Loading...
PermitL. ISSUED TO: A.irrg-Q ccla 't 1‘lals CITY OF OKEECHOBEE 55 SE T i !'IIID AVENUE PERMIT# 8- =y -: _. ' ^i ; -OF -677-a m PLUMBING ` OKEECHOBEE,4. FL 34974 ® ELECTRIC �- a.Cr-)1:: 4. �' �� Tel: 863-763-9821 Fax: 863-763-1686 DATEISSUED ' Pool Steel/grounding Pilings . •10 website: N;;;e1,eitt:�fi;L::.:.,,:a1,,,..,,,1. � ,., Grade Beam Revised 3/20/17 jd THIS RD MUST E POSTED AND VISIBLE FROM THE CLOSEST STREET UNTIL CERTIFICATE OF OCCUPANCY OR COMPLETION IS ISSUED. FOR INSPECTION CALL 863-763- 9821 BY 4:00 P.M. 24 HOURS NOTICE REQUIRE . NO INSPECTIONS SCHEDULED ON FRIDAY. Note: Failure to call for final inspection could result in code violation. NOTICE: This permit expires in 180 days if work has not commenced or it has been over 180 days since the last annroved inspection. TYPE INIT & DATE TYPE !NIT & DATE TYPE INIT & DATE T -pole ISSUED TO: A.irrg-Q ccla 't 1‘lals 11 BUILDING ® MECHANICAL SITE ADDRESS: 60 .5G, z �� PLUMBING DESCRIPTION: Framing ® ELECTRIC �- a.Cr-)1:: TYPE INIT & DATE TYPE !NIT & DATE TYPE INIT & DATE T -pole Trusses Sewer Tap Underfloor Plumb Framing Pool Pressure Underfloor Elec Wall Assembly Pool Steel/grounding Pilings Above Ceiling Pool Bond Grade Beam Rough Electric Deck Steel Monolithic slab Rough Gas Final Pool Slab/Pre-pour Rough HVA Fire Wall Screw Footing 2nd Rom' In -Progress Footing Ground '' softry , Form Board Survey Tie Beam Insulation Driveway Lintel Final Electric Elevation Certificate Rake Beam Final Gas . t Other Wall Sheetin• AlkFinal HVAC*` /1`12 Other woof Sheathi g r/ ) Final Plumbing Other Elec. Svc/Pw Relea` Fpal-BuildingitZ t Af�1., Other COMMENT *Photos & Affidavit accepted in lieu of these inspections & must be included with Permit Card on site. **Photos of On/Off Switch @ air handler & Breaker Panel labeled property accepted to final HVAC. F.S. 713.135 FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPER CE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. ISSUED BY: City of Okeechobee Inspection Report Location: 50 SE 2nd Avenue Owner: City of Okeechobee Okeechobee, FL 55 SE 3rd Avenue Subdiv: CITY OF OKEECHOBEE Okeechobee, FL 34974 Section: 0 Block: Lot: Permit #: 18-07-277 RE -ROOF COMMERCIAL Descrip.: Install new GAF Ruberoid Mod Bit Roof City PD PW01-00-04-18 Inspection: FINAL ROOF Contractor: Southern Coatings Inc. Scheduled: 9/06/2018 12:00AM For: JEFF NEWELL yj Accepted Rejected By: = - Comments: lr No4fss u-'''''''-‘1L)G? FoR. 12.> ?Dg.kr,xsz L 4Fe-t L*- A-fQ PL.4.41> Z, Rot* L S LOU Vec-4....b q. Ls • I - Fv)-,ft-LEF-4 PrCFCtb fRALA-c 5 R..c /3 /f3 No4fss u-'''''''-‘1L)G? FoR. 12.> ?Dg.kr,xsz L 4Fe-t L*- A-fQ PL.4.41> Z, Rot* L S LOU Vec-4....b q. Ls • I - Fv)-,ft-LEF-4 PrCFCtb fRALA-c 5 R..c /3 /f3 rrY 04 (1- g intL RE: Permit # 2-7 ? 'Jed 7'4E-15 xi, ) (please print name) License #f3,303'D On or about \1 t -i 7 / / Ae2/6 -(Date & time) deck nailing and/or secondary water barrier work at CITY OF OKEE OKEECHOBEE. BUILDING DEP, 863-763-9 Fax: 863-76: Roofing Affidavit ,licensed as a(n) Contractor' FS 468 Building Inspect, oil` et 7 0111061._ E//& () Jrl n I � �jO3flhj {fF(d aJvt - .b� 9-1), j r)clfhin re O C let! 5of i-e(te r ta3t L4 El brb,t/h)--- R ) 3 4 2 I did personally inspect the roof sem. a"° (Job Site Address) Based upon that examination I have determined the installation was done according to the current edition of the Florida Building Code. ignature This signed and notarized affidavit must be provided at the job site at the time of the final roofing inspection along with digital photographs of each plane of the roof with the permit number or address number clearly marked on the deck for each inspection. The photographs must include a ruler or measuring device to confirm nail spacing and overlaps. STATE OF FLORIDA COUNTY OF/ Sworn to and subscribed before me this % day ofZ9� rt ---4 11M-- . 20`13 By bbd Personally known or Produced Identification Type of identification produced. * General, Building, Residential, or Roofing Contractor or any individual certified under 468 F.S. to make such an inspection. Notary Public, State of Florida (Print, type or stamp name) Commission No.: C—ZZ D 95 Lushon tvMohorn Notary Public • State of Florida Commission # GG 22095 Expires 08/17/2020 Rev. 7/16/18 jld OP - X Y X-2 ••••2 Y•4 X.5 4 v—a Z 'c -I3 V-13 > See' • v -s X-8 Y-8 X -S Y-2 X•2 =11- > Z m> r- cn m m HO K?:(3 0 HO V-' rm- 0 x x CD 8 TAPERED INSULATION DESIGN OPIEC Building 1,11*.ateriads Corwration NEMO I etc. Certificate ofAuthorfz►tion #32455 353 Christian Street, Unit #13 Oxford, rT 06478 (203) !62-9245 ENGINEER EVALUATE TEST CONSULT CERT FY EVALUATION REPORT GAF Evaluation Report 01506.12 13-2-R11 1 Campus Drive FLLi732-R10 Parsippany, NJ 07054 Date of Issuance: 12'18/2013 (800) 766-3411 Revision 11: 04/02/2018 SCOPE: This Evaluation Report is issued under Rule 61G20-3 and the applicable rules and regulations governing t le use of construction materials in the State of Florida. The documentation submitted has been reviewed by Robert P ieminen, P.E. for use of the product under the Florida Building Code. The product described herein has been evaiiated for compliance with the 6th Edition (2017) Florida Building Code, High Velocity Hurricane Zone (HVHZ) sectims noted herein. DESCRIPTION: GAF Modified Bitumen Roof Systems LABELING: Labeling shall be in accordance with the requirements of the Accredited Quality Assurance Agency noted herein. CONTINUED COMPUANCE: This Evaluation Report is valid until such time as the named product(s) changes, the referenced Quality