Loading...
2023-02-16 V. B. 23-002-TRC Complete setCITY OF OKEECHOBEE COMMERCE CENTER GULF OF MEXICO LOT 3 IMPROVEMENTS LOCATION Section 15, Township 37S, Range 35E OKEECHOBEE, FLORIDA SHEET INDEX # SHEET TITLE ISSUE DATE REV # REV DATE C100 COVER 12/29/2022 -- -- C101 NOTES & SPECIFICATIONS 12/29/2022 -- -- C200 SWPP & DEMOLITION PLAN 12/29/2022 -- -- C300 SITE PLAN 12/29/2022 -- -- C400 GRADING & DRAINAGE PLAN 12/29/2022 -- -- 0500 CROSS SECTIONS 12/29/2022 -- -- C600 SITE & DRAINAGE DETAILS 12/29/2022 -- -- REVISION HISTORY z w z 0 U w z 0 a U V) w 0 n I REVISION BLOCK .'' 0 0 a O w � � a~�• ti M•..• O �y < a < Q �LU U i w O1z LL m } } m 0 m w z LU Y Y C2 Q U wQ U n IT 0_CD N M Adroh � � � � OKEECHOBEE COUNTY SUBMITTAL HISTORY -1 o U< <0z NE Sdr at 1 12/29/2022 INITIAL SUBMITTAL TO THE CITY OF OKEECHOBEE AND SFWMD o ' . Ivan's Body Shop Q 0 m O z Q 00 w .s m" • f` z U_ o FLORIDA z ( Q Q LU z M LU g oo w Cil 0 erica 4 00 m U tnL.UVICINITY MAP UTILITY SERVICE PROVIDERS:Z LUCENTURYLINK COMCAST-PBG FLA PUBLIC UTILITIES CITY OF OKEECHOBEE FLORIDA POWER & LIGHT--OKEECHOBEE 0O O Q BILL MCCLOUD TONY SPRINGSTEEL BRAD COLLINS UTILITIES NE JOEL BRAY o (850)599-1444 (772)321-3425 (561)252-3308 ERIC PHILLIPS (386)586-6403 Ln 0� 863-298-4174 O J JOHN HAYFORD LL (863)763-9460 PREPARED FOR WESTLAKE ROYAL ROOFING, LLC 2801 POST OAK BLVD, STE 600 HOUSTON, TX 77056 PREPARED BY %10 LOAN Engineering Group 150 SOUTH WOODLAWN AVENUE, BARTOW, FL 33830 PHONE: (863) 800-3046 FAX: (863) 800-1159 FLORIDA CERTIFICATE OF AUTHORIZATION (FLCA) #26247 CONSTRUCTION MATERIALS QUALITY AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH CITY OF OKEECHOBEE SPECIFICATIONS AND STANDARDS, AND THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES. Know what's below. Call before you dig. U J J z LL 0 J w g In w W w z w U LU U LU G 0 w 0 2 w w 0 LL 0 U LL LU 0 U ~ U z w LU0 r, J 0� U 0_ PROJECT NO. SHEET 2373 1 C100 ASBUILT/RECORD DRAWING NOTES FOR CONTRACTOR STORMWATER POLLUTION PREVENTION NOTES GENERAL SITE NOTES ALL ASBUILT/RECORD DRAWING INFORMATION SHALL BE PROVIDED FROM A LICENSED PROFESSIONAL LAND SURVEYOR IN BOTH HARD COPY SIGNED & SEALED PRINTS AND DIGITAL FORMAT. ALL DATA SHALL BE ON THE SAME BENCHMARK AS THE DESIGN PLANS AND IN THE STATE PLANE COORDINATE SYSTEM. DIGITAL COPIES OF THE CONSTRUCTION PLANS WILL BE PROVIDED FOR A BASIS OF THE ASBUILT/RECORD DRAWINGS. THE FOLLOWING IS A LIST OF ITEMS TO BE PROVIDED TO THE ENGINEER FOR REVIEW BEFORE FINAL CERTIFICATIONS CAN BE ISSUED. THIS LIST, WHILE EXHAUSTIVE, IS NOT MEANT TO BE ALL-INCLUSIVE. PLEASE USE IT AS A GUIDELINE FOR MINIMUM STANDARDS. ALL DATA PROVIDED SHALL ALSO MEET MINIMUM STANDARDS OF THE UTILITY COMPANY, WATER MANAGEMENT DISTRICT, AND LOCAL GOVERNMENT AS APPLICABLE. GENERAL: 1. AUTOCAD POINTS WITH DESCRIPTIONS TO BE PROVIDED ON A LOGICAL LAYERING SYSTEM. 2. ALL ITEMS IDENTIFIED ON THE SITE PLAN SHOULD BE SHOWN ON THE ASBUILT/RECORD DRAWING UNLESS OTHERWISE DIRECTED BY THE ENGINEER. THIS INCLUDES ITEMS SUCH AS LIGHT POLES, BIKE RACKS, CURBING, SIDEWALKS, FENCING, UTILITY PADS, ETC. 3. VERTICAL AND HORIZONTAL SEPARATION BETWEEN MAINS SHALL BE DIMENSIONED ON THE ASBUILT/RECORD DRAWING. AT A MINIMUM, SEPARATION DIMENSIONS SHALL BE ADDED IN LOCATIONS WHERE IDENTIFIED ON THE CONSTRUCTION PLANS TO SHOW THE ITEMS WERE CONSTRUCTED PER APPLICABLE STANDARDS. 4. ANY CONFLICT SEPARATIONS LESS THAN THOSE ALLOWABLE ARE TO BE SPECIFICALLY NOTED AND DIMENSIONED. DRAINAGE & GRADING: 1. CONTROL STRUCTURE DATA INCLUDING ELEVATIONS, DIMENSIONS, AND PIPE SIZE/INVERT SHOWN ON THE CONTROL STRUCTURE DETAIL. 2. POND AND SWALE TOP AND TOE OF SLOPE ELEVATIONS AT INTERVALS NOT TO EXCEED 100 FEET OR CHANGE IN DIRECTION. VISIBLY LOW OR HIGH AREAS SHOULD ALSO BE DETAILED. SUFFICIENT SPOT GRADES SHOULD BE PROVIDED SO THAT THE POND OR SWALE CAN BE RECREATED DIGITALLY AS IT IS CONSTRUCTED FOR THE ENGINEER TO DETERMINE COMPLIANCE WITH THE DESIGN. 3. DRAINAGE STRUCTURE AND PIPE ASBUILT DATA SHOULD BE PROVIDED ADJACENT TO DESIGN DATA AND IN THE SAME FORMAT AS THE DESIGN. 4. SUFFICIENT LOT GRADES TO DEMONSTRATE LOTS DRAIN IN ACCORDANCE WITH THE DESIGN. MINIMUM SPOT GRADE AT EACH LOT CORNER FOR TYPE A OR TYPE C LOTS AND AN ADDITIONAL MID -LOT LINE GRADE FOR TYPE B LOTS. ASBUILT PAD GRADING IS NOT REQUIRED FOR RESIDENTIAL DEVELOPMENTS UNLESS DESIRED BY THE OWNER. 5. SUFFICIENT PAVEMENT GRADES, TYPICALLY AT INTERVALS NOT TO EXCEED 100 FEET OR CHANGE IN DIRECTION OR SLOPE. DATUM 1. A PUBLISHED BENCHMARK WAS NOT FOUND IN THE VICINITY OF THIS PROPERTY. ELEVATIONS ARE BASED ON THE "CONTINENTAL _NGS2012B.gsb" GEOID, AS MEASURED USING REAL TIME KINETIC GOS REFERENCED FROM FDOT PERMANENT REFERENCE NETWORK. DRAINAGE STRUCTURES 1. ALL DRAINAGE STRUCTURE SHALL CONFORM TO THE LATEST FDOT STANDARD PLANS UNLESS OTHERWISE NOTED. 2. GRATE ELEVATIONS FOR ALL TYPE 5 AND TYPE 6 INLETS REFER TO EDGE OF PAVEMENT. 3. GRATE ELEVATIONS FOR ALL DITCH BOTTOM INLETS REFER TO THE FLOW LINE OF PAVEMENT. SEQUENCE OF ACTIVITIES 1. INSTALL SILT BARRIERS & TREE BARRICADES AS SHOWN ON PLANS AS APPLICABLE. 2. ROUGH GRADE THE STORMWATER POND AS WELL AS TEMPORARY SWALES TO FORCE DELIVERY OF RUNOFF TO THE POND. THE POND WILL ACT AS A SEDIMENTATION BASIN. 