2019-08-06 Ex 12CITY OF OKEECHOBEE, PUBLIC WORKS
Memo
The Public Works Department is recommending that the City accept a proposal from Florid Power and
Light to upgrade the existing High Pressure Sodium (HPS) street lights within the City to new LED
fixtures. The upgrade will be performed at no cost to the city for the new fixtures. The upgrade will also
allow the City to upgrade our level of service to our customers without increasing our annual utility
costs. Per the attached FPL presentation, the new LED fixtures offers the City several advantages:
• Enhanced visibility due to increased illumines and more natural light temperature.
o Increased visibility due to brighter lights
o Better color rendering due to more natural light
o Decreased Light Pollution.
• Increased Reliability and Reportability
To: Marcos Montes De Oca, City Administrator
From: David Allen
Date: 7/24/2019
Re: FPL Streetlight LED Upgrade
Changing the Way Florida Looks at Night
FPL LT-1 LED Lighting Tariff
Kerry Lavette
FPL LED Lighting Solutions
OUR HISTORY RUNS DEEP
FPL | LED Lighting Solutions 2
The Founding Company –Florida Power & Light Company (FPL)
•Began in the final days of 1925
•Joined the New York Stock Exchange in 1950
•Largest electric utility in Florida
•A leading Florida employer (approximately 8,900 employees)
FOUNDED IN FLORIDA
The Next Era Begins
•In 2010, FPL’s parent company (FPL Group) was renamed NextEra
Energy, a forward-looking enterprise that sees the future and gets
there first
•Headquartered in Juno Beach, Florida
•Ranked the top “green utility” in the United States in 2015 and 2016
OUR HISTORY RUNS DEEP
FPL | LED Lighting Solutions 3
FPL
•Serves nearly 5 million accounts or more than 10 million people across
nearly half of the state of Florida
•Residential and business rates among the lowest in the state and the
nation
•One of the cleanest power plant fleets among all utilities nationwide
NextEra
•Operations in 30 states and Canada
•Largest generator of renewable energy in the world
•Capacity 45.9 GW
PIONEERS OF POWER
TARIFF OVERVIEW
FPL | LED Lighting Solutions 4
* In cases where directional boring or other uncommon construction concerns exist, an upfront fee may be required
A pproved by the PSC on April 28, 2017, this tariff provides for the
installation of FPL owned LED lights at no upfront cost to customers*.
•The Tariff allows us to offer a variety of LED street and area light
solutions in a variety of different scenarios:
-Convert HPS lights currently under SL -1
-Convert customer owned and maintained lights to LED
-Install new LED street and area lights
•Monthly fixture, maintenance, and energy charges are determined
based on the fixture chosen by the customer
•Customers may pay additional monthly charges for dedicated light
poles, underground construction and conversions
NEW LT-1 TARIFF
LED STREET LIGHT CONVERSIONS ARE HAPPENING ACROSS THE US
FPL | LED Lighting Solutions 5
JUST SOME OF THE US CITIES CONVERTING
•Los Angeles, CA
•Las Vegas, NV
•Boston, MA
•New York City, NY
•West Palm Beach
•Detroit, MI
•San Francisco, CA
•Cleveland, OH
•St. Louis, MO
•Portland, OR
•Orlando, FL
•Asheville, NC
•Raleigh, NC
•Oahu, HI
•Pittsburg, PA
•Pueblo, CO
•Austin, TX
•San Antonio, TX
•Seattle, WA
•Salt Lake City, UT
•Phoenix, AZ
•Anchorage, AK
•Topeka, KS
•Des Moines, IA
•Chattanooga, TN
•Canton, OH
•Mobile, AL
•Tampa, FL
•Chicago, IL
•Providence, RI
DEMAND IS HIGH FOR LED STREET LIGHTS UNDER LT-1
FPL | Street Lighting Solutions 6
More than 40 municipalities have already signed up to do citywide conversions
LED ADVANTAGES
FPL | LED Lighting Solutions 7
LEDs offer:
•Superior color rendition and
differentiation
-High color rendering index
(CRI)
-More natural colors than HPS
•High efficiency
-Energy savings up to 50 %+
•Greater variety of choices
BENEFITS OF LED
Comparison of LED fixtures (left) versus
High Pressure Sodium (HPS) fixtures (right)
Image from http://www.myLEDlighting guide.com
LED ADVANTAGES
FPL | LED Lighting Solutions 8
WHY CHOOSE LED OVER HPS?
Compare light
pollution contribution
from HPS lights vs.
LED
Compare color
rendering from
HPS lights vs. LED
on the building
LED ADVANTAGES
FPL | LED Lighting Solutions 9
WHY CHOOSE LED OVER HPS?