Assurance documentation changes, or provisions of the Code that relate to the product change. Acceptance of this Evaluation Report by the named client constitutes agreement to notify Robert Nieminen, P.E. of any cI anges to the product(s), the Quality Assurance or the production facility location(s). NEMO I etc. requires a complete eview of this Evaluation Report relative to updated Code requirements with each Code Cycle. ADVERTISEMENT: The Evaluation Report number preceded by the words "NEMO' etc. Evaluated" may be displayed in advertising literature. If any portion of the Evaluation Report is displayed, then it shall be done in its entirety. INSPECTION: Upon request, a copy of this entire Evaluation Report shall be provided to the user by the manufacturer or its distributors and shall be available for inspection at the job site at the request of the Building Official. This Evaluation Report consists of pages 1 through 6, plus an 83 -page Appendix. Prepared by: Robert J.M. Nieminen, P.E. Florida Registration No. 59166, Florida DCA ANE1983 CERTIFICATION OF INDEPENDENCE: The facsimile seal appearing was authorized k-' Robert Nieminen, P.E. on 04/02/2018. This does noLerve as an electronically signed document 1. NEMO ETC, LLC does not have, nor does it intend to acquire or will it acquire, a financial interest in any company manuf cturing or distributing products it evaluates. 2. NEMO ETC, LLC is not owned, operated or controlled by any company manufacturing or distributing products it evaluates. 3. Robert Nieminen, P.E. does not have nor will acquire, a financial interest in any company manufacturing or distributing p Dducts for which the evaluation reports are being issued. 4. Robert Nieminen, P.E. does not have, nor will acquire, a financial interest in any other entity involved in the approval pro ess of the product. S. This is a building code evaluation. Neither NEMO ETC, LLC nor Robert Nieminen, P.E. are, in any way, the Designer of Rec rd for any project on which this Evaluation Report, or previous versions thereof, is/was used for permitting or design guidance unle s retained specifically for that purpose. System No. CONVENTIONAL SYSTEMS Deck (Note 1) TABLE 2E: STEEL OR STRUCTURAL CONCRETE DECKS - NEW CONSTRUCTION, REROOF (TEAR -OFF) OR RECOVER SYSTEM TYPE C-2.: BONDED AND MECHANICALLY ATTACHED INSULATION, BONDED ROOF COVER Base Insulation Layer Type Top Insulation Layer ROOF Cover (Note 15) Adhesive & Fasteners Attach Base I Ply I Cap Nemo I etc. SC -140 Mln, 22 ga., type B, Grade 33 steel; 6' span, two (2) Traxx/5 or Tek/5 screws 6" o,c, or min, 2,500 psi structural concrete SELF-AL/HER NO BASE PLY: Mln. 2.0 -Inch EnergyGuard RA, EnergyGuard RH, EnergyGuard RN, Loose -Laid Min. 0.25 - Inch Dens Deck Prime Adhesive: 06500 Fasteners: Drill -Tec XHD (steel only) or Drill -Tec 1114 HD (concrete only) & Drill -Tec Plates Adhesive: 12 -Inch o,c. Fasteners: 1 per 1.33 ft2 SOS -TA or APP -TA (Optional) SBS -TA or APP -TA SOS -TA or APP -TA MDP (Psi) -97.5 SC -141 Min. 22 ga., type 8, Grade 33 steel; 6' span, two (2) Traxx/5 or Tek/5 screws 6" o.c. or min. 2,500 psI structural concrete Min. 2.0 -Inch EnergyGuard RA, EnergyGuard RH, EnergyGuard RN, Loose -Laid Mln, 0.25• Inch Dens Deck Prime Adhesive: 08500 Fasteners: Drill -Tec XHD (steel only) or Drill -Tec 414 HO (concrete only) & Drill -Tec Plates Adhesive: 12 -Inch D,c, Fasteners: 1 per 1,33 ft2 SOS -SA, SB5.5A-T or WeatherWatch XT Mat -Surfaced Leak Barrier (Optional) 565 -TA or APP -TA SOS -TA or • APP -TA -97.5 System No. CONVENTIONAL SYSTEMS: SC -142 SC -143 SC -144 Deckt (Note 1) Mln. 22 ga„ type B, Grade 33 steel or min, 2,500 psI structrual concrete Mln. 22 ga., type B, Grade 33 steel or min. 2,500 psi structrual concrete Mln. 22 ga., type B, Grade 33 steel or min. 2,500 psi structrual concrete TABLE STEEL STRUCTURAL CONCRETE DECKS —NEIN CONSTRUCTION, REROOF (TEAR -OFF) OR RECOVER• SYSTEM TYPED: INSULATED, MECHANICALLY ATTACHED BASE SHEET, BONDED ROOF COVER Insulation layer(s) One or more layers, any combination One or more layers, any combination One or more layers, any combination Base GAFGLAS 475 Base Sheet, Tri -Ply 475 Base Sheet, GAFGLAS 480 Ultima Base Sheet or GAFGLAS Stratavent Nallable Venting Base Sheet GAFGLAS 475 Base Sheet, Tri -Ply 475 Base Sheet, GAFGLAS 480 Ultima Base Sheet or GAFGLAS Stratavent Nallable Venting Base Sheet GAFGLAS 475 Base Sheet, Tri -Ply 475 Base Sheet, GAFGLAS 480 Ultima Base Sheet or GAFGLAS Stratavent Nallable Venting Base Sheet Base or Anchor Sheet Note 2 Note 2 Note 2 Fasteners Attach 18 -inch o,c, at min. 2 -Inch laps and 18 -Inch o,c, In three, equally spaced, staggered center rows 12 -Inch o.c. at min. 2 -Inch laps and 18 -Inch o.c. In three, equally spaced, staggered center rows 12 -Inch o.c, at min, 3.5 -Inch laps and 12 -Inch o.c. In three, equally spaced, staggered center rows Roof Cover (Note 15) Ply I Cap BP -AA, 585 - AA 565 -TA, APP -TA SBS -AA SBS -AA SBS -TA, APP -TA SBS -AA, SOS -TA MOP (psi) -45,0" -45,0• -45.0• NEMO ETC, LLC Certificate of Authorization 432455 Prepared by: Robert Nleminen, PE -59166 6th EDITION (2017) FRC HVHZ EVALUATION GAF Modified Bitumen Roof Systems; )800) 766.3411 Evaluation Report 01506.12.13.2-R11 for FL16732.010 Revision 11:04/02/2018 Appendix 1, Page 33 of 83 The following notes apply to the systems outlined herein: 1. The evaluation herein pertains to above -deck roof components; deck -attachment details pertain to 'as -tested' conditions under TAS 114, Appendix 1. Roof decks shall be In accordance with FRC (HVHZ) requirements to the satisfaction of the Authority Having Jurisdiction, NEM0I etc. 2. Unless otherwise noted, fasteners and stress plates for Insulation or base sheet attachment shall be as follows. Fasteners shall be of sufficient length for the following engagements: > Wood: Drill -Tec #12 Fastener or Drlll•Tecflld Fastener with DrIll•Tee 3" Standard Steel Plate, Drill -Tee 3" Steel Plate or Drill•Tee AccuTrac Flat Plate or Drill -Tec AccuTrac Recessed Plate (Insulation only), Drill -Tec ASAP 35 or Drill -Tec Heavy Duty ASAP Roofing Fastener Assembled with a 3" Metal Plate, Minimum 0,75•Inch plywood penetration or minimum 1•Inch wood plank embedment, Steel: Drill -Tee #12 Fastener, Drill -Tec i114 Fastener or Drill -Tee XHD Fastener with Drill -Tee 3" Standard Steel Plate, Drill -Tec 3" Steel Plate or Drill•TecAccuTrac Flat Plate or Drill -Tec AccuTrac Recessed Plate (insulation only); trill•Tee ASAP 35; DrIll•Tee Heavy Duty ASAP Roofing Fastener Assembled with a 3" Metal Plate; Drill•Tee Extra Heavy Duty ASAP Roofing Fastener • Insulation. Minimum 0,75 -Inch steel penetralion and engage the top flute of the steel deck. 3 Structural concrete: Drill•Tee #14 Fastener or Drill -Tec CD•10 with Drill -Tee 3" Standard Steel Plate, Drill•Tee 3" Steel Plate or Drill•Tee AccuTrac Flat Plate or Drill -Tee AccuTrac Recessed Plate (insulation only) or Drill -Tee Heavy Duty ASAP Roofing Fastener Assembled with a 3" Metal Plate. Minimum 1,25 -Inch embedment Into pilot hole In accordance with the fastener manufacturer's published installation Instructions, 3. Unless otherwise noted, insulation may be any one layer or combination of polyisocyanurate, polystyrene, wood fiberboard, perlite, Dens Deck, Dens Deck Prime, MonoBoard, TopRock DD, SECUROCK Gypsum -Fiber Roof Board or SECUROCK Glass -Mat Roof Board that meets the QA requirements of F.A.C. Rule 61G20-3 and is documented as meeting FBC (HVHZ) 1516 and, for foam plastic, FBC Chapter 26, when Installed with the roof cover. Versashleid• Solo'" Fire -Resistant Slip Sheet may be used as a non -load-bearing, fire•barrier slip -sheet component within any system outlined herein. 4. If mechanical attachment to the structural deck through lightweight Insulating concrete Is proposed, field withdrawal resistance testing shall be performed to confirm equivalent or determine enhanced fastening patterns and density, All testing and fastening design shall be in compliance with Testing Application Standard TAS 105 and Roofing Application Standard RAS 117 and/or RAS 137. Calculations shall be prepared, signed and sealed by a qualified design professional, 5. Preliminary Insulation attachment for System Type D o Minimum four fasteners per 4 x 8 ft board or minimum two fasteners per 4 x 4 ft board. 6, Unless otherwise noted, Insulation adhesive application rates are as follows. Ribbon or bead width Is at the time of application; the ribbons/beads shall expand as noted In the manufacturer's published instructions. > Hot asphalt: Full coverage at 25.30 lbs/square 3 OMG OlyBond SOO (00500): Continuous 0.75 -Inch wide ribbons, 12•Inch o.c, using PaceCart, SpotShot or Canister dispensers. Note: OlyBond Classic or Oly8ond 500 Green may be used where Oly6ond 5001s referenced. GAF LRF Adhesive M (LRF -M): Continuous 1 -Inch wide ribbons, 12 -Inch o.c ADCO Millennium One -Step Foamable Adhesive (M•OSFA): Continuous 1 -Inch wide ribbons, 12•Inch o.c. GAF 2•Part Roofing Adhesive (GAF 2 -Part): Continuous 2.5 to 3 -inch wide ribbons, 12 -inch o.c, Note: When multiple layers(s) of Insulation and/or coverboard ore Installed In ribbon -applied adhesive, board Joints shall be staggered. Note: The maximum edge distance from the adhesive ribbon to the edge of the Insulation board shall be not less than one-half the specified ribbons spacing. V V V V Y 7. Unless otherwise noted, all insulations are flat stock or taper board of the minimum thickness noted, Tapered polyisocyanurate at the following thickness limitations may be substituted with the following Maximum Design Pressure (MDP) limitations. In no case shall these values be used to 'increase' the MDP listings In the tables; rather If Mop listing below meets or exceeds that listed fora particular system in the tables, then the thinner board listed below maybe used as a drop•In for the equivalent thicker material listed In the table. > Hot asphalt: MOP -240.0 psf (Min. 0.5•Inch thick) 3- OlyBond 500 (08500): MDP -292.5 psf (Min. 0.5•Inch EnergyGuard Polyiso Insulation, EnergyGuard NH Polyiso insulation, EnergyGuard Ultra Polyiso Insulation, Y OMG OlyBond SDO (08500): EnergyGuard NH Ultra Polylso Insulation) > OMG OlyBond 500 (08500): MOP -485.0 psf (Min. 0.5 -Inch thick EnergyGuard RA) (Min. 0.5 -Inch thick EnergyGuard RH or RN) > GAF 2•Part Roofing Adhesive (GAF 2 -Part): MOP •117.5 psf (Min. 1.0 -inch thick) 8. Bonded polyisocyanurate Insulation boards shall be maximum 4 x 4 ft. 9. Perimeter and corner areas shall comply with the enhanced uplift pressure requirements of these areas. Fastener densities shall be increased, as and/or Roofing Application Standard RAS 137 by a qualified design professional. 