3. STABILIZE CLEARED AREAS WITHIN 7 DAYS OF LAST DISTURBANCE IF RUNOFF IS NOT CAPTURED BY THE STORMWATER POND. 4. INSTALL STORM SEWER CONVEYANCE SYSTEMS. 5. CONSTRUCT ENTRANCE(S) AND PAVEMENT. 6. COMPLETE GRADING AND INSTALL PERMANENT SODDING OR OTHER PERMANENT STABILIZATION FEATURES. 7. WHEN ALL CONSTRUCTION IS COMPLETE, STABILIZE ANY REMAINING DISTURBED AREAS. 8. REMOVE INSTALLED SILT BARRIERS AFTER ALL DISTURBED AREAS ARE STABILIZED. A NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT IS REQUIRED BEFORE ANY EARTHMOVING ACTIVITIES COMMENCE. THE CONTRACTOR OR THEIR ASSIGNS SHALL BE THE RESPONSIBLE AUTHORITY FOR IMPLEMENTING THE SWPP. EACH PERSON MUST SIGN A CERTIFICATION TO CERTIFY THAT THEY UNDERSTAND AND SHALL COMPLY WITH THE TERMS AND CONDITIONS OF THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR STORM WATER DISCHARGE FROM LARGE AND SMALL CONSTRUCTION ACTIVITIES AND THIS STORM WATER POLLUTION PREVENTION PLAN. GENERAL POLLUTION CONTROL NOTES 1. PRIOR TO ANY CLEARING OR CONSTRUCTION COMMENCEMENT, SILT FENCES SHALL BE INSTALLED IN THE AREAS DESIGNATED ON THIS PLAN. THOSE AREAS DESIGNATED TO BE REINFORCED SHALL HAVE INSTALLED A SECOND ROW OF SILT FENCE. THE SILT FENCE SHALL BE TRENCHED IN 4 INCHES DEEP AND BACKFILLED ON THE UPHILL SIDE. 2. AFTER SILT FENCES ARE INSTALLED, A ROCK CONSTRUCTION ENTRANCE 50 FEET LONG AND 10 FEET WIDE WITH 6 INCH DEEP FDOT #57 STONE LINED WITH FILTER FABRIC SHALL BE CONSTRUCTED AT EACH CONSTRUCTION ENTRANCE SHOWN ON THIS PLAN. 3. ALL CONSTRUCTION MATERIALS AND DEBRIS WILL BE PLACED IN A DUMPSTER AND HAULED OFF SITE TO A LANDFILL OR OTHER PROPER DISPOSAL SITE. THE DUMPSTER SHALL BE LOCATED IN DESIGNATED LOCATION SHOWN ON THIS PLAN. 4. DUST SHALL BE CONTROLLED WITH THE USE OF WATER IF NECESSARY. 5. ALL TOXIC MATERIALS USED IN CONSTRUCTION SHALL BE KEPT IN A COVERED SHED AS SHOWN IN DESIGNATED LOCATION SHOWN ON THIS PLAN. 6. A DOUBLE WALL FUEL TANK WILL BE PLACED ON A DRIP PAN TO CONTAIN AND PREVENT ANY FUEL LEAKS FROM BEING DISCHARGED IN STORM WATER RUNOFF. 7. PORT-O-LETS SHALL BE PLACED IN AREAS DESIGNATED ON THIS SITE PLAN. 8. NO VEHICLE MAINTENANCE WILL BE ALLOWED ON SITE. 9. A WASHDOWN SITE SHALL BE PLACED IN THE AREAS DESIGNATED. A SMALL VEGETATIVE BERM SHALL BE PLACED AROUND THE WASH DOWN AREA. 10. FILTER SOCKS SHALL BE PLACED AT THE ENTRANCE TO ALL EXISTING INLETS TO PREVENT THE STORM SEWER SYSTEM FROM DISCHARING SEDIMENTS INTO THE RETENTION PONDS. 11. CONTRACTOR TO DEMO TREES AS REQUIRED TO ACCOMMODATE PROPOSED SITE DESIGN(REMOVE ROOT BASE OF ALL EXISTING TREES TO BE DEMOLISHED). 12. ALL CLEARED TREES AND VEGETATION SHALL BE BURNED ONSITE AFTER CONTRACTOR OBTAINS A BURN PERMIT. IF BURNING IS PROHIBITED, TREES TO BE HAULED AWAY. 13. SEDIMENTS MAY NOT BE ALLOWED TO ACCUMULATE MORE THAN HALF THE HEIGHT OF THE SILT FENCE. SEDIMENTS MUST BE PROPERLY DISPOSED OF. AFTER REMOVAL OF SILT FENCES, ALL DISTURBED AREAS SHALL BE GRASSED & MULCHED. 14. PONDS & BASIN CONTROL SHALL BE THE FIRST ITEMS CONSTRUCTED. SIDE SLOPES SHOULD BE IMMEDIATELY SODDED UPON COMPLETION. 15.OUTLETS OF ALL PIPES SHALL BE INSPECTED REGULARLY AND ANY BLOCKAGES REMOVED. ALL FLOW MUST BE MAINTAINED WITH ANY FENCING CONSTRUCTED TO ALLOW FLOW THROUGH OR UNDER THE FENCE. 16. DEWATERING, ALTHOUGH NOT ANTICIPATED, MAY BE REQUIRED FOR INSTALLATION OF UTILITIES, STORM SEWER, OR PAVEMENT. THE DURATION IS DEPENDANT ON THE SCHEDULE OF CONSTRUCTION. THE DEWATERING DISCHARGE WILL BE CONTAINED WITHIN A SETTLING AREA INSIDE THE NEAREST STORMWATER POND. THE SETTLING AREAS WILL BE SURROUNDED WITH TURBIDITY BARRIERS IN ACCORDANCE WITH FOOT INDEX 102 & 103. AFTER DEWATERING WORK HAS BEEN COMPLETED, THE SETTLING AREAS WILL BE EXCAVATED AND/OR RESHAPED TO FINALIZE THE PONDS. DEWATERING STRUCTURES SHALL REMAIN IN PLACE UNTIL TRENCHING HAS BEEN COMPLETED. ALL DISCHARGE SHALL BE CONTAINED WITHIN THE PROJECT AREA AS DESCRIBED. NO GROUNDWATER SHALL BE PUMPED DIRECTLY OFFSITE 17. DURING CLEARING AND GRUBBING AND SITE GRADING STAGES, AREAS THAT ARE DISTURBED AND INACTIVE FOR MORE THAN 7 DAYS SHALL BE STABILIZED WITH RYE GRASS APPLIED AT MANUFACTURERS RECOMMENDATIONS. AFTER SEEDING EACH AREA SHALL BE MULCHED WITH 4000 POUNDS OF STRAW PER ACRE. MAINTENANCE PLAN DURING CONSTRUCTION 1. SILT FENCE REPAIRS SHALL BE MADE IMMEDIATELY. SEDIMENT DEPOSITS SHALL BE REMOVED WHEN THEY REACH APPROXIMATELY ONE HALF THE HEIGHT OF THE BARRIER. 2. MAINTENANCE SHALL BE PERFORMED ON THE CONSTRUCTION ENTRANCE WHEN ANY VOID SPACES ARE FULL OF SEDIMENT. 3. MULCH AND SOD THAT HAS WASHED OUT SHALL BE REPLACED IMMEDIATELY. ALL OTHER AREAS ARE TO BE SEEDED UNTIL VEGETATION IS ESTABLISHED. 4. ANY WASH OUTS GOING INTO RETENTION PONDS SHALL BE CORRECTED BY INSTALLING A TEMPORARY BERM UPHILL AND ADJACENT TO THE RETENTION POND. ONE SECTION OF 12 INCH PVC PIPE SHALL BE INSTALLED AT THE UPHILL TOE OF BERM AND THROUGH THE BERM INTO THE RETENTION POND. PIPE AND BERM SHALL BE REMOVED WHEN SURROUNDING GROUND IS PERMANENTLY STABILIZED. 5. INSPECTIONS SHALL BE PERFORMED AT LEAST ONCE A WEEK AND WITHIN 24 HOURS OF THE END OF A RAIN EVENT THAT IS 0.5 INCHES OR GREATER 6. THE INSPECTOR SHALL INSPECT ALL POINTS OF DISCHARGE, ALL DISTURBED AREAS OF CONSTRUCTION THAT HAVE NOT BEEN STABILIZED, AREAS WHERE VEHICLES ENTER AND EXIT THE SITE, AND SEDIMENT CONTROL STRUCTURES. 