2010-06-151
CITY OF OKEECHOBEE
JUNE 159 2010 REGULAR CITY COUNCIL MEETING
SUMMARY OF COUNCIL ACTION
PAGE 1 OF 4
II AGENDA III COUNCIL ACTION - DISCUSSION - VOTE II
I. CALL TO ORDER - Mayor:
June 15, 2010, City Council Regular Meeting, 6:00 p.m.
II. OPENING CEREMONIES:
Invocation given by Pastor Arlen Cook, Northside Baptist Church;
Pledge of Allegiance led by Mayor.
III. MAYOR, COUNCIL AND STAFF ATTENDANCE - City Clerk.
Mayor James E. Kirk
Council Member Lowry Markham
Council Member Mike O'Connor
Council Member Dowling R. Watford, Jr.
Council Member Clayton Williams
City Administrator Brian Whitehall
City Attorney John R. Cook
City Clerk Lane Gamiotea
Deputy Clerk Melisa Jahner
Police Chief Denny Davis
Fire Chief Herb Smith
Public Works Director Donnie Robertson
IV. PROCLAMATIONS AND PRESENTATIONS - Mayor.
In the absence of Mayor Kirk, Council Member Watford will be serving as Mayor Pro-Tempore and called the June 15,
2010 Regular City Council Meeting to order at 6:00 p.m.
The invocation was offered by Pastor Cook of Northside Baptist Church;
Mayor Pro -Tern Watford led the Pledge of Allegiance.
City Clerk Gamiotea called the roll:
Absent
Present
Present
Present
Present
Present
Absent
Present
Absent
Present
Present
Present
A. Present Terisa Garcia with a 25-Year Service Award. Mayor Pro -Tern Watford presented a plaque to Ms. Terisa Garcia in recognition of completing 25 years of continuous
service with the City, together with a longevity service bonus of five hundred dollars ($500.00).
B. Present Brian Whitehall with a Five -Year Service Award
Mr. Brian Whitehall was presented with a Certificate of Longevity, and an engraved cross pen in recognition of
completing five years of continuous service with the City.
460
.TUNE 15, 2010 - REGULAR MEETING - PAGE 2 OF 4
II AGENDA III COUNCIL ACTION - DISCUSSION - VOTE II
V. MINUTES - City Clerk.
A. Motion to dispense with the reading and approve the Summary of
Council Action for the May 18, 2010 Regular Meeting.
VI. WARRANT REGISTER - City Administrator.
A. Motion to approve the May 2010 Warrant Register:
General Fund ................................ $343,510.78
Public Facilities Improvement Fund ................ $32,060.80
Capital Improvement Projects Fund ................ $20,738.00
Capital Improvement Impact Fee Fund ......... I .... $1,326.00
VII. AGENDA - Mayor.
Council Member Williams moved to dispense with the reading and approve the Summary of Council Action for the May
18, 2010 Meeting; seconded by Council Member O'Connor. There was no discussion on this item.
VOTE
KIRK - ABSENT MARKHAM - YEA O'CONNOR - YEA
WATFORD - YEA WILLIAMS - YEA MOTION CARRIED.
Council Member Markham moved to approve the May 2010 Warrant Register in the amounts: General Fund, three
hundred forty-three thousand, five hundred ten dollars and seventy-eight cents ($343,510.78); Public Facilities
Improvement Fund, thirty-two thousand, sixty dollars and eighty cents ($32,060.80); Capital Improvement Projects
Fund, twenty thousand, seven hundred thirty-eight dollars ($20,738.00); Capital Improvement Impact Fee Fund, one
thousand, three hundred twenty-six dollars ($1,326.00); seconded by Council Member O'Connor. There was no
discussion on this item.
VOTE
KIRK - ABSENT MARKHAM - YEA O'CONNOR - YEA
WATFORD - YEA WILLIAMS - YEA MOTION CARRIED.
A. Requests for the addition, deferral or withdrawal of items on today's III Mayor Pro-Tem Watford asked whether there were any requests for the addition, deferral or withdrawal of items on
agenda. today's agenda? There were none.
Vill. NEW BUSINESS
A. Presentation of recommendations for the SR 710 widening and Mr. David Dangel, Inwood Consulting Engineers for the Florida Department of Transportation (FDOT) presented a
extension - David Dangel, Inwood Consulting Engineers for FDOT power point outlining the recommendations for the State Road 710 widening and extension. Printed copies of the
power point and detailed outlines of the project were distributed. Due to the scope of the project, the area was broken
down into four segments. Segment One indicates the new ending point will be, as it intersects with North Parrott
Avenue at the City/County Limits (Northeast 14" Street). Segment Four indicates how 710 will be realigned, existing
areas abandoned, and how this project will tie 710 into the existing highway at Everglades Boulevard, just West of L-
63N Canal.
.TUNE 15, 2010 - REGULAR MEETING - PAGE 3 OF 4
461.
II AGENDA III COUNCIL ACTION - DISCUSSION - VOTE II
Vill. NEW BUSINESS CONTINUED
A. Presentation of recommendations for the SR 710 widening and
extension continued.
B. Presentation of South Florida Water Management District (SFWMD)
Report - Gary Ritter, Okeechobee Service Center.
C. Motion to approve the Employee Group Health Insurance Plan - City
Administrator.
There was a lengthy discussion, after which Mayor Pro-Tem Watford stated that from a local standpoint it was
disappointing to hear the recommendations, as local residents know the long term effect and the better alternative is
to take the roadway (Segment One) more North of town, than to bring it in only 14 blocks from the main intersection.
The citizens were hoping for something better than what is being recommended. There were two alternatives that were
studied where Segment One could end, one was at Northwest 36' Street (Cemetery Road), the other was Northwest
23rd Lane. Mr. Dangel explained that both did not meet the Federal Highway guidelines, additionally the School Board
strongly objected to the proposal of Northwest 23rd Lane, South of the High School campus, as they have recently
purchased a large parcel to the South for expansion and this would divide the campus. The project is not on the
current Five -Year Project list. However, in order for the project to move forward, a recommendation is needed from
the City Council. The consensus of the Council was to instruct Administrator Whitehall to write a letter of
support for the project, although, reluctantly.
As requested by the County, this study is including a realignment of County Road 714/Martin Highway so that it creates
an intersection of 710 and County Road 15-B. This would expedite the County's ability to apply for Federal Grants to
fund this project, but would not be included with the FDOT 710 project.
Mr. Gary Ritter of South Florida Water Management District, distributed a packet of information to the Council
containing the complete copy of River of Grass Project, Everglades Restoration Phase I Planning - Conceptual
Configurations Development. Mr. Ritter had promised a copy of the complete packet to the Council at the May 18
meeting during the update of this project. The Council again thanked Mr. Ritter for explaining the procedure and for
assisting in making the presentation to the panel that a reservoir within Lake Okeechobee would not be an appropriate
method to assist in water quality of the lake. The second packet of information was reviewed by Mr. Ritter, `Preparing
for the Rainy Season Operations and Actions.' This gave the Council a better idea of the water district's plan for the
rainy season as well as the hurricane season. Council Member Markham noted his gratitude to Mr. Ritter and his hard
work toward getting SFWMD to listen and work with Okeechobee officials. There was no official action taken on this
item.