'This extrapolation Is not permitted for systems marked with an asterisk*. NEMO ETC, LLC Certificate of Authorization #32455 Prepared by: Robert Nieminen, PE•59lee 6r"EDITION (2017) FBC HVHZ EVALUATION GAF Modified Bitumen Roof Systems; (BOO) 766.3411 calculated In compliance with Roofing Application Standard RAS 117 Evaluation Report 01506,12,13.2•R11 for F116732•R10 Revision 11: 04/02/2018 Appendix 1, Page 2 of 83 rioriaa tsuttding Code Online Equivalence of Product Standards Certified By Sections from the Code Product Approval Method Date Submitted Date Validated Date Pending FBC Approval Date Approved Summary of Products Method 1 Option D 04/02/2018 04/09/2018 04/13/2018 06/12/2018 Ptge 2 of 2 FL # Model, Number or Name Description 16732.1 GAF Modified Bitumen Roof Systems SBS and APP modified bitumen roof systems Limits of Use Approved for use in HVHZ: Yes Approved for use outside HVHZ: No Impact Resistant: N/A Design Pressure: +N/A/ -465 Other: 1.) The design pressure herein pertains to one system. Refer to ER Appendix for all systems and maximum design pressures. 2.) Refer to ER Section 5 for Limits of Use. Installation Instructions FL16732 RIO II 2018 04 FINAL Al ER GAF R10.pdf Verified By: Robert Nieminen PE -59166 Created by Independent Third Party: Yes Evaluation Reports FL16732 R10 AE 2018 04 FINAL ER GAF MB HVHZ FL1 732- R10.Pdf Created by Independent Third Party: Yes 16732 - 'Sack' keit' Contact Us :: 2601 [lair Stone Road Tallahassee Fl. 32399 Phone: 850-487-1824 The State of Florida Is an AA/EEO employer. Coovrioht 7007-2013 State of Florida, :: Privacy Statement :: Accessiblllty Statement :: Refund Statrient Under Florida law, email addresses are public records. It you do not want your email address released In response to a public -records request, do In send electronic mall to this entity. Instead, contact the office by phone or by traditional mall. If you have any questions, please contact 850.487.1395. 'Put _tont to Section 455.275(1), Florida Statutes, effective October 1, 2012, licensees licensed under Chapter 455, F.S. must provide the Department with an email ddress If they have one. The emails provided may be used for official communication with the licensee. However email addresses are public record. If you do no wish to supply a personal address, please provide the Department with an email address which con be made available to the public To determine If you are a lice see under Chapter 451, F.S., please dick here . Product Approval Amts: Credit Card Safe sccurit Ai i,TI UCS http://www.floridabuilding.org/pr/pr app dtl.aspx?param=wGEVXQwtDquBobl%2f1Zm6... 6/1 x/2018 NEMO I etc. 10. For assemblies marked with an asterisk*, the maximum design pressure (MOP) limitation listed shall be applicable to all roof pressure zones (I,e., field, perimeters and corners), Neither rational analysis, nor extrapolation is permitted for enhanced attachment at enhanced pressure zones (i.e., perimeters, corners and extended corners). 11. Fastener spacing for mechanical attachment of insulation, anchor/base sheet or membrane Is based on a minimum fastener resistance value In conjunction with the maximum design pressure (MDP) listed for a specific system. Should the fastener resistance be less than that required, as determined by the Building Official, a revised fastener spacing —prepared, signed and sealed by a qualified design professional — may be submitted. Said revised fastener spacing shall utilize the withdrawal resistance value taken from Testing Application Standard TAS 105 and calculations In compliance with Roofing Application Standard RAS 117 or Roofing Application Standard RAS 137. 12. For bonded Insulation or membrane over existing substrates Ina recover Installation, the existing roof system shall be capable of resisting project design pressures on Its own merit to the satisfaction of the Authority Having Jurisdiction, as documented through field uplift testing in accordance with Testing Application Standard TAS 124, 13. For recover Installations, the existing roof shall be examined In accordance with FOC 1521. For Recover Applications using System Type D, the Insulation Is optional, Alternatively, min, 0.5 -Inch EnergyGuard Polyiso Insulation, EnergyGuard NH Polyiso Insulation, EnergyGuard Ultra Polylso Insulation, EnergyGuard NH Ultra Polylso Insulation, EnergyGuard RA, EnergyGuard RH, EnergyGuard RN or EnergyGuard Ultra, Structodek High Density Fiberboard Roof Insulation, EnergyGuard RH HD Polylso Insulation, EnergyGuard HD Polylso Insulation, EnergyGuard NH HD Polyiso Insulation, EnergyGuard HD Plus Polylso Insulation or EnergyGuard NH HD Plus Polyiso Insulation or min. 0.25 -Inch Dens Deck, Dens Deck Prime or SECUROCK Gypsum -Fiber Roof Board or SECUROCK Glass -Mat Roof Board may be used ase separator board prior to base sheet Installation. The separator component shall be documented as meeting FBC (HVHZ) 1516 and, for foam plastic, FBC Chapter 26, when Installed with the roof cover In Recover applications, 14. Lightweight Insulating Concrete (LWC) shall be cast in accordance with FBC Section 1917 to the satisfaction of the Authority Having Jurisdiction. For systems where specific LWC Is referenced, refer to current LWC NOA or HVHZ Product Approval for specific deck construction and limitations. For systems where specific LWC Is not referenced, the minimum design mix shall be 300 psi. In all cases, the minimum top -coat thickness Is 2 -Inches, For LWC over structural concrete, reference s made to FBC Section 1917.4.1, Point 1. 