Bid PW 02-00-12-20 Engineering ReportsCity of Okeechobee 55 SE 3`a Avenue Okeechobee, FL 34974 (863) 763-3372 SE 8th Drainage Project Bid No. TW 02-00-12-20 City of Okee. Shop Drawing Review Form Shop Drawing Submittal No. 1— Drainage Structures Accepted Accepted as Noted Not Accepted Amend and Resubmit Review Not Necessary Review and acceptance is only for conformance with design concept of the Project and general compliances with the information given in the Contract Documents. Contractar is responsible for dimensions, sizing, materials, and compliance to be confirmed and correlated at the job site, for the information that pertains solely to the fabrication processing or to techniques construction and for coordination of the work of all trades. Review and acceptance does not relieve the contractor from compliance with the contract drawings and specifications. Review� Date: Z Z / 2021 (�ri ina f � f i �_.�� -�1 i �ti1�h'aC4v✓ �-fa �t ! �.r? i� ',� "in!� ' " �z: 7,�"�`_ _ _ ���, �,-�a-al AMERICAN CONCRETE INCIUSTRIES, INC. 350 NORTH ROCK ROAD FORT PIERCE, FLORIDA 34945 772-464-1187 � FAX (772) 595-9050 SE ST" STREET DRAINAGE IMPROVEMENTS OKEECHOBEE, FLORIDA ENGINEER: CITY OF OKEECHOBEE CONTRACTOR: B& B SITE DEVELOPMENT, INC. FEBRUARY 11, 2021 AMERICAN CONCRETE INCIUSTRIES� INC. 350 North Rock Road / Fort Pierce, Florida 34945 (772) 464 1187 fax (772) 595-9050 Two Extra #4 Bors �' Each Side of Openinq� � � A � � E.O.P. � + 1 �-IN N � A 49,. 6" 37" 6" � _-_� __ " US Foundry #5106-6149 Valley �----- --�' ^--'- #4 Bars RL 2—#5 Hoop Bars (2 Lop splices permitted) 30"0 Hole Up 9" For 24" A-2000 Up 12" A � �_�_�� to Grade ;ontractor #3 � 5Y2" O.C.E.W _.. .�. .. .. -i . �. Design Notes: 1. All concrete hos a minimum compressive strength of 4000 psi ot 28 days. 2. Type II Cement. 3. Reinforcing steel is Grade 60 rebar or grade 65 WWR with 2" minimum cover unless noted otherwise. Conforms with Index 425-001 and 425-052. 4. Lifting holes taper from 2 1/2"0� to 2"m. 5. All pipe openings sholi receive 1— extra #4 bar eoch side & obove pipe opening. Bars to have 1 1/2" min. hole clearonce. Side bars to overlap top bars 3" min. Top bar to overlop side bors min. 6". Corner holes shall hove 4 extra #4 bars above the hole (continuous around corner evenly spaced). Tie to the outside of vertical woil reinforcement. #3 � 5YZ" O.C. Horizontal #4 � 12" O.C. Vertical or Equal (6'-10') „� Grate: 21.10 N. Inv: — S. InV: — E. Inv� 16.10 W. I n v: — Bottom: 15.10 S—� Weight—Top Slab: TYPE "D" INLET Base: (6'-10') SE 8TH Street Drainage Improvements Okeechobee 1,500 ibs 6,500 Ibs Section A—A AMERICAN CONCRETE INdU5TR1E5� INC. 350 North Rock Road / Fort Pierce, Florida 34945 (772) 464 1187 fax (772) 595-9050 Two Extra #4 Ba Eoch Side of Ooenir 49" 6" 37" 6" _ �30"a Hole Up 9" For 24" A-2000 Up 12" A � � 'J •Lj'�f - �.. .i. .. ... -�..i. E.O.P. � �IN N � � 2—#5 Hoop Bars (2 lap splices permitted) A � 30"Or Hole Up 9" For 24" A-2000 Up 12" *Note: North invert provided, no pipe shown or identified. If required please provide size and type pipe. US Foundry #5106-6149 Valley Frame and Grate 22"X44" 3" CL. Back , 30"4� Brick to Grade By Contractor �#3 � 5YZ" O.C.E.W U � N � �4 Bars @ 11" O.C.E.W.J RL Section A—A /�3 C� 5Y" O.C. Horizontol #4 @ 12" O.C. Verticol or Equal (6'-10') 30"� Grate: 21.10 N. Inv: 16.10* S. Inv: 16.10 E. Inv: 16.10 W. Inv: — Bottom: 15.10 S-2 Weight—Top Slab: - � TYPE "Q" INLET Base: � (6'-10') SE 8TH Street Drainage Improvements Okeechobee Design Notes: 1. All concrete has a minimum compressive strength of 4000 psi at 28 days. 2. Type II Cement. 3. Reinforcing steel is Grade 60 rebar or grade 65 WWR with 2" minimum cover unless noted otherwise. Conforms with Index 425-001 and 425-052. 4. Lifting holes taper from 2 1/2"� to 2"�. 5. Ali pipe openings shall receive 1— extra �4 bar each side & obove pipe opening. Bars to have 1 1�2�� min. hole clearonce. Side bars to overlop top bars 3" min. Top bar to overlap side bars min. 6". Corner holes sholl have 4 extra ,�4 bars above the hole (continuous around corner evenly spaced). Tie to the outside of vertical woll reinforcement. 1,500 Ibs 6,100 Ibs AMERICAN CONCRETE INdU5TR1E5� INC. 350 North Rock Road / Fort Pierce, Florida 34945 (772) 464 1187 fax (772) 595-9050 Two Extro #4 Ba Each Side of Openir A � � E.O.P. ro � i ��� � � � RL 49" 6" 37" 6" r-------------i I I I 1 I I I I I � I v � I Y' i I ��� I ,/ � C�� I I I 1 I I I I L---------___J . �� _ US Foundry #5106-6149 Valley Frame and Grate 22"X44" 3" CL. U N #4 Bors � 11" O.C.E.W. Section A—A Brick to Grade By Contractor /�3 C� 5Y2" o.c.E.w #4 � 12" O.C.E.W. �Or Equal (0'-6') 24"D 2—#5 Hoop Bars (2 Lap splices permitted) 24"0 Hole Up 9" For 18" A-2000 Up 12" A � � Grate: 21.50 N. Inv: — S. Inv: — E. Inv: 18.00 W. Inv: — Bottom: 17.00 S—�j Weight—Top Slab: - � TYPE "D" INLET Base: � (0'-6') SE 8TH Street Drainage Improvements Okeechobee �.. .i• i .. .. -� . .�. Design Notes: 1. All concrete has a minimum compressive strength of 4000 psi ot 28 days. 2. Type II Cement. 3. Reinforcing steel is Grade 60 rebar or grade 65 WWR with 2�� minimum cover unless noted otherwise. Conforms with Index 425-001 and 425-052. 4. Lifting holes taper from 2 1/2"0 to 2"�. 5. All pipe openings shall receive 1— extra #4 bor eoch side & above pipe opening. Bars to have 1 1/2" min. hole cleorance. Side bars to overlap top bars 3" min. Top bar to overlap side bars min. 6". Corner holes shall have 4 extro ��4 bars above the hole (continuous around corner evenly spaced). Tie to the outside of vertical wall reinforcement. 1,500 Ibs 4, 800 I b s AMERICAN CONCRETE INdU5TR1E5� INC. 350 North Rock Road / Fort Pierce, Florida 34945 (772) 464 1187 fax (772) 595-9050 Two Extra #4 Bars Each Side of Openinq� � 49„ 6" 37" 6" 30"m Hole Up 9" For 24" A-2000 Up 12" \ �� � � 2—#5 Hoop Bars r- �— — y—� (2 Lap splices permitted) A � � A � :... .�. .. .. -� . �. 30"0 Hole Up 9" For 24" A-2000 Up 12" For 18" A-2000 Up 35'� *Note: North invert not provided. Elevation 16.10 used. Please odvise. Plan View 24"� Hole Up 32" US Foundry #5106-6149 V011ey Fr�mP �.�.� r`�..+o E.O.P. � �IN 24"G � � N M � #4 Bars RL _R•;^i< to Grade :ontractor #3 � 5Yz" O.C.E.W #3 C�? 5Y2" O.C. Horizontal #4 � 12" O.C. Vertical or Equal (6'-10') Design Notes: 1. All concrete has a minirnum compressive strength of 4000 psi ot 28 days. 2. Type II Cement. 3. Reinforcing steel is Grade 60 rebar or grade 65 WWR with 2" minimum cover unless noted otherwise. Conforms with Index 425-001 and 425-052. 4. Lifting holes taper from 2 1/2"� to 2"ro. 5. All pipe openings shall receive 1— extra #4 bar each side & above pipe opening. Bars to have 1 1/2" min. hole cleorance. Side bors to overlap top bars 3" min. Top bar to overlap side bars min. 6". Corner holes shall have 4 extra #4 bars obove the hole (continuous around corner evenly spaced). Tie to the outside of vertical woll reinforcement. Grate: 21.50 N. Inv: 16.10* S. Inv: 16.10 E. Inv: — W. Inv: 18.00 Bottom: 15.10 S-4 Weight—Top Slab TYPE "D" INLET Base (6�-10') �E 8TH Street Drainage Improvements Okeechobee 1,500 Ibs 6,400 Ibs Section A—A AMERICAN CONCRETE INdUSTRIES� INC. 350 North Rock Road / Fort Pierce, Florida 34945 (772) 464 1187 fax (772) 595-9050 Two Extra #4 Ba Each Side of Openir A L � 49" 6.� 3�„ 6,� i------------i 1 I I I I I I � I r� I ✓� � ' rY I ,� I C�� I I I I I I I 1 �-------------'-� ' �. � ' �.. .�. .. .. - � . �• Design Notes: 1. All concrete has a minimum compressive strength of 4000 psi at 28 days. 2. Type II Cement. 3. Reinforcing steel is Grade 60 rebar or grade 65 WWR with 2�� minimum cover unless noted otherwise. Conforms with Index 425-001 and 425-052. 4. Lifting holes taper from 2 1/2"� to 2"0�. 5. All pipe openings shall receive 1— extra #4 bar eoch side & above pipe opening. Bors to have 1 1/2" min. hole clearonce. Side bars to overlop top bars 3" min. Top bar to overlap side bars min. 6". Corner holes shall have 4 extra #4 bars obove the hole (continuous around corner evenly spoced). Tie to the outside of vertical woll reinforcement. E.O.P, � � �-IN � M � RL US Foundry /�5106-6149 Valley Frame ond Grate #4 Bars � 11" o.C.E.W.J Section A—A 2—#5 Hoop Bors (2 Lap splices permitted) 24"0 Hole Up 9" For 18" A-2000 Up 12" A � J Brick to Grade By Contractor �#3 � 5Y2" O.C.E.W #4 � 12" O.C.E.W. /_Or Equol (0'-6') 24"�b Grate: 21.20 N. Inv: — S. Inv: — E. Inv: 17.70 W. Inv: — Bottom: 16.70 S—�j Weight—Top Siab: 1,500 Ibs � TYPE "D" INLET Base: 4,800 Ibs n (0'-6') SE 8TH Street Drainage Improvements Okeechobee A � AM ERICAN CONCRETE I Nd USTRI ES� I NC. 350 North Rock Road / Fort Pierce, Fiorida 34945 (772) 464 1187 fax (772) 595-9050 Two Extra #4 Bars Each Side of Openinq, � e �I � � 49" 6" 37" 6" 30"4 Hole Up 9" For 24" A-2000 Up 12" \ �� � � 2—#5 Hoop Bars r- s— — -�- � (2 Lap splices permitted) I I I I / �� /�' �/ I I I 1 L I I 1 I I I 1 1 I I 1 I I 1 1 I I �l�'l���J A � �.. •�. •. �. .. - � • i• �"'30"0 Hole Up 9" For 24" A-2000 Up 12" Plan Vew �. 