2021-07-19 Ex 01CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE
FLAGLER PARK
MASTER PLAN
OKEECHOBEE
PROJECT UPDATE PRESENTATION
Presenters
Gianno Feoli
Director of Landscape Urbanism & Design
Calvin, Giordano & Associates, Inc.
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE
03
02
01
Next Steps
Progress: Visioning Master Plan
Progress: Cattlemen’s Square
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE
TASK 1:
GENERAL
SERVICES
TASK 2:
FOUNDATION
DATA-
COLLECTION
PHASE
TASK 3:
VISIONING
MASTER
PLAN & PARK
CONCEPTUAL
DESIGN PHASE
TASK 4:
DETAILED PARK SITE
DESIGN & CONSTRUCTION
PLANS FOR
CATTLEMAN’S SQUARE
OVERALL SCOPE COMPONENTS
TOPIC:
COHESIVENESS
OF EXPERIENCE
TASK 1:
CONCEPTUAL
DESIGN PHASE
TOPIC:
VISIBILITY &
CONNECTIVITY
TASK 2:
SCHEMATIC
DESIGN PHASE
TOPIC:
USE &
DESTINATION
TASK 3:
DESIGN
DEVELOPMENT
TOPIC:
IDENTITY, BRANDING &
CHARACTER
TASK 4:
FINAL BID CONSTRUCTION
DOCUMENTS PHASE
VISIONING MASTER PLAN & CONCEPTUAL PARK DESIGN
CATTLEMAN’S SQUARE (EXPEDITED PATH)
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE
VISIONING
MASTER PLAN
CATTLEMEN’S
SQUARE
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 6
01module
Cattlemen’s Square
(Cattleman’s Drive Sculpture Project)
FINALIZATION OF SCHEMATIC PHASE
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 7 MODULECATTLEMEN’S SQUARE01Follow-up
Final Discussion Items
• Sculpture Bases
• Interactive Information Kiosk
• Benches
• Donor Markers
• Order of Magnitude Cost Opinion
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 8 MODULECATTLEMEN’S SQUARE01SCULPTURE BASES
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 9 MODULECATTLEMEN’S SQUARE01Sculpture Base - Initial Concept
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 10 MODULECATTLEMEN’S SQUARE01Sculpture Base - Revised
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 11 MODULECATTLEMEN’S SQUARE01Sculpture Base - Revised
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 12 MODULECATTLEMEN’S SQUARE01Sculpture Base - Revised
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 13 MODULECATTLEMEN’S SQUARE01INTERACTIVE KIOSK
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 14 MODULECATTLEMEN’S SQUARE01Interactive Kiosk
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 15 MODULECATTLEMEN’S SQUARE01Interactive Kiosk
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 16 MODULECATTLEMEN’S SQUARE01BENCHES
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 17 MODULECATTLEMEN’S SQUARE01Furnishings
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 18 MODULECATTLEMEN’S SQUARE01Furnishings
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 19 MODULECATTLEMEN’S SQUARE01DONOR RECOGNITION MARKERS
DESIGN CONCEPTS
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 20 MODULECATTLEMEN’S SQUARE01Custom Signage
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 21 MODULECATTLEMEN’S SQUARE01Custom Signage
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 22 MODULECATTLEMEN’S SQUARE01Custom Signage
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 23 MODULECATTLEMEN’S SQUARE01Custom Signage - Detail
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 24 MODULECATTLEMEN’S SQUARE01Custom Signage - Detail
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 25 MODULECATTLEMEN’S SQUARE01Custom Signage - Detail
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 26 MODULECATTLEMEN’S SQUARE01Custom Signage - Detail
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 27 MODULECATTLEMEN’S SQUARE01Donors’ Recognition
$5,000 Level DonationSculpture Donation $10,000 Level Donation
Sponsorship Form
Okeechobee Main Street, Inc. is a 501(C) 3 not for profit organization
All proceeds go through OKMS Arts & Culture
Alliance of Okeechobee County
to be used towards the funding and installation
of this special cattle drive sculpture project.
For OKMS Use Only:
Date: ______________Amount: _______________
Payment Type: Check__CreditCard__ Cash__
OKMS Rep:_______________________________
Name__________________________________________
Company_______________________________________
Street Address ___________________________________
PO Box ________________________________________
City_____________________ State____ Zip __________
Phone___________________ Cell ___________________
E-Mail__________________________________________
Web Address __________________________________
Sponsors will be contacted to get brand/logo and any
information for monument, bricks or social media.