15, Unless otherwise noted, refer to the following references for bonded base, ply or cap sheet as l Reference Layer— Material Application BP -AA (Base/ Ply sheets, Asphalt-Applied)Ply: Base: GAFGLAS ff75 Base Sheet, Tri -Ply 1#75 Base Sheet, GAFGLAS f180 Ultima Base Sheet Hot asphalt at 251bs/square: GAFGLAS Ply 4, Tri -Ply Ply 4 Ply Sheet, GAFGLAS FlexPly6 BP -CA (Base/ Ply sheets, Cold -Applied) Base: GAFGLAS ff75 Base Sheet, Trl-Ply #75 Base Sheet Matrix' 102 SBS Membrane Adhesive at 1.5 gal/sq. B -LL (Base sheet, Loose -Laid) Base: GAFGLAS Stratavent Perforated Venting Base Sheet loose laid SBS -AA (SOS, Asphalt -Applied) Base or Ply: Ruherold 20 Smooth, Ruberold Mop Smooth, Ruberold Mop Smooth 1,5, Ruberold Mop Plus Smooth Hot asphalt at 25 lbs/square. Cap: Ruberold 30 Granule, Ruberold 30 Granule FR, Ruberold EnergyCap 30 Granule FR, Ruberold Mop Smooth, Ruberold Mop Smooth 1,5, Ruberold Mop Plus Smooth, Ruberold Mop Granule FR, Ruberold Mop Granule, Trl-Ply SOS Granule Cap Sheet, intec Flex PRF, Ruberold Mop Plus Granule FR, Ruberold Mop Plus Granule, Ruberold EnergyCap Mop Plus Granule FR SOS -CA (SBS, Cold -Applied, Matrix 102)Ruberold Base or Ply: Ruberold 20 Smooth p 3D Granule FR, Ruberold EnergyCap 30 Granule FR, Ruberold Mop Granule FR, Ruberold Mop Plus Granule FR, Ruberoid EnergyCap Mop Plus Granule FR Matrix'" 102 SBS Membrane Adhesive at 1,5 gal/sq, SOS -CA -1 (SOS, Cold -Applied, Matrix 101) Base: Ruberoid 20 Smoother Ruberoid Mop Smooth 1.5 Matrix' 101 Premium SOS Membrane Adhesive at 1.5— 2,0 gal/square Cap. Ruberoid 30 Granule FR, Ruberold EnergyCap 30 Granule FR, Ruberoid Mop Plus Granule FR, Ruberoid EnergyCap Mop Plus Granule FR SOS -TA (SBS, Torch-Applied)Ruberoid Base or Ply: Ruberold HW 25 Smooth, Ruberold HW Smooth Torch applied gyp' NW Granule, Ruberold NW Granule FR, Ruberold HW Pius Granule, Ruberold HW Plus Granule FR, Ruberold EnergyCap HW Plus Granule FR NEMO ETC, LIC Certificate of Authorization #32455 Prepared by: Robert Nieminen, PE -59166 61"EDITION (2017) FBC HVHZ EVALUATION GAF Modified Bitumen Roof Systems; (80D) 766.3411 Evaluation Report 01506,12,13.2-R11 for FL16732-RIO Revision 11: 04/02/2018 Appendix 1, Page 3 of 83 Entity Examination ERD (TST6049) Physical Properties ERD (T5T6049) Physical Properties ERD (T5T6049) Physical Properties ERD (T5T6049) Physical Properties ERD (1516049) Physical Properties ERD (T5T6049) Physical Properties ERD (TST6049) Physical Properties ERD (TST6049) TM 114/FM4474 ERD (TST6049) Physical Properties ERD (TST6049) Physical Properties ERD (TST6049) Physical Properties ERD (T5T6049) Physical Properties ERD (f5T6049) Physical Properties ERD (TST6049) Physical Properties ERD (TST6049) Physical Properties ERD (1516049) Physical Properties ERD (TST6049) TM 114/FM4474 ERD (TST6049) TAS 114/FM4474 ERD (15T6049) Physical Properties ERD (1576049) Physical Properties ERD (T5T6049) Physical Properties ERD (T5T6049) Physical Properties ERD (1516049) Physical Properties ERD (T5T6049) Physical Properties ERD (576049) Physical Properties ERD (TST6049) TAS 114/FM4474 ETEC (T517393) TAS 114 F-TEC(151/393) TAS 114 ETEC (ISI/393) TAS 114 F -TEC (TS i /393) TAS 114 ETEC 051/393) TAS 114 F -TEC (IS i /393) TAS 114 F -TEC (1 S i /393) TAS 114 ETEC (ISI/393) TAS 114 F -TEC (i s i /393) TAS 114 F -TEC (151 /393) TA5 114 FM (TST1867) FM 4470 FM (1511867) FM 4470 FM (TST1867) FM 4470 FM (TST1867) FM 4470 FM (15T1867) FM 4470 FM (T5T1867) FM 4470 FM (TST1867) FM 4470 FM (TST1867) FM 4470 FM (TST1867) FM 4470 FM (x511867) FM 4470 FM (T5T1867) FM 4470 FM (TST1867) FM 4470 FM (r5T1867) FM 4470/4474 FM (T5T1867) FM 4470/4474 FM (TST1867) FM 4470/4474 FM (TST1867) FM 4470/4474 FM (TST1867) FM 4470/4474 FM (TST1867) FM 4470/4474 FM (1511867) FM 4470/4474 FM (T5T1867) FM 4470/4474 FM (TST1867) FM 4470/4474 FM (1511867) FM 4470/4474 FM (TST1867) FM 4470/4474 FM (T5T1867) FM 4470/4474 FM (1511867) FM 4470/4474 FM (TST1867) FM 4470/4474 FM (TST1867) FM 4470/4474 FM (TST1867) FM 4470/4474 FM (TST1867) FM 4470/4474 FM (TST1867) FM 4470/4474 FM (T571867) FM 4470/4474 FM (T5T1867) FM 4470/4474 Reference G6850.08.08-1 66850.10.08 G6850.11.08 612210.06.09 G12210.0L10 431360.03.10 633470.01_11 636780.07.11-R1 640620.07.12-2 643190.11.13-1 640630.01.14-1 640630.01.14-2A 640630.01.14-2A-1 G40630.01.14-28 040630.01.14-2C 643180.0L14-1 SC8580.11.15-3 SC8580.01.16-1 GAF-SCi3285.02.17-2 GAF -5C13285.63.17-4 GAF-SC13285.03.17-1 GAE-5C13105.03.17-Rl GAF-SC13285.03.17-5 GAF -5015710.12.17-2 GAF-SC16440.12.17 GAF-SC16825.12.17-1 08-050187 08-050188 08-070077 08-070084 08-050181R 08-050186 08-070126 08-070122 08-070127 0B-080077 189A8.AM 3007500 3005640 3008178 3010215 3009788 3011140 3013614 3013788 3014547 3014692 3014960 30172.50 3022139 3022508 3025023 797-02095-267 3023458 3028039 3024805 3032383 3032695 3032943 3032811 3033719 3035864 3032172 3035140 3036225 3034978 797-05447-267 797-05487-267 NE o etc. Date Entity Examination Reference Date 08/29/2008 FM (1511867) FM 4470/4474 797-09016-267 10/06/2008 FM (TST1867) FM 4470/4474 3048496 11/05/2008 FM (TST1867) FM 4470/4474 3049601 08/03/2009 FM (T5T1867) FM 4470/4474 797-09984-267 01/08/2010 FM (TST1867) FM 4470/4474 797-09987-267 03/31/2010 FM (T5T1867) FM 4470/4474 797-10017-267 01/13/2011 FM (571867) FM 4470/4474 RR205568 07/18/2011 FM (T571867) FM 4470/4474 RR205474 07/17/2012 FM (T5T1867) FM 4470 /4474 3058483 11/15/2013 FM (r5T1867) FM 4470/4474 RR208244 01/06/2014 FM (TST1867) FM 4470 /4474 RR208306 01/07/2014 FM (5T1867) FM 4470 /4474 RR208456 01/07/2014 FM (TST1867) FM 4470 /4474 3062588 (PLA) 01/07/2014 FM (I5T1867) FM 4470 /4474 3055904 (letter) 01/07/2014 FM (7511867) FM 4470 / 4474 3055904 (data) 01/10/2014 FM (T5T1867) FM 4470 / 4474 Letter 11/09/2015 IRT (150/408) TAS 114 00001 01/20/2016 IRT(T5T7408) TA5 114 00002 02/08/2017 IRT (is! /408) TM 114 01-039 03/01/2017 IRT (T577408) TAS 114 02-005 03/08/2017 IRT (T517408) TAS 114 02-014 04/04/2017 IRT (TST7408) TAS 114 03-003 05/23/2017 IRT (x5)7408) TM 114 03-004 12/31/2017 IRT(T5517408) TAS 114 04-008 12/31/2017 M -D (CER1592) TM 114 13-0617.20 12/31/2017 M-I3(CER1592) TM 114 13-0307.02 04/28/2008 M -D (CER1592) TAS 114 13-1007.09 04/28/2008 MTI(TST2508) Physical Properties AX04C9A 07/25/2008 MTI (1512508) Physical Properties RX30C9C 07/25/2008 PRI (15T5878) Physical Properties GAF -027-02-01 04/01/2009 PRI (T5T5878) FM 4470/4474 0AF434-02-01 10/14/2008 PRI (TST5878) FM 4470/4474 GAF -434-02-03 10/14/2008 PRI (1515878) FM 4470/4474 GAF -434-02-04 10/14/2008 PRI (1515878) FM 4470/4474 GAF436-02-02 10/14/2008 PRI (T5T5878) FM 4470/4474 GAF -436-02-03 11/17/2008 PRI (1515878) FM 4470/4474 GAF436-02-04 09/04/1997 PRI (1575878) FM 4470/4474 GAF -436-02-05 06/15/2000 PRI (1515878) FM 4470/4474 GAF -436-02-08 11/09/2000 PRI (1515878) FM 4470/4474 GAF -436-02-09 12/27/2000 PRI (515878) FM 4470/4474 GAF -549-02-01 03/01/2001 PRI (1515878) FM 4470/4474 GAF -549-02-02 03/28/2001 PRI(Is15878) FM 4470/4474 GAF -559-02-01 08/14/2001 PRI (T5T5878) FM 4470/4474 GAF -559-02-05 05/06/2002 PRI (1575878) FM 4470/4474 GAF -559-02-06 01/10/2003 PRI (TST5878) FM 4470/4474 GAF -559-02-07 05/22/2003 PRI (1515878) FM 4470/4474 GAF -559-02-08 08/05/2003 PRI (TST5878) FM 4470/4474 GAF -559-02-09 03/05/2004 PRI (1515878) FM 4470/4474 GAF -559-02-11 04/05/2004 PRI (1515878) FM 4470/4474 GAF -559-02-12 05/26/2005 PRI (TST5878) FM 4470/4474 GAF -559-02-13 07/20/2005 PRI (1515878) FM 4470/4474 GAF -559-02-14 12/14/2005 PRI (1515878) FM 4470/4474 GAF -559-02-15 04/26/2006 PRI (TST5878) FM 4470/4474 GAF -559-02-16 07/18/2006 PRI (T5T5878) FM 4470/4474 GAF -559-02-17 09/11/2006 PRI (1515878) FM 4470/4474 GAF -559-02-18 11/20/2006 PRI (T5T5878) FM 4470/4474 GAF -559-02-04-R1 10/30/2008 PRI (TST5878) FM 4470/4474 GAF -559-02-19 10/30/2008 PRI (1515878) TAS 114 GAF -746-02-05 11/06/2008 PRI (1515878) TM 114 GAF -746-02-06 12/11/2008 PRI (1515878) TM 114 GAF -755-02-01 01/16/2009 PRI (TST5878) TAS 114 GAF -755-02-02 06/03/2009 PRI (1515878) TM 114 GAF -755-02-03 06/12/2009 PRI (1515878) TM 114 GAF -755-02-04 08/10/2009 UL (QUA9525) Quality Assurance Inspection (AL) 08/10/2009 UL (QUA9625) quality Assurance Inspection (CA1) 09/17/2009 UL(QUA9625) Quality Assurance Inspection (CA2) 04/13/2010 UL (QUA9625) Quality Assurance Inspection (GA) 05/12/2010 UL (QUA9625) Quality Assurance Inspection (IN) NEMO ETC, LLC Certificate of Aijthorjzatio #32455 6T" EDITION (2017) FBC HVHZ EVALUATION GAF Modified Bitumen Roof Systems Evaluation Report 01906.1 FL Revision 11: 12/17/2013 12/19/2013 01/29/2014 10/28/2014 10/28/2014 11/06/2014 06/15/2016 08/31/2016 12/09/2016 02/02/2017 02/02/2017 02/13/2017 08/01/2017 10/03/2017 11/20/2017 02/13/2018 03/30/2000 03/30/2000 01/24/2002 01/24/2002 03/26/2002 04/21/2003 04/21/2003 01/26/2004 09/05/2013 09/26/2013 01/30/2014 06/05/2009 07/09/2009 03/26/2002 09/16/2013 09/16/2013 09/16/2013 03/06/2014 03/06/2014 03/06/2014 03/06/2014 03/06/2014 03/06/2014 08/08/2014 08/08/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 03/04/2015 04/17/2015 12/15/2016 12/15/2016 02/02/2017 02/02/2017 02/02/2017 02/02/2017 11/07/2017 11/05/2017 01/25/2018 01/25/2018 01/10/2018 13 -2 -Ru 6732-R10 02/2018 ge 3 of 6 5.1 o I etc. This is a building code evaluation. Neither NEMO ETC, LLC nor Robert Nieminen, P.E. are, in any way, t - Designer of Record for any project on which this Evaluation Report, or previous versions thereof, is/was used forpermitting or design guidance unless retained specifically for that purpose. 5.2 Fire classification is not part of this Evaluation Report; refer to a current Approved Roofing Materials D -ectory for fire ratings of this product. 5.3 For steel deck installations, foam plastic insulation shall be separated from the building interior in accor-lance with FBC 2603.4 unless the exceptions stated in FBC 2603.4.1 and 2603.6 apply. 5.4 The evaluation herein pertains to above -deck roof components; deck -attachment details pertain to 'as -tested' conditions under Testing Application Standard TAS 114, Appendix J. Roof decks shall be in accordanm with FBC (HVHZ) requirements to the satisfaction of the Authority Having Jurisdiction. 5.5 Fastener spacing for mechanical attachment of anchor/base sheet or membrane is based on a minimu n fastener resistance value in conjunction with the maximum design pressure (MDP) listed for a specific system. should the fastener resistance be less than that required, as determined by the Building Official, a revised fastene spacing — prepared, signed and sealed by a qualified design professional — may be submitted. Said revised faster er spacing shall utilize the withdrawal resistance value taken from Testing Application Standard TAS 105 and calwlations in compliance with Roofing Application Standard RAS 117 or Roofing Application Standard RAS 137. 5.5.1 If mechanical attachment to the structural deck through lightweight insulating concrete is proposed, field withdrawal resistance testing shall be performed to confirm equivalent or determine enhanced fastenir ; patterns and density. All testing and fastening design shall be in compliance with Testing Application Standard TPS 105 and Roofing Application Standard RAS 117 and/or Roofing Application Standard RAS 137. Calculatior3 shall be prepared, signed and sealed by a qualified design professional. 