Loading...
American Design Engineering Constructioni:4r.>,0•Tm American Design KNOW ALL MEN BY THESE PRESENTS, that we Engineering Construction, Inc. as Principal and United Fire & Casualty Company , as Surety, are held and firmly bound unto the City of Okeechobee (the "City"), in the penal sum of $ 5% of Amount Bid lawful money of the United States, for the payment of which sum, well and truly to be made, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally, firmly by these presents. THE CONDITION OF THE OBLIGATION IS SUCH, that whereas the Principal has submitted the accompanying bid, dated September 1 , 2020 for the Contract Documents: Contract Title: OKEECHOBEE 2020 SIDEWALK AND ROADWAY CONCRETE IMPROVEMENTS Contract Number: PW 03-11-08-20 NOW, THEREFORE, 1. If the Principal, a. Within seven (7) business days after the date of the Notice of Apparent Low Bidder, provides a Statutory Payment Bond and a Common Law Performance Bond as specified in the General Terms & Conditions or, in lieu of the Statutory Payment Bond or Common Law Performance Bond, provides an alternate form of security as specified in the Contract Documents; and provides the insurance certificate required under the Contract Documents, completed by a lawfully authorized insurance agent; and b. Within seven (7) business days of receipt of the Contract Documents, enters into a written contract with the City, in accordance with the Bid, as accepted, then the above obligations of the Principal and Surety shall be null and void. 2. However, should the Principal fail to fully comply with the conditions of paragraph 1 above, then the Principal and Surety, jointly and severally, shall be liable to the City for the full penal sum of this Bond which shall be forfeited to the City as liquidated damage, but not a penalty, as a result of the Principal's failure to comply with the bid instructions and conditions, regardless of whether the City ultimately decides to change the project requirements or resolicit bids. 3. The remedies provided herein are not to be construed as the City's exclusive remedies for the Principal's failure to enter into a contract with the City but shall be deemed supplemental to all remedies available to the City at law or otherwise. City of Okeechobee Project No. PW 03-11-08-20 Public Works Department 15 DATED ON September 1 FOR NON -CORPORATE BIDDERS: (Witness) (Print Name) (Witness) (Print Name) FOR CORPORATE BIDDERS: ATTEST: Secretary SURETY: ATTEST: (Corporate Seal) As Per Attached Power of Attorney Secretary 2020 By. - (Signature of Principal) (Print Name and Title) Business Address 2853 Executive Park Drive suite 202 LDEC Weston, FI.33331 CONSTWCTION 954-274-7117 American Pipeline Construction, LLC (Signature of Corporate Principal) )ewl' (Print Name and Title) 2853 Executive Park Dr., #202, Weston, FL 33331 Business Address United Fire & Casualty Company (Corporate ur } (Print N me and Title) Jonathan A. Bursevich, Attorney -in -Fact P. O. BOX 73909, CEDAR RAPIDS, IA 52407 - 3909 Business Address 5979 NW 151 st ST, Suite 202, Miami Lakes, FL 33014 Florida Address for Service of Process 305-517-3803 Telephone Number (Surety shall provide evidence of signature authority such as a certified copy of Power of Attorney. ;o o: �-� CORPORATE 3q _Z Z- SEAL RAP'OS \NIII ol \ Oty of Okeechobee Public Works Department 16 Project No. PW 03-11-08-20 UNITED FIRE & CASUALTY COMPANY, CEDAR RAPIDS, IA Inquiries: Surety Department UNITED FIRE & INDEMNITY COMPANY, WEBSTER, TX 118 Second Ave SE FINANCIAL PACIFIC INSURANCE COMPANY, ROCKLIN, CA Cedar Rapids, IA 52401 Hf9 INSURANCE CERTIFIED COPY OF POWER OF ATTORNEY (original on file at Home Office of Company — See Certification) KNOW ALL PERSONS BY THESE PRESENTS, That United Fire & Casualty Company, a corporation duly organized and existing under the laws of the State of Iowa; United Fire & Indemnity Company, a corporation duly organized and existing under the laws of the State of Texas; and Financial Pacific Insurance Company, a corporation duly organized and existing under the laws of the State of California (herein collectively called the Companies), and having their corporate headquarters in Cedar Rapids, State of Iowa, does make, constitute and appoint DAVID T. SATINE, WARREN ALTER, JONATHAN BURSEVICH, EACH INDIVIDUALLY their true and lawful Attomey(s)-in-Fact with power and authority hereby conferred to sign, seal and execute in its behalf all lawful bonds, undertakings and other obligatory instruments of similar nature provided that no single obligation shall exceed $20, 000, 000.00 and to bind the Companies thereby as fully and to the same extent as if such instruments were signed by the duly authorized officers of the Companies and all of the acts of said Attorney, pursuant to the authority hereby given and hereby ratified and confirmed. The Authority hereby granted is continuous and shall remain in full force and effect until revoked by United Fire & Casualty Company, United Fire & Indemnity Company, and Financial Pacific Insurance Company. This Power of Attorney is made and executed pursuant to and by authority of the following bylaw duly adopted on May 15, 2013, by the Boards of Directors of United Fire & Casualty Company, United Fire & Indemnity Company, and Financial Pacific Insurance Company. "Article VI - Surety Bonds and Undertakings" Section 2, Appointment of Attomey-in-Fact. "The President or any Vice President, or any other officer of the Companies may, from time to time, appoint by written certificates attomeys-in-fact to act in behalf of the Companies in the execution of policies of insurance, bonds, undertakings and other obligatory instruments of like nature. The signature of any officer authorized hereby, and the Corporate seal, may be affixed by facsimile to any power of attorney or special power of attorney or certification of either authorized hereby; such signature and seal, when so used, being adopted by the Companies as the original signature of such officer and the original seal of the Companies, to be valid and binding upon the Companies with the same force and effect as though manually affixed. Such attomeys-in-fact, subject to the limitations set of forth in their respective certificates of authority shall have full power to bind the Companies by their signature and execution of any such instruments and to attach the seal the Companies thereto. The President or any Vice President, the Board of Directors or any other officer of the Companies may at any time revoke all power and authority previously given to any attorney -in -fact. IN WITNESS WHEREOF, the COMPANIES have each caused these presents to be signed by its . `\c vice president and its corporate seal to be hereto affixed this F.. 3rd day of December, 2019 CORPORATE �, % ° corsroRATe )ULV 2� ° - r� _ _ _ UNITED FIRE & CASUALTY COMPANY SEAL SEAL` '• 0 19eE <. 2 UNITED FIRE &INDEMNITY COMPANY �kko1.r '•4.. FOP ' <��° FINANCIAL PACIFIC INSURANCE COMPANY %I11111 U•,"` ��,i„, � 1I 11111111/1 � N,� By: .��� State of Iowa, County of Linn, ss: ' Vice President On 3rd day of December, 2019, before me personally came Dennis J. Richmann to me known, who being by me duly sworn, did depose and say; that he resides in Cedar Rapids, State of Iowa; that he is a Vice President of United Fire & Casualty Company, a Vice President of United Fire & Indemnity Company, and a Vice President of Financial Pacific Insurance Company the corporations described in and which executed the above instrument; that he knows the seal of said corporations; that the seal affixed to the said instrument is such corporate seal; that it was so affixed pursuant to authority given by the Board of Directors of said corporations and that he signed his name thereto pursuant to like authority, and acknowledges same to be the act and deed of said corporations. +l+L a Judith A. Jones i Iowa Notarial Seal 641L• Commission number 173041 Notary Public oI1 My Commission Expires 4/23=21 My commission expires: 4/23/2021 I, Mary A. Bertsch, Assistant Secretary of United Fire & Casualty Company and Assistant Secretary of United Fire & Indemnity Company, and Assistant Secretary of Financial Pacific Insurance Company, do hereby certify that I have compared the foregoing copy of the Power of Attorney and affidavit, and the copy of the Section of the bylaws and resolutions of said Corporations as set forth in said Power of Attorney, with the ORIGINALS ON FILE IN THE HOME OFFICE OF SAID CORPORATIONS, and that the same are correct transcripts thereof, and of the whole of the said originals, and that the said Power of Attorney has not been revoked and is now in full force and effect. In testimony whereof I have hereunto subscribed my name and affixed the corporate seal of the said Corporations this 1st day of September 20 20 ` &{I�ll'III f//I,/y� i� ; \; fNo[M ,, \,\\k\1,,,Ifff/ I,�� 4, �j. .