Mayor Pro-Tem Watford yielded the floor to Administrator Whitehall in order to bring the Council up to date on the
employee's health insurance proposal. The City is looking at a 26 percent increase in premiums to continue with
Aetna's current policy. Various avenues were explored. Staff is recommending the Council award the employee health
insurance to Public Risk Management of Florida Health Trust (PRM). The County and Okeechobee Utility Authority
are members of the insurance pool as well. The pros and cons of joining a pool type group were discussed at length.
Mr. Richard Schell of PRM was present to respond to questions as well.
4V2
JUNE 15, 2010 - REGULAR MEETING - PAGE 4 OF 4
II AGENDA III COUNCIL ACTION - DISCUSSION - VOTE II
VIII. NEW BUSINESS CONTINUED.
C. Motion to approve the Employee Group Health Insurance Plan
continued.
IX. ADJOURN MEETING - Mayor.
Please take notice and be advised that when a person decides to appeal any decision made
by the City Council with respect to any matter considered at this meeting, he/she may need to
insure that a verbatim record of the proceeding is made, which record includes the testimony
and evidence upon which the appeal is to be based. City Clerk media are for the sole purpose
of backup for official records of the Clerk.
ATTEST: Dowling R. Watford, May r Pro-Tempore
U
Lane-Gamiotea, CIVIC, City Clerk
Following discussion, Council Member Williams moved to accept quote as presented and award the Employee Group
Health Insurance Plan to Public Risk Management of Florida Health Trust, beginning August 1, 2010 and ending
September 30, 2012; seconded by Council Member Markham.
For the record, it was noted that Council Members Watford and O'Connor do not participate in the City's Health
Insurance Plan.
VOTE
KIRK - ABSENT MARKHAM - YEA O'CONNOR - YEA
WATFORD - YEA WILLIAMS - YEA MOTION CARRIED.
There being no further items on the agenda, Mayor Pro-Tem Watford adjourned the meeting at 7:25 p.m. The next
meeting will be July 20, 2010 at 6:00 p.m.
1
CITY OF OKEECHOBEE - June 15, 2010 - REGULAR CITY COUNCIL MEETING
HANDWRITTEN MINUTES BY I n " n I '
I. CALL TO ORDER - Mayor:
Mayor K#k called the June 15, 2010 Regular City Council Meeting to order at ®� p m
((e Te.M. W(, t)46,0L d.
II. OPENING CEREMONIES:
The invocation was offered by Pastor Arlen Cook, Northside Baptist Church; Followed by the Pledge of
Allegiance led by Mayor -I PF+o-fie to Ord'
III. MAYOR, COUNCIL MEMBERS, AND STAFF ATTENDANCE - City Clerk.
City Clerk Gamiotea called the roll:
Mayor James E. Kirk Present
Council Member Lowry Markham Present
Council Member Mike O'Connor
Dowling R. Watford, Jr. Present
Council Member Clayton Williams . Present
City AdmNaf,��inistrator Brian Whitehall Present
City Attorney John R. Cook Present
City Clerk Lane Gamiotea Absent
Deputy Clerk Melisa Jahner Present
Police Chief Denny Davis Present
Fire Chief Herb Smith
Public Works Director Donnie Robertson Present
IV. PROCLAMATIONS AND PRESENTATIONS - Mayor.
A. Ms. Terisa Garcia, was presented a $250• "in0 check and plaque which read: Recognition
ogOkeechobee
Outstanding Service to the City and its Residents as an Employee of the
for Twenty Five Years."
B. Mr. Brian Whitehall, graciously accepted a framed Certificate of Longevity Service and a personalized
cross pen, for his five years of service and dedication as an employee with the City. The certificate
read as follows: "Longevity Service Certificate - Presented To - Brian Whitehall - In Appreciation
for Your 5 Years of Hard Work and Dedication with the City of Okeechobee, June 1, ion
through June 1, 2010, Service is the lifeblood of any organization. Everything flows from it and
is nourished by it. The City and Your Fellow Citizens have Benefitted Greatly by Your
Performance."
V. MINUTES - City Clerk.
moved to dispense with the reading and approve the
A. Council Member
Summaryof Council Action for the May 18, 2010 Regular Meeting; seconded by
0 There was no discussion on this item.
VOTE
KIRK -*E* MARKHAM - YEA O' - YEA
WATFORD - YEA WILLIAMS - YEA MOTION CARRIE
VI. WARRANT REGISTER - ty Administrator moved to approve the May 2010 Warrant
A. Council Member (Im five hundred ten dollars
Register in the amounts: General Fund, three hundred forty-three thousand,
and seventy-eight cents ($343,510.78); Public Facilities Improvement Fund, thirty-two thousand, sixty
dollars and eighty cents ($32,060.80); Capital Improvement Projects Fund, twenty thousand, seven
hundred thirty-eight dollars ($20,738.00); Capital Improvement Impact Fee Fund, one thousand three
hundred twenty-six dollars ($1,326.00); seconded by Council Member b -
.There
was no discussion on this item.
KIRK - XP, -
WATFORD - YEA
MARKHAM - YEA
WILLIAMS - YEA
Page 1 of 4
O'CONNO
OTI N CARRIE .
VII. AGENDA - Mayor.
A. Mayor Kirk asked whether there were any requests for the addition, deferral or withdrawal of items on
today's agenda?
VII. NEW BUSINESS
A. Presentation of recommendations for the SR 710 widening and extension - David Dangel, Inwood
Consulting Engineers for FDOT
PQ-01 a- 6
B. Presentation of South Florida Water Management District (SFWMD) Report - Gary Ritter, Okeechobee
Service Center
Page 3 of 4
I
CN C. Council Member moved to approve the mployee Group Health Insurance an;
seconded by Council Member l.lYi
Ck-
t-7, �� �C� = (� �, 2 . Uv S��u cklsr-
(�sue?
Ckub U
. 4,r,�
tt- �Q -
A-Z) ", vo
Ok-L
KIRK -)Wr NO
WATFORD - YEA
MARKHAM - YEA
WILLIAMS - YEA
IX. THE MEETING WAS ADJOURNED AT T ')5 PM.
Page 4 of 4
O'CONN - YEA
t"D.,
ewelmed
i
t°ta n tion ° 6` iQ�tt tai t ter c e�sarc�e
to the 6'r(,rl antl its mAlents
..'7.4 llff (,f)iil�nfs®� n.�flin
CITY OF OKEECHOBEE
PAY TYPE DEPT
REG
HOLDY
AN LV
L/S IN
SCK LV
FUNERL
Cell Reim
COMMENTS:
+�
HA
CURRENTr12
YTp
DED TYPE
NT
0.0
16.8100
0.00439.40
WTH0.0
D
16.8100
0.00134.48
FICA A
41.68
1,735.27
0.0
16.8100
0.00
672.40
FICA B
31.00
937.48
0.0
16.8100
500.00
500.00
RET.