24"0 Hole Up 28" For 18" A-2000 Up 31" *Note: Grote elevation not provided. Elevotion 21.20 used. Please advise. US Foundry #5106-6149 Valley F�^•^� ^^�+ r_..,ro E.Q.P. � �-IN 24"� � � � N � #a ea�s RL �Rrir4 to Grade ;ontroctor #3 � 5YZ" O.C.E.W #3 � SY" O,C. Horizontal #4 � 12" O.C. Vertical or Equal (6'-10') Design Notes: 1. All concrete has a minimum compressive strength of 4000 psi at 28 days. 2. Type II Cement. 3. Reinforcing steel is Grade 60 rebar or grade 65 WWR with 2" minimum cover unless noted otherwise. Conforms with Index 425-001 and 425-052. 4. Lifting holes toper from 2 1/2"� to 2"�. 5. All pipe openings shall receive 1— extro /{4 bar each side & above pipe opening. Bors to have 1 1/2" min. hole clearance. Side bars to overlap top bors 3" min. Top bar to overlap side bars min. 6". Corner holes shall have 4 extra #4 bars above the hole (continuous around corner evenly spaced�. Tie to the outside of vertical wall reinforcement. Grate: 21.20* N. inv: 16.10 S. Inv: 16.10 E. Inv: — W. Inv: 17.70 Bottom: 15.10 S-6 Weight—Top Slab ?YPE "D" INLET Base (6'-10') �E 8TH Street Drainage fmprovements Okeechobee 1,500 Ibs 6,000 Ibs Section A—A 29 1 /4 53 1 /2 5 1 /4 19 1 /2 - 46 NOTES: 1- MATERIAL: 2- FRAME WT: 3- GRATE WT: 1/2 ASTM-A48 CLASS 35B GRAY IRON. 350 LBS. APP. PER SET. 240 LBS. APP. PER SET. 3/4 29 1 /4 22 22 � J," � -. -.. , � � � ONE PIECE GASKET INDEXING 1 VALLEY SCOPE 4" THRU 10" DIAMETERS = 12'-6" 12" THRU 36" DIAMETERS = 22'-0 OR 14'-0" NOMINAL AVERAGE AVERAGE PIPE MINIMUM DIAMETERS �'�' O.D. (BELL) AVERAGE STIFFNESS FLATTENING (IN.) �S��N �T� (IN.) I.D. (IN.) (PSI) ��) 4 4.3 4.9 3.9 46 40 6 6.4 6.9 5.9 46 40 8 8.6 9.3 7.9 46 40 10 10.8 11.7 9.8 46 40 12 12.8 13.9 11.7 46 40 15 15.7 16.9 14.3 46 40 18 19.2 20.6 17.6 46 40 21 22.6 24.6 20.7 46 40 24 25.6 27.9 23.5 46 40 30 32.2 35.1 29.5 46 40 36 38.7 42.3 35.5 46 40 THIS SPECIFICATION INCLUDES MATERIALS, TEST METHODS AND INSTALLATION REQUIREMENTS FOR 4 TO 36-INCH DIAMETER POLYVINYL CHLORIDE (PVC) CORRUGATED PIPE WITH A SMOOTH INTERIOR. THE REQUIREMENTS OF THIS SPECIFICATION ARE INTENDED TO PROVIDE PIPE AND FITTINGS SUITABLE FOR UNDERGROUND USE IN NON-PRESSURE APPLICATIONS SUCH AS SANITARY SEWERS, STORM SEWERS, DRAINAGE AND UNDERDRAINS. PIPE PVC CORRUGATED PIPE WITH A SMOOTH INTERIOR SHALL CONFORM TO THE REQUIREMENTS OF ASTM DESIGNATION F949. PIPE AND FITTINGS SHALL BE HOMOGENEOUS THROUGHOUT AND FREE FROM VISIBLE CRACKS, HOLES, FOREIGN INCLUSIONS OR OTHER INJURIOUS DEFECTS. PIPE SHALL BE MANUFACTURED TO 46 PSI STIFFNESS WHEN TESTED IN ACCORDANCE WITH ASTM TEST METHOD D2412. THERE SHALL BE NO EVIDENCE OF SPLITTING, CRACKING OR BREAKING WHEN THE PIPE IS TESTED PER ASTM TEST METHOD D2412 IN ACCORDANCE WITH ASTM F949 SECTION 7.5 AND ASTM F794 SECTION 8.5. THE PIPE SHALL BE MADE OF PVC COMPOUND HAVING A MINIMUM CELL CLASSIFICATION OF 12454 AS DEFINED IN ASTM SPECIFICATION D1784. FI TTI N GS: ALL FITTINGS FOR PVC CORRUGATED SEWER PIPE WITH A SMOOTH INTERIOR SHALL CONFORM TO ASTM F949, SECTION 5.2.3 OR F794, SECTION 7.2.4. TO INSURE COMPATIBILITY, THE PIPE MANUFACTURER SHALL PROVIDE ALL FITTINGS. JOI N TS: ALL JOINTS SHALL BE MADE WITH INTEGRALLY-FORMED BELL AND SPIGOT GASKETED CONNECTIONS. THE MANUFACTURER SHALL PROVIDE DOCUMENTATION SHOWING NO LEAKAGE WHEN GASKETED PIPE JOINTS ARE TESTED IN ACCORDANCE WITH ASTM TEST METHOD D3212. ELASTOMERIC SEALS (GASKETS) SHALL MEET THE REQUIREMENTS OF ASTM DESIGNATION F477. CONTECHID# 0000 � -``'''� THIS PRINT IS OWNED � Aa�'� �CA�� BY CONTECH �� � , �= � ���� CONSTRUCTION � � .. � � � `� �7 PRODUCTS INC. AND � COIVSTRUCIION PRODUCTS INC. MUST BE REfURNED � 9025 CENTRE POINTE DRIVE, SUITE 400 UPON REQUE57. NOTTO j WEST CHESTER, OHIO asoss BE COPIED. PH: 1.800.338.1122 FAk: 513.645.J399 = rrl f'l1PVRT!'_AT A-2000 PVC DRAINAGE PIPE PRODUCT SPECIFICATION FOR (F949) PVC PIPE (ENGLISH) SCALE: N/A DRAWNBY: FAM DATE: 10/10/O8 REV. BY: - DATE: - SHEEf: 1of1 f" +�li" , '-�'�' - . � I����� ��H^4�"" ' 1�,, . � � . . - -- ��� :;;� ;. ��i ��.' � .� . _,., �ti � � r; � � �,G. L i � + 4��, _ '4 � ' , '. �� n ,�.4 � � x����'�' i,. '��, c .y� '�i1' j�� k � �' • -�j_ � yRri�� ^�' `�c . "�' , *J. ; � , } K. M^i' R� l' r. � `a ,.. : X, {q� -.�F �; yy, � . � . �.a�•,� �j�, � , ,,.�� � . � �a�� ��� A��#�:5 F_ .. y'. � , "� � , � ]. �� � � � � �� �. �+ :� ,` ��r!� .. � , y,.,� . -.,. ._.�; � � f ' . � �. � „�w; . 1, � �' � � • o .y. "� �w. _.' ' _� . � ... _ .� ._ t` . _ " __._... � —_ ... .�. �.. ---..un,� . _ . . _.. . _; . .,.... , . � ' _.._.. ... _ _" \\ � // � C=..,NTECF� ENGINEERED SOLUTIONS ,�s ..,n �� A-2000TM PVC Pipe for Storm Sewers and Drainage t C=�-����� IVTECH�� �a�����: ����'�:��+����C::�:�� �A-'?��"C�TM �r�!�n��►� p��P 3 ,.� Drainage systems are required to meet muftiple criteria. The choice of a particular material depends upon a number of factors; however, the best choice is the one that yields the best performance over the project life cycle. Thermoplastic Storm Sewer and Drainage Pipe In recent years, the use of thermoplastic pipe for stormwater drainage systems has gained wide acceptance—based upon performance and economic advantages when contrasted with more conventional drainage pipe materials. There are distinct differences between A-2000 Polyvinyl Chloride (PVC) drainage pipe and other drainage pipes that can affect overall pipe system performance. Contech�A-2000 PVC Drainage Pipe: Available in Diameters 4"-36" and 14' or 22' lengths. Originally developed in the early 1980's, A-2000 has built an outstanding performance history that's setting the standard for gravity flow, sanitary sewer applications. The material advantages offered by PVC—plus the innovative, double wall design with the unique, patented gasketed joint system—makes A-2000 the ideal choice for stormwater drainage systems. Now you can have all of the advantages without the limitations of HDPE or reinforced concrete pipe. „., � . F:� �. �' �� a.; - q�,p1 ;�.�$ ��" i •_..�: .�. � ..:: � Campad A-2000 PVC profile is stable and not subjed to local buckling like HDPE. Strength A-2000's PVC compound provides 6 times greater long-term ` material stiffness as compared to HDPE . drainage pipe materials. And A-2000 pipe, UNLIKE HDPE drainage pipe, has a minimum 46 pipe stiffness for ALL diameters. Minimum Specified Pipe Stiffness (73°)* i � � �_ — I � -- i � *Actual A-2000 pipe stiffness values are 50 psi Better deflection control When compared to other thermoplastic pipes on the market, A-2000 stands up to the test. In fact, it comes out on top. When installed in accordance with ASTM D2321 , A-2000 provides excellent shape control (performance). The difference beiween effective pipe stiffness of A-2000 and HDPE drainage pipe during construction on a summer day can result in A-2000 being as much as 3 TIMES STIFFER. This significant stiffness advantage, com- bined with PVC's lower strain sensitivity and temperature sensitivity, means A-2000 can be installed with conventional flexible pipe practice and not experience excessive shape distortions. _'� � , � ,,� � 2 _— � � �<:. � ,,� ,, ` ,' � ; . ,1: � t ,`'*,, `, Heights of Cover A-2000 PVC pipe can be us�d with 1 �oot of cover under high�n,ay loading. Current AASI-ITO LRFD Design Methodology has requi«��I all thermoplastic pipes to have a minimum height of cover of 2 feel under pavement. This requirement was derived from a Minnesota DUT Research Report (2005) that studied HDPE pipe performance under highway loadinc�. The reporf Indicates significant thermal expansion of HDPE pipe under shallow fills. PVC pipe was not incorporated in this study, and it should b� not<:cl that HDPE experiences four tim�s more thermal expansion than PV:.;. �' - r� � . ` ����� � � `� J , �� �'JI ` � � � , �'�"'J��.. �.�--- �� � ,�_,—�....� �t � ��������i���}i; �,i il„ �il��Jii�i�d�. �.�rrYll7r�� ; � � � � � ��11,� .�� �� �i��\v �: ;,�� � � � A comparison of cover heights using AASHTO design methodology and H20 live loading for A-2000 and a major � manufacturer-'s M294 HDP� n+ne <-re ;�;mmc�reze�l 4�.n!n��i. 3 A-2000 vs. M294 HDPE (AASHTO Heights of Cover) n; �v�rv�n�[�}�;r \,r1,'�,�rr, � ��� _ �,a�;;...