2023-06-20 VII. A. Res No 2023-02, Fee Schedule, Exhibit 4 • •
Exhibit 4
06/20/2023
RESOLUTION NO. 2023-02
A RESOLUTION OF THE CITY OF OKEECHOBEE, FLORIDA,
REVISING AND AMENDING THE SCHEDULE OF RATES, FEES,
AND CHARGES FOR CONSTRUCTION PLANS, BUILDING
CONSTRUCTION SERVICES AND OTHER MISCELLANEOUS
SERVICES BY THE GENERAL SERVICES DEPARTMENT;
AMENDING TABLE 4 WITHIN THE CODE OF ORDINANCES
APPENDIX G; PROVIDING FOR CONFLICT; PROVIDING FOR
CODIFICATION; PROVIDING FOR SEVERABILITY; AND
PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the City of Okeechobee, Florida, finds that it is in the best interest of
the citizens to establish a schedule of rates, fees, and charges for
construction plans, building construction, and other miscellaneous services
by the General Services Department. Such Schedule of Fees shall be
charged, and collected to obtain permits and/or services; and
WHEREAS, in the interest of expedience, and ease of amendment as necessary, it
is in the best interest of the City to adopt the schedule of fees by resolution,
and that such fee schedule has been codified as Table 4 in Appendix G of
the City of Okeechobee, Code of Ordinances.
NOW, THEREFORE, be it resolved before the City Council for the City of
Okeechobee, Florida; presented at a duly advertised public meeting; and
passed by majority vote of the City Council; and properly executed by the
Mayor or designee, as Chief Presiding Officer for the City:
SECTION 1: The foregoing "WHEREAS" clauses are ratified and confirmed as
being true and correct and are made a specific part of this Resolution.
SECTION 2: That the City Council for the City of Okeechobee, Florida, amends
herein Part II of the Code of Ordinances, Subpart I3-Land Development Regulations,
providing for amendments to Appendix G-Miscellaneous Fees and Procedures,
Table 4-Rates, Fees and Charges for Construction Plans, Building Construction and
Other Miscellaneous Services by the General Services Department.
That the value of construction for permits will be determined by the most recent
publishing of the International Code Council Building Valuation Data (ICCBVD)
estimates per square foot. Any item not specifically covered in the ICCBVD and the
schedule of permit fees shall be based on a notarized bona fide contractor price
document (copy of same shall be submitted to the General Services g
Department), or the fee shall be determined by the Building Official on an individual
basis.
If, in the opinion of the Building Official, the valuation of a building, alteration,
structure, electric, gas, mechanical, or plumbing systems appear to be
underestimated on the permit application, permit shall be denied, unless the
applicant can show detailed estimates to meet the approval of the Building Official.
Permit valuations shall include total costs, such as electrical, gas, mechanical,
plumbing, equipment, and other systems, including labor.
DESCRIPTION RATE, FEE, OR CHARGE
RESIDENTIAL,BI DIIN6 ONE AND TWO FAMILY
1. New structure $5.00 per thousand total valuation
$75.00 minimum
2. Additions/remodel $6.75 per thousand total valuation
$75.00 minimum
3. Accessory structure_:
ql Prefabricated $6.75 per thousand total valuation
$75.00 minimum
Language to be added is underlined.
Language to be deleted is stiask-threegh. RESOLUTION No.2023-02, PAGE 1 OF 6
• •
Site built $6.75_per thousand total valuation
$100.00 "'minimum
4. Roof/reroof/roof repair $100.00 150.00
$0.60
5. Plan review: $000
1 to 3 reviews $1.20 per thousand total valuation
$75.00 minimum
4 or more reviews 4 times $0.60 per thousand total valuation
$200.00 minimum
After permitting $ 40.00 'minor change)
After permitting $5040 75.00 'major change'
6. Other $50.00
MOBILE, PARK MODEL, RECREATIONAL VEHICLE (RV), MANUFACTURED
HOME. MODULAR HOME
1. Triple-wide unit$ $,.fL,,,,_ 500.00 includes MEP's, not including
plan review or accessory
structures
2. Double-wide unite $ `�_ 500.00 includes MEP's, not including
plan review or accessory
structures
3. Single-wide uni RV $=-_:_.°'' 400.00 includes MEP's, not including
park model plan review or accessory
structures
4. $ ' '; 925.00 includes MEP's,
Modular home not including plan review or
accessory structures
5. Construction trailers $ 175.00
COMMERCIAL BUILDING
1. New structure $6.75 per thousand total valuation
$;__ 200.00 minimum
2. Additions/remodel $7.75 per thousand total valuation
$ 150.00 minimum
3. Accessory structure $7.75 per thousand total valuation
$ 75.00 minimum
4. Roof/reroof/roof repair $7.75 per thousand total valuation
$ 200.00 minimum
5. Plan review:
1 to 3 reviews $ 3.40 per thousand total valuation
$150.00 minimum
4 or more reviews 4 times $1.75 per thousand total valuation
$600.00 minimum
After permitting $ : ' 75.00 minor change
After permitting $100.00 major change
6. Other $75.00 flat fee
INGS
II blew-structure $5.00
$50.00 �1
■ illition/remodel WOO.