For larger sponsorships levels,
quarterly payments can be arranged.
¨ Bronze
¨ Silver
¨ Gold
¨ Platinum
¨ Diamond
$ 250
$ 500
$ 1,000
$ 5,000
$10,000
¨ Friends of the Arts $_____________
Complete this form and join our growing
group of committed sponosrs
Okeechobee Main Street Arts & Culture Alliance Cattle Drive Sculpture Project
Preliminary sponsorship acknowledgment plaques & brick design and sizes.
Individual Sculpture Piece plaques will be placed on
stone as shown in photo to fit the natural landscaping
setting planned. Plaque includes ranch brand on
the sculpture, donation acknowledgment and ranch
history/message at the sculpture base. Business or
Private donation plaque will include donor’s name
with message. Contact Main Street Representative for
Individual Sculpture sponsorhsip availability and pricing.
$10,000 Level
Ranch, Business or Private
Plaques place on stone as
shown in photo to fit the
natural landscaping setting
planned. Stones will be placed
near the sidewalk along the
cattle drive for easy access that
visitors can read.
$5,000 Level
Ranch, Business or Private
Smaller plaques, placement on
or around the brick walls on
the pads and in the center of
the park.
Sponsorship examples are only our preliminary visions and may be subject to change
once the landscaping & final sculpture design is finalized.
Size and scope of each sponsor plaque or brick level will not change.
Brick Sizes:
$1,000. - 12” x 12”
$ 500. - 8” x 8”
$ 250. - 4” x 8”
Sponsors will be given guidelines on text
area size for both plaques and bricks.
Digital renderings are not to scale and for reference only.
Friends of the Arts
Website, Dedication & Print Acknowledgment
$200 and under
Gold, Silver Bronze Levels
Sponsorship Bricks will be located
at ground level in center of park
and at both south and north pads
in the park.
Sponsorship Form
Okeechobee Main Street, Inc. is a 501(C) 3 not for profit organization
All proceeds go through OKMS Arts & Culture
Alliance of Okeechobee County
to be used towards the funding and installation
of this special cattle drive sculpture project.
For OKMS Use Only:
Date: ______________Amount: _______________
Payment Type: Check__CreditCard__ Cash__
OKMS Rep:_______________________________
Name__________________________________________
Company_______________________________________
Street Address ___________________________________
PO Box ________________________________________
City_____________________ State____ Zip __________
Phone___________________ Cell ___________________
E-Mail__________________________________________
Web Address __________________________________
Sponsors will be contacted to get brand/logo and any
information for monument, bricks or social media.
For larger sponsorships levels,
quarterly payments can be arranged.
¨ Bronze
¨ Silver
¨ Gold
¨ Platinum
¨ Diamond
$ 250
$ 500
$ 1,000
$ 5,000
$10,000
¨ Friends of the Arts $_____________
Complete this form and join our growing
group of committed sponosrs
Okeechobee Main Street Arts & Culture Alliance Cattle Drive Sculpture Project
Preliminary sponsorship acknowledgment plaques & brick design and sizes.
Individual Sculpture Piece plaques will be placed on
stone as shown in photo to fit the natural landscaping
setting planned. Plaque includes ranch brand on
the sculpture, donation acknowledgment and ranch
history/message at the sculpture base. Business or
Private donation plaque will include donor’s name
with message. Contact Main Street Representative for
Individual Sculpture sponsorhsip availability and pricing.
$10,000 Level
Ranch, Business or Private
Plaques place on stone as
shown in photo to fit the
natural landscaping setting
planned. Stones will be placed
near the sidewalk along the
cattle drive for easy access that
visitors can read.
$5,000 Level
Ranch, Business or Private
Smaller plaques, placement on
or around the brick walls on
the pads and in the center of
the park.
Sponsorship examples are only our preliminary visions and may be subject to change
once the landscaping & final sculpture design is finalized.
Size and scope of each sponsor plaque or brick level will not change.
Brick Sizes:
$1,000. - 12” x 12”
$ 500. - 8” x 8”
$ 250. - 4” x 8”
Sponsors will be given guidelines on text
area size for both plaques and bricks.
Digital renderings are not to scale and for reference only.
Friends of the Arts
Website, Dedication & Print Acknowledgment
$200 and under
Gold, Silver Bronze Levels
Sponsorship Bricks will be located
at ground level in center of park
and at both south and north pads
in the park.