7.25
219.28
0.0
16.8100
0.00
1,008.60
HEALTH
0.00
887.59
0.0
16.8100
0.00
672.40
COF/FL
0.00
274.01
0.0
16.8100
0.00
250.00
LB NA2
0.00
44.00
DIR DP
0.00
281.82
SAV FLAT
0.00
8,677.76
0.00
2,200.00
y
dew&e mow,, - f5-00 00
CURRENT YTD TAXES CURRENT
YTD ACCRUED LEAVE HOURS
EARNINGS FICA
FED W/H
VACATION
DEDUCTIONS
0.00 1.487.42 NET PAY �^^ ^' PERSO A SICK
City of Okeechobee OF.OKE�eCy
a O SunTrust Bank 63-215
55 SE 3rd Avenue Okeechobee Office s31
t�: m 815 South Parrott Avenue
Okeechobee, FL 34974 ?: Okeechobee, FL 34974
s DATE
ORio►' JUN 4,2010
PAY ••• Four Hundred Twenty and 07/100 Dollars ***
TO THE
ORDER
OF:
TERISA GARCIA
018962
AMU N
$420.07
110018962n' I:063102i52l:089300093031811'
ONGEVV SERVIGE GERI$ IG it
Pre�en�eJ To
BpliiR 111tehaff
n Appreciation for Your 5 Years of --lard \\//or� and Dedication
vvitk 4e City of O) eeci obee
June I, 2005 tkroug� June I, 2010
Service is tke lifeklood of any organization. Qverytking flows from it and is nouris4d 64 it.
Tke City and Your -[::ellovv Citizens nave -Penef itted Greatly ky Your performance.
presented tkis 15tk day of June, 2010
Dowfl ad R. Watford, Jr. Mayor Pro-?empore
bane Gamt tea, GMG, MY Mark
� I I �s I i c) '" ft-uA M ft-tLAJAA
710 PD&E Study
US 441 to SW Martin Highway
In County
FP# 419344-2-22-01
ntation Outline
■ Study Area and Study Segments
— Alternatives Considered
— Alternatives Screening
— Matrix Evaluation
— Proposed Alternatives
■ Schedule
■ Future Funding
■ Comments and Questions
Segments 1 & 2 Alternatives
Considered
NW 27I H LANE
NWJ121H.STREEi-
PRELIMINARY CORRIDORS
2
Segment 1 & 2 Alternatives
Screened
■ Project Termini
— NW 36th St/CR 718
■ 2030 Traffic Projections - 4,700 AADT
• Does Not Meet Purpose and Need
• Not Supported by FDOT and FHWA
— NW 23rd Lane
■ 2030 Traffic Projections - 10,900 AADT
• Not Supported by Okeechobee County
Schools
— NW 13th Street
• 2030 Traffic Projections - 14,300 AADT
■ Meets Purpose and Need
■ Supported by FDOT and FHWA
xis•' tSegmentsAlternative
Alignments
rat,
..a
:r T, Vft.
IIJ
ment 1&2 Matrix Evaluation
Segments 1 & 2 Alternatives Evaluation Matrix
S.R. 710 from U.S. 4/1 to the west and of the L-63N Canal bridge
KNI w W wrr NlM W bYI.Cw/
�4�
T
W �4i0wn41W
Coen M Wt a.149� wprosril
M [Vlw tlWJMrYy IMO
M
r i appears
arjA
aru4 4ha f
9e,n hpJG
sodFivn+ cr
fn[rt art
od
C Co o
ita f��
1tXjp�t �rtit�
�,nq �°r's,Jcrt
Cu,oPenx''ec�
el
Segment 1 & 2
Access Management
k .
"'Z t.I bC
alol`q OP trod
+t s� OtI0 ^ -
(G4
yy,,5416c'aiidJc
1 S i}f1G 6'f 00
of o^I-4
,"dc rpodS
.}r,o} GprvY tf
,g.-7%0 to
INWy 4415S.
�:i fio^ioyG
b)h.i wa,,ldn'i 1•iyLol•dc•�� Co^'�r"}'��{''{
co— C. i host —r Q aalti a,,c
ment 3 Matrix Evaluation
ment 4 Matrix Evaluation
Segment 4 Alternatives Evaluation Matrix
S.R. 710 from east of Sherman Wood Ranches to S.W. Martin
Highway
yr..«
0Y.—.. ,— M-1 d.Y c..n.. d J.mury 2010
P
C.R. 714 Realignment
Alternatives Evaluation Matrix
From U.S. 441 to S.W. Martin Highway in
Okeechobee and Martin Counties
�....o....,w...rr.
Ca.Mft. —0f.,nw....r.M..w.•.r�...r1Ho
CR 714
Realignment
Matrix
Evaluation
.3
Project Funding
■ FDOT's Tentative 5-Year Work
Program does not currently include
funding for design, right-of-way
acquisition or construction of any
portion of State Road 710
9
10
�s4 t - tA-
Segments 1 & 2 Alternatives Evaluation Matrix
S.R. 710 from U.S. 441 to the west end of the L-63N Canal bridge
No Build
Segments 1 & 2 Combined
U.S. 441 to the west end of the L-63N Canal
Alternative 1-2A
Urban Typical South Extension
Alignment
Alternative 1-213
Urban Typical Centered Extension
Alignment
Alternative 1-2C
Urban Typical North Extension
Alignment
Alternative 1-2D
Urban / Suburban Typical Centered
Extension Alignment
Segment Length = 3.2 mi. Segment Length = 3.1 mi. Segment Length = 3.4 mi. Segment Length = 3.1 mi.
136 ft. 136 ft. 136 ft. 136-182 ft.
Right of Way Width Required
Relocations
Residences
0
4
5
1
5
Businesses
0
0
2
0
2
FP&L Transmission Line
0
0
0
0
0
Engineering Issues
Save Existing Pavement
Yes
No
No
No
Yes
Design Variation
No
No
No
No
Border
Natural, Environmental & Physical
Impacts
T & E Species Impacts
None
Low
Low
Low
Low
Potential Contamination Sites
None
1 High
1 Medium
1 High
1 Medium
Wetlands (Ac)
0
0.38
0.70
1.60
0.70
Noise Impacts
None
Rest Home, 8 Residences
Rest Home, Church,
14 Residences
Rest Home, 1 Residence
Rest Home, Church,
16 Residences
Social & Neighborhood Impacts
None
Low
Medium
Low
Medium
Estimated Costs In Millions
(Present Day Costs)
Design ($1,200,000 per mile)
No Cost
$3,895,200
$3,680,400
$4,117,200
$3,680,400
Road Right of Way
No Cost
$7,233,100
$10,998,500
$5,514,400
$12,047,500
Pond Right of Way
No Cost
$3,245,700
$4,564,800
$3,464,800
$4,564,800
Major Utility Relocation
No Cost
$0
$0
$0
$0
Wetland Mitigation
No Cost
$38,000
$70,000
$159,000
$70,000
T & E Species Mitigation
No Cost
$0
$0
$0
$0
Roadway Construction
No Cost
$32,791,121
$31,968,701
$34,663,374
$27,257,893
CEI (15% of Construction)
No Cost
$4,928,668
$4,795,305
$5,199,506
$4,088,684
Total Cost
No Cost
$52,122,000
$56,078,000
$53,118,000
$51,709,000
- Proposed Alternative
Costs in this matrix are present day costs as of January 2010
Alternative 1-2D (Segment 2)
High Speed Suburban Roadway
Save Existing Pavement Alternative
55 mph Design Speed
�+ I Border Existing Pavement
sting
=n Hight -o of Way
a 100'Right-of-Way 82' Additional Right -of -Way (Min.)
a,
182' Minimum
Segment 3 Alternatives Evaluation
Matrix
S.R. 710 from west end of the L-63N Canal bridge to east
of Sherman Wood Ranches
No Build
Segment 3 - 2.9 miles
West end of L-63N Canal Bridge to East of Sherman Wood
Ranches
Alternative 3A
4-Lane Rural North -South Alignment
Alternative 3B
4-Lane Rural Save Pavement North -
South Alignment
Right of Way Width Required
204 ft.
