Loading...
CAS #P4142 Engineering Survey, Utility Location, Etc Services $14,300CRAIG A. SMITH & ASSOCIATES PROPOSED SCOPE OF SERVICES AND PROPOSED FEE FOR OKEECHOBEE COMMERCE CENTER PROJECT CAS PROPOSAL NUMBER: P 4142 CITY OF OKEECH�BEE DATED: July 23, 2021 Revised July 26, 2021 Revision 28�3 August 11, 2021 Revision 4 August 16, 2021 � CRAIG A. SMITH & ASSOCIATES Engineers•Surveyors•Utility Lacators•G�•ant Specialists 21045 Comrnercial 'Trail Soca Raton, Fi. 3348G Tel. (561) 314-4445 E as. (561) 314-4458 � CITY OF OKEECHOBEE CITY COMMERCE CENTER IMPROVEMENTS PROJECT CAS PROPOSAL NUMBER P 4142 PAGE2of5 CRAIG A. SMITH & ASSOCIATES PROPOSED SCOPE OF SERVICES AND PROPOSED FEE PR(}JECT NAME: CITY OF OKEECHOBEE CITY COMMERCE CENTER IMPROVEMENTS PROPOSAL NO: P 4142 In response to the South Florida Water Management District's (SFWMD's) constant assertion, the City of Okeechobee City Commissioners have requested that the City Manager seek the assistance of an engineering design firm to assist with evaluating the existing SFWMD permit and constructed system and, if required, prepare a permit modification and any necessary construction plans for the remaining surface water management system such (primarily the dry pre-treatment areas and portion of wet detention area) that the future buildout of the City's Commerce Park will not be required to construct these remaining facilities to meet their pre-treatment requirements. In response, CAS is presenting this proposal to provide Professional Engineering, Surveying, Utility Location, and other required services to assist the City in achieving these goals OWNER/CLIENT: Name: Attention: Address: Phone: Facsimile City of Okeechobee Gary Ritter — City Administrator 55 SE 3Td Avenue Okeechobee, FL 34974 ($63) 763-3372 Ext. 9812 (863) 763-1686 �:a+-;itea:lmim PROPp$A L-ASSL�1S3L1`�._Cpb9PLETED_PROPOSALS._ �2V21 `.a 1�?-Okcc('omCtr�1132_City_ Com_Ctr-Pro�>os al_F�.do< BACKGROUND: CITY OF OKEECHOBEE CITY COMMERCE CENTER IMPROVEMENTS PROJECT CAS PROPOSAL NUMBER P 4142 PAGE3of5 Craig A. Smith & Associates (CAS) Designed and oversaw construction of the City's Commerce Center (CC) around 20Q0-20Q4. The CC design and constructian was funded by a combination of grants. Grant funding fell short af what was required to complete all the surface water management system (SWMS) required for total CC buildout. In addition, to limit the amount of City owned and maintained SWMS lands, the city elected to require each lot owner to provide some level of pretreatment prior to discharge into the city owned system. As a result of the funding shortage and decision to defer some level of pretreatment, the city has been required to make incremental improvements to the core SVVMS and monitor permit compliance. Permit modifications submitted by CAS have been approved by SFWMD over time since the construction of the initial backbone drainage system. Each lot awner has applied and provided their required pre-treatment requirement by constructing the required pre-treatment system adjacent to City rights-of-way and complying with the grading requirements. In addition, city staff and lot owners must also endure SFWMD's ia�ability to track improvements and permit compliance as each devefoper must modify the permit to demonstrate compliance for their lot development. Each time a lot is developed, the developer and their engineer has been asked to re-demonstrate the sufficiency of the existing SWMS. CAS has repeatedly demonstrated to SFWMD that the extent of constructed SWMS necessary to comply with water quality and quantity has exceeded the level of development currently in the CC. CAS also recognizes that there may have been project phases designed by others and those phases may have faced the same level af scrutiny by the SFWMD. The city wishes to reduce the complexity brought on by SFWMD of future development by modifying the permit and providing all SWMS requirements for future development. Because of the piecemeal permitting and construction over the years, it is unclear how much improvements will be required to achieve the project goals. For this reason, CAS proposes to develop the project in phases. CAS proposes to prepare a preliminary engineering evaluation to develop a conceptual plan and cost estimate in phase 1. This will better define the scope of work for final design and construction plan development and should allow the potential for the city to seek funding. More specifically, the scope of work is as follows: E50 PRELIMINARY ENGINEERING SERVICES In this phase CAS will coflect and review pertinent available