the City of Okeechobee, Florida, amends herein Part II of the Code of Ordinances, Subpart B-Land Development Regulations, providing for amendments to Appendix G-Miscellaneous Fees and Procedures, Table 4-Rates, Fees and Charges for Construction Plans, Building Construction and Other Miscellaneous Services by the General Services Department. That the value of construction for permits will be determined by the most recent publishing of the International Code Council Building Valuation Data (ICCBVD) estimates per square foot. Any item not specifically covered in the ICCBVD and the schedule of permit fees shall be based on a notarized bona fide contractor rice document (copy of same shall be submitted to the General Services Department), or the fee shall be determined by the Building Official on an individual basis. If, in the opinion of the Building Official, the valuation of a building, alteration, structure, electric, gas, mechanical, or plumbing systems appear to be underestimated on the permit application, permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the Building Official. Permit valuations shall include total costs, such as electrical, gas, mechanical, plumbing, equipment, and other systems, including labor. DESCRIPTION RATE, FEE, OR CHARGE • RESIDENTIAL,, _ ONE AND TWO FAMILY 1. New structure $5.00 per thousand total valuation $75.00 minimum 2. Additions/remodel $6.75 per thousand total valuation $75.00 minimum 3. Accessory structure: gl Prefabricated $6.75 per thousand total valuation $75.00 minimum b1 Site built $6.75 per thousand total valuation $100.00 minimum • 4. Roof/reroof/roof repair $100.00 150.00 $0.69 5. Plan review: $550 minimum 1 to 3 reviews $1.20 per thousand total valuation $75.00 minimum 4 or more reviews 4 times $0.60 per thousand total valuation $200.00 minimum After permitting $10.00 40.00 !minor changed After permitting $50 0. 0 75.00 (major changed 6. Other $50.00 MOBILE, PARK MODEL, RECREATIONAL VEHICLE (RV), MANUFACTURED HOME, MODULAR HOME 1. Triple-wide units $ ' ter`` , 500.00 includes MEP's, not including plan review or accessory structures 2. Double-wide unit $' l;!,.!.!, 500.00 includes MEP's, not including plan review or accessory structures 3. Single-wide unit_ RV $350.00 400.00 includes MEP's, not including park model plan review or accessory structures 4. RV, park model $200.00 925.00 includes MEP's, Modular home not including plan review or accessory structures 5. Construction trailers $125.00 175.00 COMMERCIAL BUILDING 1. New structure $6.751 per thousand total valuation $450.00 200.00 minimum 2. Additions/remodel $7.75 per thousand total valuation $125.00 150.00 minimum 3. Accessory structure's $7.75 per thousand total valuation $4 00 75.00 minimum 4. Roof/reroof/roof repair $7.75 per thousand total valuation $450.00 200.00 minimum 5. Plan review: 1 to 3 reviews $4 0 3.40 per thousand total valuation $150.00 minimum 4 or more reviews 4 times $1.75 per thousand total valuation $600.00 minimum After permitting $ 75.00 minor change) After permitting $100.00 major change) 6. Other $75.00 flat fee a- $5.00 $50 00 minimum 2 Addition/remodel $5-00 $50:00 minimum Plan review 0 20 • $50.00 minimum MECHANICAL, ELECTRICAL, PLUMBING (MEP'S) SUBCONTRACTOR 1. HVAC $75.00 plus per thousand total valuation $0,8-0 1.90 Language to be added is underlined. Language to be deleted is-W=1. RESOLUTION NO. 2023-02, PAGE 2 OF 6 $75.00 minimum 2. Electrical $75.00 plus per thousand total valuation $ 1.90 41, $75.00 minimum 3. Plumbing $75.00 plus per thousand total valuation $ 1.90 $75.00 minimum 4. LP gas or natural gas $75.00 plus per thousand total valuation $,,_.-w, 1.90 $75.00 minimum MEP'S STAND ALONE 1. HVAC $100.00 plus per thousand total valuation $1.90 $100.00 minimum 2. Electrical $100.00 plus per thousand total valuation $1.90 $75.00 minimum 3. Plumbing $100.00 plus per thousand total valuation $1.90 $100.00 minimum 4. LP gas or natural gas $100.00 plus per thousand total valuation $1.90 $100.00 minimum 5. Solar $100.00 plus per thousand total valuation $1.90 $100.00 minimum 6. Plan Review $25.00 flat fee FLAT-FEE-CHARGES OTHER/MISCELLANEOUS 1. Non-buildable slabs (driveway, walk, etc.)_ $a50'9 75.00 under 1,000 square feet (sq. ft.) 121 $150.00 over 1,000 sq. ft 2. Demolition Permit: $1-00.00 (commercial and residential structure remoy J) Residential $100.00 b), Commercial $150.00 under 2,500 sq. ft. c Commercial $150.00 plus over 2,500 sq. ft., $600.00 $5.00 per maximum 1,000 sq. ft. 3. Fences $50:00 75.00 weed privacy and chain link, no plan review fee 4. Hood suppression $75.00 system 5. Commercial kitchen $100.00 hood 6. Siding $ 0 75.00 7. Pre-moving permit (tie $7-540 0 150.00 pinto City from outside City down) Limits) 8. Alarm system $55.00 !per label if applicable, low voltage security) 9. Fire alarm: • $50.00 75.00 $2,000.00 and under $100.00 over $2,000.00 10. Fire sprinkler: $75.00 (20 heads or less) PIP 12/ $200.00 (21 heads or more), 11. Fuel tank removal $6048A 75.00 (per tank and piping) Language to be added is underlined. Language to be deleted is skask-through. RESOLUTION No. 2023-02, PAGE 3 OF 6 a. 12. Fuel tank installation $150.00 (per tank and piping) 447 13. LP tankgs) • 4-5 al Piping only $50.00 75.00 