�•; ; PVC materials used in the manufacture of gravity flow pipe offer excellent resistance to conventional corrosion and abrasion. In fact, profile wall PVC pipe has been shown to have better abrasion resistance than reinforced concrete pipe in side-by-side laboratory testing at California State University. PVC and HDPE do noi provide equal long-term durability performance. Under loading or localized tensile stress, some grades of HDPE are subject to environmental stress cracking—also known as slow crack growth. Exhibited as premature rupture, this phenomenon can occur when stressed HDPE plastics are attacked by a reagent (even storm runoff) that causes cracking or rupture at stress levels well below design performance expectations. PVC pipe is not threatened by this rype of cracking. When you consider durability and service life, A-2000 PVC far exceeds the performance characteristics of HDPE drainage pipe. (See the National Cooperative Highway Research Program study conducted by Drexel University, March, 1999: "HDPE Pipe: Recommended Material Specifications and Design Requirements".) t �� 1 . � � �� �� `i, � � �� � � � � � � � �. �� �� � ����� � � � �. ;�,' �.�..r, - � � �: � � �,. �, �� ��; �� �� r-, � � ,. �� ._ :� _ _�.,: . � � p✓ " ,��� . � � �I; � � ' �,.�- ... ` � � _'.,, ;.:�,�,` ^ � - _- _ - ,_.... ' � �• r � . r 4 '���>��raulic Efficien� A-2000 vs. Concrete Pipe Thermoplastic pipes, w�rh smoother interiors and fewer joints, reduce resistance to flow and are hydraulicall,� more efficient than conventional (i.�::., RCP) storm drainage pipe materials. Flow testing conducred in 2002 by the Utah Water Research Laboratory concluded � � i s . t,�� , A-2000 PVC Pipe, with its inner wall formed ����� �`����`�� over a polishecl mandrel, has the lowest �£,;; wall friction factor (Manning's "n" _.009� of any ; thermoplastic pipe available and offers real advantages compared to RCP (n =.O l 2- .O l 3j. This added efficiency means A-2000 can be designed as a smaller and less expensive pipe, with less excavation due to flatter pipe slopes and less manhole/jund�l�,n h��x dep�h r.=�r,uir��ir�nt�_ A-2000 vs. HDPE Pipe Hydraulic tests performed a� a rn�al�r �Jnitec, �� ,��::s ,A� � Research Loboratory led researchers to conclude that H�;1='� drainage pipe's "n" factor varied °depending upon the smoothness of the liners" and °fhe bonding of the liner to the corrugations made tlie pipe interior somewhat wavy." Once installed, HDPE pipe walls are subject to local buckling �NCHRP Report 438) and the measured waviness increases wirh load. Using the method derived to estimate the effective Mannii�g's "n" factor, Manning`s "n" values of 0.017-0.022 provide a more accurate representation of HDPE's hydraulic efficiency when in-service and under load A-2000 PVC pipe, with its engineered, stable profile, is designed to NOT buckle. �Fs�rn you're select�n� a sys�iem �iasec� ao-� hydraulic efficiency, A-2000 PVC pipe far ��«��^-c^�^� the perforera�r��p !fi�^�a ;�H�+�s �!� �?I4�D'� �v^�' dr�sss�:a�e � <i'' ��, : i /� � ,. � _.�� , _ _ _ �, i� ;r _. C �� � � � � ,.�..+�� � ; : :r .. � � � _ �..- . .��� . _ ��� :+ � � � �f. � „�- . '� u Yr, , ��� _ . .. � � ���. _ _. . _ ��. � .:,;,�..�.._ � � _ a ��,:,. � J %-�� � `` ., !: } '� Y :� N,�� ;`"'� , ,� ;; � .'�_ z r,y '4 � . i• ; a . ,;; ' w f,� I•� �X � e,��; � �� �.�����, .. f�-4vI 5 . R��+ P:n� �� +�� P ���+ _ _- - $ k� �-,�. �����-�..�-��� The Need for Tight Joints Storm sewers have always presented special needs for tight jointing systems. Because of their function, they are subject to rapidly changing flow levels. The sudden rise and fall of flow levels leaves storm sewers susceptible to backfill migration into the sewer unless tight joints are used. This loss of backfill reduces the soil support of the pipe and causes settlement at the surface. Where storm sewers are below the existing water table, water tight joints are needed to prevent infiltration and maintain storm sewer capacity. A-2000's long, 22-feet lengths and soil/water tight joints clearly make it the preferred choice with regard to system tightness. In comparison, RCP has many joints—increasing the opportunity for soil infiltration and settlement. And with A-2000 you don't have to specify special jointing requirements Watertight gasketed joints are standard with A-2000. � � „ ��� // ..� � :�;; -�4+� � � � � �,�-�—•--S f ti � . ; i�, �+ ' _ : e, �.�.L, ,,4, „� � Constant Stiffness Thermoplastic Pipe 1.0 PIPE: Polyvinyl Chloride (PVC) storm sewer/drain pipe and fittings shall be manufactured and tested in accordance with ASTM F949. 2.0 MATERIAL AND DESIGN: The structural design of thermoplastic pipes shall be in accordance with AASHTO LRFD titled: "Buried Structures and Tunnel Liners." To ensure long-term design strength properties, PVC pipe shall be manufactured from 12454 cell class material per ASTM D1784. Pipe and fittings shall have a minimum pipe stiffness of 46 Ibs./in./in., when tested in accordance with ASTM D2412. Handling and Installation A-2000's easy handling weight and the availability of up to 22-feet lay lengths often result in reduced labor costs and more economical installation. Compared to heavy-weight and short-length RCP, A-2000 can be installed with greater ease and lower cost. And contrasted to HDPE, A-2000 has added beam strength—which means better line and grade control, increasing crew efficiency. Plus, A-2000 requires less trench width, lowering excavation costs and speeding installation. The Performance Choice With the increasing demands on our drainage and storm sewer systems, products designed and proven to provide the best performance over the project life cycle are needed. A-2000 PVC drainage pipe offers all of the initial cost advantages associated with thermoplastic pipe when compared with RCP but without the performance limitations oF HDPE drainage pipe. There's no reason to compromise on performance—Selec+ A-S000 PVC: The Besf Sform Sewer and Drainage Pipe on fhe Planef. 3.0 JOINING SYSTEM: Joints shall be an integral bell- gasketed joint. When the joint is assembled, it shall prevent misalignment of adjacent pipes and form either a soil tight joint (2 psi hydrostatic test per AASHTO Standard Specification for Highway Bridges) or a watertight joint (10.8 psi test per ASTM D3212 titled: "Standard Specification for Joints for Drain and Sewer Plastic Pipes using Flexible Elastomeric Seals") as required. 4.0 HYDRAULICS CAPACITY: The PVC Pipe covered in this section shall provide a Manning's "n" value of .009. 5.0 INSTALLATION: Thermoplastic pipe and fittings shall be installed in accordance with AASHTO Thermoplastic Specifications or ASTM D2321 . 0 Additional Products & Applications A-2000 for Roof Drainage Systems Managing large volumes of slormwater runoff from roof areas of industrial, commercial and warehouse facilities is more demanding than for most gravily-fed sewer systems. • High strength • Tight Joints • Unique gasket and bell design A2'" Liner Pipe for Trenchless Rehabilitation Utilize A2 Liner for your aging underground infrasiructure —the proven, trenchless solution to sliplining existing sewers and culverts. Contech developed A2 Liner Pipe for sliplining deterioratin� pi�elines where open trenching is r�oY practical or desirable. • Diameter ranging from 12" - 36" • Standard lengths ranging from 2.5' to 20' • Light weight • Installed cost savings A-2000 Perforated Pipe for Subdrainage Systems Contech A-2000 offers several critical features cand benefits that make it the perforrnance choice for subsurface drainage systems: • 46 psi pipe stiffness for structural stability and improved deflection control. • Glossy smooth interior for improved hydraulic capacity. • PVC rigidity that provides essential beam strength for improved line and grade control during installation. • Positive-gasketed jointing system. Standard perforations for 4"-18" diameters are slots, while perforations for pipe sizes 21 "'-36" are circular 3/A" diameter �.375") holes. Fully perforated A-2000 is also available for even greater open ar�a. ,� 'A�� M :����� ��� �'':-��„- ��'� --. �.�+ ,-,�,�w�Y ��� � 3 . v_� _...._ . . ::..�- = '' �� f } ,_ - � i� ��s�:., �`���.�., . � \ �, f. i }�_ � \ �� ������� 7 � ,` _ �_� � � �� �� � � � �� � , 'I f I ��_pl��i_i' I_6;; _,�,�.�_'_�' �_i�:�; - � � , i..'J;I .,� ...�1 "i[ IC-'l fl ;(�_ I_ , ..i. I li... �. .... . _.{ � �C.l ,. ,. �, . li —�d'9 C4J .,ft��l 'P:,r _.�I I'.�t',� ., c,n:a _ ,�.,i i��i rJ�t��� [�ir I,:�"';C�'<l� ���4<<i'! ��i ���;. i__, '�J��u , ,,'sod. t��.�;�r�':r I rp,�,�r , ;���eii � �t � ci,�,�<vn Ct�rt' �i �,,., �s n 1�'€:�r�, �t,ii ds= �,... .�v nr � 57C; ii� ,'r��r � 7C �`p.��.i _� � a,�, .:_l5. II�� � � '�� _, : I �_ `V �` I J'_ II�I�� '� � ,; � ,; L'L iJ P� ; _ � _ ,—_ . . ...._...