7. THE INSPECTOR SHALL FURNISH A STORM WATER POLLUTION PREVENTION PLAN INSPECTION REPORT FORM IN THE FORMAT DESCRIBED IN THE "SAMPLE COPY OF THE STORM WATER POLLUTION PREVENTION PLAN" AS OUTLINED ON THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION WEBSITE. MAINTENANCE PLAN AFTER CONSTRUCTION THE STORMWATER FACILITY MUST BE MAINTAINED CORRECTLY IF IT IS TO PERFORM IN THE MANNER IT WAS DESIGNED. THE STATEMENTS BELOW ARE INTENDED TO BE A GUIDE TO THE CORRECT WAYS TO MAINTAIN THIS FACILITY. THIS IS ONLY A GUIDE AND SHOULD BE REVISED AS FIELD CONDITIONS REQUIRE. THE MAINTENANCE ENTITY SHALL BE RESPONSIBLE FOR MAINTAINING THE SITE. FACILITIES SHALL BE INSPECTED BY A PROFESSIONAL ENGINEER AT INTERVALS OUTLINED IN THE ENVIRONMENTAL RESOURCE PERMIT. 1. ALL STORMWATER PIPES, INLETS, CATCH BASINS, MANHOLES, FLUMES, POND INFLOW AND OUTFALL STRUCTURES (INCLUDING OIL SKIMMERS), AND DISCHARGE PIPES SHOULD BE INSPECTED ON A REGULAR BASIS (MONTHLY OR QUARTERLY) AND AFTER MAJOR RAINFALLS. THEY SHOULD BE MAINTAINED BY REMOVING BUILT- UP DEBRIS AND VEGETATION AND REPAIRING DETERIORATING STRUCTURES. 2. MOW GRASS (WEEKLY DURING THE SUMMER MONTHS AND BI-WEEKLY DURING THE REMAINDER OF THE YEAR) WITHIN THE STORMWATER RETENTION AREAS. GRASS CLIPPINGS SHALL BE COLLECTED AND PROPERLY DISPOSED OF. 3. CHEMICALS, OILS, GREASES OR SIMILAR WASTES ARE NOT TO BE DISPOSED OF DIRECTLY TO THE STORMWATER FACILITY OR THROUGH STORM SEWERS. TREATMENT PONDS ARE DESIGNED TO TREAT NORMAL ROAD, PARKING LOT, ROOF AND YARD RUNOFF ONLY. SOME CHEMICALS MAY INTERFERE WITH A TREATMENT POND'S FUNCTIONS OR KILL VEGETATION AND WILDLIFE. DISPOSE OF THESE POTENTIALLY DANGEROUS MATERIALS PROPERLY BY TAKING THEM TO RECYCLING FACILITIES OR TO COLLECTION LOCATIONS SPONSORED BY MANY LOCAL GOVERNMENTS. ALSO, DO NOT DISPOSE OF GRASS CLIPPINGS IN A SWMS. GRASS CLIPPINGS POSE PROBLEMS BY SMOTHERING DESIRABLE VEGETATION, CLOGGING OUTFALL STRUCTURES AND, WHEN THEY DECOMPOSE, MAY CAUSE UNSIGHTLY ALGAE BLOOMS THAT CAN KILL FISH. 4. ACCUMULATED POND SEDIMENTS MAY CONTAIN HEAVY METALS SUCH AS LEAD, CADMIUM AND MERCURY, AS WELL AS OTHER POTENTIALLY HAZARDOUS MATERIALS. THEREFORE, SEDIMENTS REMOVED FROM STORM SEWERS, INLETS, PIPES AND PONDS SHOULD BE DISPOSED OF AT AN APPROVED FACILITY (CHECK WITH YOUR COUNTY SOLID WASTE DEPARTMENT OR THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION FOR DISPOSAL FACILITIES APPROVED TO ACCEPT TREATMENT POND SEDIMENT). 5. DURING ANY REPAIR OR MAINTENANCE ACTIVITY, USE CARE TO AVOID CAUSING EROSION OR SILTATION TRANSFER TO ADJACENT OR OFF -SITE AREAS. 6. ALTERATIONS (FILLING, ENLARGING, ETC.) OF ANY PART OF THE STORMWATER FACILITY IS NOT PERMITTED WITHOUT PRIOR APPROVAL FROM ALL APPLICABLE GOVERNING AGENCIES. 7. THE APPROVED OPERATION AND MAINTENANCE PERMIT AND AS -BUILT DRAWINGS ARE AVAILABLE AT YOUR LOCAL WATER MANAGEMENT DISTRICT SERVICE OFFICE OR FROM THE PERMITTING AGENCY HAVING JURISDICTION. REFER TO THOSE PLANS AND PERMITS FOR ADDITIONAL RESTRICTIONS, INSTRUCTIONS AND CONDITIONS. 8. IT IS USUALLY MORE COST-EFFECTIVE TO MONITOR AND PERFORM ROUTINE MAINTENANCE ON A STORMWATER MANAGEMENT SYSTEM, RATHER THAN LET IT FAIL AND HAVE TO RECONSTRUCT THE ENTIRE SYSTEM. 9. MOSQUITO GROWTH CAN BE MINIMIZED IN A STORMWATER MANAGEMENT SYSTEM, BY THE FOLLOWING MEASURES: DO NOT DUMP GRASS CLIPPINGS OR OTHER ORGANIC DEBRIS INTO A SWMS DECAYING GRASS CLIPPINGS AND OTHER DECOMPOSING VEGETATION CREATE IDEAL CONDITIONS FOR BREEDING MOSQUITOES. CLEAN OUT ANY OBSTRUCTIONS THAT GET INTO THE SYSTEM. DEBRIS CAN OBSTRUCT FLOW AND HARBOR MOSQUITO EGGS AND LARVAE. REMOVE WATER LETTUCE AND WATER HYACINTH, WHICH NOURISH AND SHELTER MOSQUITO LARVAE. PAVING OPERATION NOTES 1. BEFORE PAVING OPERATIONS BEGIN, THE ENGINEER SHALL BE PROVIDED WITH ALL DENSITY TESTING INCLUDING PIPE BACKFILL, SUBGRADE, AND ROAD BASE. TESTING SHALL BE PROVIDED BEFORE ANY PREPAVING MEETINGS ARE SCHEDULED. 2. ASPHALT MIX DESIGNS MUST BE PROVIDED TO THE ENGINEER FOR APPROVAL PRIOR TO PAVING. MIXES MUST BE SIGNED AND SEALED BY A PROFESSIONAL ENGINEER OR SUPPLIED BY AN APPROVED FDOT PLANT. 3. ANY DEVIATIONS IN ASPHALT TYPE, LIFT THICKNESS, OR COMPACTION MUST BE PRESENTED TO THE ENGINEER FOR APPROVAL PRIOR TO IMPLEMENTATION. DEVIATIONS MAY REQUIRE APPROVAL BY THE AHJ. 4. IT IS RECOMMENDED THE CONTRACTOR SUBMIT A TESTING PLAN TO THE ENGINEER BEFORE COMMENCING PAVING OPERATIONS SO ANY DEFICIENCIES CAN BE DETERMINED BEFORE STARTING. 5. TESTS FOR IN -PLACE DENSITY AND LAYER THICKNESS, FOR EACH COURSE, SHALL BE CONDUCTED AT A FREQUENCY OF ONE TEST PER 300 LINEAR FEET OF ROADWAY (MINIMUM 3 TESTS PER ROAD). 6. 6" PAVEMENT CORES ARE TO BE TAKEN AT A MINIMUM FREQUENCY OF 3 CORE PER 500 TONS OF ASPHALT. DENSITY, THICKNESS, AND GRADATION REPORT IS TO BE PROVIDED FOR ASPHALT, BASE, AND SUBGRADE. MINIMUM ASPHALT DENSITY SHALL BE 89% GMM, WITH A MINIMUM AVERAGE BETWEEN 3 CORES OF 92% GMM. 7. MINIMUM LIFT THICKNESS SHALL CONFORM TO FOOT SPECIFICATIONS 334-1.4.1. 