& ......... ♦ F A �o�Qp G�PP�pl�c��� Q%po CORPORATE �y : F CORPORATE _- $ r 2 SULY Eg , o SEAL ` %� SEAL e` 1998 a g v o- Assistant Secretary, rl11111% �n�ln�� �""„Rfill 0oo�d° OF&C & OF&I & FPIC BPOA0049 1217 INVITATION TO BID NO. PW 03-11-08-20 OKEECHOBEE 2020 SIDEWALK AND ROADWAY CONCRETE IMPROVEMENTS Opening Date and Time: September 1, 2020, 3:00 PM The City of Okeechobee, Florida is currently soliciting bids to provide construction services needed to install various concrete projects located within the City including: • 8-inch-thick roadway slab work. • Removal of existing sidewalk and installation of new ADA ramps. • Removal and replacement of existing sidewalk and/or curb and gutter. • Installation of new sidewalk and/or curb and gutter. Sealed bids must be received within the General Services Department at City Hall, 55 SE 3rd Avenue, Rm 101, Okeechobee, FL 34974, no later than 3:00 PM EST on or before Tuesday, September 1, 2020. All responses received by the deadline will be opened and recorded in the presence of one or more witnesses within the Council Chambers, Rm 200, at the address listed above. Any bids received after the above noted date and time will not be opened or considered. Facsimile or emailed bids will not be accepted. Product specifications are available in the Bid Packets that may be obtained on the City's website: www.cityofokeechobee.com/contracting-opportunities.html, or from the General Services Department at City Hall during normal office hours, Mon -Fri, 8 AM-4:30 PM, except holidays, or by contacting Patty Burnette, 863- 763-3372 x 9820, or via email at pburnette@cityofokeechobee.com. Questions concerning the scope of work are to be directed to Public Works Director David Allen, 863-763-9790, or dallen ancityofokeechobee.com NOTE: Bonding Requirements Apply to this Bid Opportunity. Bid submittals must be within a sealed envelope and contain two (2) clearly identified originals and one (1) copy of the bid, with the outside of the envelope clearly labeled "BID NO. PW 03-11-08-20 OKEECHOBEE 2020 SIDEWALK AND ROADWAY CONCRETE IMPROVEMENTS, 9-1-20, 3:00 PM" with the submitting Company Name, and Return Address. Bids may be mailed, hand delivered and/or express mailed to the address listed above. Firms properly registered in the State of Florida are encouraged to submit their bid for consideration. It is the sole responsibility of the Bidder to deliver personally or by mail, their bid to the General Services Department on or before the closing hour and date for the receipt of bids as noted above. This solicitation does not commit the City of Okeechobee to award any contracts, to pay any costs incurred in the preparation of a response to this bid, or to contract for any services. The City Council reserves the right to reject any or all bids, to waive informalities and to accept or reject all or part of any bid, as they may deem to be in the best interests of the City of Okeechobee. Responses to this bid, upon receipt by the General Services Department, will become public records subject to provisions of Florida Statute Chapter 119 Florida Public Records Law. City of Okeechobee Project No. PW 03-11-08-20 Public Works Department 1 SECTION I PW 03-11-08-20 GENERAL INFORMATION All responses which comply with the requirements of this Bid will be considered. Submittals must be made in the official name of the Firm or Individual under which business is conducted (showing official business address) and must be signed in ink by a person duly authorized to legally bind the person, Partnership, Company, or Corporation submitting the response to this Bid. Two clearly identified originals and one copy of your bid submittal are required. Bid submittals will be received by the General Services Department until 3:00 p.m. on September 1, 2020. Bid submittals are to be mailed, hand -delivered, and/or Express Mail to: City of Okeechobee General Services Department 55 S.E. 31 Avenue, Room 101 Okeechobee, FL 34974 The submitting offeror is required to have printed on the sealed envelope or wrapping containing their submission their Company name and return address, the Bid Number, Title, Opening Date and Time. Bids received after the date and time specified above shall be returned to the sender unopened_ Facsimile or emailed bids will not be accepted. All bids shall remain in effect for a period of ninety (90) days after the last day on which bids must be submitted. City of Okeechobee Project No. PW 03-11-08-20 Public Works Department 2 SECTION II PW 03-11-08-20 SUBMISSION REQUIREMENTS The bidder shall submit two (2) original clearly identified originals and one copy of the following: 1. Bid Documentation Form (Section III) 2. Minimum Qualifications for Bidders Form (Section IV) and three (3) references (Attachment H) 3. Bid Bond 4. Bid Unit Price Schedule (Section VII, Exhibit B) In addition to the above, please complete the following forms that must be returned with your bid: Attachment A — No Lobbying Affidavit Attachment B — Anti Collusion Statement and No Gifts Statement Attachment C — Proposer's Certification Attachment D — Sworn Statement Pursuant to Section 287.133(3)(a), FL Statutes on Public Entity Crimes Attachment E — Conflict of Interest Disclosure Attachment F — Immigration Law Certification Attachment G — Drug Free Workplace Certification City of Okeechobee Project No. PW 03-11-08-20 Public Works Department 3 SECTION III PW 03-11-08-20 BID DOCUMENTATION City Council City of Okeechobee 55 S.E. 3rd Avenue Okeechobee, FL 34974 (BIDDER'S COMPANY NAME) I have received the documents titled OKEECHOBEE 2020 SIDEWALK AND ROADWAY CONCRETE IMPROVEMENTS, Project No. PW 03-11-08-20. 1 have also received addendum number _ through and have included these provisions in my Bid. I have examined both the Bid documents and the construction site and submit the following Bid in which I agree: 1 _ To hold my Bid open until an agreement has been executed between the City of Okeechobee and accepted Bidder, or until ninety (90) days after Bids are opened, whichever is longer. 2. Regarding the Disposition of Bid Security: to accept the provisions of the Instructions to the Bidders. 3. To accomplish the work included in, and in accordance with the Contract Documents, if this Bid is accepted. 4. To start work on the first day of the month following the date of the Notice to Proceed. This contract will be in force for a period of one (1) year. This contract may be extended beyond the initial one (1) year. Each extension period will be for an additional one (1) year and may be renewed thereafter on an annual basis. It may be under the same or superior terms and conditions as this bid. This shall be accomplished by mutual written agreement/acceptance between the vendor and the City. 5. Payment will be made on a monthly cycle after work has been completed. A monthly invoice will be submitted on or before the 911' day of each month for payment. The invoice will be processed through our regular cycle with payment usually made by the end of the following month. Example: Work performed from September 1st through September 301h. The bill is to be received by the City no later than October 9th, and payment should be made by October 301h. NOTE: The City shall not be liable to pay interest on any unpaid balance. Vendor is solely responsible for all taxes, withholding, or social security obligations. 