2022-10-04 IV. Item COKEECHOBEE UTILITY AUTHORITY
0
I
o
i
C �•
M
i
Glades
County
I A I
OUA Water Service Area
4 I 3
2 I 1
I D 1
M0
Mo
OKEECHOSEE UTILITY AUTHORITY A
ONEECMOE E UTILnY AUMORTY
9udd,ead RIdpe Elmw Storup Tank
Dcpmlby: 7%OM 711am R%mm IIE MIX &W
13uckhecd Ridge
5 IT, 4 3 1 2 1t
IMM
IC
I B
1m
OUA Wastewater Service Area
d7:tRi:Rf�C3: 1' ��•�
- vt
y� 'tefe�
I, i
Okeechob
Glades
Uounty
EE UTITY ALliT4DR Y
Rd. WASTEWATER TREATMENT PUNT
Copadly. 1.1 NOD
6L-
m
CI
BI
OKEECHOBEE UTILITY AUTHORI "
WASTEWATER COLLECTION AREA
OKEWH09EE U71UTY AUTHDmTY A
BuG4thead Rideau `` J WASTMIER SUNCE AREA
0
K]
PROJECT AREA
410 NW 2ND STREET
SEC Sumner Engineering &Consulting, Inc. Okeechobee. FL 34972
♦ Agriculture, Civil, Land do Wafer Resources 8W363.9474
4
South00t 5th Avenue
OR
Prgjn ed
RessMent Qwaterr c ustorner� comp0aonts
regardng poor ssoptoc funcfoond
pardcd Hy dIuHng wet season
o Lack of scMce to much o IIse
comrnerdaa corrWorr on west ssNe of US
441
Exstofrlp Cc rnrnlnns Anayysoss
o along SO Od
Avenue,
o Exstung Uf'� S't atr on QSvW-8- on SO 5th
Avenue, wJH'h apparent excess capadty
Figure 3 Lots Currently on ®UA Sower
OMO AERYME LOTS
L2r�
I PM EnWOW&AIR
5
L-a: vacuum newer Aixernanve — rra
1_
t
m
L
j
.PIPE LEGEND
Purple = 4" VM
.__. =6„VM
( -White - 4" FM - - -
Service Area
Boundary: ❑
-0UA Gravity
Serviced. ® i
N
0.1
0 Miles
77H 5T
7
12TH LN i
ew iSTH
Exhibit 1
E ECKLERENoINEERP:,;. 1�. SW 5th Avenue Service
Area Map
I
A-2: Gravity Sewer Alternative - Map (Sumner Enaineering K Consulting, Inc.)
7
Southwest 5t" Avenue
Project Alternatives Analysis -
Low Pressure Sewer
Advantages
o Lowest Capital Cost ($3,166,922)
o Easily Constructible Infrastructure
o Lowest Disruption to Area
o Disadvantages
o Highest Operational Effort and Cost
o Requires Electric to Each Griner
Pit Site
o Higher Maintenance Costs
o Multiple Pits / Pumps to _
Maintain
o Shorter Service Life for Pumps
o More Frequent Service Calls
" ap
'� . All
Blended / Staggered Option
• The residential area from SW 71h Avenue to SW 5the Avenue
is the primary area of concern from a public health
perspective and is the main source of customer complaints.
• The commercial area from SW 3rd Avenue to US 441 is less
critical and is potentially easier to serve with expansion of
the existing gravity system along SW 3rd Avenue.
• OUA could consider immediately moving forward with
design/permitting/construction of a LPS system to serve the
residential area, and then consider future expansion of
gravity sewer for the commercial corridor in the future.
Funding Options?
Our team is analyzing several different funding options, and
will present those for consideration at the next Board
meeting.
Southwest Service Area
• Project 1
o SWSA Master Force Main
✓ Currently under construction
o SWSA Master Pump Station
✓ Currently under construction
o SWSA SE2 Interconnect
✓ Design/Permitting
• Project 2
o SWSA Collection System
✓ Design/Permitting
• Project 3
o Okee-Tantie
✓ Design/Permitting
Treasure Island
o Engineering Review
Pine Ridge Park
o Under Construction
Okeechobee Utility Authority
Questions & Answers
11