8. WHEN THE DEFICIENCY IN THICKNESS IS IN EXCESS OF THE MINIMUM THICKNESS REQUIRED ON APPROVED PLANS, LESS THE ALLOWABLE CONSTRUCTION TOLERANCE, THE CONTRACTOR SHALL CORRECT THE DEFICIENCY EITHER BY REPLACING THE FULL THICKNESS FOR A LENGTH EXTENDING AT LEAST 50 FEET FROM EACH END OF THE DEFICIENT AREA, OR WHEN PERMITTED BY THE COUNTY ENGINEER BY OVERLAYING THE ENTIRE WIDTH OF THE AREA. NORMALLY AN OVERLAY WILL NOT BE PERMITTED IN A CONCRETE CURB SECTION. 9. ASPHALT SHALL BE UNIFORM IN TEXTURE AND SLOPE TO THE GREATEST EXTEND POSSIBLE. AREAS OF POOR GRADATION SHALL BE REPAIRED AT THE CONTRACTORS EXPENSE. 10. TESTS FOR SUBGRADE STABILIZATION SHALL BE LOCATED NO MORE THAN 400 FEET APART (FOR ROADWAYS) OR EVERY 8,000 SF (FOR PARKING LOTS) AND SHALL BE STAGGERED TO THE LEFT, RIGHT, AND ON THE CENTERLINE OF THE ROAD. 1. SEE BOUNDARY & TOPOGRAPHY SURVEY FOR LEGAL DESCRIPTION & BENCHMARK INFO. 2. ALL PAVEMENT MARKINGS SHALL BE PAINTED, UNLESS OTHERWISE NOTED, AND SHALL BE ACCOMPLISHED WITH USE OF PAINTING MACHINES AND/OR STENCILS. ALL PAINT FOR PAVEMENT MARKINGS SHALL MEET THE REQUIREMENTS OF SOLVENTBORNE APPLICATION RECOMMENDATIONS. 3. CONTRACTOR TO SAW CUT EXISTING PAVEMENT AT PROPOSED DRIVEWAY TIE IN'S TO PROVIDE A CLEAN EDGE FOR NEW PAVEMENT AND BASE CONNECTION. 4. CONTRACTOR TO BECOME FAMILIAR WITH AND ADHERE TO ALL ADA STANDARDS. 5. CONTRACTOR TO PROVIDE SMOOTH TRANSITION AT LOCATIONS WHERE EXISTING FEATURES MEET PROPOSED FEATURES (CONCRETE, ASPHALT, ETC.). 6. ALL "MEG" (MATCH EXISTING GRADE) ELEVATIONS ON ROADWAY SURFACES OR EDGES AND UNDERGROUND STORM/UTILITY PIPES SHOWN ARE APPROXIMATE. 7. AT A MINIMUM, ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE STABILIZED WITH EITHER SOD OR SEED. SOD OR SEED AREAS SHOULD BE WATERED BY EITHER IRRIGATION OR TANKER TRUCKS UNTIL ESTABLISHED. SOD SHALL BE STAKED AS REQUIRED IN SLOPED AREAS AND MONITORED FOR WASHOUTS. ONCE THE SOD IS ESTABLISHED, GC MAY REMOVE STAKES. SEEDED AREAS MUST BE WATERED AS NECESSARY TO ALLOW GRASS TO BEGIN GROWING. 8. CONTRACTOR SHALL OBTAIN THE LATEST EDITION OF THE SOIL REPORT FOR THIS PROJECT. GC SHALL ADHERE TO ALL RECOMMENDATIONS AND INSTRUCTIONS INCLUDED IN SOIL REPORT. 9. A COPY OF THE APPROVED PERMIT AND DRAWINGS MUST BE ON THE JOBSITE AT ALL TIMES. 10. ANY SIDEWALKS DISTURBED DURING CONSTRUCTION ARE TO BE REPLACED. 11. IF CONSTRUCTION, RECONSTRUCTION, REPAIR OR MAINTENANCE ACTIVITY NECESSITATES THE CLOSING OF ONE OR MORE TRAVEL LANES OF ANY ROAD ON THE STATE PRIMARY, COUNTY ROAD OR CITY STREET SYSTEM FOR A PERIOD OF TIME EXCEEDING TWO HOURS, THE PARTY PERFORMING SUCH WORK WILL BE RESPONSIBLE TO GIVE NOTICE TO THE APPROPRIATE LAW ENFORCEMENT AGENCY WHICH HAS JURISDICTION WHERE SUCH ROAD IS LOCATED PRIOR TO COMMENCING WORK ON THIS PROJECT. 12. TRAFFIC SHALL BE MAINTAINED IN ACCORDANCE WITH THE REQUIREMENTS OF FOOT INDEX 102-600 THROUGH 102-670. 13. TRAFFIC SHALL BE MAINTAINED THROUGH THE WORK ZONE AT THE ESTABLISHED SPEED LIMIT. 14. DURING NON -WORKING HOURS, THE DROP-OFF BETWEEN THE TRAVEL LANES AND THE WORK AREA SHALL BE MAINTAINED IN ACCORDANCE WITH INDEX 102-600. 15. ALL EXISTING MARKINGS THAT ARE IN CONFLICT WITH PROPOSED MARKINGS SHALL BE REMOVED. 16. THE PERMANENT REMOVAL OF SIGNS WITHIN THE CONSTRUCTION LIMITS ARE NOT REQUIRED UNLESS SHOWN IN THE PLANS. ALL ADJUSTMENTS SHALL BE IN ACCORDANCE WITH FDOT SPECIFICATIONS. 17. DO NOT PLACE THERMOPLASTIC STRIPES AND MARKINGS ON NEWLY CONSTRUCTED FINAL SURFACES COURSES PRIOR TO 30 CALENDAR DAYS AFTER PLACEMENT OF THE FINAL SURFACE COURSE. THE ENGINEER MAY REQUIRE LONGER CURE PERIODS. PROVIDE TEMPORARY MARKINGS IF THE ROAD IS OPEN TO TRAFFIC. 18.THE LOCATIONS OF EXISTING UTILITIES SUCH AS WATER MAINS, SEWER, GAS LINES, ETC., AS SHOWN ON THE PLANS HAVE BEEN DETERMINED FROM THE BEST AVAILABLE INFORMATION, AND ARE PROVIDED FOR THE CONVENIENCE OF THE CONTRACTOR. HOWEVER, THE ENGINEER AND OWNER DO NOT ASSUME RESPONSIBILITY FOR THE SIZES AND LOCATIONS SHOWN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION OF THE SIZE AND LOCATION OF ALL EXISTING UTILITIES SHOWN AND NOT SHOWN ON THESE PLANS AND RELATED CONSTRUCTION PRIOR TO COMMENCEMENT OF WORK. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO CONTACT ALL UTILITY COMPANIES 48 HOURS PRIOR TO COMMENCEMENT OF CONSTRUCTION AND HAVE THEIR FACILITIES LOCATED IN THE FIELD PRIOR TO ANY WORK. 19. BENCHMARKS AND OTHER REFERENCE POINTS SHALL BE CAREFULLY MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD. IF DISTURBED OR DESTROYED, THESE POINTS SHALL BE REPLACED BY A FLORIDA P.L.S. AT CONTRACTOR'S EXPENSE. 20.THE CONTRACTOR IS DIRECTED TO NOTIFY SLOAN ENGINEERING GROUP, INC., PHONE (863) 800-3046, FOR PROBLEMS REQUIRING DEVIATION FROM THESE PLANS AND SPECIFICATIONS. 21.THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION AND REMOVAL OF ALL EXISTING STRUCTURES, ETC., UNLESS OTHERWISE NOTED. ALL SOIL STRIPPINGS AND ANY UNSUITABLE MATERIAL SHALL BE REMOVED FROM THE SITE AND DISPOSED OF BY THE CONTRACTOR UNLESS OTHERWISE DIRECTED BY THE OWNER. 22.THE CONTRACTOR SHALL PROTECT ALL EXISTING STRUCTURES AND UTILITIES NOTED TO REMAIN, FROM DAMAGE OR DISPLACEMENT DURING CONSTRUCTION. IN THE EVENT OBSTRUCTIONS ARE ENCOUNTERED, THE CONTRACTOR SHALL PROMPTLY NOTIFY THE ENGINEER AND THE UTILITY COMPANY. THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL COSTS INCURRED TO REPAIR DAMAGE OR CORRECT DISPLACEMENT. 