Loading...
2022 09 06 Item VIII. A. Exhibit 05\3U S Florida Department of Transportation SR 70 Resurfacing n US 44 1 to NE 17th Avenue ): 444641-1-52-01 ►R 70 Resurfacing om US 441 to NE 17t" Avenue Project length = 0.972 miles Milling and resurfacing across all 4-lanes ADA sidewalk and driveway modifications Minor drainage modifications Signing/pavement marking, signalization, and lighting safety improvements SR 70 Resurfacing from US 441 to NE 17t" Avenue Previous coordination meetings December 10, 2020, and April 8, 2021 • Recent follow-up meetings August 29, 2022 • Past concerns from the City SR 70 Resurfacing from US 441 to NE 1711 Avenue SR 70 FROM 4TH AVENUE TO 17TH AVENUE F P 1 D 444641-1-52-01 -� ... i` !. ..�• �4 +ii.;'EMD MW ♦ gi;1 b.. coMsrwcrev•orwu. .-- xiow+anw.. 9y loo t - otir.��.� ���.ro Ir _ W.rr. SR 70 Resurfacing from US 441 tQ NE 17tl Avenue 70 Resurfacing US 441 to NE 17t" Avenue Design Phase Construction Ad Letting Construction NTP = Underway = March 2023 = May 2023 = Fall 2023 x W Resurfacing 441 to NE 17t" Avenue Questions?