CPH, Inc. (Presentation)%mob&
THE CITY OF bKEECHOBE�
"PROFESSIONAL LANDSCAPE ARCHITECT SERVICES
RFQ No. ADM 03-32-09-201 December 15, 2020
0
=� � A D--
ali4l
ARCHITECTURE SURVEY CEI LAND PLANNING
PERMITTING ENVIRONMENTAL LANDSCAPE ENGINEERING
240 AFF
MEMBERS
\ I /
PROVIDING SERVICES
IN FLORIDA SINCE. 1981
2020 - THE AMERICAN SOCIETY OF
LANDSCAPE ARCHITECTS (ASLA) - WARD
OF HONOR - BOK TOWER VISIONING PLAN
ASLA) Florida Chapter Award -
2017 - THE AMERICAN SOCIETY OF
LANDSCAPE ARCHITECTS (ASLA) - CAPE
CORAL NORTHWEST CAPE AND SEVEN
ISLAND VISION PLAN — 2017 AWARD OF
EXCELLENCE
2014 - ENR SOUTHEAST TOP DESIGN FIRMS
" - ,• #8 IN LANDSCAPE ARCHITECTURE
ORLANDO BUSINESS JOURNAL OP 25
LARGEST LANDSCAPE ARCHITECTURAL FIRM
CA1411 0 1 OPEZ
I YNN OFHI INGFR
PRINCIPAL -IN -CHARGE PROGRAM MANAGER
NIKHELJINOAL, GCC, ASSOC. DBIA, ENVSP MAXWELLO. SPANN,PLA, CLARB
LANDSCAPE ARCHITECT
JEREMIAH D. OWENS, P.E. CFM JAM ES K. WINTER, PLA, CLARB JAVIERE.OMANA,CNU-A
ALLEN LANE, P.E. DANITA BRYANT, PLA MICHELLE TANNER
HEN BUENCAMINO I I-
PROJECTI)ESIGNER PLANNING, CODES, DESIGN
GUIDELINES, SUPPORT
JASON AGRONT
RODNEY"CHIP"SMITH TARA SALMIERI, AICP
LILLIAN REYES
DAMEION DONALDSON MARKZ. ERQUITT
GREGORY D. TAYLOR, M.S.E.E., RE.
S�URIEIING �ANIMAPPI�NG BUILDINGSISTRUCTUR
STRUCTURAL
OSCIEL F. PLAZA, RE THOMAS J. GALLOWAY, PSM JOSE M. DRT14 MCE, P.E.
DEREK GEORGE HAJJAR, RE PAULJ. KATREK, PSM EDUARDOAVILES, P.E.
NILLSON N. WILSON, P G JEFFREYW. PATTERSON, PSM
GILBERT RAMOS, P.E. - --- i
BRIAN RICHARDS, P.G.
SUBSURFACE UTILITY
ENGINEERING
KURTR.L MAN,JR.,P.E.
MATTHEW CUSHMAN, P.E.
JOSEPH M. LOFASO, JR., P.E.
FIRM
..... ......... .........
M/WBE
........ ..
CPH, INC.
............................................. ...... ..........
... ....... .... ...
REDEVELOPMENT MANAGEMENTASSOCIATES
....... .... ................... . ...
PLANACTIVII STUDIO
✓
........................................... I ............... .......................... .
COMPUTERIZED DESIGN SERVICES
. ...................
............. I . .... ....... ...... ...... ..... I ...... .. .. -4-
QUEST CORPORATION OF AMERICA, INC
✓
..................................... ....... ...... . ... .... ..... ........
ELECTRICAL DESIGN ASSOCIATES, INC. (EDA)
.. .. ........ ....
....... .... ........... ......
ECHO UES, INC.
.................
ARE-ANAENGINFFRING, INC AP
... .................... I .................. ...... ... ..........
. .. ...
... ........
- ...
BLUE MARLIN ENGINEERING, LLC
...
L
............................ .....................................................
GATOR ENGINEERING & AOU IFER RESTORATION, INC.
.. .................
.