__. �ti ii�i_ � ��� �, � I I �_�;��-� ,. �r_; ; ��, �_ _ ;i � . _� ��1.,�����_����'y r. � <, : ib �`oili ornia �I� �vi I�i Ui;� .- ��. ^ ��3 ;� I, �.�cJ�'c�t"1.G1J�(..� V'i�;�.�1�� r'.�C) :,37:'-ci`t.�,:i `.x"�� ` k=1oe� 3c� j�?�I�E7d�) 37 �?.:�,. ��; '1 0 ��, IVIf,l6 �)Cr.:,.��f��3 -:X1C]t.,i� {f,�? ;��.'-s,� _ ` c � _ ey�.,� . �.'• � �,_ . --. �✓I<���� .elL�ri�iiii�:."�) �4��s-�;�a'�^`�,�' �S= � ,•�}� .�� a � ' �y 5 � - ' � •, ., _ ¢ �' �'x' .� Je�' � =orS� �ii['1) , i � � ±� � r. �`� i �I1. !� , „ d � ; , � �i � i li --- ' __._ _ _ __ _ _ _ . ;.� ' _ � _: . _ ' . . � . � .i �NO'.. � l _ ;":+�1'v � LI D i\:�� '.PF.?I`d i '�� I,. .. � . . , , i .. �•:Ir I � 9E�( �w..n �f I :s-}W i �.,-.I_'-,7i�,+,-. - . . , . . ., , . . i i � � . � .. ,.kk�ru�ll �r_;(�' � 3ll_.�I�Y �„V"1Y;..;�i�-., „ . � �� ' � � . . . �. �� � �cF-', i II^i��i[pJ� ,t ��L? C� I� .. ;,�.I. ., � , � . . , .. , . i��� i iifCl r m.�.r C>` ", ...� �.. . ... �� .. . . � � � . . 141.k1 �-Iltl _ _.� - . , . � . . , �� � � �(-]� �� '� i . . - . � , I l 5 � � - � � � - �� I . _ �.� r li - . . �. . . . , , �. , � ., . � r i%iVll ��.� q .— � , , , ,�v;� ' � .. ,� . �.._ � . Patty Burnette From: Sent: To: Cc: Subject: Attachments: Marcos Montes De Oca Thursday, February 18, 2021 12:07 PM Michelle Baughman <bbsitedevelopmentinc@gmail.com> (bbsitedevelopmentinc@gmail.com) Patty Burnette; David Allen; Robin Brock SE 8th MOT SE 8th shop drawing 2.pdf See the attached shop drawing returned for the MOT Please give public works 48 hours heads up before implementing this plan Thank you Marcos Marcos Montes De Oca, P. E. City Administrator � ���� ��� �� ������ �_ _.,,,.�+�` r e.�� P. � ra �� i. i 4 55 SE 3rd Avenue Okeechobee, FL 34974 Phone: (863) 763-3372 x 9812 Cell: (863) 801-0177 FAX: (863) 763-1686 Email: marcos c� cityofokeechobee.com Website: www.cityofol<eechobee.com NOTICE: Florida has a very broad public records law. As a result, any written communication created or received by the City of Okeechobee officials and employees will be available to the public and media, upon request, unless otherwise exempt. Under Florida law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request, do not send electronic mail to this office. Instead, contact our office by phone or in writing. � __ City of Okeechobee �� � 55 SE 3rd Avenue ��� Okeechobee, FL 34974 �-�' � (863) 763-3372 SE 8t'' Drainage Project Bid No. TW 02-00-12-20 City of Okee. Shop Drawing Review Form Shop Drawing Submittal No. 2- Maintenance of Traffic Accepted �— '7- -- .. Accepted as Noted Not Accepted Amend and Resubmit Review Not Necessary Review and acceptance is only for conformance with design concept of the Project and general compliances with the information given in the Contract Documents. Contractor is responsible for dimensions, sizing, materials, and compliance to be confirmed and correlated at the job site, for the information that pertains solely to the fabrication processing or to techniques construction and for coordination of the work of all trades. Review and acceptance does not relieve the contractor from compliance with the contract drawings and specifications. Reviev Date: '�� / 2021 2/15/2021 �� ,�C� S1 Go gie Maps - 1��l�lgreens P�toto � U��c� tl`- � A�3U ��� .`r'�.,� r�, 5pirit= ��'- --- �hr•� j,y'���1��;(?:��t� S _ ��� - - - _--- � Q �o�. ��T��t , P'Q � -�t�McG� - - --- __ - r�i �iif��(i .�� ..:�-:: _ _ __�_ � a— Q _ .�.�:,�ly `., �. � i _`Ketl :- �' - PpStB) SefViC� � � Joe 's Su reme � Y p . �8�' E3��ffalo ���.� t�w , � .,; Wendy�s � � f � %�{ � � - P�zza & Subs II �LL �' �° Hampton Inn Alex S�rum GMC �����r s� ^ ` �' � ; Motor Homes, inc D � = � � � ..� � Okeechobee - Lake... y3Y r-, G ! D ? � � r � SE 2nd Si aa � �. • � �C 2nd �: q Pizza Heaver � � Domer's Q _ e SE 3ri St SE 3rd St )� � �jW ��.�) Si ��. Q��1 .�'r . _ . .. . . Arby's P � i � a D ; SE 5th St � Bucio Chine�� �� 6i� �� �% Beet '0' E3rady'�- �Goiden Corra: 8uffet � Gril! � �� - � s. � � _ e � ._ , � � . - . �,� ��� �e�/ ,� ����`��� � _-� \ 1 �_� � �4w�tt -.,,-.: ,,-;p.�,�^-,cr' tV�''? � Canvas Shop - � � �` � � �. � � �� � � �1,��? v�.+o�ti� Google Maps J � . m c,.� � 54 4� Mi:{ V � .:::.�':.,� �.'� SCiOQI � Kaiiedoscope Studios � � :� � SE 5t� Si m � t��t�� p�CC�� �� � � D _ _ . _., _,. s� �;� st Hope Ministry Center A Church-Cad �G � ���� _ G. _��'� s � ,,,, , i" �� v� � �2 ( - �7 �- •q � W&W Lumber � � � of Okeechobee 7°� :� f --__ _ _ RaceTrac Q _ _ � c��,tvr st � � ��� � . ,_; Sc 9ih S# SE 9th Ct �. � . . ;; ���' sr ���, st � >� v�:f� t'Cii.3�� �Si � � Homeowners Association � � Go gle SE 5ih b..n ; � . !"" CcV Y � / �Gf l •.t � � �..� �= ��� �-=�y w/ G�u-7Z''''d1'� ! I � �� Cr�{/ff U� /�S �/n/ �t \ / � / �j// . � z/� ��� ( .:,r: � y � � � _._ f � Map data 02021 500 ft.�.-,�...am„=,,.�„„; � � ittps://www.google.com/maps/@27.2393072,-80.8182935,16z 1/1 e Patty Burnette From: Sent: To: Subject: Attachments: Michelle Baughman <bbsitedevelopmentinc@gmail.com> Thursday, February 18, 2021 1:36 PM Patty Burnette; Philip J Baughman City- 8th Ave- Submittal Cascade Separator City 8th Ave- Submittal Contech Cascade Structure.pdf Patty, Good Afternoon ! Attached is the submittal for the Cascade Separator. Please return once reviewed. Once we receive it back stamped by the engineer we can then get it scheduled. Thanks so much. Michelle Baughman, President . .. . .. .... ............ � _. _._. _.__. _ _ i � CiTy of Okeechobee 55 SE 3`d Avenue Okeechobee, FL 34974 (863)763-3372 SE 8t'' Drainage Project Bid No. TW 02-00-12-20 City of Okee. Shop Drawing Review Form Shop Drawing Submittal No. 3- Separator Detail Drawing Accepted ,' Accepted as Noted ` Not Accepted Amend and Resubmit Review Not Necessary Review and acceptance is only for conformance with design concept of the Project and general compliances with the information given in the Contract Documents. Contractor is responsible for dimensions, sizing, materials, and compliance to be confirmed and correlated at the job site, for the information that pertains solely to the fabrication processing or to techniques construction and for coordination of the work of all trades. Review and acceptance does not relieve the contractor from compliance with the contract drawings and specifications. Review Date: �7�/ 2021 a a 30"H x 4" FRAME AND COVER CONTRACTOR TO GROUT TO FINISHED GRADE CONTRACTOR TO PROVIDE GRADE RINGS/RISERS CYLINDER EXTENSION INLET 1 24"� A2000 (30"AJ OPENING) CASCADE CYLINDER INSERT SECTIONS CONTAINING INTERNAL COMPONENTS ARE DELIVERED MECHANICALLY ATTACHED SOLIDS STORAGE SUMP INLET 1 � PLAN VIEW (INTERNALS NOT SHOWN) ----1—L-- I � I I � I �, �\ � �\ i i J I I� I 11\ � i �� I o f i .��,, � i , — -- --� � ! E I I I � I I I � I 7 � � � j I I .� L� I I I � �_� . I--T_1 � C j� � I �T �� I I I I � I I I L---- ----J � 4'-10"Pl � ELEVATION VIEW �/ OUTLET 1 G � OUTLET 1 24"fd A2000 (30"eJ OPENING) PERMANENT POOL � 0 m � CASCADE FIBERGLASS INTERNALS SECTION FOR PIPE ORIENTATION (TOP SLAB NOT SHOWN) RIM ELEV. 21.50+/- �/ TOP OF SYSTEM ELEV.20.44' f MATERIAL LIST (PROVIDED BY CONTECH) COUNT DESCRIPTION INSTALLED BY 1 CS-4 FIBERGLASS CYLINDER INSERT, STD. CONTECH 4 CS-4 ALUMINUM INSTALLATION BRACKET CONTECH 1 CS-4 FIBERGLASS CYLINDER EXTENSION, 3 FT. CONTRACTOR 1 SEALANTFORJOINTS CONTRACTOR 1 30"PJ x 4" FRAME 8 COVER, EJ#41600484, OR EQUIV. CONTRACTOR GENERALNOTES 1. CONTECH TO PROVIDE ALL MATERIALS UNLESS NOTED OTHERWISE. 2. FOR FABRICATION DRAWINGS WITH DETAILED STRUCTURE DIMENSIONS AND WEIGHTS, PLEASE CONTACT YOUR CONTECH REPRESENTATIVE. www.ContechES.com 3. CASCADE SEPARATOR WATER QUALITY STRUCTURE SHALL BE IN ACCORDANCE WITH ALL DESIGN DATA AND INFORMATION CONTAINED IN THIS DRAWING. GONTRACTOR TO CONFIRM STRUCTURE MEETS INLET 1 INVERT REQUIREMENTS OF PROJECT. ELEV. 16.10' 4. TRUCTURE SHALL MEET AASHTO HS-20 LOAD RATING, ASSUMING EARTH COVER OF 0' - 2', AND OUTLET 1 INVERT GROUNDWATER ELEVATION AT, OR BELOW, THE OUTLET PIPE INVERT ELEVATION. ENGINEER OF RECORD TO ELEV. 13.D0' L— CONFIRM ACTUAL GROUNDWATER ELEVATION. CASTINGS SHALL MEET AASHTO M306 AND BE CAST WITH n� THE CONTECH LOGO. � v ✓� 5. CASCADE SEPARATOR STRUCTURE SHALL BE PRECAST CONCRETE CONFORMING TO ASTM C-478 AND �� � L D AASHTO LOAD FACTOR DESIGN METHOD. �� `L�,�,� INSTALLATION NOTES /� A. ANY SUB-BASE, BACKFILL DEPTH, AND/OR ANTI-FLOTATION PROVISIONS ARE SITE-SPECIFIC DESIGN f/ � p.