Varies 192 ft. - 204 ft.
Relocations
Residences
0
0
0
1
Businesses
0
2
FP&L Transmission Line
0
0
0
Engineering Issues
Save Existing Pavement
Yes
No
Yes
Design Variation
No
No
Border
Natural, Environmental & Physical
Impacts
T & E Species Impacts
None
Low
High
Potential Contamination Sites
0
1 Medium, 1 High
1 Medium
Wetlands (Ac)
0
4.37
3.56
Noise Impacts
None
7 Residences
7 Residences
Social & Neighborhood Impacts
None
Low
Low
EstimatedCosts in Millions
(Present Day Costs)
Design ($1,200,000 per mile)
No Cost
$3,480,000
$3,480,000
Road Right of Way
No Cost
$3,338,100
$6,379,500
Pond Right of Way
No Cost
$3,538,900
$3,538,900
Major Utility Relocation
No Cost
$0
$0
Wetland Mitigation
No Cost
$435,000
$354,000
T & E Species Mitigation
No Cost
$18,000
$28,500
Roadway Construction
No Cost
$28,251,009
$25,464,572
CEI (150/o of Construction)
No Cost
$4,237,651
$3,819,686
Total Cost
No Cost
$43,299,000
$43,065,000
- Proposed Alternative
Costs in this matrix are present day costs as of January 2010
Alternative 3A
Rural Roadway
65 mph Design Speed
c a 40 10 ( 7 B .I,.,, +8 24 10 40 I 16 • . , d
a t
-W p E.isting Right -of -Way Llne o 0
I6L
100' Right -of -Way 104' Additional Right -of -Way (Min.)
a:
204' Minimum '
Alternative 313
Rural Roadway
Save Existing Pavement Alternative
65 mph Design Speed
to r'... 28 10,.. 24' 8 I�8 - 24 ,10 40' 16 ,.j T
3 I Border e,nnngP,rem«t o 3
E t gRight-of-Way Line ,ng
W O
t ( 100' Right -of -Way .a L
a_
�' 192'Minimum z
Segment 4 Alternatives Evaluation Matrix
S.R. 710 from east of Sherman Wood Ranches to S.W. Martin
Highway
No Build
Segment 4 - 6.3 miles
East of Sherman Wood Ranches to S.W. Martin Highway
Alternative 4A
4-Lane Rural
Relocate FPL
Easement Save
Pavement
Alternative 4B
4-Lane Rural
Relocate FPL
Easement Save
pavement with
Railroad Impact
Alternative 4C
4-Lane Rural
Relocate FPL
Easement Full
Reconstruction
Alternative 4D
4-Lane Rural Split
Roadway Around
Utilities
Alternative 4E
4-Lane Rural on
New Alignment
Right of Way Width Required
100 ft.
127 ft.
100 ft.
138 ft.
204 ft.
Residences
0
2
2
2
6
11
Businesses
0
1
1
1
1
1
FP&L Transmission Line
0
1
1
1
O
0
Engineering Issues
Save Existing Pavement
Design Exception
Yes
No
Yes
Border
Yes
No
Yes
No
No
No
Border
No
N ; ironmental & Physical
Impacts
T & E Species Impacts
None
High
High
High
Medium
High
Potential Contamination Sites
None
1 Medium
1 Medium
1 Medium
None
None
Wetlands (Ac)
0
2.95
10.86
2.29
8.64
13.68
Noise Impacts
None
3 Residences
3 Residences
3 Residences
13 Residences
9 Residences
Social & Neighborhood Impacts
None
Low
Low
Low
Low
Low
Estimated Costs in
(Present Day Costs)
Design ($1,200,000 per mile)
No Cost
$7,560,000
$7,560,000
$7,560,000
$7,560,000
$7,560,000
Road Right of Way
No Cost
$7,085,500
$7,825,500
$7,119,500
$11,417,300
$13,107,300
Pond Right of Way
No Cost
$2,485,000
$2,485,000
$2,485,000
$2,485,000
$2,485,000
Major Utility Relocation
No Cost
$5,250,000
$5,250,000
$5,250,000
$O
$0
Wetland Mitigation
No Cost
$294,000
$1,081,000
$228,000
$860,000
$1,362,000
T & E Species Mitigation
No Cost
$33,000
$33,000
$33,000
$16,500
$18,000
Roadway Construction
No Cost
$31,213,313
$31,213,313
$36,737,398
$30,759,608
$36,715,706
CEI (15% of Construction)
No Cost
$4,681,997
$4,681,997
$5,510,610
$4,613,941
$5,507,356
Total Cost
No Cost
$58f603,000
$60,130,000
$64,924,000
$57,712,000
$66,755,000
- Proposed Alternative
Costs in this matrix are present day costs as of January 2010
Alternative 4A
Rural Roadway
65 mph Design Speed
sawILInE
Tvolt'.�Itw3'I9'
1
24' I 40I 24� IIoI 40� 1
I 111 TGG
41' ' w t�
I
,oy i
w fNAD RW FRL EASEMEM GAS EASEMENT EASF GAS EASEMENT FPSL MENT
IX XI5TNJGtExlS PROPOSED P
Alternative 413
Rural Roadway
65 mph Design Speed
. . . . ... ....
�Gn�s uNE
2T �i3 8� 24' ( 40' I 24 110' I a0�1�E
g)
��1000100 500 100�500 100,
PAd.POAD RW�P0AG0.M
EXISTING) IF%19TP1^I
FPdL E—S T GAS EASEMEM GAS EASEMENT fPdL EAEEMENTfiW�PpAD0.NY FPdL EASE T GAS EASEMEM GAS EASEMENT fPdL EASEMENT
IIXISme, IIXISTINtiI (PPOP09EG) IPRGPOSEG,
Alternative 4C
Rural Roadway
65 mph Design Speed
XTJ
• s
2<' IO' 24' 10
_ 3U' GAS LM: 30'GAS LWE
t
100
50' I. Sa
ROADRW FP(EXTTAG) GASEASE ) 'I' GAS FASEIBNf FP6L EA.SENFM
(E%ISi1NG) (EXISTWGI IXISGNG (PROPOSED,
Alternative 4D
Rural Roadway
65 mph Design Speed
W- %71*2 �-
�WS UNE I 30'GA�a LNE "�..
f00 I ,00,..