6. Regarding the Award of the Contract: if I am awarded a contract for this project, I understand that the award may be for all or any portion thereof, of the items listed under the Bid Unit Price Schedule_ City of Okeechobee Project No. PW 03-11-08-20 Public Works Department 4 American Design Engineering Bidder: Construction Inc (Comp ny Name) (Si nature) Steven Esponal (Printed Name) Date:August 28, 2020 Title: VP steven.espinal @ade Email: construction inc.com of • • - •DRUMM M41YARTITM roMM Office Number: 954-740-7777 City of Okeechobee Public Works Department Fax Number: Project No. PW 03-11-08-20 SECTION IV PW 03-11-08-20 MINIMUM QUALIFICATIONS FOR BIDDERS Minimum Qualifications: 1.0 Experience 1.1 Bidder must have at least 3 years of experience in providing commercial concrete services including sidewalks and other flat work, roadway curbing, and roadway concrete pavement. 1.2 Bidder has successfully completed at least 12 concrete projects including at least one project in each of the following categories: 1.2.1 Sidewalk installation 1.2.2 Roadway curbing 1.2.3 Roadway concrete pavement 2.0 References 2.1 Bidder must provide at least 3 verifiable references of similar prior concrete services including sidewalks and other flat work, roadway curbing, and roadway concrete pavement 2.2 For each reference, Bidder shall submit a completed Reference Form provided in Attachment H. provide the client name, client phone number, and client e- mail address. 2.3 Bidder shall provide a written description of the services performed in sufficient detail as they directly relate to the work of this Request for Bid. The description shall include the dates of the period that the Bidder provided the services as well as the contractual amount of the services provided. 2.4 The City, in its sole discretion, may reject any and all bids if the City is not able to verify the references provided. 3.0 Bidder certifies that 3.1 Bidder meets the qualifications listed in Section IV, 1.0 above. 3.2 Bidder has never failed to complete work awarded under a contract due to circumstances that were under Bidder's control. Bidder:American Design Engineerang Construction Inc Date:,4ljc1%8., 20 0 _(Company Name) By: L4ko27. Title: VP ( ignature) steven.espinal@ad Steven Espinal Email: econstructioninc.co (Printed Name) m Mailing Address: 2853 Executive Park Dr. Suite 202, Weston, FI 33331 Office Number: 954-740-7777 City of Okeechobee Public Works Department Fax Number: Project No. PW 03-11-08-20 EXHIBIT B BID UNIT PRICE SCHEDULE PW 03-11-08-20 OKEECHOBEE 2020 SIDEWALK AND ROADWAY CONCRETE IMPROVEMENTS EST. ITEM UNIT UNIT DESCRIPTION 4N AMOUNT NO. MEASURE PRICE POUR EIGHT (8) INCH CONCRETE ROADWAY SLAB TWENTY-FOUR (24) FEET ONE HUNDRED -FIFTY (150) FEET, 3,000 PSI MINIMUM W/6 INCHES X 61NCHES-1.4 X 1A WWF REINFORCEMENT ON NW 10TH STREET. CITY 1 TO REMOVE EXISTING ASPHALT AND EXCAVATE EACH 1Q��� EXISTING ROAD BASE AND PROVIDE NEW SUBBASE. WORK TO BE PERFORMED IN TWO SEGMENTS TO MAINTAIN ACCESS TO APARTMENT COMPLEX ON NORTH SIDE OF 10TH STREET. POUR EIGHT (8) INCH CONCRETE ROADWAY SLAB TWENTY-FOUR (24) FEETX ONE HUNDRED -FIFTY (150) FEET, 3,000 PSI MINIMUM W/6 INCHES 6INCHES —1.4 X 1.4 WWF REINFORCEMENT ON NW 10TH STREET. CITY pCY7. CYJ �3'')'000 OL 2 TO REMOVE EXISTING ASPHALT AND EXCAVATE EACH 1 EXISTING ROAD BASE AND PROVIDE NEW SUBBASE. WORKTO BE PERFORMED IN TWO SEGMENTS TO MAINTAIN ACCESS TO DIAMOND R FERTILIZER. REMOVE EXISTING SIDEWALK AND INSTALL NEW ADA CURB RAMP CR-B PER FDOT INDEXES 300 CURB & CURB AND GUTTER, AND 304 DETECTABLE WARNINGS AND 3 SIDEWALK CURB RAMPS. CONCRETE SHALL BE 3,000 EACH 1 K jl g- 45500. OU PSI WITH FIBER OF OTHER APPROPRIATE REINFORCEMENT MATERIAL. DETECTABLE WARNING MAT COLOR SHALL BE BRICK RED. REMOVE EXISTING SIDEWALK AND INSTALL NEW ADA CURB RAMP CR-C PER FDOT INDEXES 300 CURB & CURB AND GUTTER, AND 304 DETECTABLE WARNINGS AND SIDEWALK CURB RAMPS. CONCRETE SHALL BE 3,000 PSI WITH FIBER OF OTHER APPROPRIATE 500.0D 4 EACH 7 O' REINFORCEMENT MATERIAL. DETECTABLE WARNING i MAT COLOR SHALL BE BRICK RED. WIDTH TO VARY FROM 6 FEET TO 8 FEET DEPENDING ON LOCATION. RAMP WIDTH TO MATCH WIDTH OF EXISTING PAVER SIDEWALK. City of Okeechobee Public Works Department Project No. PW 03-11-08-20 54 REMOVE EXISTING SIDEWALK AND INSTALL NEW ADA CURB RAMP CR-L PER FDOT INDEXES 300 CURB & CURB AND GUTTER, AND 304 DETECTABLE WARNINGS AND 5 SIDEWALK CURB RAMPS. CONCRETE SHALL BE 3,000 EACH 2� 5(o0.0a PSI WITH FIBER OF OTHER APPROPRIATE 3�7gp.r REINFORCEMENT MATERIAL. DETECTABLE WARNING MAT COLOR SHALL BE BRICK RED. 6 REMOVE AND REPLACE EXISTING FIVE (5) FOOT WIDE LINEAR 100 �(D,rj (�� Ov CONCRETE SIDEWALK. TEN (10) YARD TOTAL. FOOT �.5�. 7 REMOVE AND REPLACE EXISTING FIVE -FOOT -WIDE LINEAR 50 l tG l tG✓•�C3� S� • O� CONCRETE SIDEWALK. LESS THAN TEN (10) YARD TOTAL FOOT 8 REMOVE AND REPLACE EXISTING CONCRETE "F" CURB. LINEAR 100 a - O� a �n0. O� TEN (10) YARD TOTAL FOOT 9 REMOVE AND REPLACE EXISTING CONCRETE "F" CURB. LINEAR 100 LESS THAN TEN (10) YARD TOTAL FOOT 10 INSTALL NEW FIVE (5) FOOT WIDE CONCRETE LINEAR 500 NQ p�a4�0IX7. DO SIDEWALK. TEN (10) YARD TOTAL FOOT 11 INSTALL NEW FIVE (5) FOOT WIDE CONCRETE LINEAR 100 ���(� 00 ��� 000.0� SIDEWALK. LESS THAN TEN (10) YARD TOTAL FOOT12 INSTALL NEW CONCRETE "D" CURB. TEN (10) YARD OR LINEAR GREATER TOTAL FOOT 13 INSTALL NEW CONCRETE "D" CURB. LESS THAN TEN LINEAR 50 ��j� 00 �I1? jp. DU (10) YARD TOTAL FOOT 14 INSTALL NEW CONCRETE "F" CURB. TEN (10) YARD OR LINEAR 100 3�' 00 bDD b. 00 GREATER TOTAL FOOT 15 INSTALL NEW CONCRETE "F" CURB. LESS THAN TEN (10) LINEAR 50 .r7n �I ?50.0) YARD TOTAL FOOT i 16 INSTALL NEW 4-INCH-THICK CONCRETE SLAB SQUAREFOOT 500 (y 00 t3(900. 00 17 INSTALL NEW 6-INCH-THICK CONCRETE SLAB SQUARE 500 � LI, 000. o � FOOT .�) TOTAL BID AMOUNT a O I0, 0� (Based on Bid Unit Prices & Estimated Quantities) 11a 0lo.00 City of Okeechobee Project No. PW 03-11-08-20 Public Works Department 55 Bidders Company Name American Design Engineering Construction Inc NOTE: This Bid is on a unit price basis. The total estimated amount is for Bid comparison purposes only. The Contractor should field verify the actual site conditions prior to time of bidding and before submitting the Bid proposal. The Contractor should read the special conditions and the requirements for insurance before submitting a Bid proposal. The Contractor should verify the quantities to be included in the construction contract. The Contractor shall furnish the City of Okeechobee with a Payment and Performance Bond in 100 percent (100%) of the total estimated amount of the contract. The Payment and Performance Bond shall continue in effect for one (1) year after completion and acceptance of the work as guarantee against construction defects. The Contractor in his Bid shall include the cost of said bond. I have attached the required 5 percent (5%) Bid Security to this Bid. Bidder: American Design Engineering Construction Inc. Date: Aug. 28. 2020 (Company Name) By: Title: VP ( ignature) steven.espinal@ade Steven Espinal Email: constructioninc.com (Printed Name) Mailing Address: 2853 Executive Park Dr. Suite 202, Weston, FI 33331 Office Number: 954-740-7777 Fax Number: City of Okeechobee Public Works Department Project No. PW 03-11-08-20 SECTION Vill PW 03-11-08-20 MISCELLANEOUS A. No Lobbying: All respondents are hereby placed on notice that any communication, whether written or oral, with City of Okeechobee elected officials or any City staff or outside Individuals working with the City in respect to this request (with the exception of the General Services personnel designated to receive requests for interpretation or corrections or technical questions), is prohibited. These persons shall not be lobbied, either individually or collectively, regarding any request for Bid, qualifications and/or any other solicitations released by the City. To do so is grounds for immediate disqualification from the selection process. All respondents must submit the attached No Lobbying Affidavit with their submittal stating that they and their Subcontractor, sub - consultants and agents agree to abide by the no lobbying restrictions in order to be considered for this request. Any respondent that does not submit the required No Lobbying Affidavit will be automatically disqualified from further consideration. NOTE: For respondents' convenience, this certification form is attached and made a part of the procurement package. See Attachment A B. Collusion, Gratuities and Kickbacks: It shall be unethical for any respondent to collude with any other respondent or offer, give or agree to give any City Council member, City employee