Loading...
2021-08-03 Ex 06CITY OF OKEECHOBEE COMPONENT SUMMERY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION FLAGLER PARK MASTER PLAN CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE DESIGN LEAD Gianno Feoli Director of Landscape Urbanism & Design Calvin, Giordano & Associates, Inc. CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 03 02 01 04 Progress: Cattleman’s Square Scope of Work & Schedule Who Are We? Progress: Visioning Master Plan CITY OF OKEECHOBEE COMPONENT SUMMERY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 3 01module Who Are We? CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 4 MODULEWHO ARE WE?01CALVIN, GIORDANO & ASSOCIATES, INC. [+] Multi-disciplinary firm [+] Award winning design team [+] Since 1937 - over 80+ years [+] 370+ employees Location and Background CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 5 MODULEWHO ARE WE?01SUBJECT-MATTERINDUSTRY EXPERTS DEDICATED TEAM GIANNO FEOLI, ASLA VISION LEAD / URBAN DESIGN LEAD MARCOS MENDOZA LANDSCAPE DESIGN / IRRIGATION TAMMY COOK-WEEDON, PLA LANDSCAPE ARCHITECT STEVE WATTS, PSM SURVEYOR MICHAEL CONNER, PLA, ISA LANDSCAPE ARCHITECT DREW LINDEMANN, ISA CERTIFIED ARBORIST DOMINIC MACK, ASLA LANDSCAPE DESIGNER JENNA MARTINETTI, PE CIVIL ENGINEER MARIA ALONSO, NCIDQ LANDSCAPE DESIGNER MOHAMMED SHARIFUZZAMAN, PE CIVIL ENGINEER JORGE CERVANTES, PE ELECTRICAL ENGINEER BOB MCSWEENEY, PE CEI / CONSTRUCTION ADMINISTRATION+ CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 6 MODULEWHO ARE WE?01Project Experience CITY OF OKEECHOBEE COMPONENT SUMMERY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 7 02module Scope of Work CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 8 MODULESCOPE OF WORK02TASK 1: GENERAL SERVICES TASK 2: FOUNDATION DATA- COLLECTION PHASE TASK 3: VISIONING MASTER PLAN & PARK CONCEPTUAL DESIGN PHASE TASK 4: DETAILED PARK SITE DESIGN & CONSTRUCTION PLANS FOR CATTLEMAN’S SQUARE OVERALL SCOPE COMPONENTS TOPIC: COHESIVENESS OF EXPERIENCE TASK 1: CONCEPTUAL DESIGN PHASE TOPIC: VISIBILITY & CONNECTIVITY TASK 2: SCHEMATIC DESIGN PHASE TOPIC: USE & DESTINATION TASK 3: DESIGN DEVELOPMENT TOPIC: IDENTITY, BRANDING & CHARACTER TASK 4: FINAL BID CONSTRUCTION DOCUMENTS PHASE VISIONING MASTER PLAN & CONCEPTUAL PARK DESIGN CATTLEMAN’S SQUARE (EXPEDITED PATH) CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 9 MODULESCOPE OF WORK02 CITY OF OKEECHOBEE COMPONENT SUMMERY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 10 03module Cattleman’s Square (Cattleman’s Drive Sculpture Project) CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 11 MODULESPECIFICS: CATTLEMEN’S SQUARE03Park Viewsheds Design Brief CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 12 MODULESPECIFICS: CATTLEMEN’S SQUARE03Intersections & Accessibility Design Brief CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 13 MODULESPECIFICS: CATTLEMEN’S SQUARE03Edge Conditions & Infrastructure Design Brief CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 14 MODULESPECIFICS: CATTLEMEN’S SQUARE03SW Park St. Commercial Frontage Design Brief CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 15 MODULESPECIFICS: CATTLEMEN’S SQUARE03Design Brief Design Objectives • Express authenticity in design • Capture the ‘essence’ of the Sculptor’s story • Capture the movement of the herding experience • Create an immersive experience • Address all the existing conditions: opportunities & constraints • Provide: • Viewing area • ADA access and connectivity • Various seating opportunities • Locations for picnic tables • Donor paver area • Locations for naming markers • Educational signage opportunity • Clearly-marked main entrance CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 16 MODULESPECIFICS: CATTLEMEN’S SQUARE03SCULPTURE + PARK CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 17 MODULESPECIFICS: CATTLEMEN’S SQUARE03Design Concept CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 18 MODULESPECIFICS: CATTLEMEN’S SQUARE03Design Concept SW PARK ST NW PARK ST SW 6TH AVESW 5TH AVE CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 19 MODULESPECIFICS: CATTLEMEN’S SQUARE03Design Concept CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 