I 50' 50 I 40' u«•�� 24 40 1 ;G
T,0•l,
tr
9. ROAG RW MIKLE�A�mSEA�I�M I ,
i IE%!STING) i IEMLSDNG)
GAS EASENENT GAS EASEMENT1
i (EXISTING) i {PROPOSEGI
I.V MMML'M
Alternative 4E
Rural Roadway
65 mph Design Speed
i,
`mow
2
WS I
100' � t00'
SP urvE xG•UNE
24' 24' 10' 10'
1 50' 1 50'0' � 40' I�1040
ROAD AAN FPdL EASEMEM
(FXISTMSI 'EXISTING)
+'I
YYYGASEASEMENf"''GASEASEMEWI II I I ,
IE%STNGI )PRO EO)
204 MMIMGM _�
C.R. 714 Realignment
Alternatives Evaluation Matrix
From U.S. 441 to S.W. Martin Highway in
Okeechobee and Martin Counties
No Build
C.R. 714 Realignment
Alternative A
Alternative B
Relocations
Residences
0
0
O
Businesses
0
0
0
FP&L Transmission Line
0
0
0
Natural, Environmental & Physical
Impacts
T & E Species Impacts
None
Low
Low
Potential Contamination Sites
None
None
None
Wetlands (Ac)
0
O
0
Noise Impacts
None
None
None
Social & Neighborhood Impacts
None
Low
Low
Estimated Costs in Millions
(Present Day Costs)
Design
No Cost
$211,500
$193,500
Road Right of Way
No Cost
$366,100
$357,100
Pond Right of Way
No Cost
$0
$0
Major Utility Relocation
No Cost
$0
$0
Wetland Mitigation
No Cost
$0
$0
T & E Species Mitigation
No Cost
$0
$0
Roadway Construction
No Cost
$2,115,000
$1,935,000
CEI (15% of Construction)
No Cost
$317,250
$290,250
Total Cost
No Cost
$3,010,000
$2,776,000
- Proposed Alternative
Costs in this matrix are present day costs as of January 2010
Uj-� C +ot -:D40-w-:�LIT
Preparing for the Rainy Season
SFWMD Operations & Actions
np
r
The Central & Southern
Florida Project
• Authorized by Congress in
1948
• Major Components:
■ River Channelization
■ Herbert Hoover Dike
■ Water Conservation Areas
■ Protective Levees
■ Everglades Agricultural Area.
■ Lower East Coast
■ Disconnected Parts of
the System
■ Lower West Coast
■ Upper East Coast
■ Drainage Network i
■ Salinity Structures
Fort
Adando
Big
a
' Key West °
Fort
Pierce
West
ort
Miami
y
Current C&SF Project
Purpose & Challenges
• Purpose:
■ Flood control
■ Water supply
■ Navigation
■ Protection and enhancements
of the ecosystem
• Challenges:
■ Unintended ecological impacts
■ Florida's extreme climate
■ Increased population & land
use
■ Balancing multiple, often
conflicting regional water
resource needs
System Modifications
;Y
J
�? Kissimmee
�4. VaHey
Big`
Cypress
w _ 1
■ Natural Areas
Water Flows
Pre -drainage Flow
N
■ Natural Areas
■ Water Flows
Pre -drainage Boundary
a
Current Flow
Today's C&SF
System
• 2,669 miles of canals
and levees
• 160 major drainage
basins
• 1,290 water control
structures
• 66 pump stations
• 9 Regional Field
Stations &
Headquarters
A,SM
*,"
Gulf of MONICO
u na
wo swe...
■ W
fMwr.dw
SPOM
w.
�rraw..
Q AwA 06"
+ Mrtirw
W
� OrMCar
i
v*
16
Affa/flc Otte&
y
♦5
CUM
-
f+i.
s
'A'AV
r
YB C,MCSi
MAW414.
MCf01.0
r
'l 6Ar
C&SF Project
Roles & Responsibilities
• U.S. Army Corps of Engineers
(Regulatory Agency)
■ Features associated with Lake
Okeechobee, Caloosahatchee River,
St. Lucie Canal and main spillways of
the Water Conservation Areas in
accordance with USACE regulations
• SFWMD (Local Sponsor)
■ Most of the features associated with the
C&SF Project in accordance with
regulations approved by the Secretary
of the Army
How much water can we move?
More than 41 Billon Gallons per Day!
• Fill Lake Okeechobee in 27 days
• Fill Dolphin Stadium 400 times a day
How operational decisions are made
SOUTH FLORIDA WATER MANAGEMENT DISTRICT
Herbert
Hoover
Dike
Public
Health &
Safety
Regional/
National
Economy
Lake
Ecology
•
Waterway
Navigation
Flora/ Commercial/
Fauna Recreational
Traffic
Threatened/
Endangered
Species
Regional/
National
Economy
Regional
Economy
•
Estuaries —
Caloosahatchee
& St. Lucie
Flora/Fauna
Threatened/ Endangered
Species
Regional Economy
•1aw.IIIs
Greater
Everglades
Water
Supply
Flora/
Municipal,
Fauna
Industrial,
Native
Threatened/
American,
I
Endangered
Agricultural,
Species
Environment
Regional Regional
Economy Economy
^nOO �CMTT LINES
l V SrWMD CANAL
BFWMD HOUNDARY LINE.