23.THE CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PROTECT ALL TREES AND OTHER VEGETATION OUTSIDE THE LIMITS OF CONSTRUCTION. 24. WHEN DETAILS ARE PROVIDED, CONTRACTOR SHALL CONSTRUCT JOB PER SPECIFIC DETAILS, AND NOT BY SCALING FROM THESE PLANS. 25.THE CONTRACTOR SHALL RESTORE OFF SITE CONSTRUCTION AREAS TO EQUAL OR BETTER CONDITION THAN EXISTED PRIOR TO COMMENCEMENT OF CONSTRUCTION. IT IS RECOMMENDED TO PROVIDE A VIDEO OF EXISTING CONDITIONS TO THE ENGINEER. 26.THE CONTRACTOR SHALL TAKE SPECIAL NOTICE THAT ALL SPECIFICATIONS AND DETAILS SHOWN HEREON ARE BELIEVED TO BE THE LATEST AND MOST ACCURATE AT THE TIME OF DESIGN AND SUBMITTAL, HOWEVER THE ENGINEER DOES NOT WARRANTY ANY OF THE PROVIDED SPECIFICATIONS AND DETAILS. THESE SPECIFICATIONS AND DETAILS ARE SUBJECT TO REVISION BY THE ISSUING MUNICIPALITIES AND AGENCIES. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT ALL CONSTRUCTION, TESTING AND MATERIALS CONFORM TO THE LATEST EDITIONS OF THE DESIGN REFERENCES INCLUDING, BUT NOT LIMITED TO THE MUNICIPAL LAND DEVELOPMENT REGULATIONS, FOOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, FOOT MANUAL OF UNIFORM MINIMUM STANDARDS FOR DESIGN, CONSTRUCTION AND MAINTENANCE FOR STREETS AND HIGHWAYS (GREEN BOOK) AND THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS. 27.THE STORMWATER MANAGEMENT SYSTEM IS TO BE MAINTAINED BY THE PROPERTY OWNER. 28. WITHIN CITY OF OKEECHOBEE RIGHT OF WAY, ALL STREET SIGNS SHALL BE SECURED TO 2" MIN ROUND POLES AND ALL OTHER TRAFFIC SIGNS SHALL BE SECURED TO 2.5" MIN ROUND POLES. ALL SIGNAGE WITHIN PRIVATE RIGHT OF WAY MAY BE DECORATIVE. BACKFILL, COMPACTION, AND INSPECTION NOTES 1. IT IS RECOMMENDED THE CONTRACTOR SUBMIT A TESTING PLAN TO THE ENGINEER BEFORE COMMENCING CONSTRUCTION SO ANY DEFICIENCIES CAN BE DETERMINED BEFORE STARTING. 2. PROCTOR TESTS SHALL BE PERFORMED ON ALL MATERIAL TO BE USED AS BACKFILL. TESTING FREQUENCY SHALL BE PER FDOT SPECIFICATIONS SECTION 125-9, MINIMUM 1 TEST PER SOIL TYPE OR REPRESENTATIVE SAMPLE. 3. ALL PIPE SHALL BE CAREFULLY LAID, TRUE TO THE LINES AND GRADES AS SHOWN ON THE PLANS. ALL PIPE SHALL BE LAID IN DRY BEDDING CONDITIONS. 4. BACKFILLING SHALL PROGRESS AS RAPIDLY AS THE CONSTRUCTION AND TESTING OF THE WORK WILL PERMIT. ALL BACKFILL MATERIAL SHALL BE SUITABLE AND FREE OF DELETERIOUS MATERIAL. 5. MATERIAL NOT SUITABLE FOR BACKFILL INCLUDES MUCK, ROCK, CLAY, PHOSPHATE SLIMES, OR OTHER PLASTIC MATERIALS INCLUDING A-2-6, A-2-7, A-5, A-6, AND A-7. NOTE: A-7 MAY BE USED AS SPECIFIED IN FOOT SPECIFICATIONS SECTION 125-8. THESE SOILS, IF ENCOUNTERED DURING SITE PREPARATION, SHOULD BE REMOVED WITHIN A 6' MARGIN OF THE CONSTRUCTION AREA AND FDOT #57 AGGREGATE BEDDING MATERIAL SHALL BE PLACED UNDER THE PIPE IN ACCORDANCE WITH THE TYPE A BEDDING DETAIL. 6. THE INITIAL BACKFILL SHALL BE CAREFULLY DEPOSITED ON BOTH SIDES OF THE PIPE AT THE SAME TIME AND UNIFORMLY COMPACTED AROUND THE BARREL OF THE PIPE UNTIL ENOUGH HAS BEEN PLACED TO PROVIDE A COVER OF 12" ABOVE THE CROWN OF THE PIPE. IN NO CASE SHALL BACKFILL MATERIAL BE PLACED IN THE TRENCH IN A MANNER THAT WILL CAUSE SHOCK TO OR UNEQUAL PRESSURE ON THE PIPE. 7. INITIAL LIFTS OF 6" SHALL BE PLACED UP TO THE TOP OF PIPE. LIFT MAY CONTINUE AT 12" INTERVALS THEREAFTER IF COMPACTION REQUIREMENTS CAN BE ACHIEVED. 8. IN AREAS WITHIN 6' OF ANY PAVED SURFACE, BACKFILL SHALL BE COMPACTED TO 100% OF T-99. IN ALL OTHER AREAS, BACKFILL SHALL BE COMPACTED TO 95% OF T-180. 9. EXCAVATABLE FLOWABLE FILL IS ACCEPTABLE. 10. BACKFILL AROUND STRUCTURES SHALL BE COMPACTED TO 100% OF T-99. 11. COMPACTION TESTS SHALL BE IN ACCORDANCE WITH SECTION 125-8 OF THE FOOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, LATEST EDITION. THE CITY/COUNTY ENGINEER MAY DETERMINE THAT MORE COMPACTION TESTS ARE REQUIRED TO CERTIFY THE INSTALLATION DEPENDING ON FIELD CONDITIONS. THE LOCATIONS OF COMPACTION TESTS WITHIN THE TRENCH SHALL BE IN CONFORMANCE WITH THE FOLLOWING SCHEDULE: 11.1. CROSS DRAIN CULVERTS SHALL HAVE A MINIMUM OF TWO DENSITY TESTS PER LIFT. 11.2. ONE TEST AT THE SPRING LINE OF THE PIPE. 11.3. AT LEAST ONE TEST FOR EACH 12-INCH LAYER OF BACKFILL WITHIN THE PIPE BEDDING ZONE FOR PIPES 24 INCHES AND LARGER. 11.4. ONE TEST AT AN ELEVATION OF ONE FOOT ABOVE THE TOP OF THE PIPE. 11.5. ONE TEST FOR EACH TWO FEET OF BACKFILL PLACED FROM ONE FOOT ABOVE THE TOP OF THE PIPE TO FINISHED GRADE ELEVATION. 12. CONTRACTOR TO INSPECT ALL STORM PIPES AND GRAVITY SANITARY SEWER MAINS UTILIZING A CLOSED CIRCUIT TELEVISION SYSTEM PREPARING A DVD OF THE RESULTS. THE INSPECTION SHALL DETERMINE THE CONDITION OF THE PIPE FOR ACCEPTABILITY. VIDEO SHALL EXTEND TO THE END OF ALL PIPES. EXISTING LEGEND EXISTING GRAVEL a 7_1 EXISTING CONCRETE EXISTING PAVEMENT - - EXISTING RIGHT OF WAY EXISTING CENTERLINE GAS- GAS- EXISTING GAS LINE OHE EXISTING OVERHEAD UTILITY LINE TEL TEL - EXISTING FIBER OPTIC LINE UTL UTIL EXISTING MISC. UTILITY - - - 123 - - - EXISTING CONTOUR PW Pw EXISTING POTABLE WATER TOB TOB EXISTING TOP OF BANK Tos Tos EXISTING TOE OF SLOPE O EXISTING SANITARY/STORM MANHOLE EXISTING TREES EXISTING BASIN LINE - - - - - - - EXISTING SOIL BOUNDARY DEMO LEGEND DEMO EXISTING PAVEMENT DEMO