20 MODULESPECIFICS: CATTLEMEN’S SQUARE03Design Concept CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 21 MODULESPECIFICS: CATTLEMEN’S SQUARE03Design Concept CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 22 MODULESPECIFICS: CATTLEMEN’S SQUARE03Design Concept CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 23 MODULESPECIFICS: CATTLEMEN’S SQUARE03Sculpture Base - Revised CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 24 MODULESPECIFICS: CATTLEMEN’S SQUARE03Sculpture Base - Revised CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 25 MODULESPECIFICS: CATTLEMEN’S SQUARE03MATERIALS PALETTE CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 26 MODULESPECIFICS: CATTLEMEN’S SQUARE03Design Concept CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 27 MODULESPECIFICS: CATTLEMEN’S SQUARE03Design Concept CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 28 MODULESPECIFICS: CATTLEMEN’S SQUARE03Materiality CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 29 MODULESPECIFICS: CATTLEMEN’S SQUARE03Materiality CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 30 MODULESPECIFICS: CATTLEMEN’S SQUARE03FURNISHINGS PALETTE CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 31 MODULESPECIFICS: CATTLEMEN’S SQUARE03Furnishings CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 32 MODULESPECIFICS: CATTLEMEN’S SQUARE03Materiality CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 33 MODULESPECIFICS: CATTLEMEN’S SQUARE03Furnishings CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 34 MODULESPECIFICS: CATTLEMEN’S SQUARE03INTERACTIVE KIOSK CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 35 MODULESPECIFICS: CATTLEMEN’S SQUARE03Interactive Kiosk CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 36 MODULESPECIFICS: CATTLEMEN’S SQUARE03Interactive Kiosk CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 37 MODULESPECIFICS: CATTLEMEN’S SQUARE03LIGHTING STRATEGY CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 38 MODULESPECIFICS: CATTLEMEN’S SQUARE03Experience - Day CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 39 MODULESPECIFICS: CATTLEMEN’S SQUARE03Experience - Night CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 40 MODULESPECIFICS: CATTLEMEN’S SQUARE03Lighting Strategy FIXTURE: IN-GROUND UPLIGHT COLOR TEMP: 3000K EFFECT: • PROVIDES A WASH OF LIGHT ON THE SCULPTURES • GENERATES A SOFT GLOW FIXTURE: POST AREA LIGHT COLOR TEMP: 3000K EFFECT: • PROVIDES GENERAL AREA LIGHTING (ADA REQ’T) • TARGETED LIGHTING FIXTURE: TREE STRAP LIGHT COLOR TEMP: 3000K EFFECT: • PROVIDES UNDER-GLOW OF TREE AND PALM CANOPY • SPATIAL DEFINITION CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 41 MODULESPECIFICS: CATTLEMEN’S SQUARE03Lighting Fixtures CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 42 MODULESPECIFICS: CATTLEMEN’S SQUARE03PLANTING PALETTE CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 43 MODULESPECIFICS: CATTLEMEN’S SQUARE03Materiality CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 44 MODULESPECIFICS: CATTLEMEN’S SQUARE03DONOR RECOGNITION MARKERS DESIGN CONCEPTS CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 45 MODULESPECIFICS: CATTLEMEN’S SQUARE03Custom Signage CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 46 MODULESPECIFICS: CATTLEMEN’S SQUARE03Custom Signage - Detail CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 47 MODULESPECIFICS: CATTLEMEN’S SQUARE03Custom Signage - Detail CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 48 MODULESPECIFICS: CATTLEMEN’S SQUARE03Custom Signage - Detail CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 49 MODULESPECIFICS: CATTLEMEN’S SQUARE03Donors’ Recognition $5,000 Level DonationSculpture Donation $10,000 Level Donation Sponsorship Form Okeechobee Main Street, Inc. is a 501(C) 3 not for profit organization All proceeds go through OKMS Arts & Culture Alliance of Okeechobee County to be used towards the funding and installation of this special cattle drive sculpture project. For OKMS Use Only: Date: ______________Amount: _______________ Payment Type: Check__CreditCard__ Cash__ OKMS Rep:_______________________________ Name__________________________________________ Company_______________________________________ Street Address ___________________________________ PO Box ________________________________________ City_____________________ State____ Zip __________ Phone___________________ Cell ___________________ E-Mail__________________________________________ Web Address __________________________________ Sponsors will be contacted to get brand/logo and any information for monument, bricks or social media. For larger sponsorships levels, quarterly payments can be arranged. ¨ Bronze ¨ Silver ¨ Gold ¨ Platinum ¨ Diamond $ 250 $ 500 $ 1,000 $ 5,000 $10,000 ¨ Friends of the Arts $_____________ Complete this form and join our growing group of committed sponosrs Okeechobee Main Street Arts & Culture Alliance Cattle Drive Sculpture Project Preliminary sponsorship acknowledgment plaques & brick design and sizes. Individual Sculpture Piece plaques will be placed on stone as shown in photo to fit the natural landscaping setting planned. Plaque includes ranch brand on the sculpture, donation acknowledgment and ranch history/message at the sculpture base. Business or Private donation plaque will include donor’s name with message. Contact Main Street Representative for Individual Sculpture sponsorhsip availability and pricing. $10,000 Level Ranch, Business or Private Plaques place on stone as shown in photo to fit the natural landscaping setting planned. Stones will be placed near the sidewalk along the cattle drive for easy access that visitors can read. $5,000 Level Ranch, Business or Private Smaller plaques, placement on or around the brick walls on the pads and in the center of the park. Sponsorship examples are only our preliminary visions and may be subject to change once the landscaping & final sculpture design is finalized. Size and scope of each sponsor plaque or brick level will not change. Brick Sizes: $1,000. - 12” x 12” $ 500. - 8” x 8” $ 250. - 4” x 8” Sponsors will be given guidelines on text area size for both plaques and bricks. Digital renderings are not to scale and for reference only. Friends of the Arts Website, Dedication & Print Acknowledgment $200 and under Gold, Silver Bronze Levels Sponsorship Bricks will be located at ground level in center of park and at both south and north pads in the park. Sponsorship Form Okeechobee Main Street, Inc. is a 501(C) 3 not for profit organization All proceeds go through OKMS Arts & Culture Alliance of Okeechobee County to be used towards the funding and installation of this special cattle drive sculpture project. For OKMS Use Only: Date: ______________Amount: _______________ Payment Type: Check__CreditCard__ Cash__ OKMS Rep:_______________________________ Name__________________________________________ Company_______________________________________ Street Address ___________________________________ PO Box ________________________________________ City_____________________ State____ Zip __________ Phone___________________ Cell ___________________ E-Mail__________________________________________ Web Address __________________________________ Sponsors will be contacted to get brand/logo and any information for monument, bricks or social media. For larger sponsorships levels, quarterly payments can be arranged. ¨ Bronze ¨ Silver ¨ Gold ¨ Platinum ¨ Diamond $ 250 $ 500 $ 1,000 $ 5,000 $10,000 ¨ Friends of the Arts $_____________ Complete this form and join our growing group of committed sponosrs Okeechobee Main Street Arts & Culture Alliance Cattle Drive Sculpture Project Preliminary sponsorship acknowledgment plaques & brick design and sizes. Individual Sculpture Piece plaques will be placed on stone as shown in photo to fit the natural landscaping setting planned. Plaque includes ranch brand on the sculpture, donation acknowledgment and ranch history/message at the sculpture base. Business or Private donation plaque will include donor’s name with message. Contact Main Street Representative for Individual Sculpture sponsorhsip availability and pricing. $10,000 Level Ranch, Business or Private Plaques place on stone as shown in photo to fit the natural landscaping setting planned. Stones will be placed near the sidewalk along the cattle drive for easy access