Browwd County Secondary Drainage Districts
AN AD COON" MCD 92 954-631-0167
BAONARD COON" MCD 93 954-831-9767
RAOMARD COUNTY ■CD 94 954-931-0767
CENTRAL BROWMD DRAINAGE DISTRICT 954-432-5119
COCONAR WATER CONTROL DISTRICT 954-031-0167
CORAL RAY COMMUNITY DEV. DIST. 954-724-2001
CORAL SPRINGS IMPROVEMENT DISTRICT 954-753-0380
MDIAN TRACE COMMUNITY DEVELOPKMT DIST 954-153-5841
LAUDERDALE ISLES ROD 954-584-7591
NORTH. LAUDERDALE WCD 954-771-0880
NORTH SPRINGS IMPROWNENT DISTRICT 954-153-0380
OLD PLANTATION WATER CONTROL DIST. 9S4-472-SS96
PIPE TAKE WATER CONTROL DISTRICT 954-753-0380
PLANTATION ACRES II4PROVENENT DISTRICT 954-474-3092
AR, WOOD WATER CONTROL DISTRICT 954-831-0167
SOUTH AROMARD DRAINAGE DISTRICT 954-680-3337
SUWSRTAE NATE,R CONTROL DISTRICT 954-753 03 0
INDA TLL RAMMOCN IRRIGATION 6 SOIL CD 954-566-8341
TURTLE RUN COMMUNITY DEV. DIST. 9S4-753-0390
THIN LANES WATER CONTROL DISTRICT 954-831-0767
NE8T LAUDERDALE NAMR CONTROL DIST, 954-753-0380
Collier Gourd Secondary Drainage Districts
COW ELO A WATER CONTROL D STRICT 941-494-4021
DEVILS GARDEN WATER CONTROL DIST. 941-675-2966
Glades County Secondary Drainage Districts
AARON WATER MAWAGT.MF.NT DISTRICT 111-675-1341
DISSTON ISLAND CONSERVANCY DISTRICT 941-983-6124
FLAGHOLE WATER CONTROL DISTRICT 941-983-5111
Hendry County Secondary Drainage Districts
RAW WATER NAKAGEMENT DISTRICT 9d 1-675-0746
ROLLES DRAINAGE DISTRICT 941-963-9620
CENTRAL COUNTY MCD 941-993-5791
CLEWISTON DRAINAGE DISTINCT 941-983-6124
CDLLINS SLOUGH WCD 941-675-2966
CON SLOOGR WATER CONTROL DISTRICT 941-494-4021
DEVILS GARDEN WATER CONTROL DIST. 941-675-2966
£AST RESORT COUNTY WCD 941-675-5220
FIAGHOLE WATER CONTROL DISTRICT 941-983-5111
GEAAER GROVES WATER CONTROL DIST. 941-675-3507
MEMORY-KILLIAAD WATER CONTROL DIST. 941-983-5111
NID-COUNTY NSAU PHONE NO. 09RPOWN
HITTA WATER CONTROL DISTRICT 941-963-6124
SOUTH PLORIDA CONSERVANCY DISTRICT 561-996-2940
8OGRRLAND HATER CONTROL DISTRICT 941-983-5111
Se Highlands County condary Drainage Districts
= SPRING LAKE IMPROVEMENT DISTRICT 954-753-0300
Lee County Secondary Drainage Districts
■CWNTY LINE DRAINAGE DISTRICT 941-494-3500
EMT NULLOCH WATER CONTROL DISTRICT 941-257-8898
Martin County Scrowidary, Drainage Districts
HOBS ST. L-11 CONSERVANCY -STRICT 111-655-0121
PAL MAR RATER MANAGENTNT DISTRICT 954-753-0390
TROUP-INDIANTOWN DRAINAGE DISTRICT 561-597-2112
Okeechobee County Secondary Drainage Districts
Q COMMA WATER MAPAGENrENT DISTRICT 954-525-3441
Orange County Secondary Drainage Dtstricts
NEE- CREEK IMPROVEMENT DISTRICT 407-026-2250
VALENCIA WATER CONTROL DISTRICT 407-351-2766
Palm Beach County Secondary Drainage Districts
-:::.ACME IMPROVEMENT DISTRICT 551-791-4000
EAST MACE MAT EA CONTROL DISTRICT 561-996-2940
EAST SHORE WATER CONTROL DISTRICT 561-996-2910
GLADEPZEM DRAINAGE DISTRICT 561-655-0620
HIGHLAND GLADES DRAINAGE DISTRICT 561-655-0629
INDIAN TRAIL IMPROVEMENNT DISTRICT 561-193-0974
LANE NORTH DRAINAGE DISTATCT 561-737-3835
LONARATCREE GROVE9 NOD 561-793-0884
NOA TH PALM BEACH HEIGHTS WCD 561-844-5205
NORTHEM PALM MACA COIN" IMPROVE. DIST 561-624-7830
PANONLE DRAINAGE DISTRICT 561-996-2940
PAL MAR WATER MANAGEMENT DISTRICT 954-153-03SO
PELICAN LANE WATER CONTROL DISTRICT 561-996-2940
PINE TREE WATER CONTROL DISTRICT 561-655-0620
AITTA WATER CONTROL DISTRICT 963-902-2603
SEEM LE WATER CONTROL DISTRICT 561-655-0620
9RAMANO DRAINAGE. DISTRICT 361-555-0620
SOU TA FLORIDA CONSERVANCY DISTRICT 561-996-2940
90UTH INDIAN RIVER MCD 561-741-0550
SOUTH SHORE DRAINAGE DIBMICT 561-996-2940
SLLuda County Secondary Drainage Districts
FORT PIERCE FARMS WATER CONTROL DISTRICT 561-461-5050
NORTH ST. LUCIA RIVER WATER CONTROL DIST 561-461-5050
Canal Maintenance in Miami -Dade County
N DADE COURT
DITCH
N NOW CIPALI"
WONICIPALITT, UNDER CONTRACT W/DAVE COOS"
SOUTH FLORIDA WATER MANAGEMENT DISTRICT
72 local
"298„
Districts
Canal / Groundwater Interaction
Normal Dry Season Operations
Canals serve two primary
purposes....
1. Flood Control
2. Water Supply
Groundwater
Canal stages held high
to facilitate groundwater
recharge and assist
supplemental irrigation
/ Low groundwater
levels due to low,
dry season
rainfall
Canal / Groundwater Interaction
Normal Wet Season Operations
Canal stages held lower
to facilitate surface
drainage of urban &
agriculture lands
Groundwater Long-term low canal
stages depress
regional groundwater
levels
Canal / Groundwater Interaction
Wet Season Pre -Storm Drawdown Operations
Canal stages lowered up to Short-term lowering
an additional -1 foot to of canal stages
increase surface drainage generally does not**
of urban & ag lands prior significantly
forecasts storms decrease regional
groundwater levels.
®®R @1lAe
®® ®®
`�►
Groundwater ** Problems occur during a
water shortage with pre -storm
drawdown if the rainfall does
_ not occur and the water is lost
from the system.
Seasonal Variation of South Florida
Rainfall
10
9
8
7
006
�5
4
3
2
1
0
Dry Season
Wet Season
c
D
months
Average Monthly Rainfall 1965-1995
System Conditions
• Drought conditions
experienced over
last several years
• Above average
rainfall in January -
May 2010
■ +5.87 inches of
normal rainfall
• Regional
rainfall/outlook:
(TBD)
s
(174
UPPER i
KISSIMMEE
13.9
(151 %;
LOWEli (1357,
HIS5IAIME ++.05")
14.76'
15m. MARTIN/
-� +5,43") 9T LUCIE
_KE
15351I OK EECHOB EE
1
�`+
(160%. +5.75") /f
18.34"
j� J
(140%,
1�PL009rY-IATCH
8.28 ' 15.17"
+5,20")
_
E
16.89, 194%, (164%, 17.3 PALMBEACH
}1 {199X, 8.85"} +5.91 } 1789C
17
AE5T EAST EAA
1 +6.92 EM
13.91 14.14"
(1759L,
OU7HWEST t149%• (1569C,
+8.23")
C CAST +4.59"} +5.{17")
ElsrERN
BIG CYPRESS
1 BROWARO
PRESERVE V'-A 3
1{1
13.89"
�j {1419C,
10.50"
�137%, +2.01"
EARN
MIAMI—LADE
ERCLADE3 1 MAT'IONAL PAR F
}
ry (Ertlm atetl} �'�
1\�
10.401
+2.2411)
KEYS
(Ee4mtltetl}
>300%
200-300%
150-200%
120-150%
90-120%
60-90%
30-50%
<30%
ilea sured
(% of Avg,
Diff From Avg)
DISTRICT -WIDE: . I , •
B L
District Actions
Wet Season /Hurricane Preparation
• Annual updates of Standard Operating Procedures
and Training
• O&M Staff and Corps performing joint aerial
inspection of entire system — pump stations, canals
and levees, spillways and culverts
• Regulatory inspections of above -ground
impoundments and permitted projects
• All facilities and auxiliary equipment inspected
• Communications equipment tested
• Emergency response equipment on stand by
• Emergency Response Trailer ready
What can you do?