EXISTING CONCRETE MILL & RESURFACE EXISTING PAVEMENT PROPOSED LEGEND PROPOSED PAVEMENT PROPOSED ASPHALT OVERLAY PROPOSED CONCRETE PROJECT BOUNDARY LINE PW PROPOSED POTABLE WATER LINE SILT PROPOSED SILT FENCE > PROPOSED FLOW LINE - - - - - - - PROPOSED GRADE BREAK PROPOSED EASEMENT LANDSCAPE BUFFER BUILDING SETBACK 0 0 ❑ PROPOSED FENCE - 123 PROPOSED CONTOUR PROPOSED STORM SEWER PIPE 50.00 PROPOSED SPOT GRADE PROPOSED FIRE HYDRANT z PROPOSED WATER VALVE O STORM MANHOLE SOIL BORING NOTE: NOT ALL ITEMS MAY BE USED ON THESE PLANS w F- O z REVISION BLOCK •MCD••�, Q O Lun Q�P y a w z _j O- LLi • Lu0Zz-�:W in IN v o Lu r woow- v Luin N G zceo P 8� z :� LU U : Z �0� b., Q p w Y z Q Y Lu C7 U Lu p p U z OL 0 a� 01 Omi 01 v tn c w LL Lu z Cn Lu z U 0 J Lu I --I J Lu U ILL o 0 LL J U i"i U oLu Lu Lu Lu co 0 (f') Y g vZS o wLu' Lu ^ 0 LJ/ LL 0 0 r z I- 4 U n O N M � 00 N M rn *k M Ln LL rti J io o 0 M O � o co s < N Lu ZLL O w _ z 6 M LL goLu o p W O cYi Q O�oU 00 H OZ Lu Q U cn = Q a p o � - O J LL N n M J LL LLJ w m O U w w Y O Z w Q 2 w Z ~ U Z w LuO r, J � U a PROJECT NO. SHEET 2373 1 C101 Know what's belm" Call before you dig. "CRAIG SMITH" 1 � I NORTH SCALE: 1" = 30' 0' 30' 60' z O Aldll 3Ln w 20.5_ LU \ Q NE 12TH STREET' FIRE HYDRANT z (TRACT "Rl" (P)) 80' PUBLIC R/W) 12" WATER CID-) I REVISION BLOCK - - - VALVE I 6" WATER VALVE R/W LINE _ _ - S 01 a w ����ZZ••... ...H Lup SANITARY c cl�O t�V9s` o - - �D MANHOLE o ¢ Oz= :z a * � w z _ - °k LO \ l-RN=21.07 20.88 - - g w p Zn� i, o � `� 0 20.83 _ �� L�• 60 / / � Ln H U" w i p S'� z v� ��5� I Z 40' 0ti 20.93 o �/� S .•O� ��� z LD o \ 20.90 - 21.00 SANITARY ��� 2�.32 'L1'S° - Li BENCHMARK �pB 9 'i,01 * PFt`�� _ 20.98 - - �/ MANHOLE00 ��h 2j6 21.45 aB Uk ELEVATION=19.89 + 20.61 20.82 �� \ 0.96 p^� RIM=21.9�n 21 C/L OF R/W L�/ T 0.81 m m m 20.77 / � . 6? 20.8 249 10 Q ?j 1 ?7 S) 60 7 L 21.24 i + 0.72 z `1 z �1 Y � 0•0� MANHOLE 20.57 \ \ 20.83 _ _ - 2� 16 y1� ��2,0 1' + 21.14 38 5g '�' / / + 20.42 + 20.14 � +�.� 2p�o �� � � w � \ RIM=21.01\O i / 1.03 1 �b �'. - -_ )12.2 /_--- _- 0.57 w U 091 20 f + 21.0 ?p)3 i / Sp 1 / - - 40 -21- - -' - 3-``+ 2 z END 6" PVC + 2TT3� + 20.67 \ \ 1 0 20 6 CULVERT Onj6" PVC� / �6 �� �• ° 21. � 29.1' + 20.7� - Z + CULVERT g0 .21- - - 06� 1� 1� \\ I + 20_77_ - - -21- - 23.11 \ �- - "2 �_ - 1 \ + 79.q( - n - - - - - - - P -4/21.9 1�IS � "IIS + 20. 4 10 20.33 L ----- 21.24 +2�11 �11I5� - �t2I2` \ O• v o N _ - - - - e �� 2 21.21 - -21- - - _+�20.87 1 -22� - - - - - - - \FN21 4 \ + 20. 20.12 `LU N 3 pi 1g ` 21------ca y� �' / ----- ^ 21.9¢� -IIS� 8 ----- \ 00 IV W - J%�� \ - 1 _ _ + 20.7� - 2• 1lIS �� 11I5 - - - 23.35� \ 85 + 0.10 c) Ln + 19.55 �® 0 CONSTRUCTION ENTRANCE 21- 2 - �Tis R/W LINE - - 3 \ 22.17 o U O J Q + 19.46 y/ + 20.80_ - - - _ � + 2 - - - - ABL �ED TAIL o w U -ill 6f + 00.78_�� _ ------ oom\ +120.1� � 10' W °�° c� + 20.40 /, 2`.` - �� -�r22 93 = SILT - - - - - - I I I v \ ¢:1 , 20.09 0 o +18.26 `�h18.9-20---- +20.17 _----- g `� SILT -- + 3 _ Q\, 'V�CNTURYLIN Q- F- Y 0 - ,,- - �. SILT ` + 19.03 + 94b� t-S1 O °� Z `\ / �� 9.20 / _ -+ 19.62 -20- - + .9 = - - - - - - - - - - - - + 2 h IL 42 3,� SIL71-2� 2F'� SILT - - - - - - I - 22.83 22.31 I II �o B 1 &MARK 19.91 v 1 °o - L \ IN +19.3 �°�'+19.64 - �21.75 ---- + 20.47 21- SILT - J - - - - I �- I - 22.38 , 1 \ / �` _ x AGE INLET + 21.18 + 21.7� l ` / W U •� Z Qw 0 ATE=18.88 \ + 18.22 \ _ i SILT - - a / ^ 1 \ I �` SILT SILT SILT SILT - - - - - - - w r - I I I 1 \ / Z � W i �p � +)Q.34 � _ + 43 SILT _ _ _ -_ -_ - 0 "FI LB 110 I Q LEVATION nBENCH18.25 + 181Y - - / _ - - - - - ��� ��� PRE -BASIN A r Ire LL 5/8"FIRC LB3\0 \ - r 5/8"PIRG ILLEGIBLE `� 3 (SENT) ■�4 F- 1 i 1 I 19.85 19.78 .� o O I \\ � LU I / ^o + 18.19 34.3" (BENT) 0 /W &OE22.95 + 0.581 +\9.31 1 19.87 a� Ul) - 1 o 14.5" 7 + N+ 18�44 + 9.63 COVERED CONSTRUCTION SHED 1AWui 22.48 22.8( GAS z w O U DOUBLE WALL FUEL TANK 22.88 MAR EREXISTING EMPLOYEE9+,6.n - - - - -_ Qo �,� ;O� \ ` WASFiDOWN SITE 0 � Uo O + 1�6\ \ CONSTRUCTION DUMPSTER 21.44 � \ \ o ° �\ OVERFLOW PARKING 1� +�2Ifi�5 I i 1 J \ fl J I I I 9.64 19.53 � I I I + 1 w PORT-O-LETS 1-21.10 +21.21 L, \\ \ \+ 19. 2\SST \ 0 I 1 I I I I I 10 O 19.58 0'� R/W LINE \ +\-47.80\ \\ )�N.s" I I I F I \\ \ 11 +21.04 22ss \+17.74 I � �( I I I 1 \ 49� + 21.16 22.9 � s � - ` � 22.63 \ \ \ r j 6 EXISTING TILE / +17.54 + s.3o 1 +1�7\ \ \ \\\ / 42.0" e� STORAGE AREA 0 o I I 1 1 10,I \ \ \ \ \ I 0 Ln I I I \101 BASIS OF BEARING \ \ \ \ �- I 22.94 +-2 43 TILT 1 / 19 9 I 19.15C/L TRACT "R-1" DRAINAGE INLff \ / 1 GRATE=18. I I / \ \\ \+\8.01\ \\ \ i 1 1 27 IV V WEIR=16. I llI / \ \+ 17.74 \ \ \ ` _ 0 0J) ` - - -� / 1 _ _ - - - - -CITY =R-EEC1iO�E 1 I 1 + 1� 64\ \ \ \ \ \sf�T \ "FIRC LB31 10 11 I - - / \ �- - - -22 UTILITY EASEMENT I rjt J/ C/ OF R/W I �/ \ \57 \ \ \ \ \ 123.09 22.44 \ \ \ LU \ JI - \� �/K � + 9.14 40' i \ 17.81 \ p \ + 21.80 + �94 I I 19.34 0:33 Z ~ o \\I\ I rr / 19.40 W \ \ +17.46 \\ \� \ �� � LU + 19\7 � � \ \� � � \ .QJ 53.s" N \ \ III 0' SANITARY U v � � � LATER M 22.39 NowI � + 21.5 I MANHOLE 1 J LL \\ \ \\ \�' 1 9` \\ \ �I 22.47 PRE BASIN A I I -I- X RIM=19.63 J w O LL \ \ \ \ 22.80 52 _� I I I i SILT 58 \ 1 (D _ ' \ \ _ 223/ _ - / / \ I� I I _ IL now Now/ 1�� L- +'1� 60 / �20. I CA 11 E ` v °'�O LL DO \\ \ LU 1+2+\ � �- - 1N4 �9.34 O O r \ \ \ \ I __ --� r�_I �_-- -- _ ++ �( 5------ --- I PED$TAL + .29 19.42 /0� H� +) �'o \ + 20�52 I� \ ` \ _ - - �_ t-�_ I_1♦ TT �� SILTL� '�21.5 _ _ _ - - - 10J / /S/8"FIRC LB31 10 1 I I l \ �050 `J _j LU __ _ _ _ O = �m 1� t)18.82 � =1_--1 -- -� - s��� � - - - - / / I I I I \ 19.58 19.37 Q w O Y \\h 6.82 \ -� �- - - _ LU - o \ + 17.50 + 1753 I \ I!