Loading...
SW 5th AVE Resurfacing Project, Survey & Design EngineeringCULPEPPER & TERPENING INC CONSULTING ENGINEERS LAND SURVEYORS PROJECT AUTHORIZATION FORM CT Project No: 21-254 Project Name: SW 5t1 Avenue Widening & Resurfacing Project Authorization No. Project Requested By: David Allen, Public Works Director City of Okeechobee DAI[en@Cityof0keechobee.com Date Of This Authorization January 27, 2022 Consultant: z Culpepper & Terpening, Inc. Kelly Cranford, PE kcranford@ct-eng.com In accordance with the terms of the Professional Engineering Services Agreement with the City of Okeechobee, C&T, Inc. hereby provides confirmation of request for services requested by the Owner/Client. All of the Agreement terms and conditions shall remain in force and effect, except as modified in this Work Authorization. Scope: Consultant shall provide the construction plans for the widening and resurfacing of 5th Avenue from Park Street to south of Central Elementary School. Plans shall include the following: • Milling and resurfacing of existing travel lanes • Signing and pavement markings • Maintenance of Traffic Plans • Side road and driveway turnouts • Upgrade drainage facilities Specific services and tasks to be performed by Consultant are as follows: PHASE 2: PRELIMINARY DESIGN SERVICES Task 2.1 Design Survey Consultant shall provide field data collection in sufficient detail to prepare the resurfacing plans along the entire corridor. The survey shall define the limits of the public road right-of-way. Consultant shall also prepare topographic survey of the proposed corridor including 5' outside of the proposed right of way. Record drawing information will be procured from the Okeechobee Utility Authority to establish the location of the existing potable water, gas, electric and sanitary sewer facilities. Task 2.2 Geotechnical Survey Consultant shall have produced a geotechnical survey of the project corridor specifically for the milling and resurfacing project. Geotechnical survey shall be limited to five (5) cores of the existing pavement to establish the pavement profile for the milling and resurfacing design. A LEGACY OF EXPERTISE AND EXCELLENCE 2980 SOUTH 25TH STREET FT. PIERCE, FL 34981 (772) 464-3.537 FAX: (772) 464-9497 CULPEPPER & TERPENING INC CONSULTING ENGINEERS ! LAND SURVEYORS PHASE 3: FINAL DESIGN SERVICES Task 3.1 60% Roadway Plans Consultant shall provide the Client with the initial 60% plan submittal documents in general accordance with the FDOT FDM and Florida Green Book. The Plans shall be prepared on 11" x 17" size format and comply with the City of Okeechobee criteria, FDM, and FDOT Standard Plans. The Plan submittal requirements shall be consistent with the FDM, Part III, Chapter 301.2, 60% and include the following components: • Key Sheet (Preliminary) • General Notes/Summary of Pay Items (Preliminary) • Typical Sections (Preliminary) • Project Layout Sheets @ 100 scale (Preliminary) • Roadway Plan Sheets @ 40 Scale (Preliminary • Roadway Soil Survey (Final) This task shall include a review meeting with the City of Okeechobee. Consultant shall also provide the following items commensurate with the development of the 60% Plan information: • Geotechnical Report • Engineer's Estimate of Probable Construction Cost commensurate with the development of the 60% Plan information. Task 3.2 Final 100% Resurfacing Plans Consultant shall provide the Client with the final plan for roadway milling and resurfacing plans. The plans shall be in general accordance with the FDOT FDM and Florida Green Book. The Plans shall be prepared on 11" x 17" size format and comply with the City of Ft. Pierce criteria, FDM, and FDOT Standard Plans. The Plan submittal requirements shall be consistent with the FDM, Part III, Chapter 301.2, 100% and include the following components: • Key Sheet (Final) • General Notes/Summary of Pay Items (Final) • Typical Section (Final) • Project Layout Sheets @ 100 scale (Final) • Roadway Plan Sheets @ 40 scale (Final) • Sidewalk ADA Compliance section (Final) • Roadway Soil Survey (Final) • Stormwater Pollution Prevention Plan (Final) • Traffic Control Plan (Final) • Signing & Pavement Marking Plan (Final) This task shall include a review meeting with the City of Okeechobee. Consultant shall also provide the following items commensurate with the development of the Final Plan information: • Response to comments received from the City of Okeechobee and FDOT. • Engineer's Estimate of Probable Construction Cost commensurate with the development of the Final Plan information. Task 3.3 FDOT ERC Review Responses Consultant shall provide responses to the comments generated by the FDOT ERC review process. A LEGACY OF EXPERTISE AND EXCELLENCE 2980 SOUTH 25TH STREET FT. PIERCE, FI- 34981 (772) 464-3537 FAX: (772) 464-9497 CULPEPPER & TERPENING INC CONSULTING ENGINEERS I LAND SURVEYORS PHASE 4: BIDDING SERVICES Task 4.1 Bid Assistance Consultant shall provide the following assistance to City of Okeechobee as part of the bidding process: • Bid Document Preparation: Consultant shall prepare the standard technical specifications and special provisions required for inclusion in the Bid Documents. The technical specification and special provision shall be prepared in the standard City bid format included in the Technical Specification section of the Bid Documents. • Prepare for and attend the pre -bid meeting for the project. • Provide City with responses to request for information and/or questions that arise from the meeting. • Provide necessary plans changes from comments during the bidding process. • Review bid tabulations prepared by City and provide recommendations of award. • Issue "Approved for Construction" plan sets to the contractor EXCLUSIONS Specific exclusions from this Work Authorization are listed as follows: 1. Utility Relocation Design 2. Preparation of Temporary Construction Easements 3. Title work to determine Right -of -Way to be provided by Client. Resolution of Right -of -Way issues to be provided as additional service. 4. Dewatering Permit to be applied for by Contractor 5. No permits required Payment will be as follows on a percent complete basis: Phase/Task Description Task Fee Phase 2 Preliminary Design Services Task 2.1 Design Survey $ 11,940.00 FEE Task 2.2 Geotechnical Design Exploration $ 5,445.00 FEE Phase 3 Final Design Services Task 3.1 60% Plan Submittal $ 15,805.00 FEE Task 3.2 100% Plan Submittal $ 10,800.00 FEE Task 3.3 FDOT ERC Review Responses $ 3,940.00 FEE Phase 4 Bidding Services Task 4.1 Bidding Assistance $ 4,280.00 FEE Reimbursable Expenses $ 500.00 T&E Total Fees $52,710.00 A LEGACY OF EXPERTISE AND EXCELLENCE 2980 SOUTH 25TH STREET I FT. PIERCE, FL 34981 (772) 464-3537 1 FAX: (772) 464-9497 CULPEPPER & TERPENING INC CONSULTING ENGINEERS LAND SURVEYORS Submitted By. - Culpepper & Terpening, Inc. Kelly Cr ord, PE, Env p. Sr. Project Manager Dowling R. atford Jr., ayor ATT ST: Lane G miotea .CMC, City Clerk REVIEWED FOR LEGAL SUFFICIENCY: JohrYJ. Wero, City Attorney A LEGACY OF EXPERTISE AND EXCELLENCE 2980 SOUTH 25TH STREET I FT. PIERCE, FL 34981 1 (772) 464-3537 1 FAX: (772) 464-9497