4 Tankisl/piping $b0:00 75.00 (up to 420 pounds) 4 91 Tanktsl/piping $100.00 (over 420 pounds) 14. Tank(s), excluding $75.00 septic or gas 15. Spray booth for cars/ $80.00 (not including electric) 4-8 equipment 16. Solar and related $50700 75.00 generation devices 4-9 energy (ground/wall/ roof) 17. Pool: 20 pl Residential peel $350.00 400.00 lin-groundi. not including electric or plumbing, includes plan review Residential p0010 $100.00 above-ground not including electric or plumbing, includes plan review cl Commercial ` $ .,©'® 650.00 not including electric; or plumbing and, includes plan review 18. Spa, whirlpool: al Residential $' - _`, 75.00 not including electric,, or plumbing Of, includes plan review • 121 Commercial $200.00 not including electric7 or plumbing of, includes plan review 19. Lawn irrigation: al Residential _ $40.00 rigatidi • 121 Commercial $80.00 20. ' Dock: • al Residential $ h ';, 75.00 (fixed or floatingL not including electric, plumbing, and any covered structure • b) Commercial III $ t. 200.00 (fixed or floating not including electric, plumbing, and any covered structure 21. Boat lift or davits: al Residential $50.00 75.00 not including electric • 121 Commercial - $4-00 90, 150.00 not including electric 22. Seawall, retaining wall, $0.65 per linear foot or riprap, privacy walls $50 75.00 minimum 23. Temporary Power Poles: 327 al Residential $50.00 75.00 121 Commercial $100.00 24. Certificate of $0.00 included in permit occupancy • 25. Temporary certificate of occupancy: al Residential $50.00 121 Commercial $100.00 Language to be added is underlined. Language to be deleted is RESOLUTION No. 2023-02, PAGE 4 OF 6 26. Letter of Substantial $50.00 Completion • SIGN{SI 1. Signage $5.75 per thousand of total valuation $50.00 minimum 2. Plan review $1.25 per thousand of total valuation $40.00 minimum FACTORY INDUSTRIAL GROUP F FACILITY 1. Factory Industrial $2,500.00 applied for and issued annually Group F Facility In lieu of individual permits for buildings or structures that are categorized in the Florida Building Code Section 306 as Factory Industrial Group F, the Building Official is authorized to issue an annual permit. Group F occupancy includes, among others, the use of a building or structure, or a portion thereof, for assembling, disassembling, fabricating, finishing, manufacturing, packaging, repair, or processing operations that are not classified as a Group H hazardous or Group S storage occupancy. The list and categories of Group F facilities is provided on the online free version of the most recent Florida Building Code or can be provided by the General Services Department. The annual permit will allow, within specific parameters and reporting requirements, for routine alternations, emergency services, repairs, or refurbishing, to existing electric, gas, mechanical, plumping, or non- structural interior, minor renovations of service systems or manufacturing equipment installations/relocations. PARTIAL, RE-INSPECTION{S1 FEES Ordinary building inspection fee(s) are included in the building permit fee. The following re-inspection fees are implemented when the contractor/permittee deviates from the routine inspection or fails inspection(s): 1. Partial Inspections $75.00 must be paid prior to any further inspections being scheduled 2.11,. First Re-inspection $25700 75.00 3.1. Second Re-inspection $50.00 100.00 4.& j Third Re-inspection $200.00 PERMIT RENEWAL FEE, EXTENSION, DUPLICATE, CONTRACTOR CHANGE 1. Renew expired permits $50.00 2. First extension $75.00 3-months or less from expiration date 3. Subsequent extensions $150.00 up to 18-months from expiration date 4. Extensions for more $200.00 than 18-months from expiration date 1111 5. Demolition extension $100.00 30-day extension, one time only 6. Duplicate Permit Card $50.00 7.4-: Contractor change $50.00 same permit Language to be added is underlined Language to be deleted is � _. . ems:y. RESOLUTION No. 2023-02, PAGE 5 OF 6 PENALTIES Where work for which a permit is required is started or preceded prior to obtaining said permit, said work shall be subject to a fee established by the Building Official • that shall be in addition to the required fees. SECTION 3: Conflict All resolutions or parts of resolutions in conflict herewith are hereby repealed. SECTION 4: Inclusion in the Code of Ordinances It is the intention of the City Council of said City, and it is hereby resolved that the provisions of this Resolution shall become made part of the City Code of Ordinances. SECTION 5: Severability If any provision or portion of this resolution is declared by a court of competent jurisdiction to be void, unconstitutional, or unenforceable, then all remaining provisions and portions of this resolution shall remain in full force and effect. SECTION 6: Effective Date This Resolution shall take effect thirty (30) days from the adoption date. INTRODUCED AND ADOPTED in regular session this 6th day of June 2023. Postponed to this 20th day of June 2023. N/A Dowling R. Watford, Jr., Mayor ATTEST: N/A Lane Gamiotea, CMC, City Clerk REVIEWED FOR LEGAL SUFFICIENCY: N/A John J. Fumero, City Attorney • Language to be added is underlined. Language to be deleted is RESOLUTION No. 2023-02, PAGE 6 OF 6