Sponsorship Form
Okeechobee Main Street, Inc. is a 501(C) 3 not for profit organization
All proceeds go through OKMS Arts & Culture
Alliance of Okeechobee County
to be used towards the funding and installation
of this special cattle drive sculpture project.
For OKMS Use Only:
Date: ______________Amount: _______________
Payment Type: Check__CreditCard__ Cash__
OKMS Rep:_______________________________
Name__________________________________________
Company_______________________________________
Street Address ___________________________________
PO Box ________________________________________
City_____________________ State____ Zip __________
Phone___________________ Cell ___________________
E-Mail__________________________________________
Web Address __________________________________
Sponsors will be contacted to get brand/logo and any
information for monument, bricks or social media.
For larger sponsorships levels,
quarterly payments can be arranged.
¨ Bronze
¨ Silver
¨ Gold
¨ Platinum
¨ Diamond
$ 250
$ 500
$ 1,000
$ 5,000
$10,000
¨ Friends of the Arts $_____________
Complete this form and join our growing
group of committed sponosrs
Okeechobee Main Street Arts & Culture Alliance Cattle Drive Sculpture Project
Preliminary sponsorship acknowledgment plaques & brick design and sizes.
Individual Sculpture Piece plaques will be placed on
stone as shown in photo to fit the natural landscaping
setting planned. Plaque includes ranch brand on
the sculpture, donation acknowledgment and ranch
history/message at the sculpture base. Business or
Private donation plaque will include donor’s name
with message. Contact Main Street Representative for
Individual Sculpture sponsorhsip availability and pricing.
$10,000 Level
Ranch, Business or Private
Plaques place on stone as
shown in photo to fit the
natural landscaping setting
planned. Stones will be placed
near the sidewalk along the
cattle drive for easy access that
visitors can read.
$5,000 Level
Ranch, Business or Private
Smaller plaques, placement on
or around the brick walls on
the pads and in the center of
the park.
Sponsorship examples are only our preliminary visions and may be subject to change
once the landscaping & final sculpture design is finalized.
Size and scope of each sponsor plaque or brick level will not change.
Brick Sizes:
$1,000. - 12” x 12”
$ 500. - 8” x 8”
$ 250. - 4” x 8”
Sponsors will be given guidelines on text
area size for both plaques and bricks.
Digital renderings are not to scale and for reference only.
Friends of the Arts
Website, Dedication & Print Acknowledgment
$200 and under
Gold, Silver Bronze Levels
Sponsorship Bricks will be located
at ground level in center of park
and at both south and north pads
in the park.
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 28 MODULECATTLEMEN’S SQUARE01Design Concept
DONOR PAVER AREA
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 29 MODULECATTLEMEN’S SQUARE01Design Concept
Donor Paver
Opportunities
• 4x8: 313 (43 Sold)
• 8x8: 88 (12 Sold)
• 12x12: 40 (6 Sold)
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 30 MODULECATTLEMEN’S SQUARE01ORDER OF MAGNITUDE
OPINION OF ESTIMATE
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 31 MODULECATTLEMEN’S SQUARE01Opinion of Cost (Schematic-design)
Demolition and Site Preparation
Hardscape and Walkways
Plantings and Irrigation
Furnishings
Lighting and Electrical
Sub-total
General Conditions 15%
Contingency 20%
Total
$
$
$
$
$
$
$
$
$
35,418.75
241,962.50
233,385.00
77,550.00
277,900.00
866,216.25
129,932.44
173,243.25
1,169,391.94
Assume a yearly
market fluctuation of
average 4.5%
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 32 MODULECATTLEMEN’S SQUARE01Investment Comparison Across Municipalities
Minimum Programming/Elements:
Medium Programming/Elements:
High Programming/Elements:
Cattlemen’s Sculpture Park
$ 450,000 per acre
$ 805,000 per acre
$ 1,550,000 per acre
$ 1,114,000 per acre
Costs reflect general park
construction costs
on a per-acre basis.