• Inspect and maintain neighborhood drainage
systems
• Clear debris from ditches, swales and drainage
grates
• Ensure canal right-of-ways are clear
• Identify and address drainage problems,
blockages or flow restrictions
• Utilize storm wise landscaping
z
O
E
O
0
L
O
L
O
u
v
IM�
`' A
r,��s
G° o W� t l i
'a IN
dd=se$i
VS: e IT I arining
nceptual Configurations
imv B. Strowd. P.E.
Development
J
. Deputy Executive Director, Everglades Restoration
■ Review stakeholder input
process
■ Review stakeholder
conceptual configurations
■ Next steps
■ Stakeholder involvement Richard. A. Pettigrew
"Determine the the range and general
location of acreage needed north of
the Everglades Protection Area for
storing, treating, and delivering the
water flows needed to restore the
Everglades, while enhancing
ecological values in Lake Okeechobee
and the northern estuaries."
SOUTH FLORIDA WATER MANAGEMENT D I S T R I C
Phase ( Planning ConcepINOXonfiqura&ftsl-."01&41-
Provide stakeholders with an opportunity to develop
Conceptual Configurations
Utilize information discussed during previous
workshops that may be relevant
(Maps/Land
Water Quality
Modeling
Economic Impacts
* Costs
i Generate discussion regarding what aspects of the
configuration are most important to the team/authors
is e.g., feature type, location, or operations
Program Overlap Northern Everglades
i Storage
Northern Everglades ',
C-44
g
Pro ram
River Watershed_ -
Protection --�
Program
EAA Storage
!J ,
C-43 .. _
CERP EAA Treatment
� v
EFA -Long Term Plan
Everglades needs
For the ROG Phase-1 configuration Planning exercise
(March 31 —April 1), 5 key performance measure summary
maps were developed to provide ,general guidance for sizing_
of storage features north & south of Lake Okeechobee:
1. Percent Reduction in Lake -Triggered High Discharges to
the Northern Estuaries
2. Lake O Stage Envelope - Standard Score Above
3. Everglades Demand Target Delivered — Standard Score
4. Dry Season Everglades Demand Target Delivered —
Standard Score
5. Annual Average Flow to the Everglades — for use in sizing
south treatment area
S O U T H
F L 0
R
I D
A
WATER
MANAGEMENT
DI STR
I C T
yam
...
...
% Reduction in Lake -Triggered High Discharges to the Northern Estuaries
1.35
1.20
0
1.05
E
0.00
0.75
a�
0.60
0
v}
0.45
z
C
0.15
0.00
■■■■■■■■MMMMMM■■■■■
WEMEMEEMNAOMMMMMMM■
■
■■■■E
■■■■■■■■■■■
M
O►1■■■
' q
mmmmmmmmm■
� MM
'10
M■■
■■■■■■■■■■
`MMMMMMMMMM
Inkamm nc;�%MMMMMMMMMM
Ob OhM
• -, .. , ■\slid'\\
\`�\LI\1MOZI■■■■■
40
■■■■■■■■■■
K'S
NA
■■■■■■■■■■
M■■■■■■■■■
aNk
IDOMMMMMMMM
,
MMMMM■■
..II'1■IZ•PZMAUI
,■■,■■■■
0.00 0.15 0.30 0.45 "( U�(5 0,90 1.35 1.2� 1.35
Deep South Storage Capacity (million aff)
Performance Maps
provide guidance for
selecting storage size
combinations to achieve
desired levels of
performance.
Results from RESOPS
Model simulations of
specific configurations
will consider more
detailed specifications
and performance may
vary from the general
guidance provided here.
Note..:
Eacn a the 200 poom used
to create tn+s reap represents
an opurnized operation of the
cDrrespondrng storage
configuravons. Approx. 350
RESOAS model summations
Ltere perrormed for each storage
mohyaratuon..
Preliminary Estimates of Additional Treatment Area.
Assumes the Reservoir Provides TP Treatment,
Additional Flow
to Everglades
AF/ r
Preliminary Estimate of Additional Treatment Area acres
Assumed Lake TP ppb
40
80
100
150
200
50,000
2,100
37800
47600
65500
85100
1001000
31000
5,300
6, 400
8,900
11,000
150,000
37800
67800
8,200
11, 300
13,900
200,000
4,600
87300
10,000
13,600
16,800
2505000
57300
9,800
111700
16,000
191700
300,000
61100
11,300
139500
18,400
221500
350,000
67800
127700
157300
207800
25,300
400,000
71500
14, 200
171100
23,200
281200
450,000
87200
151700
18,800
257500
31,000
500,000
81800
17,200
1 20,600
27,900
33,800
P W21
Olin
inning
Conce tual Configu Ali!
ti#
w, Draw final sketch
Once tears developed the
proposed configuration, drew a
final sketch of the configuration
on the table -top base reap (2'x3')
Complete the documentation
Information necessary to
evaluate the configurations
Focus on communicating the
aspects of the configuration that
were most significant/important
to the tears/authors
■ 9 proposed team configurations
■ Each configuration will be evaluated for its costs, benefits,
and impacts
■ Each configuration assigned an engineer who developed
design assumptions for configuration based on
interaction/feedback from stakeholder team
■ Design assumptions were used to assist with modeling and
costing of each configuration
■ For each evaluation category, an internal team was formed
to evaluate all configurations for that category
• (e.g. real estate cost team; benefits team)
■ In most cases,
component of
configuration
evaluated the details of
a proposed configuration
each individual
as well as the overall
r�
SOUTH FLORIDA WATER M A N A G E
■ Physical Features
■ Footprint
Land Ownership
Land Use
■ Performance / Benefits
Hydrology (RESOPs)
Water Quality
Other
■ Cost Impacts
Rernediation
Real Estate
Construction
Operation & Maintenance
■ Potential Project Impacts to Sugar Production Economics
■ Staff development of evaluation data continues...
■ Will be discussing today:
Conceptual configurations design results
• Preliminary Performance/Benefits
• Hydrology (RESOPS)
■ To be discussed at future meetings:
Water Quality
Cost Estimates
Economic Impacts
Other
■ General Measures (used to develop performance
maps)
Reduction in Lake -Triggered High Discharges to the
Northern Estuaries- % Reduction
Lake Okeechobee Stage Envelope- Standard Score
Above
Everglades Demand Target Delivered- standard Score
- Dry Season Everglades Demand Target Delivered -
Standard Score
• Increase in Mean Annual Flows to the Everglades (k-
af/yr)
SOUTH FLORIDA WATER MANAGEMENT D I S T R I C T
Performance Measures
Additional Performance Measur
■ Lake Okeechobee
Stage Statistics (% of time < 10ft, < 11 ft, > 15ft, > 17ft,
inside envelope)
Stage Envelope
• Water Budget and Annual Flows
• Stage Duration Curves and Stage Hydrographs
■ Caloosahatchee and St. Lucie Estuaries
* Distribution of Mean Monthly Flows
* Frequency of High Discharge Events
* LO Regulatory Discharges in Excess of Estuary Demand
■ Water Supply
• LOSA Supply and Demand not delivered
LOSA Supply and Demand not delivered for average of 7
largest drought years
■ Everglades
Average Annual Flows
Average Dry Year Flows
Seasonality of Flows
Inter -Annual variability of Flows
■ Water Quality
Assumed Lake O Discharge water Quality
i Treatment Area Sizing Check
SD Storage —Deep —Above Ground
(Reservoir, Major Impoundment)
SS Storage —Shallow (Minor Impoundment)
FTS flow -ways —Managed for Conveyance,
Treatment &Storage (dark green —wet year
round; light green —allowed dry)
LT
Lake Technology
Ecoreservoir Lake
LTE
Lake Technology
Ecoslough
DS Storage — Dispersed
STA Stormwater Treatment Area
WM Wetlands — Managed Aquatic Plant Systems
SOUTH
FLORIDA
WATER
MANAGEMENT
D I S
T R I C T
Estuary
Driven
Everglades
Restorati.,
Mark Perry,
Ann
Wessel,
Pete
Qua"WNW ,
G
Ted
GuyWENE,
Rae
■ Utilize the performance charts to achieve large
reductions in Lake -triggered high discharges to
the northern estuaries while maximizing
storage north of Lake Okeechobee and
maximizing storage and conveyance features
south of Lake Okeechobee to meet the
Caloosahatchee minimum flow level and dry
season Everglades demand targets.