-- - - �� - - - - - - - 6 0 CO 1 \ L-SiL��+2� - .03 - - - / / / 26.26 9 P1 I 1 0,5 O / LL 0 I \ \ =�I� _ - - - - - - - CITY OF OKEECHOBEE / J I I OLU -r-Slt� _ - - - T c0.71 - _ _ - - n DRAINAGE EASEMENT / / + 20.80 I + p,74 + .28 19.60 "CRAIG SMITH" Y Z _ -SItT _------ \ / \ �L1 I 19.41 Q Q W RAINAGE INLET I 94 _ - - - - - - \ / \ - - - - _ - - - 1?51 I w Q GRATE=18.68 _ V WEIR=17.07 +,9.p5 l - - - - - \ LOT 2 \ I + 171i� ao 5/8"FIRC LB3110 10 / \ / / / / �O I \\\+11� 19.55 0*1 O a- W \\ + 1 .36 I+ 19.28 h� c029 \ \ ' - - _ _ i Z I + 20.64 + 20.14 + 19.83 + 19.20 + 0.25 + 20.68 \ / + 20.67 + 20.52 \+L21.01 SANITARY / W i FIRE MANHOLE Z n HYDRANT RIM=20.04 / W i a I"CRAIG SMITH" / PROJECT NO. SHEET 2373 C200 Know what's belm, Call before you dig. SITE CHARACTERISTICS PARCEL INFORMATION: PARCELID: 3-15-37-35-0020-000000-0030 PROPOSED USE: INDUSTRIAL FLOOD AREA: ZONE AE ZONING / LAND USE: INDUSTRIAL / INDUSTRIAL PARCEL AREA: 3.153 AC BUILDING SETBACKS: NORTH: 25' SOUTH: 20' EAST: 15' WEST: 15' DEVELOPMENTAL STATISTICS PRE DEVELOPMENT IMPERVIOUS: 0.000 AC 0 SF 0.00% PERVIOUS: 3.153 AC 137,342 SF 100.00% TOTAL SITE AREA: 3.153 AC 137,342 SF 100.00% POST DEVELOPMENT PERVIOUS 0.821 AC 35,743 SF 26.02% IMPERVIOUS 2.332 AC 101,599 SF 73.98% PAVEMENT/CONCRETE 2.332 AC 101,599 SF BUILDING 0.000 AC 0 SF TOTAL SITE AREA: 3.153 AC 137,342 SF 100.00% NE 12TH STREET (TRACT "Rl" (P)) 80' PUBLIC R/W) — R35' — R35' R35' — — R35' PROPOSED 24"x24" /D1-1) CT(1D CT(_KI R35' R35' � POND 100 10.2' STANDARD PAVEMENT, TYP. J 1p 90� � r w is OR c t o vm 10.2' �G \ R20' 10' LANDSCAPE BUFFE O R35' ao 24" STOP BAR R35' — STOP SIGN �I NORTH SCALE: 1" = 30' 0' 30' 60' z O H a U V) LU 0 LU Q REVISION BLOCK `%%jJ 14? w H �II� a w `,�� ti�S •••• Q z •• ..�� wo LM/1 �` zJiwO�WO'y u� IfV ^bo C)wZz=ZW A * H Jwz LU=� Z��n�N% o tiVzow O Q W U % a a J#0 • �PFt�� `o o n i..••.......... m m m U p n QO N M � N M Q� � O M Ln LL . U j O CDLL °0 �J M O C INLU� ZLLO w Q� zoQ M LL goo T o 00 cYiQ OLL 1AC1 O � iUi LU Lij z U :3A V) O = O 0 Q a p O O J LL F A 0L LU LU U U w U N v- � J LU M LL LL G W z 0 00 J U LU LULU LU CO W Y LU 0 LU O ~ 2 z W LnLu LU i LU O LU W LL Z O r I --I U ~ z U W LU r, 01 J U a PROJECT NO. 7=HEET 2373 1 C300 Know what's below. Call before you dig. E�EVA�o� l OTTOP E vpvo r 12 f S�I��� E�EVP 001 fo y�0 0 PIPE INVERT 1/4" ENVIROSKIM FIBERGLASS SKIMMER OR EQUAL 12"FROM STRUCTURE TYPE "C" DITCH BOTTOM INLET SECURED W/ 3/8" S.S. BOLTS (FDOT INDEX No. 233) CONTROL STRUCTURE DETAIL N. T. S. CONTROL STRUCTURE A B C D E F G H I S-152 20.90 21.00 1 20.50 N/A 18.25 36" 24" N/A 15" 20.90 go 8 - - k0 N 4 1� 20.57 \\ \ 20.83 � 1 0.91 ?q) l + 21 A, \ ?q 5. 9 + 19.5+ 19 46®' $ S-145 TYPE "C" INLET PER \ - 1 FDOT INDEX 425-052 .40 +18.26 `��� 89-20----_ _ +20.17 _ 9.20 w/ WEEPHOLE - 1 M.E.G. @ 19.63 + 19.62 + TOP: 20.40 INV OUT: 17.75 (E) \ + 19��k 1 75 - .z3 19.64 + 20.47 21-+ 21.18 + 21.76 -�- \ \�+18.22 \ \+ 43 M.E_G. @ 21.80 SON � \ + 0\ � \ \ \ \�,9\ \ \ �2 S-152 \ + 18.17 \ c, TYPE T" INLET - - - + 1�64 �.9 �� \ TOP: 20.90 21.44 \ \ \ \ INV OUT: 18.25 (SW) \ \ \ 43 LF 15" ADS N-12 @ 0.59% + 21.' \ \ STORMWATER POND \ \ 1 4 rn \ i18. 2 \ 1 + I 1 1 + 17.50 it 53 1 +\19.a5 - - \� M.E.G. @ 19.32 \\ +11 I \\ + 11 36 I+19.2 \ l \ I 19.01 I 20.51 - - i i )20.77 03 � J + 21.14 WEEP HOLE NOTE 1. ALL WEEP HOLES TO BE 5" DIAMETER CIRCLE HOLE ON THE BOTTOM OF THE STRUCTURE. 0.5 CUBIC FEET(12"X12"X6") OF NO. 6 AGGREGATE TO BE PLACED UNDER EACH HOLE. 1 SQ.FT. OF GALVANIZED WIRE MESH V4" OPENINGS) SHALL BE PLACED BETWEEN THE AGGREGATE AND THE CONCRETE. + NORTH SCALE: 1" = 30' 0' 30' 60' 101 � I i i 1 1O11 21.03 � 1 / 20.92 � \ NE 12TH STREET (TRACT "R1" (P)) 80' PUBLIC R/W) z I k L \ 20.88 0 o� �'0.93 z O a U Ln w 0 w Q 0 I REVISION BLOCK � `01 #1 ..�H ��'�I�a o z .���� ti�%••'" In �� •• ••• Z o W ]/O �0W����.y c" U. �y � �O M o Cw:W * ,> �._�¢wOwOw-v tp}iN�y1Vq_jO2wZ 0U, Zo HhWLnU,i0W� O wU i� % Z m } } 00 m w z LU Y Y C7 Q U wp U n 0-C) N 00 N M m *k Ori M Ln LL O CD 00 ?� . c� 0 0,0 Q C oa0 LUx Z U_• � L>U dJ z CS o go •C LU a oco1 Ocnj5 ALLJ C U1-- 6j z Lu o=" V) a Lin '-' O w LU � z w U N U LU U W � J J � LCU M LLLL G < LL LL z m � Q U H O J p W W Q O c w CO 0 LL _�C Y g = W 66 z w V Q Ln LU LU z Q W Z L V U ~ z U W r1 w J 0 ce U a PROJECT NO. SHEET 2373 1 C400 5' 36 3' 22' 3 2' 7 6' 62 3' 12 2' 4' STANDA6RD DUTY PAVEMENT 26 25 25 24 24 5' STANDARD DUTY PAVEMENT 23 23 STANDARD DUTY PAVEMENT 1011124LU 22 22 24 IN oil 21 — 21 23 23EXISTING mommmmml GRADE a- 20 20 22 19 19 21 21 18 18 20 20 17 17 19 19 z O 1616 18 18 U wL 15 15 17 170 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 153 0 10 20 30 40 50 51 HSECTION A -A SECTION B-B VERT. SCALE: 1" = 0' VERT. SCALE: 1" = 0' Ci HORIZ. SCALE: 1" = 1'HORIZ. SCALE: 1" = 1'REVISION BLOCK a '••/ja STANDARD DUTY PAVEMENT w ��tiZ.