Compare uplight
component from
HPS lights vs. LED
Compare color
rendering from HPS
lights vs. LED on the
stripe colors
LED ADVANTAGES
FPL | LED Lighting Solutions 10
LED ADVANTAGES
FPL | LED Lighting Solutions 11
CITY OF LOS ANGELES
LIGHTING CHOICES
FPL | LED Lighting Solutions 12
Thanks to the flexibility of the new LT-1 tariff, we are able to offer dozens of
street and area lighting options from leading LED manufacturers such as
CREE, Cooper, Holophane, and AEL
WE WORK WITH TOP BRANDS
LIGHTING CHOICES
FPL | LED Lighting Solutions 13
Color Temperature
Thank you for your time
FPL | Street Lighting Solutions 15
Questions?
Page 1 of 4
FPL Account Number: 3624124784
FPL Work Request Number:
LED LIGHTING AGREEMENT
In accordance with the following terms and conditions, CITY OF OKEECHOBEE (hereinafter called the Customer),
requests on this 22 day of June, 2019 , from FLORIDA POWER & LIGHT COMPANY (hereinafter called FPL), a corporation organized and
existing under the laws of the State of Florida, the following installation or modification of lighting facilities at (general boundaries)
STREETLIGHTS, located in OKEECHOBEE , Florida.
(a) Installation and/or removal of FPL-owned facilities described as follows:
Poles
Pole Type Existing Pole Count
(A)
# Installed
(B)
# Removed
(C)
New Pole Count
(A+B-C)
Wood
Standard Concrete
Standard Fiberglass
Decorative Concrete
Decorative Fiberglass
Underground Conductor
Type Existing Footage
(A)
Feet Installed
(B)
Feet Removed
(C)
New Footage
(A+B-C)
Under Pavement N/A(1)
Not Under Pavement
(1) All new conductor installed is in conduit and billed as Not Under Pavement
Page 2 of 4
Fixtures (2)
Type
(HPSV,MV,LED) Manufacturer
Watts Lumens
Color
Temperature
(LED Only) Style
Existing
Fixture
Count
(A)
#
Installed
(B)
#
Removed
(C)
New
Fixture
Count
(A+B-C)
HPSV 70 ROADWAY 157 157
LED CREE 41 5000 4000K RSW 157 157
HPSV 100 ROADWAY 82 82
LED AEL 45 8,653 4000K ATBS 82 82
HPSV 150 ROADWAY 4 4
LED CREE 102 10,882 4000K XSP2 4 4
HPSV 200 ROADWAY 103 103
LED AEL 133 16,593 4000K ATB2 103 103
HPSV 400 ROADWAY 1 1
LED AEL 268 32,329 4000k ATB2 1 1
(2) Catalog of available fixtures and the assigned billing tier for each can be viewed at www.fpl.com/partner/builders/lighting.html
Page 3 of 4
(b) Modification to existing facilities other than described above (explain fully):
That, for and in consideration of the covenants set forth herein, the parties hereto covenant and agree as follows:
FPL AGREES:
1. To install or modify the lighting facilities described and identified above (hereinafter called the Lighting System), furnish to the Customer
the electric energy necessary for the operation of the Lighting System, and furnish such other services as are specified in this Agreement,
all in accordance with the terms of FPL's currently effective lighting rate schedule on file at the Florida Public Service Commission (FPSC)
or any successive lighting rate schedule approved by the FPSC.
THE CUSTOMER AGREES:
2. To pay a contribution in the amount of $0.00 prior to FPL's initiating the requested installation or modification.
3. To purchase from FPL all of the electric energy used for the operation of the Lighting System.
4. To be responsible for paying, when due, all bills rendered by FPL pursuant to FPL's currently effective lighting rate schedule on file at
the FPSC or any successive lighting rate schedule approved by the FPSC, for facilities and service provided in accordance with this
agreement.
5. To provide access, final grading and, when requested, good and sufficient easements, suitable construction drawings showing the
location of existing and proposed structures, identification of all non-FPL underground facilities within or near pole or trench locations,
and appropriate plats necessary for planning the design and completing the construction of FPL facilities associated with the Lighting
System.
6. To perform any clearing, compacting, removal of stumps or other obstructions that conflict with construction, and drainage of rights-of-way
or easements required by FPL to accommodate the lighting facilities.
IT IS MUTUALLY AGREED THAT:
7. Modifications to the facilities provided by FPL under this agreement, other than for maintenance, may only be made through the execution
of an additional lighting agreement delineating the modifications to be accomplished. Modification of FPL lighting facilities is defined as
the following:
a. the addition of lighting facilities:
b. the removal of lighting facilities; and
c. the removal of lighting facilities and the replacement of such facilities with new facilities and/or additional facilities.