� T�j� y CONSIDERATIONS AND SHALL 8E SPECIFIED BY ENGINEER OF RECORD. OU SIDE BOTTOfy. B. CONTRACTOR TO PROVIDE EQUIPMENT WITH SUFFICIENT LIFTING AND REACH CAPACITY TO LIFT AND SET ELEV. 8.50' ./ THE CASCADE SEPARATOR MANHOLE STRUCTURE. C. CONTRACTOR TO ADD JOINT SEALANT BETWEEN ALL STRUCTURE SECTIONS, AND ASSEMBLE STRUCTURE. D. CONTRACTOR TO PROVIDE, INSTALL, AND GROUT PIPES. MATCH PIPE INVERTS WITH ELEVATIONS SHOWN. ALL PIPE CENTERLINES TO MATCH PIPE OPENING CENTERLINES. E. CONTRACTOR TO TAKE APPROPRIATE MEASURES TO ASSURE UNIT IS WATER TIGHT, HOLDING WATER TO FLOWLINE INVERT MINIMUM. IT IS SUGGESTED THAT ALL JOINTS BELOW PIPE INVERTS ARE GROUTED. STRUCTURE WEIGHT APPROXIMATE HEAVIEST PICK = B500 LBS. OF 2 PIECES MAXIMUM FOOTPRINT = 4'-10"0 CONTECH CONTRACT DRAWING BARG LAYOUT 1A a�a��YEu aS���Ee as� €`g„oa €�nuE�LLos $sa v�� F;��tE_�- �g= _ °- _��c�i 3` v€ �2p°cEUe��. 2avEG-ar-� >ma`a�'" c��L°=n�nc _ �n'A�`v,�nE e��ugy aeo - _ o� v a � o �a�o?:€ae ��A%EA= z 0 � U � W ❑ z 0 � w z � 0 H Z � W � � W Z � W O � � � � I-- � � m W V � QO00� _ � � Q w O � �wU � � O W w Uiw �� � � I-- � � � O � e w o� �� o J rj ] N � $ ^� � Z w � � � O o �0 ii� 5 ° � WAoQ� J Q r�$U �, �v�i d LL �^ N Z����� � U N � Q ����� W � � �iu�Z ��(� � W ^ � 02/17/21 JAK CEN CHECKED: APPROVED' JAK JAK PROJECTNa.' SE�UENCENo.'. 658681 10 SHEET 1 oF 1 t-�„ �, J.D. A A DETAIL B TM10 dosign and Informalion shown on ihis drawing Is piovitleE m �u IM1a piojocl ownar, anglnoa� nnd mnlraqe� by Conlech�Enpinoeretl Salutions LLC. o� ona ol its allilialotl mamw��e: ('cem��n•). Nonno. m'�: a�n.,;�s, ��� aoy p�n o�aoi, may na mad, rop�oaucoa or moa�roa m��y m���a� 'IhaullFo prior writton eansenl al Conlech. Failure lo comPly Is tlonv al lha usor'S own ri5k antl Conlvch eRpressly tlisc�aimz any rae�ry or ro�w�smuny mr :�on �:o. I/ distto a es be�ween ��e su liod inlo�malion u n w1ilcM1 p n PP Pa Iha drawin Is basotl antl adual �old cantlilions ara ca�unier a as s�m �re progros:�:, meso d�x«p��aas m�:� vanoa m co�mon �mmaa�moy m< <o-a.�w�uan oi m� dvsign. ComecM1acwplsnoliabililyle�designsbasatlan alhais9' incomplola or ina¢urala inlorr.ulion supPliotl by SECTION A-A A I 2018.09.24 REV � DATE INITIAL RELEASE DESCRIPTION 1808-3 IM. BROOKS ECN# I BY C�NTECH' ENGINEERED SOWTIONS LLC www.ContechES.aom 9025 Cenlre Poinle Dr., Suile 400, Wesl Chester, OH 45069 800-338-'1122 513-645-7000 513-645-79g3 FAX PART NUMBER CYLINDER HEIGHT OVERALL HEIGHT 325-003957 1' 1'3" 325-003958 2' 2'-3" 325-003959 3' 3'-3" 325-003960 4' 4'-3" NOTES: 1. MATERIAL: FIBERGLASS, ISOPTHALIC POLYESTER RESIN, CHOPPED-STRAND FIBERGLASS, THICKNESS 1/4" MINIMUM, MEDIUM BLUE PANTONE 541 2. MANUFACTURE IN ACCORDANCE WITH ASTM D4097, TYPE 1, GRADE 1 3. ALL INTERIOR AND EXTERIOR SURFACES SHALL HAVE SMOOTH RESIN FINISH 4. ALL JOINTS SHALL HAVE A MINIMUM 3" FIBERGLASS SPLICE ON BOTH SIDES OF THE JOINT INSIDE & OUT. ADDITIONALLY, EXTERIOR JOINT SPLICES SHALL BE 1/8" THICK AND ALL INTERIOR JOINT SPLICES SHALL BE 1/16" THICK 5. CONTECH TO PROVIDE DXF FILE CYLINDER EXTENSION CS-4 CASCADE SEPARATOR UNLESS OTHERWISE SPECIFIED rmeonNc�ereo�ecnor� DIMENSIONS ARE IN INCHES TOLERANCES: FRACTIONAL ± 1/16 ANGLES ± 1 DEGREE P + � TWO LACE DECIMA L _ 0.06 THREE PLACE DECIMAL ±0.030 325-003957 THRU 3960 M.BAUER M.BROOKS GPROVED BV DAiE� �F.AWN BY OniE: REv: 2018.09.24 2018.06.21 A N/A � SHEET 1 OF 1 �24.13 � �—{ 0.25 � I . � � : � ,�� 11 ',� CUSTOM LOGO 1/2" SAN SERIF BOLD FLAT FACE LETTERS �.���n��l� 7/8" DIA HANDLING HOLE (2) CLOSED �PICKHOLES 1 1/2" 6) 7/8" DIA VENT HOLES 1 /2" LUCIDA SANS UNICODE LETTERING �— 31 7/8" DIA 1 3/8" 3�4�� � �� I � � 1 ' 3" f I 26 9/16" DIA --I COVER SECTION 33 1 /8" DIA —� I- 32 1/8" DIA - I 1 3/8 �� r-- 4" � �2„ 1 3/8" 30" DIA - 32 1 /8" DIA —� 42" DIA FRAME SECTION BLANK TAG AREA /� �\ /��'11 a�,�=�r �.��, f�s•oducf �lumber 41600484 f��sign Features -Materials Cover Gray Iron (CL35B) Frame Gray Iron (CL35B) � � -Design Load Heavy Duty -Open Area n/a -Coating Undipped -�- Designates Machined Surface Cc�ifuc����n -ASTM A48 -Country of Origin: USA flflajor Com�d�e«��s 00180783 41600419 i�f"c^:1I1/�6i� �C�'V`'sO�G➢ 11/19/2007 Designer: DEW 6/20/2017 Revised By: DAE [�ssc�aa���r Weights (IbsJkg) dimensions (inches/mm) and drawmgs provided for yow guidance. We reserve lhe riohl tc modi(y specifications wilhoul prior nofica. CONFIDENTIP.L This drav✓ing is the property of EJ GROUP. Inc.. and r;mbodi2s confidenlial inforrr�ation. regisiered mads, pzlenis, trade secret informatior�. andior kna�.v hovr that is the prop2rty of EJ GROUP. Inc. Capyrighl r` 2012 EJ GROUP, Inc. All riyhis reser�ed. Gon�«cE 800 626 4653 ejco.com Patty Burnette From: Michelle Baughman <bbsitedevelopmentinc@gmail.com> Sent: Wednesday, May 19, 2021 12:11 PM To: Patty Burnette Subject: Re: Density Test Reports Sorry I just sent Candace at GFA a request to change. She probably used the form as a template from another job. Michelle Baughman, President � ..�. _. . .._._._.�__.�_ On Wed, May 19, 2021 at 12:03 PM Patty Burnette <pburnette@citvofokeechobee.com> wrote: ' Hi Ms. Michelle. On the attached Density Test Report the project name is reflected as Port St. Lucie CSD/CMT 11, Okeechobee, County, FL? Shouldn't this reflect the SE 8th Avenue Stormwater Conveyance Project? Thank you Patt� Nl. Burnette C'j. enera�Services Coord�inator Cit� of O�eec�o6ee 55 S� 3Y`� A.venue � O�eec(�o6ee, �F� 34974 P�one: (8 63� 763 -3372 ext. g 8 2 0 Direct: (863� 763-g8�o �Fax: (863� 763-1686 e-mai� �6urnette@cit�uofo�eec(�o6ee.com � tive6site: �www.cit�ofo�eecF�o6ee.com 11 IA,r� ' � - .. �:,,oYt::• ' Under Florida law, email addresses are public records. If you do not want your email address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by phone or in writing, Florida Statute 668.6076. CITY OF OKEECHOBEE ELECTRONIC DEVICE DISCLAIMER: Florida has a very broad public records law. Most written communications to or from local officials regarding city business are public records available to the public and media upon request. Your correspondence via e-mail, text message, voice mail, etc., may therefore be subject to public disclosure. ��, 5,►-r da., �. �: ���.t��� � C, ` ;�::!�S''� �� Patty Burnette From: Michelle Baughman <bbsitedevelopmentinc@gmail.com> Sent: Thursday, May 13, 2021 1028 AM To: Patty Burnette Subject: Re: Se 8th Avenue Stormwater Conveyance Project We are working on it I should have paperwork back from GFA by tomorrow and I will check with Phil on Asbuilts Michelle Baughman, President _.. ... ... . . . � :_. __ . _.._ ... ._..�. On Thu, May 13, 2021 at 10:24 AM Patty Burnette <pburnette@citvofokeechobee.com> wrote: Good Morning Ms. Michelle. Just checking in on the two pending items for this project: . . �� �.��` ��Lt� � �=-t:� � �� �� • Final As-Built drawings ` � • Documentation for testing of the backfill areas. Thank you ' Patt� `1�1. Burnette C'j. enera�Services Coord�inator Cit� of O�eec�o6ee 55 S� 3'"d Avenue O►�eec�o6ee, �'L 34974 � P�one: (863� 763-3372 ext. g82o Direct: (863� 763-g8�o �'ax: (863� 763-1686 e-mail• �6i�r�rietteC��citti�o�o�eec�io6ee.co���ti tive6site: v���u�.citti�ofo�eec(�.o6ee.co��i : - _,�;: =����Fr -. ;.`�.�� ;;,� `:=�� �'0'- `,: -� 1: y I�4 s 1��`� Under Florida law, email addresses are public records. If you do not want your email address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by phone or in writing, Florida Statute 668.6076. CITY OF OKEECHOBEE ELECTRONIC DEVICE DISCLAIMER: Florida has a very broad public records law. Most written communications to or from local officials regarding city business are public records available to the public and media upon request. Your correspondence via e-mail, text message, voice mail, etc., may therefore be subject to public disclosure. ' � UES Project No: 3310.1800325.0000 A Universal Workorder No: 233591-1 Engineering Report Date: 05/17/2021 Sciences � ' � Company yrFRNATI�NP 607 Northwest Commodity Cove, Port St. Lucie, FL 34986 - P: 772-924-3575 - F: 772-924-3580 In-Place Density Test Report Client: B& B SITE DEVELOPMENT, INC. UES Technician: Johnnie Smith 1505-C South Parrott Avenue Date Tested: 05/12/2021 Okeechobee, FL 34974 Project: Port St Lucie CSD/CMT 11,Okeechobee, County, FL Area Tested: Drainage Material: Fill Reference Datum: 0= Springline of Pipe �pe of Test: Field: ASTM D-6938 Nuclear Gauge Method Laboratory: AASHTO T180 Modified Proctor The tests below meet the 98% minimum compaction requirement. Maximum Optimum Field Dry Field Soil Pass Test Density Moisture Density Moisture Compaction or No. Location of Test Range (pc� (%) (pcf) (%) (%) Fail 1 Drainage Between S1 & Tie-in, 20' E 0-1 ft 115.7 11.4 114.1 10.0 99 Pass of S1, S Side of Pipe 2 Drainage Between S1 & Tie-in, 40' E 0-1 ft 115.7 11.4 113.9 9.9 98 Pass of S1, N Side of Pipe 3 Drainage Between S1 & Tie-in, 60' E 1-2 ft 115.7 11.4 115.0 11.0 99 Pass of S1, Top of Pipe 4 Drainage Between S1 & Tie-in, 75' E 2-3 ft 115.7 11.4 114.6 9.8 99 Pass of S1, Top of Pipe 5 Drainage Between S1 & Tie-in, 85' E 3-4 ft 115.7 11.4 115.6 11.0 100 Pass of S1, Top of Pipe � 6 Drainage BPfi��^�- - ��� Jj���� 115.7 11.4 113.9 9.7 98 Pass � f J� f 7 ,-- 115.7 11.4 114.0 9.8 99 Pass Ili�Sl.