VON h P AYAl A MC CI F, I AN
MIRANDA LANSDALE
DAVIDA. TERWILLEGER, RE., CGC
JESSESUDA
LEE MURRAH
J ON N A. BAER, AIA, NCAR B, LEED AP
BD-C, GOP
BROOK K. SHERRARO, AIA, NCARB
ISMAIL ILKER U7UN, AIA, LFFD AP RD.0
KEVIN SMITH
SEAN J. MCGLUMPHY, RE
AMY E. DALY, LEED AP
AARON P. MOORE. PWS
DAVID LANDERS
A WELL QUALIFIED TEAM
STREETSCAPE,
VISIONING, AND
REDEVELOPMENT
W. GEORGIA AVE STREETSCAPE/VISIONING
• Vision Plan for Redevelopment of Historic
Downtown
• Placemaking and Context Sensitive Design
• Shared -Use / Curbless — "Festival Street"
• Removable Bollards and Market Lights
• ADA Upgrades
• Complete Streets Design
CORRIDOR
PLANNING ANC
IMPLEMENTATIC
SANFORD RIVERWALK STREETSCAPE PH II -III
Phase II - 1.5 miles of 10-14 foot wide trz
Phase III - 3.8 Mile Complete Street
Seawall Replacement
• 2 Roundabouts, 3 Mini -roundabouts,
Roadway Chicaning To Incorporate
Landscaped Medians
Single Lane Roundabout With 3
Approaches And A 120-ft Inscribed Circle
Two-laned Roundabout With 180-ft
Inscribed Circle With Two Right -turn Slip
Lanes
• On -street Parking
COMPLETE
STREETS
ORLANDO W. CENTRAL BLVD. COMPLETE
STREET - DESIGN -BUILD
• Complete Streets Design
• Coordination With FDOT
• Complete Roadway Reconstruction With
Additional Turn Lanes
• Intersection Updates
• Upsizing Of Existing Sewer
• Dedicated Bus Lanes
• Pedestrian Safety Improvements
COMPLETE
STREETS
CAPE CORAL 47TH TERRACE COMPLETE STREET
• 0.93 Mile Complete Street
• Single Lane Roundabout
• 98 Ft Inscribed Circle
• Included Raised, Traversable Curbed Islands
To Keep Speed Low
• Landscape/Hardscape & Gateway Elements
• Existing Intersection Upgraded
• Extensive Public Involvement
• CMAR Project
.v
PARKS AND
RECREATION
LEESBURG AQUATIC FACILITY
• Regional Aquatic Center
• Eight (8) Lane Competition Facility Designed To USA
Swimming Standards For High School Competitions
• Recreational Pool With Interactive Play Features, Zero
Entry Swim Area
• Two Story Water Slide
• Shaded Areas For Party Rentals
• Entry/Ticket Building
• Concession Building
• Changing/Locker Facilities
SEMINOLE COUNTY SPORTS COMPLEX
• New Sports Complex Situated On Over 120 Acres
• 15 Tournament Quality Baseball Fields
• 25 Batting Cages
• 3 Concession/Restroom Buildings
• Administration And Conference Building
• Playground
• Walking Trail
• Storage Buildings
0 Maintenance Facility
,c- Ab
1
SE ZONAL SPORTS COMPLEX
,Aw --0a
s
PARKS AND
RECREATION
WIRZ PARK & AQUATIC CENTER REDEVELOPMENT
• Master Planning And Bond Referendum
• Park Re -design
• New Entrance
• Relocation Of Maintenance Building
• Expansion Of The Existing Community Building
• New Outdoor Terrace
• Event Patio With 20' X 20' Pavilion
• Splash Pad
• Zero Entry Pool With Interactive Features, 5-lane/25-
meter Pool
• Shade Structures
• Volleyball And Basketball Courts And Playground
MILL LAKE STORMWATER PARK
• Plaza Area Sized For Multiple Events and Pavilions
• Multiuse TraiI
• On -street Parking
• Stormwater Pond With Water Feature
• Gateway / Entrance
• Interactive Water Feature (Splash Pad)
MEDIAN
LANDSCAPE
IMPROVEMENTS
M,
w
CITY OF CAPE CORAL MEDIAN LANDSCAPE
• Median Improvements To Multiple Roadways
• Developed Theme And Templates In One Mile
Segments
• Provided A Consistent Design Throughout The City In
Regards To Plant Species, Theme, And Landscape
Intensity
• Designed For 20 Ft Wide Median In A Curbed
Roadway With A Design Speed Of 45 MPH
• Utilized City Of Cape Coral And FDOT Design Criteria
OCOEE SR 50 GREEN UP PROGRAM
• 3.25 Miles Median Landscape
• Processed Multiple FDOT Variances
• City CRA Planning District
• Urban Principal Arterial
• Followed City's 50-west Planning Guide
• Designing Irrigation Without Disturbing New
Pavement
• Meeting Grant Schedule
• Lane Closure Analysis
• Mixture Of High And Low Design Speed
• Multiple Signalized Intersections, Bridges, And Two
Interchanges
MISCELLANEOUS
CAPITAL
UPGRADES
Tree and Landscape Beautification
Tree and Landscape Maintenance and
Replacement
Entry / Gateways / Monuments
Wayfinding/ Signage
r
Lighting and Drainage Modifications
Playgrounds
MULTI -DISCIPLINED
✓ Easy Collaboration
✓ Saves Time & Money
✓ Can Provide Virtually
Any Scope
*00
240+ STAFF
EXPERTS
✓ Full -Service Planning,
✓ Extensive Landscape Architecture and
Resources Design Team
✓ Available Locally ✓ Experts in Open Space and
✓ Rapid Response Urban Design
✓ Complete Streets and
Streetscape Expertise
CONTINUITY
✓ Long -Term Staff
✓ Cohesive Team
✓ Proven & Successful