or City representative (including selection committee members) a gift, gratuity or an offer of employment in connection with any decision, approval, disapproval, recommendation or preparation of any part of the procurement process. NOTE: For respondents' convenience, this certification form is attached and made a part of the procurement package. See Attachment B C. Modifications: The City reserves the right to modify, alter or change the scope or other aspects of this solicitation. D. Level Playing Field: The contents of this solicitation are intended to provide a level playing field on which Firms or Individuals may base their responses. E. Public Entity Crime Affidavit. As requested by Florida Statute 287.133(2)(a), a person or affiliate who has been placed on the convicted vendor list following a conviction for a Public Entity Crime may not submit a Bid on a contract with a Public Entity for the construction or repair of a public building or a public work, may not submit Bids on leases of real property to a Public Entity, may not be awarded or perform work as a Contractor, supplier, Subcontractor, or consultant under a contract with any Public Entity, and may not transact business with any Public Entity in excess of the threshold amount provided in F.S. 287.017 for Category Two for a period of thirty-six (36) months from the date of being placed on the convicted vendor list. Any person must notify the City within thirty (30) days after a conviction of a Public Entity crime applicable to that person or to an affiliate of that person. NOTE: For respondents' convenience, this certification form is attached and made a part of the procurement package. See Attachment D Ciiy at Okeechobee Public Works Department Project No. rvv 03-11-06-20 57 F. Conflict of Interest: The award hereunder is subject to the provisions of Chapter 112, Florida Statutes. All respondents must disclose with their submission the name of any officer, director, employee or agent who is also a public officer, employee or an agent of the City of Okeechobee City Council, or any of its agencies. Furthermore, all respondents must disclose the name of any City officer, employee or agent who owns, directly or indirectly, an interest of five percent (5 %) or more in the Firm or any of its parent companies or subsidiaries. NOTE: For respondents' convenience, this certification form is attached and made a part of the procurement package. See Attachment E G. Immigration Laws: Respondents must comply with all applicable immigration laws in their employment practices. NOTE: For respondents' convenience, this certification form is attached and made a part of the procurement package. See Attachment F H. Tie Bids: Preference shall be given to businesses with drug -free workplace programs. Whenever two or more bids which are equal with respect to quality and service are received by the City for the procurement of commodities or contractual services, a bid received from a business that certifies that it has implemented a drug -free workplace program shall be given preference in the award process. Established procedures for processing tie bids will be followed if none of the tied vendors has a drug -free workplace program. City of Okeechobee Public Works Department Project No. PW 03-11-08-20 58 ATTACHMENT A PW 03-11-08-20 NO LOBBYING AFFIDAVIT STATE OF FLORIDA COUNTY OF Palm l;e.iAr k This ? day of &,P 4fT, 20?-6 ' t-eVtf\ C.Sbeing first duly sworn, deposes and says that he/she is the authorized representative of 4 we "o) Yii(Name of Contractor, Firm or Individual) respondent to the attached request for Bid, or qualifications and/or any other solicitation released by City of Okeechobee, and that the Bidder and any of its agents agrees to abide b the City of Okeechobee no lobbying restrictions in regard to this solicitation. Affiant The foregoing instrument was acknowledged before me by means of r�Kphysical presence or ❑ online notarization, this tL day of fk-44Mn r 20�J , by �jevy, who is personally known to me or produced 1=L— L-)r; yzr L % c: z- n se as identification. City of Okeechobee Public Works Department Notary Public Signature Commission No. MnkA. Hammon - Notary PU t~ State of Florida Mycommission Expires 12/151202i Commission No. GG 939923 Bonded through CNA Suratr Project No. PW 03-11-08-20 59 vomci O.AQ Y4wtm, I ATTACHMENT B PW 03-11-08-20 ANTI -COLLUSION STATEMENT AND NO GIFTS STATEMENT Date: Atjg- 28, 2020 Anti -collusion statement: The below -signed Bidder has not divulged to, discussed, or compared his/her Bid with other Bidders and has not colluded with any other Bidder or parties to a Bid whatsoever. No gifts statement: Firm Name: By (printed/typed): By (signature): Title: Mailing Address: City, State, Zip: Telephone No.. - City of Okeechobee Public Works Department No premiums, rebates, gifts or gratuities are permitted with, prior to, or after submission of the Bid. Any such violation will result in rejection of the Bid and removal from the Bid list(s). American Design Engineering Construction Inc VP 2853 Executive Park Dr. Suite 202 Weston, FI 33331 954-740-7777 Project No. PW 03-11-08-20 W ATTACHMENT C PW 03-11-08-20 PROPOSER'S CERTIFICATION I have carefully examined this Request for Bid (BID)/Request for Proposals (RFP)/ Request for Qualifications (RFQ), which includes scope, requirements for submission, general information and the evaluation and award process. I acknowledge receipt of the following addenda. Addendum # - Date: Addendum # Date: Addendum # - Date: Addendum # Date: Addendum # - Date: Addendum # - Date: I hereby propose to provide the services requested in the City's BID/RFP/RFQ and, if awarded, to enter into the attached draft contract. I agree that the terms and conditions of the City's BID/RFP/RFQ shall take precedence over any conflicting terms and conditions submitted with my proposal and agree to abide by all conditions of the BID/RFP/RFQ, unless a properly completed Exceptions to BID/RFP/RFQ form is submitted. I acknowledge that the City may not accept the proposal due to any exceptions. I certify that all information contained in my proposal is truthful to the best of my knowledge and belief. I further certify that I am duly authorized to submit this proposal on behalf of the Company as its agent and that the Company is ready, willing and able to perform if awarded a contract. I further certify, under oath, that this proposal is made without prior understanding, agreement, connection, discussion or collusion with any other person, Company or Corporation submitting a proposal for the same product or service; no gratuities, gifts or kick -backs were offered or given by the Bidder or anyone on its behalf to gain favorable treatment concerning this procurement; no City Council member, employee or agent of City of Okeechobee or of any other Company is interested in said Bid; and that the undersigned executed this Proposer's Certification with full knowledge and understanding of the matters therein contained and was duly authorized to do so. American Design Engineering Construction Inc 2853 Executive Park Drive Suite 202 Name of Business Mailing Address Weston, FI 33331 City, State & Zip Code ,,:Y�V�;ti2, �, 954-740-7777 Authorized Signature Telephone Number/Fax Number Steven Esp4nal VP Steven.esl2inal@adeconstructioninc.com Name & Title, Typed Email Address STATE OF FLORIDA COUNTY OF Palms 1'jaro, The foregoing instrument was acknowledged before me by means of physical presence or ❑ online notarization, this _� day of "<-;,-1,11Ides 20 �- , by S3,2van 9S� nLti who is personally known to me or produced �L— hr;ti�$r LiCeAsC. as identification. Notary Public Signature Commission No. Mark A, Hamllton - Notary PubW State of Florida AVW8 VNJ 4BM41 pepme My Commission Expires 12/1512023 CE6666 JJ'oN u0lss!ww00 Commission No. GG 939923 ap Wa9 swldx3 uo!ss!wwoo An Bonded through CNA Surety spuolA 10 SIKS Wd Ae1oN - uoulweH -y k-W City of Okeechobee Project No. PW 03-11-08-20 Public Works Department 61 ATTACHMENT D PW 03-11-08-20 SWORN STATEMENT PURSUANT TO SECTION 287.133 (3)(a), FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. This sworn statement is submitted to CITY OF OKEECHOBEE, FLORIDA by: Steven Esr)inal VP (print Individual's name and title) for: American Design Engineering Construction Inc. (print name of entity submitting sworn statement) whose business address is 2853 Executive Park Dr. Suite 202, Weston, FI 33331 and (if applicable) its Federal Employer Identification Number (FEIN) is:2F-n71,qng7 (If the entity has no FEIN, include the Social Security Number of the Individual signing this sworn statement: 2. 