� 8 115.7 11.4 114.6 9.7 99 Pass 9 - � 115.7 11.4 114.9 10.1 99 Pass /1 5 /� � '� 10 �i' ��� �, I� ��'C ����-�� 115.7 11.4 115.1 9.9 99 Pass � � , �. 11 � ' J ;' �; /� � 15.7 11.4 114.7 10.2 99 Pass ' ��� U�� �r 12 C � jl �� ! ' 5.7 11.4 114.9 10.1 99 Pass S ! r 13 D����, ,� ��/,���` 5.7 11.4 114.6 9.9 99 Pass S< � r�(, 14 Dr. � �� .7 11.4 115.0 10.1 99 Pass y � �J � � 'L/ . S2 � �i 15 Dra `!�_., .,� �x S2, 23' W of 3-4 ft 115.7 11.4 114.5 10.5 99 Pass S2, � op of Pipe 16 Drainage Between S4 & S2, 20' N of 0-1 ft 115.7 11.4 113.9 9.7 98 Pass S2, E Side of Pipe To establish a mutual protection to Universal's clients, the Public and ourselves, all repo�ts are submitted as confidential property of our clients and authorization for pub/ication of statements, conc/usions or extracts from or regarding Universa/'s reports is reserved pending our written approva/. Page 1 ' , UES Project No: 3310.1800325.0000 A Universal Workorder No: 233591-1 Engineering Report Date: 05/17/2021 Sciences , ' � Company yTFRNATI�NP 607 Northwest Commodity Cove, Port St. Lucie, FL 34986 - P: 772-924-3575 - F: 772-924-3580 In-Place Density Test Report Client: B& B SITE DEVELOPMENT, INC. UES Technician: Johnnie Smith 1505-C South Parrott Avenue Date Tested: 05/12/2021 Okeechobee, FL 34974 Project: Port St Lucie CSD/CMT 11,Okeechobee, County, FL �pe of Test: Area Tested: Drainage Field: ASTM D-6938 Nuclear Gauge Method Material: Fill Laboratory: AASHTO T180 Modified Proctor Reference Datum: 0= Springline of Pipe The tests below meet the 98% minimum compaction requirement. Maximum Optimum Field Dry Field Soil Pass Test Density Moisture Density Moisture Compaction or No. Location of Test Range (pcf� (%) (pc� (%) (%) Fail 17 Drainage Between S4 & S2, 40' N of 0-1 ft 115.7 11.4 114.3 9.9 99 Pass S2, W Side of Pipe 18 Drainage Between S4 & S2, 60' N of 1-2 ft 115.7 11.4 115.0 10.3 99 Pass S2, Top of Pipe 19 Drainage Between S4 & S2, 80' N of 2-3 ft 115.7 11.4 115.5 11.0 100 Pass S2, Top of Pipe 20 Drainage Between S4 8� S2, 110' N 3-4 ft 115.7 11.4 114.9 10.1 99 Pass of S2, Top of Pipe 21 Drainage Between S4 & S5, 5' W of 0-1 ft 115.7 11.4 115.0 9.9 99 Pass S4, S Side of Pipe 22 Drainage Between S4 & S5, 10' W of 0-1 ft 115.7 11.4 114.6 9.8 99 Pass S4, N Side of Pipe 23 Drainage Between S4 & S5, 15' W of 1-2 ft 115.7 11.4 113.6 9.6 98 Pass S4, Top of Pipe 24 Drainage Between S4 & S5, 18' W of 2-3 ft 115.7 11.4 114.0 9.9 99 Pass S4, Top of Pipe 25 Drainage Between S4 & S5, 23' W of 3-4 ft 115.7 11.4 114.8 10.4 99 Pass S4, Top of Pipe 26 Drainage Between S4 & S6, 10' N of 0-1 ft 115.7 11.4 113.5 10.0 98 Pass S4, E Side of Pipe 27 Drainage Between S4 & S6, 20' N of 0-1 ft 115.7 11.4 114.0 9.8 99 Pass S4, W Side of Pipe 28 Drainage Between S4 & S6, 30' N of 1-2 ft 115.7 11.4 114.7 9.8 99 Pass S4, Top of Pipe 29 Drainage Between S4 & S6, 40' N of 2-3 ft 115.7 11.4 113.9 10.0 98 Pass S4, Top of Pipe 30 Drainage Between S4 & S6, 45' N of 3-4 ft 115.7 11.4 115.1 10.4 99 Pass S4, Top of Pipe 31 Drainage Between S7 & S6, 5' W of 0-1 ft 115.7 11.4 114.0 9.7 99 Pass S6, S Side of Pipe 32 Drainage Between S7 & S6, 10' W of 0-1 ft 115.7 11.4 115.7 11.2 100 Pass S6, N Side of Pipe To establish a mutual protection to Universal's clients, the Public and ourse/ves, all reports are submitted as confidential property of our clients and authorization for publication of staiements, conclusions or extracts from or regarding Universal's reports is reserved pending our written approval. Page 2 A Universal Engineering Sciences � � Company yTFRNATti��P UES Project No: 3310.1800325.0000 Workorder No: 233591-1 Report Date: 05/17/2021 607 Northwest Commodity Cove, Port St. Lucie, FL 34986 - P: 772-924-3575 - F: 772-924-3580 In-Place Density Test Report Client: B& B SITE DEVELOPMENT, INC. UES Technician: Johnnie Smith 1505-C South Parrott Avenue Date Tested: 05/12/2021 Okeechobee, FL 34974 Project: Port St Lucie CSD/CMT 11,Okeechobee, County, FL Area Tested: Drainage Material: Fill Reference Datum: 0= Springline of Pipe Type of Test: Field: ASTM D-6938 Nuclear Gauge Method Laboratory: AASHTO T180 Modified Proctor The tests below meet the 98% minimum compaction requirement. Maximum Optimum Field Dry Field Soil Pass Test Density Moisture Density Moisture Compaction or No. Location of Test Range (pcf) (%) (pcf) (%) (%) Fail 33 Drainage Between S7 & S6, 15' W of 1-2 ft 115.7 11.4 115.0 10.9 99 Pass S6, Top of Pipe 34 Drainage Between S7 & S6, 20' W of 2-3 ft 115.7 11.4 113.8 11.0 98 Pass S6, Top of Pipe 35 Drainage Between S7 & S6, 30' W of 3-4 ft 115.7 11.4 114.5 10.7 99 Pass S6, Top of Pipe 36 Coquina Between S1 & S6, 100' N of 0-6 inch 127.1 8.4 126.4 7.9 99 Pass S1, E Side of Centerline 37 Coquina Befinreen S1 & S6, 160' N of 0-6 inch 127.1 8.4 126.7 8.4 100 Pass S1, W Side of Centerline 38 Drainage AT S1, E Section 0-1 ft 117.1 11.0 116.1 9.8 99 Pass 39 Drainage AT S1, W Section 1-2 ft 117.1 11.0 117.0 10.0 100 Pass 40 Drainage AT S1, S Section 2-3 ft 117.1 11.0 116.2 9.9 99 Pass 41 Drainage AT S1, N Section 3-4 ft 117.1 11.0 116.5 9.8 99 Pass 42 Drainage AT S1, E Section 4-5 ft 117.1 11.0 115.9 10.0 99 Pass 43 Drainage AT S2, E Section 0-1 ft 117.1 11.0 115.9 9.8 99 Pass 44 Drainage AT S2, W Section 1-2 ft 117.1 11.0 116.7 10.0 100 Pass 45 Drainage AT S2, S Section 2-3 ft 117.1 11.0 114.9 9.8 98 Pass 46 Drainage AT S2, N Section 3-4 ft 117.1 11.0 116.1 9.9 99 Pass 47 Drainage AT S2, E Section 4-5 ft 117.1 11.0 115.8 10.0 99 Pass 48 Drainage AT S3, E Section 0-1 ft 117.1 11.0 117.1 10.1 100 Pass 49 Drainage AT S3, W Section 1-2 ft 117.1 11.0 115.1 9.9 98 Pass 50 Drainage AT S3, S Section 2-3 ft 117.1 11.0 116.3 9.7 99 Pass 51 Drainage AT S3, N Section 3-4 ft 117.1 11.0 114.3 9.8 98 Pass 52 Drainage AT S3, E Section 4-5 ft 117.1 11.0 116.4 9.9 99 Pass To establish a mutual protection to Universal's clients, the Public and ourselves, all reports are submitted as confiidential property of our clients and authorization for publication of statements, conclusions or extracts from or regarding Universal's reports is reserved pending our written approval. Page 3 A Universal Engineering Sciences , � Company �rFRNATI�NP UES Project No: 3310.1800325.0000 Workorder No: 233591-1 Report Date: 05/17/2021 607 Northwest Commodity Cove, Port St. Lucie, FL 34986 - P: 772-924-3575 - F: 772-924-3580 In-Place Density Test Report Client: B& B SITE DEVELOPMENT, INC. UES Technician: Johnnie Smith 1505-C South Parrott Avenue Date Tested: 05/12/2021 Okeechobee, FL 34974 Project: Port St Lucie CSD/CMT 11,Okeechobee, County, FL Type of Test: Area Tested: Drainage Field: ASTM D-6938 Nuclear Gauge Method Material: Fill Laboratory: AASHTO T180 Modified Proctor Reference Datum: 0= Springline of Pipe The tests below meet the 98% minimum compaction requirement. Maximum Optimum Field Dry Field Soil Pass Test Density Moisture Density Moisture Compaction or No. Location of Test Range (pcf) (%) (pcf) (%) (%) Fail 53 Drainage AT S4, E Section 0-1 ft 117.1 11.0 115.6 9.8 99 Pass 54 Drainage AT S4, W Section 1-2 ft 117.1 11.0 117.0 10.0 100 Pass 55 Drainage AT S4, S Section 2-3 ft 117.1 11.0 115.4 10.1 99 Pass 56 Drainage AT S4, N Section 3-4 ft 117.1 11.0 116.5 10.0 99 Pass 57 Drainage AT S4, E Section 4-5 ft 117.1 11.0 114.5 9.9 98 Pass 58 Drainage AT S5, E Section 0-1 ft 117.1 11.0 114.8 9.7 98 Pass 59 Drainage AT S5, W Section 1-2 ft 117.1 11.0 115.1 9.8 98 Pass 60 Drainage AT S5, S Section 2-3 ft 117.1 11.0 114.9 9.8 98 Pass 61 Drainage AT S5, N Section 3-4 ft 117.1 11.0 115.0 10.0 98 Pass 62 Drainage AT S5, E Section 4-5 ft 117.1 11.0 116.8 10.0 100 Pass 63 Drainage AT S6, E Section 0-1 ft 117.1 11.0 116.1 9.9 99 Pass 64 Drainage AT S6, W Section 1-2 ft 117.1 11.0 114.6 9.7 98 Pass 65 Drainage AT S6, S Section 2-3 ft 117.1 11.0 116.1 9.8 99 Pass 66 Drainage AT S6, N Section 3-4 ft 117.1 11.0 116.4 9.9 99 Pass 67 Drainage AT S6, E Section 4-5 ft 117.1 11.0 116.9 10.5 100 Pass 68 Drainage AT S7, E Section 0-1 ft 117.1 11.0 115.6 9.8 99 Pass 69 Drainage AT S7, W Section 1-2 ft 117.1 11.0 115.9 9.9 99 Pass 70 Drainage AT S7, S Section 2-3 ft 117.1 11.0 114.5 9.7 98 Pass 71 Drainage AT S7, N Section 3-4 ft 117.1 11.0 117.0 10.2 100 Pass 72 Drainage AT S7, E Section 4-5 ft 117.1 11.0 117.2 11.1 100 Pass To establish a mutual protection to Universal's clients, the Public and ourse/ves, all reports are submitted as confidential property of our clients and authorization for publicafion of statements, conclusions or extracts from or regarding Universal's reports is reserved pending our written approval. Page 4 Reviewed By GFA International, Inc FBPE Registry No.4930 ,,��"""'���-, Digitally signed by .