minimum
$fi0 minimum
MECHANICAL, ELECTRICAL, PLUMBING (MEP'S) SUBCONTRACTOR
1. HVAC $75.00 plus per thousand total valuation
$-7' 1.90
$75.00 minimum
Language to be added is underlined.
Language to be deleted islIMIM RESOLUTION No.2023-02, PAGE 2 OF 6
•
•
2. Electrical $75.00 plus per thousand total valuation
$11111 1.90
$75.00 minimum
3. Plumbing $75.00 plus per thousand total valuation
$ 1.90
$75.00 minimum
4. LP gas or natural gas $75.00 plus per thousand total valuation
MI 1.90
$75.00 minimum
MEP'S STAND ALONE
1. HVAC $100.00 plus per thousand total valuation
$1.90
$100.00 minimum
2. Electrical $100.00 plus per thousand total valuation
$1.90
$75.00 minimum
3. Plumbing $100.00 plus per thousand total valuation
$1.90
$100.00 minimum
4. LP gas or natural gas $100.00 plus per thousand total valuation
$1.90
$100.00 minimum
5. Solar $100.00 plus per thousand total valuation
$1.90
$100.00 minimum
6. Plan Review $25.00 flat fee
OTHER/MISCELLANEOUS
1. Non-buildable slab (driveway, walk, etc.):
$55.00 75.00 under 1,000 square feet (sq. ft.)
121 $150.00 over 1,000 sq. ft
2. Demolition _ $100 00
to moval)
AI Residential $100.00
121 Commercial $150.00 under 2,500 sq. ft.
Commercial $150.00 plus over 2,500 sq. ft., $600.00
$5.00 per maximum
1,000 sq. ft.
3. Fences $_-' ,; 75.00 weer privacy and chain Zink, no
plan review fee
4. Hood suppression $75.00
system
5. Commercial kitchen $100.00
hood
6. Siding $58 9d 75.00
7. Pre-moving min (tie $ AA 150.00 unto City from outside City
down) Limits'
8. Alarm System $55.00 1per label if applicable, low
voltage security'
9. Fire Alarm:
$500 75.00 $2,000.00 and under
1-07 P1 $100.00 over $2,000.00
10. Fire Sprinkler.
al $75.00 120 heads or lessg
121 $200.00 (21 heads or morel
11. Fuel Tank Removal $ 75.00 (per tank and piping)
Language to be added is underlined.