5.6 For systems where specific lightweight insulating concrete is referenced, consult the current HVI-I_ product approval documentation for specific deck construction and limitations. For systems where specific I ihtweight insulating concrete is not referenced, the minimum design mix shall be for minimum 300 psi cellular mate ial. 5.7 For recover installations, the existing roof shall be examined in accordance with FBC 1521. 5.8 Perimeter and corner areas shall comply with the enhanced uplift pressure requirements of these areas. Fastener densities shall be increased, as calculated in compliance with Roofing Application Standard RAS 1= and/or Roofing Application Standard RAS 137 by a qualified design professional. *This extrapolation is not pe itted for systems marked with an asterisk*. 5.9 All attachment and sizing of perimeter nailers, metal profile and/or flashing termination designs shall c nform to Roofing Application Standard RAS 111 and applicable wind load requirements. 5.10 5.11 For assemblies marked with an asterisk*, the maximum design pressure (MDP) limitation listed shall be to all roof pressure zones (i.e., field, perimeters and corners). Neither rational analysis, nor extra permitted for enhanced attachment at enhanced pressure zones (i.e., perimeters, corners and extended c For bonded insulation or membrane over existing substrates in a recover installation, the existing roof sy be capable of resisting project design pressures on its own merit to the satisfaction of the Authori Jurisdiction, as documented through field uplift testing in accordance with Testing Application Standard T 5.12 All products listed herein shall have quality assurance audit in accordance with the F.A.C. Rule 61G20-3. NEMO ETC, LLC Certificate of Authorization #32455 6T" EDITION (2017) FBC HVHZ EVALUATION GAF Modified Bitumen Roof Systems pplicable dation is rners). em shall Having 124. Evaluation Report 01506.1 13 -2 -Ru FL .732-R10 Revision 11: 02/2018 gesof6 Okeechobee Police Department, 50 SE 2' Ave, Okeechobee, Fl 34972 Page 2 Page 3 Page 4 a►� CiT' OF OKEECHOBEE, PUBLIC WORKS Exhibit 4 Aug 7, 2018 Memo To: Marcos Montes De Oca, City Administrator From: David Allen, Public Works Director —pt."^ Date: 7/24/2018 Re: Police Department roof replacement contract extension Per the attached. memo, there has been a change in the specification for the Police Department roof replacement. The chain:ge'in the specification ;is due to the contractor determining that the deck of the PD roof is metal rather than plywood as -anticipated. The change in the specification is very minor with slight changesin fastener size, felt, and granulate. There isno change. to thepricefor the project. The contractor has requested a 21 -day extension as the new specification needs to be approved by the manufacturer to assure that the 15 -year warranty is valid. Given the possible potential for a rain delay, Public Works is requesting that the contract completion date be extended by 60 days to account for any other possible dekays. The contractor will' only be notified that the•requested 21 -day has been. granted. The new contract end date will be October 26, 2018 (elkQsf-l�� Gti i—o care eS (� V eat I t q (CLS rtes( 7/17/18 Mr. David Allen Public Works Director The City of Okeechobee, Florida Mr. Allen as to our conversation Tuesday morning about the changes of the re -roofing scope for ITB # PW 01- 00-04-1.8 The City of Okeechobee, Fl. Description of changes to be made to improve the scope of roofing materials to meet manufactures(GAF) specifications to qualify for the required 15 year warranty as stated in the bid document. #1 No changes #2 Changing of roof fasteners or deck screws from a #12 to #14 gauge #3 Increasing the type# 4 felt to a type #6 fiberglass felt. #4 Instead of using a modified bitumen white granulate, SCI will use modified bitumen white granulate (Fire Insulated). SCI is asking for a 3 week extension period for completion of the project. The original completion date was August 27th 2018. This extension is for changing the permit process period and having the GAF representative to look at and approve the changes in scope to give a 15 year manufacture warranty. SCT is increasing the quality of the Police Department roofing surface at NO extra charge to the City of Okeechobee. I am attaching the original scope so you can compare the new changes to be made for ITB # PW 01-00-04-18 Thanks for you cooperation in this matter. We look forward to developing a quality relationship with the City of Okeechobee. )V) Mark K1in Account Director 2241 NW 22nd Street • Suite 104 • Pompano Beach • Florida 33069 • www.SouthemCoating,..net Phone: (954) 984-0100 • Toll Free: (800) 343-4452 • Fax: (954) 984-0119 STATE LICENSE CCC1330390 • STATE LICENSE CC -C043994 BID UNIT PRICE SCHEDULE PW 01-00-04-18 OKEECHOBEE POLICE DEPARTMENT ROOF REPLACEMENT SEGMENT Na DESCRIPTION UNIT MEASURE EST, QTY. UNIT PRICE AMOUNT 1 RE -ROOF EXISTING OKEECHOBEE POLICE DEPARTMENT ROOFfINCLUDING: ' 11'"",) REMOVAL OF EXISTING DRIP EDGE FROM PERIMETER AND PREPARATION FOR NEW ROOF. INSTALL A Y" INSULATED TAPERED SYSTEM ON ENTIRE ROOF. FASTENERS #12 DECK SCREWS AND 3" STRESS PLATES. 