� Op671NIC,Np'�'<; �:rr uceNse ' :Yr ; „.. 9y : Thomas D = *: "° &146 ` *'= Montano:A01410C00000 =�° ����'�; 17818498DCD000019A3 � � '. STATE OF : <fI` : C� ,'.. �•F�°«�����'�`,� Date: 2021.05.17 0925:43 ���`��� ��L � -04'00' Thomas Dominic Montano Branch Manager STATE OF FLORIDA Professional Engineer No. 84146 This item has been digitally signed and sealed 6y Thomas Dominic Montano on the date adjacent to the sea/. Printed copies of this document are not considered signed and sealed and the signature must 6e verifed on any elecfronic copies. To establish a mutual protection to Universal's clients, the Public and ourselves, alI reports are submitted as confidential property of our clients and authorization for publication of statements, conc/usions or extracts from or regarding Universal's reports is reserved pending our written approval. Page 5 FF�y CITY OF OKEECHOBEE ;,�°� 55 SE TxIRv AVENUE � � OKEECHOSEE, FL 34974 o' Phone: (863)763-3372 19� " www.cityofokeechobee.com Offrce of tlie City Administrator Dir•ect Line: 873-763-9812 May 17, 2021 Arlene Acevedo, FCCM Environmental Specialist III Water Spring Restoration Program Division of Water Restoration Assistance 3900 Commonwealth Blvd. Douglas Building, MS 3602 Tallahassee, FL 32399-3000 Okeec/:obee City Council Mayor powling R. Watford, Jr. Wes Abney Monica Clark Bob Jarriel Bobby Keefe Subject: SE 8TH Avenue — Water Quality and Roadway Improvements FDEP Grant No. LP47020 To Whom It May Concern: This letter is being written to certify construction completion of site work at the South East 8th Avenue Drainage and Water Quality Improvements Project. Based on observations of the work by field representatives under my direct control, review of geotechnical testing, and review of as- built drawings provided by the contractor, I certify the site work and roadway construction to be complete. Please find a copy of the submitted as-built sheet and density testing reports with this certification. I hereby certify that the site work associated with the project has been completed in substantial conformance with the approved plans and specifications. .64984?85Ci00 t :�' � d` %:_ �ll/-�/� 0'�99' sa�l`�;e.�,e. o .. C0�,9�,d y A� _ e � �:� /° : o C�°; 2 ^' a p` ' p � S�/ g/'�za�` o w �r�os,�Ioi�tes `�e ��`,�'E. 'I�ra e si � � C �� e�al Engin�r 1�Poa- 63897 �,o fi�� s� -n �: ,�o e �. � ��O ^��,� r�,, �` ' • . . ' �,�4 �, � ..,� a ���. �R, �Cr� ,,� �`��':OS9i.5%aP,i. A Universal Engineering Sciences � �, Company �FRNA7toNP UES Project No: 3310.1800325.0000 Workorder No: 233591-1 Report Date: 05/20/2021 607 Northwest Commodity Cove, Port St. Lucie, FL 34986 - P: 772-924-3575 - F: 772-924-3580 In-Place Density Test Report Client: B& B SITE DEVELOPMENT, INC. 1505-C South Parrott Avenue Okeechobee, FL 34974 UES Technician: Johnnie Smith Date Tested: 05/12/2021 Project: PW 02-00-12-20 City of Okeechobee Taylor Creek Southeast 8th Avenue Stormwater Conveyance Area Tested: Drainage Material: Fill Type of Test: Field: ASTM D-6938 Nuclear Gauge Method Laboratory: AASHTO T180 Modi�ed Proctor Reference Datum: 0= Springline of Pipe The tests below meet the 98% minimum compaction reQuirement. Maximum Optimum Field Dry Field Soil Pass Test Density Moisture Density Moisture Compaction or No. Location of Test Range (pcfl (%) (pc� (%) (%) Fail 1 Drainage Between S1 & Tie-in, 20' E 0-1 ft 115.7 11.4 114.1 10.0 99 Pass of S1, S Side of Pipe 2 Drainage Between S1 & Tie-in, 40' E 0-1 ft 115.7 11.4 113.9 9.9 98 Pass of S1, N Side of Pipe 3 Drainage Between S1 & Tie-in, 60' E 1-2 ft 115.7 11.4 115.0 11.0 99 Pass of S1, Top of Pipe 4 Drainage Between S1 & Tie-in, 75' E 2-3 ft 115.7 11.4 114.6 9.8 99 Pass of S1, Top of Pipe 5 Drainage Befween S1 & Tie-in, 85' E 3-4 ft 115.7 11.4 115.6 11.0 100 Pass of S1, Top of Pipe 6 Drainage Between S1 8� S2, 5' N of 0-1 ft 115.7 11.4 113.9 9.7 98 Pass S1, E Side of Pipe 7 Drainage Between S1 & S2, 10' N of 0-1 ft 115.7 11.4 114.0 9.8 99 Pass S1, W Side of Pipe 8 Drainage Between S1 & S2, 15' N of 1-2 ft 115.7 11.4 114.6 9.7 99 Pass S1, Top of Pipe 9 Drainage Between S1 & S2, 19' N of 2-3 ft 115.7 11.4 114.9 10.1 99 Pass S1, Top of Pipe 10 Drainage Between S1 & S2, 23' N of 3-4 ft 115.7 11.4 115.1 9.9 99 Pass S1, Top of Pipe 11 Drainage Between S3 8� S2, 5' W of 0-1 ft 115.7 11.4 114.7 10.2 99 Pass S2, S Side of Pipe 12 Drainage Between S3 & S2, 10' W of 0-1 ft 115.7 11.4 114.9 10.1 99 Pass S2, N Side of Pipe 13 Drainage Between S3 & S2, 15' W of 1-2 ft 115.7 11.4 114.6 9.9 99 Pass S2, Top of Pipe 14 Drainage Between S3 & S2, 19' W of 2-3 ft 115.7 11.4 115.0 10.1 99 Pass S2, Top of Pipe 15 Drainage Between S3 & S2, 23' W of 3-4 ft 115.7 11.4 114.5 10.5 99 Pass S2, Top of Pipe 16 Drainage Between S4 8� S2, 20' N of 0-1 ft 115.7 11.4 113.9 9.7 98 Pass S2, E Side of Pipe To establish a mutual protection to Universal's clients, the Public and ourse/ves, alI reports are submitted as confidential property of our clients and authorization for publication of statemenfs, conc/usions or extracts from or regarding Universal's reports is reserved pending our written approval. Page 1 A Universal Engineering Sciences � � Company �FRNATIO�P UES Project No: 3310.1800325.0000 Workorder No: 233591-1 Report Date: 05/20/2021 607 Northwest Commodity Cove, Port St. Lucie, FL 34986 - P: 772-924-3575 - F: 772-924-3580 in-Place Density Test Report Client: B& B SITE DEVELOPMENT, INC. UES Technician: Johnnie Smith 1505-C South Parrott Avenue Date Tested: 05/12/2021 Okeechobee, FL 34974 Project: PW 02-00-12-20 City of Okeechobee Taylor Creek Southeast Sth Avenue Stormwater Conveyance Area Tested: Drainage Material: Fill Type of Test: Field: ASTM D-6938 Nuclear Gauge Method Laboratory: AASHTO T180 Modified Proctor Reference Datum: 0= Springline of Pipe i ne tests beiow meet the 98% minimum compaction requirement. Maximum Optimum Field Dry Field Soil Pass Test Density Moisture Density Moisture Compaction or No. Location of Test Range (pcfl (%) (pcf) (%) (%) Fail 17 Drainage Between S4 8� S2, 40' N of 0-1 ft 115.7 11.4 114.3 9.9 99 Pass S2, W Side of Pipe 18 Drainage Between S4 & S2, 60' N of 1-2 ft 115.7 11.4 115.0 10.3 99 Pass S2, Top of Pipe 19 Drainage Between S4 & S2, 80' N of 2-3 ft 115.7 11.4 115.5 11.0 100 Pass S2, Top of Pipe 20 Drainage Between S4 & S2, 110' N 3-4 ft 115.7 11.4 114.9 10.1 99 Pass of S2, Top of Pipe 21 Drainage Between S4 & S5, 5' W of 0-1 ft 115.7 11.4 115.0 9.9 99 Pass S4, S Side of Pipe 22 Drainage Between S4 & S5, 10' W of 0-1 ft 115.7 11.4 114.6 9.8 99 Pass S4, N Side of Pipe 23 Drainage Between S4 & S5, 15' W of 1-2 ft 115.7 11.4 113.6 9.6 98 Pass S4, Top of Pipe 24 Drainage Between S4 & S5, 18' W of 2-3 ft 115.7 11.4 114.0 9.9 99 Pass S4, Top of Pipe 25 Drainage Between S4 & S5, 23' W of 3-4 ft 115.7 11.4 114.8 10.4 99 Pass S4, Top of Pipe 26 Drainage Between S4 & S6, 10' N of 0-1 ft 115.7 11.4 113.5 10.0 98 Pass S4, E Side of Pipe 27 Drainage Between S4 8� S6, 20' N of 0-1 ft 115.7 11.4 114.0 9.8 99 Pass S4, W Side of Pipe 28 Drainage Between S4 & S6, 30' N of 1-2 ft 115.7 11.4 114.7 9.8 99 Pass S4, Top of Pipe 29 Drainage Between S4 & S6, 40' N of 2-3 ft 115.7 11.4 113.9 10.0 98 Pass S4, Top of Pipe 30 Drainage Between S4 & 56, 45' N of 3-4 ft 115.7 11.4 115.1 10.4 99 Pass S4, Top of Pipe 31 Drainage Between S7 & S6, 5' W of 0-1 ft 115.7 11.4 114.0 9.7 99 Pass S6, S Side of Pipe 32 Drainage Between S7 8� S6, 10' W of 0-1 ft 115.7 11.4 115.7 11.2 100 Pass S6, N Side of Pipe To establish a mutual protection to Universal s c/ienfs, the Public and ourse/ves, a!1 reports are submitted as con�dential property of our clients and authorization for publicafion of statements, conclusions or extracts from or regarding Universal's reporfs is reserved pending our written approval. Page 2 A Universal Engineering Sciences i � Company ylFRNATI�NA UES Project No: 3310.1800325.0000 Workorder No: 233591-1 Report Date: 05/20/2021 607 Northwest Commodity Cove, Port St. Lucie, FL 34986 - P: 772-924-3575 - F: 772-924-3580 in-Place Density Test Report Client: B& B SITE DEVELOPMENT, INC. 1505-C South Parrott Avenue Okeechobee, FL 34974 UES Technician: Johnnie Smith Date Tested: 05/12/2021 Project: PW 02-00-12-20 City of Okeechobee Taylor Creek Southeast 8th Avenue Stormwater Conveyance Area Tested: Drainage Material: Filf Type of