Language to be deleted is RESOLUTION No.2023-02, PAGE 3 OF 6
• •
12. Fuel Tank Installation $150.00 per tank and piping;
II
13. LP tankIs)
III al Piping only $ 75.00
III 121 Tankjsl/piping $ 75.00 !up to IIIINIIIIIounds
Re Tank{sl/piping $100.00 'over 420 pounds
14. Tank(s), excluding $75.00
septic or gas
15. Spray booth for cars/ $80.00 'not including electric
equipment
16. Solar and related $ , 75.00 generation devices
energy (ground/wall/
roof)
17. Pool:
al Residential PIN $ 400.00 'in-ground)y not including
electric or plumbing, includes
Ian review
NI 121 Residential Neils $100.00 above-ground's not including
electric or plumbing, includes
plan review
III c_l Commercial _ $. 650.00 not includin electric; or
plumbing includes plan
review
18, Spa, whirlpool:
pit ai Residential 1111 $ ti. t: 75.00 not including electric;; or
whidPGol plumbing ei. includes plan
review
bl Commercial $200.00 not including electric; or
plumbing 4.41 includes plan
review
19. ofoial Lawn irrigation_
111 21 Residential " d__, $40.00
,
® ti Commercial $80.00
20. Dock_
1. al Residential $ 75.00 'fixed or floating not including
electric, plumbing, and any
covered structure
Commercial NMI $ 200.00 'fixed or floating', not including
electric, plumbing, and any
covered structure
21. y cid intal Boat lift or davits:
® al Residential $ 75.00 not including electric
■ 121Commercial N $ 150.00 not including electric
22. Seawall, retaining wall, $0.65 per linear foot,or
® riprap, privacy walls $ 75.00 minimum
23. Temporary Power Pole':
11 21 Residential $ 75.00
121 Commercial $100.00
24. Certificate of $0.00 included in permit
occupancy
25. Temporary Certificate of Occupancy:
Residential $50.00
121 Commercial $100.00
Language to be added is underlined
Language to be deleted is ; w,_,. :::. RESOLUTION No.2023-02, PAGE 4 OF 6
• •
26. Letter of Substantial $50.00
Completion
SIGN{SZ
1. Signage $5.75 per thousand of total valuation
$50.00 minimum
2. Plan review $1.25 per thousand of total valuation
$40.00 minimum
FACTORY INDUSTRIAL GROUP F FACILITY
1. Factory Industrial $2,500.00 applied for and issued annually
Group F Facility
In lieu of individual permits for buildings or structures that are categorized in
the Florida Building Code Section 306 as Factory Industrial Group F, the
Building Official is authorized to issue an annual permit.
Group F occupancy includes, among others, the use of a building or
structure, or a portion thereof, for assembling, disassembling, fabricating,
finishing, manufacturing, packaging, repair, or processing operations that
are not classified as a Group H hazardous or Group S storage occupancy.
The list and categories of Group F facilities is provided on the online free
version of the most recent Florida Building Code or can be provided by the
General Services Department.
The annual permit will allow, within specific parameters and reporting
requirements, for routine alternations, emergency services, repairs, or
refurbishing, to existing electric, gas, mechanical, plumping, or non-
structural interior, minor renovations of service systems or manufacturing
equipment installations/relocations.
PARTIAL, RE-INSPECTION{SZ FEES
Ordinary building inspection fee(s) are included in the building permit fee. The
following re-inspection fees are implemented when the contractor/permittee
deviates from the routine inspection or fails inspection(s):
1. Partial Inspections $75.00 must be paid prior to any
further inspections being
scheduled
2.1- First Re-inspection $2549 75.00
3.2, Second Re-inspection $50700 100.00
4.3, Third Re-inspection $200.00
PERMIT RENEWAL FEE, EXTENSION, DUPLICATE, CONTRACTOR
CHANGE
1. Renew expired permit' $50.00
2. First extension $75.00 3-months or less from
expiration date
3. Subsequent extensions $150.00 up to 18-months from
expiration date
4. Extensions for more $200.00
than 18-months from
expiration date
5. Demolition extension $100.00 30-day extension, one time
only
6. Duplicate Permit Card $50.00
7 Contractor change $50.00 same permit
Language to be added is underlined.
Language to be deleted is RESOLUTION No.2023-02, PAGE 5 OF 6
• •
PENALTIES
Where work for which a permit is required is started or preceded prior to obtaining
said permit, said work shall be subject to a fee established by the Building Official
that shall be in addition to the required fees.
SECTION 3: Conflict
All resolutions or parts of resolutions in conflict herewith are hereby repealed.
SECTION 4: Inclusion in the Code of Ordinances
It is the intention of the City Council of said City, and it is hereby resolved that the
provisions of this Resolution shall become made part of the City Code of
Ordinances.
SECTION 5: Severability
If any provision or portion of this resolution is declared by a court of competent
jurisdiction to be void, unconstitutional, or unenforceable, then all remaining
provisions and portions of this resolution shall remain in full force and effect.
SECTION 6: Effective Date
This Resolution shall take effect thirty (30) days from the adoption date.
INTRODUCED AND ADOPTED in regular session this 6th day of June 2023.
Dowling R. Watford, Jr., Mayor
ATTEST:
Lane Gamiotea, CMC, City Clerk
REVIEWED FOR LEGAL SUFFICIENCY:
John J. Fumero, City Attorney
Language to be added is underlined.
Language to be deleted is stfusli-thcouglh RESOLUTION No.2023-02, PAGE 6 OF 6