0 USING HOT ASPHALT APPLY ON LAYER OF 744 BASE SHEET ALONG WITH TWO PLY'S OF TYPE IV FIBERGLASS FELT. [- ALSO USING HOT ASPHALT PROPERLY INSTALL ONE LAYER OF MODIFIED BITUMEN, COLOR: WHITE GRANULATED WARRANTY: FIFTEEN (15) YEARS 5. INSTALL PROPER DRIP EDGE AROUND PERIMETER AND PAINT TO MATCH EACH' 1 $ 97,777.00 2 REPLACE ROT TED ROOF SHEATHING AS REQUIRED WITH SQF'f TBD $ 4.50 TBD 3 REPLACE ROTTED FACIA AS REQUIRED LF TBD $ 15.00 TED 4 REPLACE 2" PRESSURE TREATED DRIP EDGE AS REQUIRED LF TBD $ 12.00 TED TOTAL BID AMOUNT (Based on Bid Unit Prices & $ 97 777,00 Estimated Quantities) Bidders Company Name Southern Coatings, Inc. NOTE: This Bid is on a unit price basis. The total estimated amount is for Bid comparison purposes only, The Contractor should field verify the actual site conditions prior to time of bidding and before submitting the Bid proposal. The Contractor should read the special conditions and the requirements for insurance before submitting a Bid proposal. The Contractor should verify the quantities to be included in the construction contract. The Contractor shall furnish the City of Okeechobee with a Payment and Performance Bond in 100 percent (100%) of the total estimated amount of the contract, The Payment and Performance Bond shall continue in effect for one (1) year after completion and acceptance of the work as guarantee against construction defects. The Contractor in his Bid shall include the cost of said bond, Density testing shall be at the expense of the City of Okeechobee, except for failing tests, which shall be charged to the Contractor. I have attached the required 5 percent (5%) Bid Security to this Bid. City of Okeechobee Project No, PW 01-00-04-18 Public Works Department 6 AUGUST 7, 2018 - REGULAR MEETING - PAGE 6 OF 11 AGENDA COUNCIL ACTION - DISCUSSION - VOTE VII. NEW BUSINESS CONTINUED D. Motion to amend a Bid award in the amount of $19,580.00 for Project No. PW 03-00-06-18 for pressure washing and painting City Hall, Fire Department, and Records Retention Building - Public Works Director (Exhibit 3). E. Motion to grant a request for a 21 -day extension for Project No. PW 01-00-04-18, Police Department Roof Replacement - City Administrator and Public Works Director (Exhibit 4). F. Motion to award a Bid in the amount of $35,865.00 to Boromei Construction for Project No. PW 02 -00 -05 -18 -RB, City Hall Door Replacement - Public Works Director (Exhibit 5). Motion and second by Council Members Ritter and Clark to amend the Contract awarded to Painting and Pressure Cleaning by Big Lake, LLC, for Bid No. PW 03-00-06-18 Pressure Washing and Painting City Hall, Fire Department, and Records Retention Building as follows: waive the performance bond requirement; amend and clarify the workers compensation requirement to read that Big Lake Painting and Pressure Cleaning, LLC may operate under the Florida workers compensation exemption law, or outside workers must be hired through an agency with workers compensation insurance. VOTE: WATFORD—YEA CHANDLER—YEA CLARK—YEA RITTER — YEA MOTION CARRIED. Motion and second by Council Members Chandler and Clark to grant an extension of the Police Department Roof Replacement Contract for Bid No. PW 01-00-04-18. The Contract began June 28, 2018, with a completion date of August 27, 2018. However, after the forensic investigation of the roof was concluded, it was discovered that the underlying roofing material is metal as opposed to the assumed plywood. The specifications have to be modified; the price remains the same. The Contractor requested extending the Contract completion by 21 -days in order to obtain approval by the manufacturer to assure the 15 year warranty would be valid with the minor specification change. Additionally, there could be weather delays and staff requested authorization to extend the project 60 -days if needed. Mayor Watford asked if there was any additional discussion on the request for a 60 -day extension; there was none. VOTE: WATFORD — YEA CHANDLER — YEA CLARK — YEA RITTER — YEA MOTION CARRIED. Council Member Chandler moved to award Bid No. PW 02 -00 -05 -18 -RB City Hall Door Replacement, in the amount of $35,865.00 to Boromei Construction of Okeechobee; seconded by Council Member Clark. The Re -Bid was let on June 29, 2018, with a mandatory Pre -Bid meeting held on July 10, 2018. The opening was July 18, 2018. In addition to Boromei Construction, Meticulous Construction of West Palm Beach submitted a bid for $79,000.00. Council Member Ritter expressed concern with the almost 50 percent price difference from the opposing Bidder. Administrator MontesDeOca assured him research has been done on the discrepancies of prices. VOTE: WATFORD — YEA CHANDLER — YEA CLARK — YEA RITTER — YEA MOTION CARRIED. Patty Burnette From: Patty Burnette Sent: Wednesday, August 15, 2018 3:35 PM To: mklein@southerncoatings.net Subject: Extension on project PW 01-00-04-18 Good Afternoon Mark. The City Council at their Meeting Tuesday evening (August 7, 2018) approved your company's requested extension for the Okeechobee Police Department Roof Replacement Project I hope you are recovering well from your procedure. Patty Pa41y M. 6 0-r ,i-€ e, Genera/Services Coordinator City of Okeechobee 55 Southeast 3rd Avenue Okeechobee, FL 34974 def: 863-763-3372 Direct: 863-763-9820 Tax: 863-763-1686 e-mail y6urnette@cityofokeecho6ee.com website: www.cityofokeechobee.com NOTICE: Florida has a very broad public records law. As a result, any written communication created or received by the City of Okeechobee officials and employees will be available to the public and media, upon request, unless otherwise exempt. Under Florida law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request, do not send electronic mail to this office. Instead, contact our office by phone or in writing. 1 Piece of concrete Public Works Director Allen displayed at the Council meeting regarding the portion of the Police Department roof where it had been poured. The concrete is turning into sand. CC Mtg: August 7, 2018 RE: Bid No. PW 01-00-04-18