that visitors can read. $5,000 Level Ranch, Business or Private Smaller plaques, placement on or around the brick walls on the pads and in the center of the park. Sponsorship examples are only our preliminary visions and may be subject to change once the landscaping & final sculpture design is finalized. Size and scope of each sponsor plaque or brick level will not change. Brick Sizes: $1,000. - 12” x 12” $ 500. - 8” x 8” $ 250. - 4” x 8” Sponsors will be given guidelines on text area size for both plaques and bricks. Digital renderings are not to scale and for reference only. Friends of the Arts Website, Dedication & Print Acknowledgment $200 and under Gold, Silver Bronze Levels Sponsorship Bricks will be located at ground level in center of park and at both south and north pads in the park. Sponsorship Form Okeechobee Main Street, Inc. is a 501(C) 3 not for profit organization All proceeds go through OKMS Arts & Culture Alliance of Okeechobee County to be used towards the funding and installation of this special cattle drive sculpture project. For OKMS Use Only: Date: ______________Amount: _______________ Payment Type: Check__CreditCard__ Cash__ OKMS Rep:_______________________________ Name__________________________________________ Company_______________________________________ Street Address ___________________________________ PO Box ________________________________________ City_____________________ State____ Zip __________ Phone___________________ Cell ___________________ E-Mail__________________________________________ Web Address __________________________________ Sponsors will be contacted to get brand/logo and any information for monument, bricks or social media. For larger sponsorships levels, quarterly payments can be arranged. ¨ Bronze ¨ Silver ¨ Gold ¨ Platinum ¨ Diamond $ 250 $ 500 $ 1,000 $ 5,000 $10,000 ¨ Friends of the Arts $_____________ Complete this form and join our growing group of committed sponosrs Okeechobee Main Street Arts & Culture Alliance Cattle Drive Sculpture Project Preliminary sponsorship acknowledgment plaques & brick design and sizes. Individual Sculpture Piece plaques will be placed on stone as shown in photo to fit the natural landscaping setting planned. Plaque includes ranch brand on the sculpture, donation acknowledgment and ranch history/message at the sculpture base. Business or Private donation plaque will include donor’s name with message. Contact Main Street Representative for Individual Sculpture sponsorhsip availability and pricing. $10,000 Level Ranch, Business or Private Plaques place on stone as shown in photo to fit the natural landscaping setting planned. Stones will be placed near the sidewalk along the cattle drive for easy access that visitors can read. $5,000 Level Ranch, Business or Private Smaller plaques, placement on or around the brick walls on the pads and in the center of the park. Sponsorship examples are only our preliminary visions and may be subject to change once the landscaping & final sculpture design is finalized. Size and scope of each sponsor plaque or brick level will not change. Brick Sizes: $1,000. - 12” x 12” $ 500. - 8” x 8” $ 250. - 4” x 8” Sponsors will be given guidelines on text area size for both plaques and bricks. Digital renderings are not to scale and for reference only. Friends of the Arts Website, Dedication & Print Acknowledgment $200 and under Gold, Silver Bronze Levels Sponsorship Bricks will be located at ground level in center of park and at both south and north pads in the park. CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 50 MODULESPECIFICS: CATTLEMEN’S SQUARE03Design Concept DONOR PAVER AREA CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 51 MODULESPECIFICS: CATTLEMEN’S SQUARE03Design Concept Donor Paver Opportunities • 4x8: 313 (43 Sold) • 8x8: 88 (12 Sold) • 12x12: 40 (6 Sold) CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 52 MODULESPECIFICS: CATTLEMEN’S SQUARE03ORDER OF MAGNITUDE OPINION OF ESTIMATE CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 53 MODULESPECIFICS: CATTLEMEN’S SQUARE03Opinion of Cost (Schematic-design) Demolition and Site Preparation Hardscape and Walkways Plantings and Irrigation Furnishings