Modifications will be subject to the costs identified in FPL's currently effective lighting rate schedule on file at the FPSC, or any successive
schedule approved by the FPSC.
8. Lighting facilities will only be installed in locations that meet all applicable clear zone right-of-way setback requirements.
9. FPL will, at the request of the Customer, relocate the lighting facilities covered by this agreement, if provided sufficient right-of-ways or
easements to do so and locations requested are consistent with clear zone right-of-way setback requirements. The Customer shall be
responsible for the payment of all costs associated with any such Customer- requested relocation of FPL lighting facilities. Payment shall
be made by the Customer in advance of any relocation.
10. FPL may, at any time, substitute for any luminaire installed hereunder another luminaire which shall be of at least equal illuminating capacity
and efficiency.
11. This Agreement shall be for a term of ten (10) years from the date of initiation of service, and, except as provided below, shall extend
thereafter for further successive periods of five (5) years from the expiration of the initial ten (10) year term or from the expiration of any
extension thereof. The date of initiation of service shall be defined as the date the first lights are energized and billing begins, not the date
of this Agreement. This Agreement shall be extended automatically beyond the initial the (10) year term or any extension thereof, unless
Page 4 of 4
either party shall have given written notice to the other of its desire to terminate this Agreement. The written notice shall be by certified
mail and shall be given not less than ninety (90) days before the expiration of the initial ten (10) year term, or any extension thereof.
12. In the event lighting facilities covered by this agreement are removed, either at the request of the Customer or through termination or
breach of this Agreement, the Customer shall be responsible for paying to FPL an amount equal to the fixture, pole, and conductor charges
for the period remaining on the currently active term of service plus the cost to remove the facilities.
13. Should the Customer fail to pay any bills due and rendered pursuant to this agreement or otherwise fail to perform the obligations contained
in this Agreement, said obligations being material and going to the essence of this Agreement, FPL may cease to supply electric energy
or service until the Customer has paid the bills due and rendered or has fully cured such other breach of this Agreement. Any failure of
FPL to exercise its rights hereunder shall not be a waiver of its rights. It is understood, however, that such discontinuance of the supplying
of electric energy or service shall not constitute a breach of this Agreement by FPL, nor shall it relieve the Customer of the obligation to
perform any of the terms and conditions of this Agreement.
14. The obligation to furnish or purchase service shall be excused at any time that either party is prevented from complying with this Agreement
by strikes, lockouts, fires, riots, acts of God, the public enemy, or by cause or causes not under the control of the party thus prevented
from compliance, and FPL shall not have the obligation to furnish service if it is prevented from complying with this Agreement by reason
of any partial, temporary or entire shut-down of service which, in the sole opinion of FPL, is reasonably necessary for the purpose of
repairing or making more efficient all or any part of its generating or other electrical equipment.
15. This Agreement supersedes all previous Agreements or representations, either written, oral, or otherwise between the Customer and
FPL, with respect to the facilities referenced herein and constitutes the entire Agreement between the parties. This Agreement does not
create any rights or provide any remedies to third parties or create any additional duty, obligation or undertakings by FPL to third parties.
16. In the event of the sale of the real property upon which the facilities are installed, upon the written consent of FPL, this Agreement may be
assigned by the Customer to the Purchaser. No assignment shall relieve the Customer from its obligations hereunder until such obligations
have been assumed by the assignee and agreed to by FPL.
17. This Agreement shall inure to the benefit of, and be binding upon the successors and assigns of the Customer and FPL.
18. The lighting facilities shall remain the property of FPL in perpetuity.
19. This Agreement is subject to FPL's Electric Tariff, including, but not limited to, the General Rules and Regulations for Electric Service and
the Rules of the FPSC, as they are now written, or as they may be hereafter revised, amended or supplemented. In the event of any
conflict between the terms of this Agreement and the provisions of the FPL Electric Tariff or the FPSC Rules, the provisions of the Electric
Tariff and FPSC Rules shall control, as they are now written, or as they may be hereafter revised, amended or supplemented.
IN WITNESS WHEREOF, the parties hereby caused this Agreement to be executed in triplicate by their duly authorized
representatives to be effective as of the day and year first written above.
Charges and Terms Accepted:
Customer (Print or type name of Organization)
By:________________________________________________
Signature (Authorized Representative)
___________________________________________
(Print or type name)
Title: _______________________________________________
FLORIDA POWER & LIGHT COMPANY
By:_______________________________________________
(Signature)
KERRY LAVETTE
(Print or type name)
Title: LED LIGHTING SOLUTIONS