1 understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or of the United States, including but not limited to, any Bid or contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state or of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentations. 3. 1 understand that "convicted" or "conviction" as defined in Paragraph 287.133(1)(b), Florida Statutes, means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trial court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, non -jury trial, or entry of a plea of guilty or nolo contendere. 4. 1 understand that an "affiliate" as defined in Paragraph 287.133(1)(a), Florida Statutes, means: a. A predecessor or successor of a person convicted of a public entity crime; or b. An entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity crime. The term "affiliate" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair market value under an arm's length agreement, shall be a prima facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. City of Okeechobee Public Works Department Project No. PW 03-11-08-20 62 5. 1 understand that a "person" as defined in Paragraph 287.133(1)(e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding contract and which Bids or applies to Bid on contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The term "person" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of an entity. 6. Based on information and belief, the statement which I have marked below is true in relation to the entity submitting this sworn statement. (Indicate which statement applies). Neither the entity submitting this sworn statement, nor any of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, nor any affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. ❑ The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. ❑ The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. However, there has been a subsequent proceeding before a Hearing Officer of the State of Florida, Division of Administrative Hearings and the final Order entered by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list (attach a copy of the final order). I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 1 ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED. I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES FOR CATEGORY O O�� .F ANY CHANGE IN THE INFORMATION CONTAINED IN THIS FORM. Signature, � %� 1 STATE OF FLORIDA COUNTY OF Pc;Im The foregoing instrument was acknowledged before me by means of fsphysical presence or Cl online notarization, this 1— day of S�gkw)bo,- 20d0 , by who is personally known to me or produced r l_- Llczr:- as identification. City of Okeechobee Public Works Department Notary Public Signature Commission No. Mark A. Hamilton - Notary Pubr* State of Florida My Commission Expires 12/15/2M Commission No. GG 939923 Bonded through CNA Surety Project No. PW 03-11-08-20 III 63 ATTACHMENT E PW 03-11-08-20 CONFLICT OF INTEREST DISCLOSURE FORM For purposes of determining any possible conflict of interest, all Bidders must disclose if any City of Okeechobee employee(s), elected official(s), or any of its agents is also an owner, corporate officer, director, agent, employee, etc., of their business. Indicate either "yes" (a City employee, elected official or agent is associated with your business), or "no". If yes, give person(s) name(s) and position(s) with your business. Firm Name: By (Printed): By (Signature): YES NO %/ Name(s) Position(s) American Design Engineering Construction Inc. Title: VP Address: 2853 Executive Park Drive Suite 202 Weston FI 33331 Phone Number: 954-740-7777 City of Okeechobee Public Works Department Project No. PW 03-11-08-20 64 ATTACHMENT F PW 03-11-08-20 IMMIGRATION LAW CERTIFICATION City of Okeechobee will not intentionally award City contracts to any Contractor who knowingly employs unauthorized alien workers, constituting a violation of the employment provisions contained in 8 U.S.C. Section 1324 a(e) (Section 274a(e) of the immigration and nationality act ("INK)). City of Okeechobee may consider the employment by any Contractor of unauthorized aliens a violation of Section 274A(e) of the INA. Such violation by the recipient of the employment provisions contained in Section 274A(e) of the INA shall be grounds for unilateral cancellation of the contract by City of Okeechobee. Respondent attests that it is fully compliant with all applicable immigration laws, specifically relating to the 1986 immigration act and subsequent amendments. American Design Engineering Con tr ction Inc mpany Name Signature VP Title Aug. 28,2020 Date STATE OF FLORIDA COUNTY OF Palm Beads The foregoing instrument was acknowledged before me by means of EI`physical presence or ❑ online notarization, this 1 day of �e�i,omiw 20 q0, by Sk-t-n C-5Cj,rNvk , who is personally known to me or produced 'VL- as identification. Notary Public Signature City of Okeechobee Public Works Department Commission No. Mark A. Hamlltgn-Notary Public State of Florida My Commission Expires 12/15/2023 Commission No. GG 939923 Bonded through CNA Surety Project No. PW 03-11-08-20 65 ATTACHMENT G PW 03-11-08-20 DRUG -FREE WORKPLACE CERTIFICATION THE BELOW SIGNED Bidder/proposer CERTIFIES that it has implemented a drug -free workplace program. In order to have a drug -free workplace program, a business shall: Publish a statement notifying employees that the unlawful manufacture, distribution, dispensing, possession or use of a controlled substance is prohibited in the workplace and specifying the actions that will be taken against employees for violation of such prohibition. 2. Inform employees about the dangers of drug abuse in the workplace, the business's policy of maintaining a drug -free workplace, any available drug counseling, rehabilitation and employee assistance programs, and the penalties that may be imposed upon employees for drug abuse violations. 3. Give each employee engaged in providing the commodities or contractual services that are under quote a copy of the statement specified in subsection 1. 4. In the statement specified in subsection 1, notify the employees that, as a condition of working on the commodities or contractual services that are under quote, the employee will abide by the terms of the statement and will notify the employer of any conviction or plea of guilty or nolo contendere to any violation occurring in the workplace no later than five (5) days after such conviction. 5. Impose a sanction on, or require the satisfactory participation in, drug abuse assistance or rehabilitation program if such is available in the employee's community, by an employee who is convicted. 6. Make a good faith effort to continue to maintain a drug -free workplace through implementation of this section. As the person authorized to sign this statement, I certify that this Firm complies fully with the above 9requirem ts. Signature: 7�Yx , / J Date: Aug. 28, 2020 American design Engineering Company: Construction Inc. Name: Steven Espinal Address: 2853 Executive Park Dr. Suite 202 Weston, FI 33331 City of Okeechobee Public Works Department Title: VP Phone Number: 954-740-7777 Project No. PW 03-11-08-20 m ATTACHMENT H CITY OF OKEECHOBEE OKEECHOBEE 2020 SIDEWALK AND ROADWAY CONCRETE IMPROVEMENTS PW 03-11-08-20 REFERENCE Client Name: JOEL CORTEZ Client Phone Number: 786 512 1240 Client E-mail: icortes@lantana_oM Service Dates: Beginning APRIL 2020 End JUNE 2020 Estimated Annual Contract Amount: $97,000.00 Description of the services performed as they directly relate to the work of this Request for Bid: REMOVAL OF EXISTING CONCRETE & SAW CUTTING CONCRETE CURB & GUTTER TYPE D CONCRETE SIDEWALK & DRIVEWAYS 6 " THICK REGULAR EXCAVATION FILLING & REGRADING TREE REMOVAL MOT City of Okeechobee Project No. PW 03-11-08-20 Public Works Department 67 ATTACHMENT H CITY OF OKEECHOBEE OKEECHOBEE 2020 SIDEWALK AND ROADWAY CONCRETE IMPROVEMENTS PW 03-11-08-20 REFERENCE Client Name: FDOT DISTRICT 6 MO