••• 6,LZU•21' 18' ¢ O w -t-8; y M•.. z cm pA w z w - O= W a STANDARD DUTY PAVEMENT STANDARD DUTY PAVEMENT ;Z W C)wZw¢Ow �� WQ � w I O •• J Z VJ ���` (� z5' '�i�b�'••........ STANDARD DUTY PAVEMENT 5- STANDARD DUTY PAVEMENT 24 24 LL a J z25' 16' 26J_23 i18 26 23 23 STANDARD DUTY PAVEMENT STANDARD DUTY PAVEMENT 24 25 - - 25 22 -- GRADE a 22 mEXISTING z C2 J z J L24 U Ln23 III 09% 20 PROPOSED GRADE 2 /o LU d 23 24 24 21 21 Amman a EXISTING GRADE PROPOSED GRADE S.0 M.E.G. I EXISTING GRADE PR Q o �22 L 22 23 23 20 200 M.E.G. O M �wo-21 21 22 22 19 19 i20 20 21 21 18 18 mNNFIVE �� I ZEF,�R/m^^ 11 W Q19 19 20 - 20 17 17wo W�o�18 18 19- -19 16 16 c � - LL v 1A 73 LF 18" ADS HP @ 1.82% w Hz wU17 ii-r17 18- L18 15 iii-r15 U) Q 0 10 20 30 40 50 51 0 10 20 30 40 50 51 0 10 20 30 40 49 oLO LLSECTION C-C SECTION D-D SECTION E-E VERT. SCALE: 1" = 0' VERT. SCALE: 1" = 0' VERT. SCALE: 1" = 0' HORIZ. SCALE: 1" = 1'HORIZ. SCALE: 1" = 1'HORIZ. SCALE: 1" = 1' 2,NOTE 26 15' 11,26 GRADED AREAS TO BE SODDED WITH EXCEPTION OF POND BOTTOM wALL 25 25 ULL,_w24 / 24 JU MJW23 - 23 o m _ U n \ — L-q H� Wco w Co O O 0 \ i N — NORTH I� U U U 22 22 - —21— WLU W�co SCALE: 1" = 80' �- w c/� o— 21 14_� 20 ___=-1 -� sf_ — I � 0Ln w 20 20 \ oo U � ULU \ m U Co w � � F m 19 19 ���SECTION \q-A O Lu SECTION l l I LL A -A \\ �- I O 1s 0 10 20 30 33 1a \\ \\ \ \ \ 1 N `^SECTION SECTIONSECTION UVERT. F-F \\ \ E-E SCALE: 1" = 0' \\ \ \HORIZ. SCALE: 1" = 1' \\SILTSIL-T~ULU W rn C]00 PROJECT NO. SHEET o LL- JV- 2373 C500 SOD SOD FT SOD SOD FLATSILT FENCE1.4%STORMWATER PONDz TOP: 21.50BOTTOM: 20.00SHWT: 18.92 pPROPOSED GRADE M.E.G.--PROPOSED GRADEEXISTING GRADEJ EXISTING GRADE STANDARD DUTY PAVEMENTSOD SILT FENCEPROPOSED GDE o.1°r°IM.E.GEXISTING GRADE f1Add5 'I P 6» z 30" / I 1 0 a 2 POND BOTTOM POND BOTTOM �FPG� o 00 �� ° SO'M/N2ti/(/ 3 qooOqooOooOO o of w D O� O O� O� OD oO o 0 00.00 0 0O 00 0O o 0O o b o ° Oo no 00 00 0 1. 1.5" TYPE "SP-9.5" ASPHALTIC CONCRETE; TRAFFIC LEVEL B OR HIGHER; 0O o 0O o 0O o 00 0 0O o o LAYER THICKNESS 1.0" TO 1.5"; RAP WILL BE APPROVED BY THE FOR IN COMPLIANCE WITH 0oO�oO 00O�(DO �o FDOT SPECIFICATIONS, SECTION 334; BINDER COURSE TO BE APPLIED PER FDOT 0�0O�0O�0O�o0 SPECIFICATION, SECTION 334-2. _,)Oo0Oo0Oo0Oo0Oo 0O 0 0O 0 0O 0 0O 0 0O o 0 2. 6" LIMEROCK MIN LBR 100 ; COMPACTED 98% AASHTO T180 METHOD "D"; 6" MINIMUM Op Op 00 00 ( ) o �0 0O 0O 0O 0O o ALTERNATIVE: 6" CRUSHED CONCRETE(LBR 150); COMPACTED 98% AASHTO T180 METHOD REVISION BLOCK 000O�ou (DOu O� 1. 6"-9" LAYER OF RIP RAP RUBBLE °000 00 00 „D„ FDOT DESIGN STANDARD FOR ROAD AND BRIDGE CONSTRUCTION SECTION 530 000 000 000 3. 12" TYPE "B" STABILIZATION PER FDOT SPECIFICATION 160; LBR 40 (MINIMUM); COMPACTED ( ) u w ��� Z #57 STONE 00 00 ♦ tiZ............. H i 0O 0 00 J� TO 98% AASHTO T180. NOTE, IF EXISTING MATERIAL IS ANTICIPATED TO MEET THE 2. GEOTEXTILE FILTER FABRIC a o ?••- z WHITE LEGEND RED BACKGROUND oO ����� REQUIREMENTS ABOVE THEN TESTING SHALL BE SUBMITTED TO THE FOR FOR VERIFICATION. (FDOT DESIGN STANDARD FOR ROAD AND BRIDGE CONSTRUCTION SECTION 514 o w ^ ��':� cn ,L �yP � w GEOTEXTILE UNDERLINER STRUCTURAL NUMBER CALCULATION: 1.5" x 0.44 = 0.66 AND STANDARD INDEX 199) z � -j cm o TYPICAL STOP SIGN DETAIL z z u, i s h w MINIMUM ALLOWABLE = 2.27 6.0" x 0.18 = 1.08 0 o z w- :LLI � * a L Q 12.0" x 0.08 = 0.96 3. 6" COMPACTED SUBGRADE u, o �� v t�f c•0 0 RIP -RAP DETAIL w ° ••� - 9 2 N I`- CONSTRUCTION ENTRANCE DETAIL 2.7o z o J !���.•. .•.,a NTS TYPICAL LIGHT DUTY ASPHALT PAVEMENT DETAIL NTS a �•*'PROZ NTS fill. m m m p w Y z Y Lu C7 Q U L a w Q p 2 U n Q O N 6 MAX M � 20' 45"x24" 10' MIN.* ^� POST OPTIONS: VERTICAL PAINTED WOOD 2 1 2" MIN.DIA. M rn / OPTIONAL POST WHITE 0 -j -1 Q WOOD 2"X4" POSITIONS PRINCIPAL POST ° ° PLYWOOD L " o u OAK 1 STEEL 1� 33 LBS// T' MIN. 20SITION OWARDANTED FLOW) CONCRETE L3 0 � WASHO T H^ zp o FILTER FABRIC T° ° t%-@ m Q Of ;n t BLACK LETTERS— = a O z = --SILT FLOW 3' 6" HEIGHT " 0 z LU 4" , 10' MIN.* Q) z o Q Lu ELEVATION SECTION ������ •C o 0 i,./�,,/i, ,//� _ o FILTER FABRIC g (IN CONFORMANCE WITH 3 v � v tn o^ Q SEC.985 FDOT SPEC.) NOTE: SILT FENCE TO BE PAID FOR UNDER WOOD POSTS C 0 00 u THE CONTRACT UNIT PRICE FOR STAKED �Y 4"x4"x8' w � v H FENCE(L.F.) �✓ STAKE (TYP.) w — CONCRETE WASHOUT D 0 U \ -SILT FLOW SIGN DETAIL � a o (OR EQUIVALENT) o \ NOTES: o 1. CONCRETE WASHOUT SHALL BE AT PLAN TWO STACKED RF LEAST 50 FT. FROM ANY STORM SEWER 2"x12" ROUGH 0* INLET. 2 LAYERS WOOD FRAME 6 MIL PLASTIC LINING SILT FENCE SILT FENCE 2. THE CONCRETE WASHOUT SIGN SHALL BE INSTALLED WITHIN 30 FT. OF THE TEMPORARY CONCRETE WASHOUT �vv FACILITY. WOOD FRAME SECURELY FASTENED AROUND ENTIRE PERIMETER WITH TWO OPPOSING STAKES SECTION A -A NOTE: DO NOT DEPLOY IN ANY MANNER THAT SILT FENCES WILL ACT AS A DAM ACROSS PERMANENT FLOWING TYPE III SILT FENCE PROTECTION WATERCOURSES. SILT FENCES ARE TO BE USED AT AROUND DITCH BOTTOM INLET WASHOUT FACILITY DETAIL UPLAND LOCATIONS AND TURBITY BARRIERS USED NTS AT PERMANENT BODIES OF WATER. SILT FENCE DETAIL Lu ITS z w U Q N w U U � J M J Cw 0 z C Lu L W m O O 02 U u J Q W O LL.I I� Y � � O w O Y = Z g w w 0 Q O 06 LL w W z O U U ~ W z r, W O J � U a PROJECT NO. SHEET 2373 C600 2