Test: Field: ASTM D-6938 Nuclear Gauge Method Laboratory: AASHTO T180 Modified Proctor Reference Datum: 0= Springline of Pipe The tests below meet the 98% minimum compaction reauirement Maximum Optimum Field Dry Field Soil Pass Test Density Moisture Density Moisture Compaction or No. Location of Test Range (pcfl (%) (Pcfl (%) (%) Fail 33 Drainage Between S7 & S6, 15' W of 1-2 ft 115.7 11.4 115.0 10.9 99 Pass S6, Top of Pipe 34 Drainage Between S7 8� S6, 20' W of 2-3 ft 115.7 11.4 113.8 11.0 98 Pass S6, Top of Pipe 35 Drainage Between S7 & S6, 30' W of 3-4 ft 115.7 11.4 114.5 10.7 99 Pass S6, Top of Pipe 36 Coquina Between S1 & S6, 100' N of 0-6 inch 127.1 8.4 126.4 7.9 99 Pass S1, E Side of Centerline 37 Coquina Between S1 & S6, 160' N of 0-6 inch 127.1 8.4 126.7 8.4 100 Pass S1, W Side of Centerline 38 Drainage AT 51, E 5ection 0-1 ft 117.1 11.0 116.1 9.8 99 Pass 39 Drainage AT S1, W Section 1-2 ft 117.1 11.0 117.0 10.0 100 Pass 40 Drainage AT S1, S Section 2-3 ft 117.1 11.0 116.2 9.9 99 Pass 41 Drainage AT S1, N Section 3-4 ft 117.1 11.0 116.5 9.8 99 Pass 42 Drainage AT S1, E Section 4-5 ft 117.1 11.0 115.9 10.0 99 Pass 43 Drainage AT S2, E Section 0-1 ft 117.1 11.0 115.9 9.8 99 Pass 44 Drainage AT S2, W Section 1-2 ft 117.1 11.0 116.7 10.0 100 Pass 45 Drainage AT S2, S Section 2-3 ft 117.1 11.0 114.9 9.8 98 Pass 46 Drainage AT S2, N Section 3-4 ft 117.1 11.0 116.1 9.9 99 Pass 47 Drainage AT S2, E Section 4-5 ft 117.1 11.0 115.8 10.0 99 Pass 48 Drainage AT S3, E Section 0-1 ft 117.1 11.0 117.1 10.1 100 Pass 49 Drainage AT S3, W Section 1-2 ft 117.1 11.0 115.1 9.9 98 Pass 50 Drainage AT S3, S Section 2-3 ft 117.1 11.0 116.3 9.7 99 Pass 51 Drainage AT S3, N Section 3-4 ft 117.1 11.0 114.3 9.8 98 Pass 52 Drainage AT S3, E Section 4-5 ft 117.1 11.0 116.4 9.9 99 Pass To esfablish a mutua/ protection to Universal's clients, the Public and ourselves, al/ reports are submitted as confrdential property of our clienfs and authorization for publication of statements, conclusions or eac(racts from or regarding Universal's reports is reserved pending our written approval. Page 3 A Universal Engineering Sciences � � Company �FRNA7�ONP 607 Northwest Commodity Cove, Port St. Lucie, FL 34986 - P: 772-924-3575 UES Project No: 3310.1800325.0000 Workorder No: 233591-1 Report Date: 05/20/2021 - F: 772-924-3580 In-Place Density Test Report Client: B& B SITE DEVELOPMENT, INC. UES Technician: Johnnie Smith 1505-C South Parrott Avenue Date Tested: 05/12/2021 Okeechobee, FL 34974 Project: PW 02-00-12-20 City of Okeechobee Taylor Creek Southeast 8th Avenue Stormwater Conveyance Area Tested: Drainage Material: Fill Reference Datum: 0= Springline of Pipe Type of Test: Field: ASTM D-6938 Nuclear Gauge Method Laboratory: AASHTO T180 Modified Proctor The tests below meet the 98% minimum compaction requirement. Maximum Optimum Field Dry Field Soil Pass Test Density Moisture Density Moisture Compaction or No. Location of Test Range (pc� (%) (pcf) (°/,) (%) Fail 53 Drainage AT S4, E Section 0-1 ft 117.1 11.0 115.6 9.8 99 Pass 54 Drainage AT S4, W Section 1-2 ft 117.1 11.0 117.0 10.0 100 Pass 55 Drainage AT S4, S Section 2-3 ft 117.1 11.0 115.4 10.1 99 Pass 56 Drainage AT S4, N Section 3-4 ft 117.1 11.0 116.5 10.0 99 Pass 57 Drainage AT S4, E Section 4-5 ft 117.1 11.0 114.5 9.9 98 Pass 58 Drainage AT S5, E Section 0-1 ft 117.1 11.0 114.8 9.7 98 Pass 59 Drainage AT S5, W Section 1-2 ft 117.1 11.0 115.1 9.8 98 Pass 60 Drainage AT S5, S Section 2-3 ft 117.1 11.0 114.9 9.8 98 Pass 61 Drainage AT S5, N Section 3-4 ft 117.1 11.0 115.0 10.0 98 Pass 62 Drainage AT S5, E Section 4-5 ft 117.1 11.0 116.8 10.0 100 Pass 63 Drainage AT S6, E Section 0-1 ft 117.1 11.0 116.1 9.9 99 Pass 64 Drainage AT S6, W Section 1-2 ft 117.1 11.0 114.6 9.7 98 Pass 65 Drainage AT S6, S Section 2-3 ft 117.1 11.0 116.1 9.8 99 Pass 66 Drainage AT S6, N Section 3-4 ft 117.1 11.0 116.4 9.9 99 Pass 67 Drainage AT S6, E Section 4-5 ft 117.1 11.0 116.9 10.5 100 Pass 68 Drainage AT S7, E Section 0-1 ft 117.1 11.0 115.6 9.8 99 Pass 69 Drainage AT S7, W Section 1-2 ft 117.1 11.0 115.9 9.9 99 Pass 70 Drainage AT S7, S Section 2-3 ft 117.1 11.0 114.5 9.7 98 Pass 71 Drainage AT S7, N Section 3-4 ft 117.1 11.0 117.0 10.2 100 Pass 72 Drainage AT S7, E Section 4-5 ft 117.1 11.0 117.2 11.1 100 Pass To establish a mutua/ protection to Universal's clients, the Public and ourselves, al/ repo�ts are submitted as confrdential property of our clienfs and authorization for publication of statements, conclusions or extracts from or regarding Universal's reports is reserved pending our written approval. Page 4 Reviewed By GFA Internafional, Inc FBPE Registry No.4930 ,�o�,,;;;;�;'-•, Digitallysigned byThomas D `��'"E"`����o': Montano:A01410C00000178 _ ;=°' �, a.,., x = = `� �� ,��-�� � ^ = 18498DCD000019A3 :: :;'. ' � ' '�: c�`�.f�. ; ?`°� Date: 2021.05.20 16:14:00 ;;,, � e.�,,. � � -04'00' Thomas Dominic Montano Branch Manager STATE OF FLORlDA Professionai Engineer No. 84146 This item has been digifally signed and sealed by Thomas Dominic Montano on the date adjacent to the sea/. Piinted copies of fhis document are not considered signed and sealed and !he signature must be veri�ed on any electronic copies. To establish a mutual protection to Universal's clients, the Public and ourselves, all reports a�e submitted as confidential p�operty of our clients and authorization for publication of statements, conclusions or extracts from or regarding Universa/'s reports is reserved pending our wriften app�ova/. Page 5 Date: 5-14-2021 City of Okeechobee 8th Avenue Drainage Improvements S��i�t� B Structure Table Edge of Payment Elevation Item No. Elevation A Z'� .45 B Z1.23 C 21.13 D 21.03 jStructure Table � � NOrtIt � SOUSh CaSi l��!C52 I i$vucwm ' � , Invert InvCM1 � Invcr' � Invert I lio. �Strucwmsize Inlct7ype RimElev. � EL^v. I H•e. � Elcr. "elee. ;6tmElev. � 1 iF00T i•;pi� p I;l'allc�':nlc1 Gr�lo- � _G.i ' 15.! _ �FUOT T�:p� D ���� II�„ Inl��� Gralc �l.l I ] : ', ' 1 '' :C : I - ' " ]i.l .___... __._ . . ..._. ._ . , _...__. . ._... . '._—._ _._ __ � ��DOi 1•:P;.0 . .'.\.,Ilrr.nb:lGraic : 'I.5 ' ]: C 17A__ �;fUCi itl�- C� !l�:.11r�; lnle! Gr�li• i '_i.5 ;G.i � I5.0 15.7 - IFDri?�sp, f� I•:allr; hJri Gratc '].' I I ' '- � 16.; � " ifD0T7'ili_[r �\'allcl'IrI��:G�.]l_ ' �. !G.: :G._ ' .- ]�.7 ]5.1 � �;SFCC�,ta�l ,'SccUcta�l i.5 � ic.� ! ' � PAVING GRADING AND DRAINAGE PLAN VIEW — WITHOUT AERIAL � RIGHT OF INqY -�`-, _ / ��'^`�I.<` V �: :� � ��.� � ��___n a � -- �=' � � � �---- :_ �=' _ ��� - � --�^ -- _��--, � _� Ci_ c:::s�. c;;. �_ �: �,-a v-��c: c:�:� ; � Li c�.ic � T"v i::'::.i� C:::::'i_ '::.T G; Sy .JJi �Fi� iir�:-. � � _ �_. ; � .. � _ � ., c,•-._ :z cr-= r--,.;;; � -. , ___ � �_,... .,, . ..�� ...:. .:,... '-=-�---._._ ;- ;; - "'"—__ -- - ---=----------af----� _ ' , _. �. . ,_ �._ , . ;_._ _ —r c_:'sr.:_. G c-., . _� .. .-_: �_ � �-_-..:., R�� 1 1 1 c t/�//� �/ _ _ C; j'.:.'�.; C': �5 �i" °'•:; f._':=.:'., r�,'.i.:.S ." �::.::. O I� V�7/"� 7 •'rr-.'.'�'i4],l=f.J ; �'bi� F 7 f_".��� C: "Lr EC.. L-... ,_ i_ � � CONTRACTOR TO COAIPLETE ►AAINTFNANCE OF 7itAFFIC PLAN FOR REVIEW PHlOR 7D CONSiRUCTION ONE UWE MOT IS AC(�TABLE IMhI FUCGQt A!1 DRIVEIYAY REi'LACOAET175 70 BE FIELD LOCA7ED MD WORDIHATION IMTH ONNERS ROADWAY A1UST RE]IAIN OPEN FOR TRAFFlC AT Nl TIAIES. ALL D(CAVATID IAA7FRIALS ARE THE PROPERTY OF 7HE diY Of 0lCFECHOBEE ALL p(C/�VA7ED MATQtIALS SHALL BE COORDINATED WI1H hIE PUBUC WORICS DEPARTMD(T fOR ROAOVAL PRO.ECT PRO�CT MIWHG UMITS ; EJi'IIRE ROADWAY 1M7F#H PR0.ECT AREA TO BE A�LLED A MINIMUM OF 3/4' PER N i1S CONTRACIOR TO COOROINAiE ALL UTriITY CONFlJCiS AHD NOIiFY pTY AS HECESSMY 4 �A. �. scalc �• _ b• °`���� °�"LOJ � MARWS MONTES DE OCA, PE 6Y1 6 OIE N61 �" °"� °R'"" MYM b3B97 2/2021 rwmucxwa 716 9QT� 1A16f � �. , , �❑ � � � � aipesi:c ',, ripelengeh �. i PipeKo. ', flnch=sl (Fec:l h4ace:i�1 � , i __ _. i ,.,GC�: ; ,.. l.`G ' ; . � ., , , �,_��_i�i °.. i,:r ' _ �iC ' � I � i!/.,,( �. - � __ � ii � C.........:�e•i � ..�.; � ;::_;�-=,. ;s-:'!_r so e:s'_:= i.'.:^._° ���'C'_+': � -- \`1 � �. _-�--_—,_ :.�:,,:: ".: 5::� i,;? C. 5`' i"'T C:: C4 :".^.'" ,.i ::7Li EJ C- C"i:= - : �i P':� �� � �1- • � Know whar5 below. C2�� before you dig, Cfl'1' OF OFEGCHOIlEE ii S@ 31iD:1\'E\UG OI:GECNODEL.FL 3a97-1 (SGg�i6:-3;;_ NPDES NOTE: CONTRAC70R TO INSURE ALL HPDES IlEMS AND INLEIS ARE SAFELY SECURED 1MTN APPl1CABLE TURBIWiY CON7ROLS IN PLACE STRWING NOiE: CONiRACTOR TO RESiRIPE M,L pp$'11NG PARIONG AREAS AS IH EI0S71NG CONDff10N CONSTRUCTION PLANS FOR SOUTHEAST 8TH AVENUE "�"` DRAINAGE IMPROVEMEM'S CI71' OF OKEECHOBEE 2 � PAVING, DRAINAGE CONSTRUCTION P1AN SHEEf B A