ALKORSHEMI Client Phone Number: 786 479 7860 Client E-mail: Mohamed. Alkorshemi@dot. state. fI Service Dates: Beginning OCTOBER 2018 End OCTOBER 2019 Estimated Annual Contract Amount: $225,000.00 Description of the services performed as they directly relate to the work of this Request for Bid: REMOVAL OF EXISTING CONCRETE CONCRETE CURB & GUTTER, TYPE F CONCRETE SIDEWALK & DRIVEWAYS 4" THICK CONCRETE SIDEWALK & DRIVEWAYS 6" THICK DETECTABLE WARNINGS MOT City of Okeechobee Project No. PW 03-11-08-20 Public Works Department 67 ATTACHMENT H CITY OF OKEECHOBEE OKEECHOBEE 2020 SIDEWALK AND ROADWAY CONCRETE IMPROVEMENTS PW 03-11-08-20 REFERENCE Client Name: FDOT DISTRICT 6 ERNESTO RODRIGUEZ Client Phone Number: 786 512 1240 Client E-mail: Ernesto Rodriguez @dot state fl us Service Dates: Beginning MARCH 2O20 End SEPTEMBER 2020 Estimated Annual Contract Amount: $135,000.00 Description of the services performed as they directly relate to the work of this Request for Bid: MILLING EXISTING PAVT. 1 1/2" DEPTH ASPHALT CONCRETE FRICTION COURSE RAISED PAVEMENT MARKER MANHOLE, ADJUST THERMOPLASTIC MOT City of Okeechobee Public Works Department Project No. PW 03-11-08-20 67 FD� Florida Department of'Transportation ICON DESANTIS 14655 SW 122nd Avenue- KEVIN J. THIBAULT GOVERNOR Miami, FL 33186-6102 SECRETARY October 29, 2019 .,?015 1520 0002 4822 9451 American Design Engineering Construction, Inc. 2853 Executive Park Drive Weston, FL 33331 (954) 274 7117 Steven.espinel(d)adeconstuctionine.com RE: Contract: E6M23 RO Description: Concrete Repair Financial#: 444284-1-72-01 Attached is the Final Contractor Field Performance Report (CFPR) for E6M23-RO. Please sign the CFPR and return to this office within 10 business days. If you desire a meeting to discuss the results of the Report, please submit your written request to 14655 SW 122 Av Miami FL, 33186, or email bencze_Vajta��i�.dt�tate.fY.us or fax (305) 640-7287. Written request for a meeting must be received by this office within ten (10) business days from your receipt of this letter. If requested, the Project Manager will schedule the meeting based on a mutually agreed upon time and date at a location selected by the Department. If a meeting is not requested, or you fail to attend the meeting that is scheduled to discuss the CFPR, you will be deemed to have accepted the Final CFPR and forfeit your dispute rights. Sincerely, c e Vajta Roadway Area Manager cc: R. Marrero, L Salazar, B. Jimmerson, H. Bechtold, K. AI -Said, E6M23-RO Contract's file www.dot.state.fl.us Page 1 of 4 FLORIDA DEPARTMENT OF TRANSPORTATION 375-020-43 CONTRACTOR MAINTENANCE 1119 FIELD PERFORMANCE REPORT Contractor: American Design Engineering Contruction Over Contract: E61VI23-RO Evaluation Date: October 22.2019 Type of Evaluation: Periodic 09 Final Category One Pursuit and Timely Completion of Work ; Performance The Contractor performed all work in an effective and expedient manner. The Department's expectations Excellent regarding timely pursuit and completion of the work were often exceeded. Q Except for a few occasions, the Contractor completed all of the work within authorized timeframes. The Satisfactory Contractor consistently demonstrated sufficient efforts to complete work in a timely fashion. The Department's expectations regarding timely pursuit and completion of the work were usually met and O sometimes exceeded. The Contractor occasionally completed the work in a timely manner, but efforts were consistently less than s`, Unsatisfactory adequate. Department involvement was required on more than one occasion to prompt the Contractor to 0 �complete the work. — _._.._ _ ..._ _.._._..._._ _._....... -- --- The Contractor failed to complete the work in a timely fashion. On several occasions the Contractor failed t6 poor begin work in a timely fashion, and the Contractor made little effort to correct deficiencies. Substantial } Department involvement was required to prompt completion of the work, including written correspondence advising the Contractor of potential default. Expectations were not met_ _ Notes & Comments The contractor preformed his work in professional manner and met the departments expectation. Work was completed within the dates on the work documents . in U.S 1 Work order 3 the contractor finished his work before the work order due date and demonstrated great effort to complete the work in a timely fashion. MA Category Two Maintenance of Traffic MOT & Safety, Operateons Performance MOT setups and compliance were proper with no correctable complaints from Department personnel and/or , Excellent traveling public. No incidents or injuries occurred within work zones due to improper MOT. Qualified MOT personnel were present at all times_ .Expectations were exceeded, Contractor often went above and beyond FDOT Design Standard requirements to ensure safety for both work crews and traveling public. MOT setups and compliance were mostly proper with few correctable complaints from Department Satisfactory personnel and/or traveling public. No incidents or injuries occurred within work zones due to Improper MOT. Qualified compliance Expectations a met and exceeded occasionally. fied MOT personnel were resent. were i MOT setups and were at times achieved, but there were several complaints and/or Unsatisfactory incidents of non-compliance. No major Incidents or injuries occurred within work zones due to improper MOT. Qualified MOT personnel were usually present. Some involvement from Department personnel was ,` 0 required on a few occasions. Expectations were not consistently met. } Proper MOT deployment and overall compliance was lacking. Numerous correctable complaints from poor. Department personnel and/or traveling public were noted. An incident with injuries may have occurred l within the work zone due to improper MOT. Qualified MOT personnel were seldom on site or in close I Q proximity to the work site. Expectations were not met. WA ( NIA (To be used when MOT was not necessary or included in the contract). Notes & Comments MOT setup was per the deisgn standards and specs and expectation were met. No incidents or injuries occurred within work zones due to improper MOT Set up. MA Page 2 of 4 375-020-43 MAINTENANCE 1119 The Department identified notable errors and failures to meet contract requirements. control was only met on occasion. Notes & Comments Contractor: American Design Engineering Contruction Over Contract: E6M23-RO Evaluation Date: October 22. 2019 Category Three Ti:mel and Complete Submittal of Documents and Re orts Performance Written correspondence and documentation were error free and critical dates were met. Excellent Contractor adequately followed the contract from a written correspondence perspective. Quality in relation Satisfactory to written correspondence was good with few errors. timeliness of personnel documents , . ..... � s a __..._..._._... _.uali...__._._ Department ersonnel encountered issues with the overall quality of the written correspondence or overall 'Unsatisfactory submittal- _.. 0 . _ Overall quality control from a correspondencelpaperwork aspect was not met. Excessive prompting from Poor Department personnel for required documentation was required and the correction of substandard/ low quality work was necessary. Contractor failed to submit required documents such as Form 21 A within O allowable time. Notes & Comments Contractor submitted doceuments timely, complete, and free of errors.when the work order is completed the contractor always submited all the invoices and documents in a professional maner. MA Category Four Overall QualitControl, Environmental Compliance, and Co p iance with Contract Requirements Contractor followed all of the requirements/conditions of the contract with superior quality in accordance with FDOT Standards and Specifications (including environmental issues if applicable). Contractor was self- sufficient requiring no help from the Department. Contractor consistently performed quality work operations according to the contract with few errors. Performance Excellent t Satisfactory 0 Overall quality control in the field was not consistently met. Department personnel were often required to f Unsatisfactory prompt the Contractor for correction. of substandard or low quality work. Overall quality Poor R The contractor followed all requriments /conditions of the contract and provided quality work for the department. The field crew did their best to exceed work expectation.The contractor kept the department informed of every problem found during the operations. MA Page 3 of 4 375-020-43 MAINTENANCE 1/19 Contractor: American Design Engineering Contruction Over Contract: E6M23-RQ Evaluation Date: October 22, 2019 Category Five Interaction, Coordination, and Cooperation With Department Personnel, Traveling Public, Other �— _ Performance Contractors, Property Owners and Other Governmental Agencies i Interaction with Department personnel was outstanding; no complaints from the traveling public or adjacent Excellent property owners were noted- The Contractor handled any issues that arose, notifying the Department of the outcome. Positive feedback the wasa - - ck from .. _... public __ ._.. _. _ .._ P _were..... -- — often exceeded. a - public o Whe- � ^ .