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 33
02module
Visioning Master Plan
INITIAL IDEAS
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 34 MODULENEXT STEPS04Okeechobee Master Plan Study Area
NW PARK STNW PARK ST
SW PARK STSW PARK ST
SW 2ND STSW 2ND ST S PARROT AVES PARROT AVESW 4TH AVESW 4TH AVESW 3RD AVESW 3RD AVESE 2ND AVESE 2ND AVESE 3RD AVESE 3RD AVESW 5TH AVESW 5TH AVESW 6TH AVESW 6TH AVESW 7TH AVESW 7TH AVESW 3RD STSW 3RD ST
SW 4TH STSW 4TH ST
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 35 MODULENEXT STEPS04Okeechobee Master Plan Study Area
NW PARK STNW PARK ST
SW PARK STSW PARK ST
SW 2ND STSW 2ND ST S PARROT AVES PARROT AVESW 4TH AVESW 4TH AVESW 3RD AVESW 3RD AVESE 2ND AVESE 2ND AVESE 3RD AVESE 3RD AVESW 5TH AVESW 5TH AVESW 6TH AVESW 6TH AVESW 7TH AVESW 7TH AVESW 3RD STSW 3RD ST
SW 4TH STSW 4TH ST
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 36 MODULENEXT STEPS03Objectives
• Explore opportunities to maximize existing ROW
• ROW varies with a difference of approx 3.5 feet
• Considerations:
• Visibility
• Shade and landscaping
• Outdoor Commercial Uses
• Vehicular Parking
• Walkability & Connectivity
• Connection to the parks
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 37 MODULEVISIONING MASTER PLAN02Concept - Street Section 01
45-degree Angled ParkingSidewalk with
Furnishings and
Tree Plantings
13-ft Pedestrian Realm
Curbside
Parallel Parking
Sidewalk
(Park Border)
2-way Travel Lanes
w/Sharrow
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 38 MODULEVISIONING MASTER PLAN02Concept - Street Section 01
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 39 MODULEVISIONING MASTER PLAN02Concept - Street Section 01
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 40 MODULEVISIONING MASTER PLAN02Concept - Street Section 02
45-degree Angled ParkingSidewalk with
Furnishings and
Tree Plantings
17-ft Pedestrian Realm
Curbside
Parallel Parking
Sidewalk
(Park Border)
1-way
Travel Lane
Bike
Lane
Bike
Lane
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 41 MODULEVISIONING MASTER PLAN02Concept - Street Section 02
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 42 MODULEVISIONING MASTER PLAN02Concept - Street Section 02
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 43 MODULEVISIONING MASTER PLAN02Concept - Street Section 03
45-degree Angled ParkingSidewalk with
Furnishings
Stree-trees
w/Expanded
Pedestrian
Amenity Area
22.5-ft Pedestrian Realm
Sidewalk
(Park Border)
2-way Travel Lanes
w/Sharrow
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 44 MODULEVISIONING MASTER PLAN02Concept - Street Section 03
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 45 MODULEVISIONING MASTER PLAN02Concept - Street Section 03
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 46 MODULEVISIONING MASTER PLAN02Concept - Street Section 04
45-degree Angled ParkingSidewalk with
Furnishings and
Tree Plantings
28-ft Pedestrian Realm
Stree-trees w/Expanded
Pedestrian & Cyclist
Amenity Area
Sidewalk
(Park Border)
1-way Travel Lane
w/Sharrow
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 47 MODULEVISIONING MASTER PLAN02Concept - Street Section 04
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 48 MODULEVISIONING MASTER PLAN02Concept - Street Section 04
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 49 MODULEVISIONING MASTER PLAN02Concept - Street Section 04
17-ft Pedestrian Realm
28-ft Pedestrian Realm
13-ft Pedestrian Realm
22.5-ft Pedestrian Realm
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 50
04module
Next
Steps
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 51 MODULENEXT STEPS03
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE 52 MODULENEXT STEPS03Next Steps
• Cattlemen’s Square - Design Development Phase
• Visioning Master Plan - Conceptual Design Phase
• One Unified Plan
• Parks Conceptual Design
• Streetscape Design & Beautification
• Strategies for Cohesiveness, Connectivity & Safety
• Strategies for Branding
• Strategies for Sustainability
• Strategies to Support and Catalyze Business
CITY OF OKEECHOBEE
DESIGN PROGRESS PRESENTATION | SCHEMATIC DESIGN
JULY 19, 2021FLAGLER PARK DESIGN REVIEW ADVISORY COMMITTEE
Questions?
GFeoli@cgasolutions.com
Gianno Feoli
Director of Landscape Urbanism & Design
Calvin, Giordano & Associates, Inc.
Tel: 954-766-2776