Lighting and Electrical Sub-total General Conditions 15% Contingency 20% Total $ $ $ $ $ $ $ $ $ 35,418.75 241,962.50 233,385.00 77,550.00 277,900.00 866,216.25 129,932.44 173,243.25 1,169,391.94 Assume a yearly market fluctuation of average 4.5% CITY OF OKEECHOBEE COMPONENT SUMMARY: CATTLEMEN’S SQUARE JULY 22, 2021UPDATE TO CITY COMMISSION 54 MODULESPECIFICS: CATTLEMEN’S SQUARE03Investment Comparison Across Municipalities Minimum Programming/Elements: Medium Programming/Elements: High Programming/Elements: Cattlemen’s Sculpture Park $ 450,000 per acre $ 805,000 per acre $ 1,550,000 per acre $ 1,114,000 per acre Costs reflect general park construction costs on a per-acre basis. Demolition and Site Preparation Surveying 1 LS 2,500.00$           2,500.00$                                    Temporary Fencing 1 LS 5,000.00$           5,000.00$                                    Sediment/Dust control 940 LS 5.00$                   4,700.00$                                    GPR Utility Locate 1 LS 2,800.00$           2,800.00$                                    Lab Testing 1 LS 2,000.00$           2,000.00$                                    Demolition of existing walkways 615 SY 11.25$                 6,918.75$                                    Demolition and Disposal of Existing Lighting 6 EA 1,250.00$           7,500.00$                                    Grading and earthwork 1 LS 4,000.00$           4,000.00$                                    35,418.75$                                  Walkways New Concrete Walkways 982 SY 125.00$               122,750.00$                                Paver Curb 71 LF 37.50$                 2,662.50$                                    Paver Area 175 SF 16.50$                 2,887.50$                                    Sculpture Foundations 735 CF 22.50$                 16,537.50$                                  Flagstone Areas 3,765 SF 25.00$                 94,125.00$                                  Sculpture Finishing Concrete 200 SF 15.00$                 3,000.00$                                    241,962.50$                                Funishings Boulders 800 CF 20.00$                 16,000.00$                                  Benches 6 EA 2,300.00$           13,800.00$                                  Picnic Tables 3 EA 4,800.00$           14,400.00$                                  Fence 40 LF 65.00$                 2,600.00$                                    Ranch Entrance 1 LS 12,000.00$         12,000.00$                                  Sculpture Signs 15 EA 1,250.00$           18,750.00$                                  77,550.00$                                  Lighting and Electrical Poles 23 EA 6,800.00$           156,400.00$                                Bollards 15 EA 3,200.00$           48,000.00$                                  In‐ground Spotlights 60 EA 850.00$               51,000.00$                                  Miscellaneous 1 LS 10,000.00$         10,000.00$                                  Rack and infrastructure 1 LS 12,500.00$         12,500.00$                                  277,900.00$                                Plantings and Irrigation Sod ‐ Sculpture Area 7,800 SF 1.75$                   13,650.00$                                  Sod ‐ General 5,160 SF 1.75$                   9,030.00$                                    Hedges 1,470 EA 12.00$                 17,640.00$                                  Shrub Areas 3,856 EA 15.00$                 57,840.00$                                  Ornamental Grasses 2,570 EA 17.50$                 44,975.00$                                  Canopy Trees 13 EA 850.00$               11,050.00$                                  Palms 108 EA 400.00$               43,200.00$                                  Irrigation 1 LS 36,000.00$         36,000.00$                                  233,385.00$                                866,216.25$                                129,932.44$                                173,243.25$                                1,169,391.94$                            Sub‐total General Conditions 15% Contingency 20% TOTAL 2020 0626 1800 QTY UNIT UNIT COST LINE ITEM SUB‐TOTALDESCRIPTION