information. CAS will evaluate what additional information wi11 be required to evaluate exis#ing conditions and prepare permit appiications and construction plans sufficient to achieve the praject goals. Anticipated available information includes the information CAS has in our filss from the original design, subsequent designs, and as-built surveys. CAS will download and review information from SFWMD permit files and any files the city might have. CAS will perForm one site visit to �cas-ti!e�:uLnIn�PROYOSAL-ASSE]1HLY�.._C0�1PLE'fED_PROPOSALS_�2U'_1��3!J2-OkeeC'omCtr`4142_City_Coin_Cv-Proposal Rd.duc CITY OF OKEECHC)BEE CITY COMMERCE CENTER IMPROVEMENTS PROJECT CAS PROPOSAL NUMBER P 4142 PAG E 4 of 5 compare the gathered information with actual field conditions to confirm accuracy. It is anticipated CAS will need to provide supplemental field surveys to verify the accuracy of the information and create base maps for detailed construction plan development. From the information gathered and field observations, CAS will devefop a conceptual plan and a conceptual level cost estimate for achieving the project goals. CAS will meet with the City to review the findings, present the conceptual pian and cost estimate for approva! prior to advancing to plan development. CAS will meet virtually or by teleconference with the City Manager as needed to coordinate the progress of this phase. Because of the uncertainty of the missing or unavailable information and proposed scope of work to achieve the project goals, CAS will provide a summary report of the findings along with a detailed scope and proposed price to gather the additional required data, prepare any required permit modifications and construction plans at the conclusion of this initial phase. Deliverables for this phase will be a report of findings and a scope and fee proposal. The contents of the report will include: 1. A project overview outlining the initial construction, conditions of development, summary of overall SWMS requirements and what was and wasn't constructed. 2. A permit summary outlining the subsequent lot development to date, permit modifications and water management constructed with each incremental build. 3. A summary of remaining items to be constructed for full buildout of the surface water management system (SWMS). 4. A conceptual plan/outline of requirements to achieve buildout of the water managernent system such that the remaining lots can be built without having to construct additional SWMS 5. A conceptual construction cost estimate to achieve the plan in #4 6. We will schedule a preapplication meeting with #he SFWMD to develop a tentative/draft permit modification as appropriate and necessary. In addition to the report, CAS will prepare and submit a scope of work and fee proposal fior CAS to perform any surveying and engineering to prepare construction plans and specifications, contract documents, modify the permit, bid, perForm construction services and certify construction (phase 2, design & phase 3, construction). Modi�cation of the permit will include the preparation of the permit modification or letter modification ir� the form of an application to the SFWMD and assistance to obtain the permit modification. Permit application fees wilt be the responsibility of the city. CAS'S Lump Sum (LS) Fee for Task E50 .....................$14,300.00 '�cas-filc:almiu��PROi'OSAI: �\SSF�1BLl^._CO:NPLEfY:U_ PROPOSALS_"_G21 �41 �2-Okc �omCtr�41 ti2 Ci:y_Ccm _ftr-Propos:il_Rd.doc CITY OF OKEECHOBEE CITY COMMERCE CENTER IMPROVEMENTS PROJECT CAS PROPOSAL NUMBER P 4142 PAGE5of5 ADDITIONAL SERVICES Any service not specifically includeci in the final Agreement will be considered as an Additional Service. CAS will accomplish Additional Services upon proper written authorization of the City of Okeechobee. The fees for Additional Services are at the attached hourly rates or at a mutually agreed upon Lump Sum Fee. It you are in agreement with the above scope of services and the terms, please sign in the authorization space provided below and return one (1) executed copy of this proposal to our Boca Raton office at 21045 Commercia! Trail, Boca Raton, FL 33486 so that we can proceed. Should you have any questions or need additional information, please do not hesitate to call. SUBMITTED BY: CRAIG A. SMITH � ASSOCIATES � �? .� .-1.�,� � ��=�-�---- ;�j - _ � �_y .�ames R. Orth, P.E. Vice President of Engineering APPROVED BY: CITY OF OKEECHOBEE Gary Ritter City Administrator "�cas-fitc�admin�PRU!'OSAL-ASSEMBLY��_COMPLGTLD_PRUPOSALS, `�'_(1:1•d14�•OktxeComQr�dli2_Citp_Com_Cir-Proposal_R4doc