__;___ Few, if an complaints from the traveling n a concern ( property were noted _...._.___._. Satisfactory was expressed, the Contractor was quick to resolve it. Positive interaction with Department personnel with some positive feedback from the public was noted. Expectations were always met and occasionally O exceeded. Some complaints from outside parties and Department personnel were noted (mostly minor in nature). Most Unsatisfactory complaints were handled in a time!y manner. Expectations were not consistently met. 4 Numerous complaints were received about work operations, staging of equipment, and/or poor attitude. The; Contractor repeatedly failed to follow instructions; communication and cooperation was inadequate. Poor O Notes & Comments When the department had any concerns or issues the contractor was quick to help us resolve them. No complaints from the department or the traveling public. The contractor showed excellent interaction with department personnel_ MA Category Six Disadvantaged Business Enterprise (DBE) Reporting__ � �..� E Contractor's staff was very well qualified and capable to address sufficient utilization of the Equal Opportunity Compliance (EOC) System application to collect, review, and report any DBE commitments/payments. Periodic checks of the EOC System by Department personnel revealed no issues and no follow up with the Contractor in regard to DBE issues was required. Contractor's staff sufficiently utilized the Equal Opportunity- Compliance (EOC) System to adequately collect, review and report DBE commitments/payments. Periodic checks of the EOC System by Department personnel revealed very few issues and minimal follow up with the Contractor in regard to DBE Contractor _ demonstrated little interest in utilizing the EOC system to collect, review, and report any DBE commitments/payments. Requests for the Contractor to utilize the system were repeatedly made by Department personnel and follow up with the Contractor was often required. 'Contractor failed to adequately report DBE commitme - ___-... ____ _.- nts/payments. Requests for the Contractor to correct errors within the system were repeatedly made by the Department; excessive/recurring assistance to the Contractor was necessary. N/A (To be used when the Contractor is exempt from DBE reporting requirements.) Notes & Comments The contractor met all requirment in regards to DBE information. MA Performance Excellent 0 Satisfactory O Unsatisfactory O Poor O '. N/A O Page 4 of 4 375-020-43 MAINTENANCE 1119 Contractor: American Design Engineering Contruction Over Contract: E6M23-RO Evaluation Date: October 22.2019 Overall Score: 'too Summary ----------- -- Overall contractor ADE Construction has made a good effort to complete the work on time and with great quality. MOT setup were according to the FDOT design standard. no incidents or injuries occurred within work zones_ contractor s provided daily report with no errors. Looking forward to working with ADEC again in the future. MA Pursuit and Timely Completion of Work Maintenance of Traffic (MOT) & Safety Operations Timely and Complete Submittal of Documents and Reports Overall Quality Control, Environmental Compliance, and Compliance with Contract Requirements Interaction, coordination, and cooperation with Department personnel, traveling public, other contractors, property owners and Government agencies Disadvantaged Business Enterprise (DBE) Reporting CONTRACTOR COPIES: Contractor Project File District Maintenance Engineer - Original Cost Center Manager Date Excellent Excellent Excellent Excellent Excellent Excellent Submitted By Project Manager Date Reviewed Reviewed DoouSign Envelope ID: 6B483B88-ABAA-4E04-972F-0559941659D9 FDQ Florida Department of Transportation RON DESANTIS 1000 N W 1 1 1 Avenue KEVIN 3. THIBAULT, P.E. GOVERNOR Miami, FL 33172 SECRETARY July 30, 2020 Steven Espinal — Vice President American Design Engineering Construction, Inc. 2853 Executive Park Drive Weston, FL 33331 Steven. espinal(a-)-adeconstructioninc.com RE: Contract: E6NO3 RO Description: Asphalt Repair Financial#: 42357-1-8-72-01 Attached is your Contractors Periodic Field Performance Evaluation for the list Quarter of the year. This contract will be evaluated quarterly as a courtesy. The results of these evaluations will determine the Contractors Final Field Performance Report that will be issued at the end of this contract. If deficiencies are shown in this evaluation you are urged to take the necessary measures to correct them. Should you have any questions with this procedure or of this evaluation please contact me at (305) 640-7200 DocuSigned by: Sincerely, �11 5 WEDT 3 05 EAAB27A9541 E68428... Howard Bechtold South Dade Operations Manager cc: R. Marrero, L Salazar, B. Jimmerson, H. Bechtold, K. AI -Said, E6NO3-RO Contract's file Improve Safety, Enhance Alto iility, Inspire Innovation www.fdot.gov DocuSign Envelope ID: 6B483B88-ABAA-4E04-972F-0559941659D9 Page , of 4 FLORIDA DEPARTMENT OF TRANSPORTATION 375-020-43 CONTRACTOR MAINTENANCE 1/19 FIELD PERFORMANCE REPORT Contractor: American Design Engineering Construction Inc. Contract: E6NO3-RO Evaluation Date: July 30, 2020 Type of Evaluation: () Periodic rTf Final Category One Pursuit and Timely Completion of Work Performance The Contractor performed all work in an effective and expedient manner. The Department's expectations Excellent regarding timely pursuit and completion of the work were often exceeded_ Except for a few occasions, the Contractor completed all of the work within authorized timeframes. The Satisfactory Contractor consistently demonstrated sufficient efforts to complete work in a timely fashion. The Department's expectations regarding timely pursuit and completion of the work were usually met and. sometimes exceeded. The Contractor occasionally completed the work in a timely manner, but efforts were consistently less than Unsatisfactory adequate. Department involvement was required on more than one occasion to prompt the Contractor to C1, complete the work_ The Contractor failed to complete the work in a timely fashion. On several occasions the Contractor failed to Poor begin work in a timely fashion, and the Contractor made little effort to correct deficiencies. Substantial Department involvement was required to prompt completion of the work, including written correspondence of advising the Contractor of potential default. Expectations were not met. Notes & Comments The contractor had has provided timely work and has had no problem with the Department personnel expectations on pursuit of work. The contractor has demonstrated that they are willing to work hard to complete all their work on time. FOR Category Two Maintenance of Traffic MOT & Safety Operations Performance MOT setups and compliance were proper with no correctable complaints from Department personnel and/or Excellent traveling public. No incidents or injuries occurred within work zones due to improper MOT. Qualified MOT personnel were present at all times. Expectations were exceeded, Contractor often went above and c: beyond FDOT Design Standard requirements to ensure safety for both work crews and traveling public. MOT setups and compliance were mostly proper with few correctable complaints from Department Satisfactory personnel and/or traveling public_ No incidents or injuries occurred within work zones due to improper MOT. Qualified MOT personnel were present. Expectations were met and exceeded occasionally_ MOT setups and compliance were at times achieved, but there were several complaints and/or Unsatisfactory incidents of non-compliance. No major incidents or injuries occurred within work zones due to improper MOT. Qualified MOT personnel were usually present. Some involvement from Department personnel was (`w` required on a few occasions. Expectations were not consistently met. Proper MOT deployment and overall compliance was lacking. Numerous correctable complaints from Poor Department personnel and/or traveling public were noted_ An incident with injuries may have occurred within the work zone due to improper MOT_ Qualified MOT personnel were seldom on site or in close" proximity to the work site. Expectations were not met. N/A (To be used when MOT was not necessary or included in the contract)_ N/An•-,, Notes & Comments The contractor till now has provided MOT by using Sub ACME and they have done a great job on all MOT operations. Crews have demonstrated that they are all very well trained and have good experience on various MOT procedure and set- ups. FOR DocuSign Envelope ID: 6B483B88-ABAA-4E04-972F-0559941659D9 Page 2 of 4 375-020-43 MAINTENANCE 1119 Contractor: American Design Engineering Construction Inc. Contract: E6NO3-RO Evaluation Date: July 30.2020 Category Three Timely and Complete Submittal of Documents and Reports Performance Written correspondence and documentation were error free and critical dates were met. Excellent Contractor adequately followed the contract from a written correspondence perspective. Quality in relation Satisfactory to written correspondence was good with few errors. -i� Department personnel encountered issues with the overall quality of the written correspondence or overall Unsatisfactory timeliness of contract document submittal. Overall quality control from a correspondence/paperwork aspect was not met- Excessive prompting from Poor Department personnel for required documentation was required and the correction of substandard/ low quality work was necessary- Contractor failed to submit required documents such as Form 21-A within allowable time. Notes & Comments The contractor office personnel have providing all written correspondence and documentation to the Department with few errors and met all deadlines. The office staff is always ready the next morning upon job completion to submit their invoice - FOR Category Four Overall Quality Control, Environmental Compliance, and Compliance with Contract Reauirements Performance , Contractor followed all of the requirements/conditions of the contract with superior quality in accordance with Excellent FDOT Standards and Specifications (including environmental issues if applicable)- Contractor was self- sufficient requiring no help from the Department. Contractor consistently performed quality work operations according to the contract with few errors. Satisfactory Overall quality control in the field was not consistently met. Department personnel were often required to Unsatisfactory prompt the Contractor for correction of substandard or low quality work- >. The Department identified notable errors and failures to meet contract requirements. Overall quality Poor control was only met on occasion. Notes & Comments The contractor follows all requirement/conditions of the contract- The contractor sub also performes a great job on the resurfacing of asphalt pavment on the Departments roadways. The contractors Sub perffomes all precedures properly and has all the required equipment to perform their opeations. EOR. DocuSign Envelope ID: 6B483B88-ABAA-4E04-972F-0559941659D9 Page 3 of 4 375-020-43 MAINTENANCE 1119 Contractor: American Design Engineering Construction Inc. Contract: E6NO3-RO Evaluation Date_ July 30, 2020 Category Five Interaction, Coordination, and Cooperation With Department Personnel, Traveling Public, Other Performance Contractors, Property Owners and Other Governmental Agencies Interaction with Department personnel was outstanding; no complaints from the traveling public or adjacent Excellent property owners were noted. The Contractor handled any issues that arose, notifying the Department of the outcome. Positive feedback from the public was noted. Expectations were often exceeded. Few, if any, complaints from the traveling public or adjacent property owners were noted. When a concern Satisfactory was expressed, the Contractor was quick to resolve it. Positive interaction with Department personnel with some positive feedback from the public was noted. Expectations were always met and occasionally exceeded. Some complaints from outside parties and Department personnel were noted (mostly minor in nature). Most Unsatisfactory complaints were handled in a timely manner. Expectations were not consistently met. 0 Numerous complaints were received about work operations, staging of equipment, and/or poor attitude. The Poor Contractor repeatedly failed to follow instructions; communication and cooperation was inadequate. Notes & Comments The contractor has never received any complaints from the traveling public or adjacent property owners. If the contractor was to recive any complaints I know that he will be ready to correct any issues that arise. FOR Category Six Disadvantaqed Business Enterprise (DBE) Renortinn Performance Contractor's staff was very well qualified and capable to address sufficient utilization of the Equal Excellent Opportunity Compliance (EOC) System application to collect, review, and report any DBE commitments/payments. Periodic checks of the EOC System by Department personnel revealed no issues" and no follow up with the Contractor in regard to DBE issues was required. Contractor's staff sufficiently utilized the Equal Opportunity Compliance (EOC) System to adequately Satisfactory collect, review and report DBE commitments/payments. Periodic checks of the EOC System by Department personnel revealed very few issues and minimal follow up with the Contractor in regard to DBE i Contractor demonstrated little interest in utilizing the EOC system to collect, review, and report any DBE Unsatisfactory commitments/payments. Requests for the Contractor to utilize the system were repeatedly made by Department personnel and follow up with the Contractor was often required. `"D Contractor failed to adequately report DBE commitments/payments. Requests for the Contractor to correct Poor errors within the system were repeatedly made by the Department; excessive/recurring assistance to they Contractor was necessary. N/A (To be used when the Contractor is exempt from DBE reporting requirements.) N/A, Notes & Comments The contractor has provided all requirements on the DBE web site. FOR DocuSign Envelope ID: 6B483B88-ABAA-4E04-972F-0559941659D9 Page 4 of 4 375-020-43 MAINTENANCE 1119 Contractor: American Design Engineering Construction Inc. Contract: E6NO3-RO Evaluation Date: July 30, 2020 Overall Score: 88 Over all the contractor has successfully completed all work documents in a timely manner and the employee out on the field our more then capable of accomplishing their duties. The contractor office personnel have shown to process and prepare all documentation on time__ The contractor had no incidents and has no problems with the traveling public and with the Department personnel. If the contractor continues to preform their work in this manner they will do well throught the year. FOR Pursuit and Timely Completion of Work Maintenance of Traffic (MOT) & Safety Operations Timely and Complete Submittal of Documents and Reports Overall Quality Control, Environmental Compliance, and Compliance with Contract Requirements Interaction, coordination, and cooperation with Department personnel, traveling public, other contractors, property owners and Government agencies Disadvantaged Business Enterprise (DBE) Reporting CONTRACTOR COPIES: Contractor Project File District Maintenance Engineer - Original Cost Center Manager Date Satisfactory Excellent Satisfactory Satisfactory Satisfactory Excellent ocu igne y: HOWARD BE TJ0*#r 7/3�0f3� Submitted By q Project Manager ap��— Reviewed By: Reviewed By: Cost Center Manager Date District Maintenance Engineer Date