-----SOUTH FLORIDA ER MANAGEMENT DIST R I C T
Conceptual Configuration
Estuary Driven Everglades Restc"l-a61
I lqll.
P
pt4t
IN
sfwmd-goviriverotgrass
;. F
IF F
I
Is
■ North Features
0 1, 000,000 ac-ft; 15' depth, 75,000 acres
■ South Features
591,024 ac-ft storage; 87,712 acres; 4
compartments
i 44,381 acres treatment;15 compartments
Conceptual Configuration
EstuaryEvergladesDriven Rest ka
Base (Current
Target
Results
Conditions)
Estuaries -High Discharges (%
NA
95%
96%
reduction)
(84 months)
(3 months)
Lake O-Stage Envelope (Std
79
87
83
Score Above)
Everglades- Demand Target (Std
29
93
98
Score)
Everglades- Dry Season
42
95
98
Demand Target (Std Score)
Increased Annual Average Flow
NA
380
548
to Everglades (kaf/yr)
(1,380 kaf)
SOUTH FLORIDA WATER MANAGEMENT DISTRICT
■ Utilize natural, vegetated flow -ways to store
and treat water prior to discharging into the
Everglades. Mimic historic sheet flow as much
as possible.
■ Provide storage north of Lake Okeechobee to
reduce harmfu9 discharges to the estuaries and
help maintain environmentally healthy lake
levels,
■ Provide STA's at Lake Hicpochee and Disston
Island in order to improve water quality in the
Caloosahatchee River.
Lake 706
elk eechobcc
North Deep Storage 47,0
550,000 ac-ft
..� u • r- •rr .� w rr.—aa �� tea.• - .. _ . �^ -. _ .. � ... ! _ tie�e
F-
M.
TS RTS RTS VqM
RTS f , "S
I
"St SIP"
s RTS or , M
Flowway
"S `FTS
JFMTS
(Wet)
S "SFT. TG
"SFM FT*
AC:
s�aean
i RTi fTi fTi RTS PTO
i
Computmmt C
I
STAB
i
t
-- — 704 — — `T
98 '
98
882 _ 882 -
�.,
New canals for ,
conveyance
r
of treated water PR -
to WCAs (exist.
canals remain) 809
- 808 _
— a v — 798--
A
WATER
MANAG
E M
ENT
DISTRICT
■ North Features
550,000 ac-ft; 10' depth preferred, 15' maximum depth;
41,250 acres
■ South Features
551,205 ac-ft; three flow -ways (expected to provide
treatment); 0.5-3' depth; 204,150 acres; no
compartments
a west Features
i Two STAB (Disston Island and Hicpochee); 7,650 acres
*The authors prefer to utilize 10' maximum depth for the proposed reservoirs, if the additional land
necessitated by that depth could be acquired. Recognizing potential limitations to land acquisition,
they are willing to utilize the 15' depth if necessary
Base (current
Target
Results
Conditions)
Estuaries -High Discharges (%
NA
NS
77%
reduction)
(84 months)
(19 months)
Lake O-Stage Envelope (Std
79
NS
80
Score Above)
Everglades- Demand Target (Std
29
NS
83
Score)
Everglades- Dry Season
42
NS
80
Demand Target (Std Score)
Increased Annual Average Flow
NA
NS
221
to Everglades (kaf/yr)
(1,380 kaf)
® Utilize above -ground water storage and treatment features
intended to mimic a natural setting to a greater degree than
CERP Standard Reservoirs and STA9s. 12:1 vegetated
variable side slopes are utilized to provide more natural
aesthetics.
Features are intended to be open for recreationai uses such
as hiking, angling, binding and hunting. An increase in storage
of water for Everglades deliveries and decrease in harmful
discharges to estuaries is expected, although no specific
targets for these parameters are dictated by this configuration.
Provide storage north of Lake Okeechobee to reduce harmful
discharges to estuaries and help maintain environmentally
healthy lake levels.
Provide storage at ®isston Island to further reduce harmful
discharges to the Caloosahatchee River.
(81
Chain of Lakes
Landform Sections
EcoS loll g h LANDFORM (2.5- HT.)
ECOSLOUGH .2-3 FT Water Depth h.""•.nw ",weL_n {ISI BID LAYER
Slcm;amur Troatrnaht Aron Nawral4ac Farm: Cauuon HawuO "Nuc:n.r.,:..n H..0
(InJ
ud,,d o, blota3e) Gronut)
Gr.Aa For H13hir t:ulncnl Rcmc.:f - Occaaonal rn:.:nx , and PC;- ;
LOa Uro,Ls o,1--d:,in caltl..cUwtnhi::.a�,.rxc)
3 - 5 Ft. Ht. EcoSlough Landform Section
rJot to SC_^a: OcrcJ Elot=,.cn E)_gp.ra. W
EcoReservoir - Lake
LAKE
LITTORAL
tnouW1:ta d.:,gn c nlulaYa IACc e_n
Ivam, a pJpco.,a
I:rra+t, u�rg u;twL_d ol.; SIJIJ,a
pwed.d a, ,:,,tu _upµy.. Ury vu.a)
13�TopofL]ndicm�___�-
T
10 Luce Oepth,
o' �rPzbnard
-:-_
(GrcLL-A,:alrl L' ru11 mCUUGtl as Sluaga)
Nona: 1)Eo:a.ale c•rung y:.aa tar l;.naUml Lit andn y,_f c.uw,uc{�Gry; 2). Sod to
rcrr:c:o :uri.:cu pc Im:•nr,; 3) cna:.a.J mta grcund.,a;a gra., Iw cry c_amn V.ddl.,;.` Hcanat
c; a mc;nd,ring uc_K c:,:nncuy tom tho m,ctewmr sung rcuc cucr.:l;na operaccn; rbawI
10 Ft. Ht. EcoReservoir Landform Section
0;,1 tJ Ei,'_; l'cr, c:J �m.�,.i•n Er.cgi.r;, ca
IIJ'_PECTIOIJ
ROAD
r+l... • .rre
....wtl InspMwn Canal an Road -m u._
tt.mrdnayle.cay.,m:_.p.3•.cux,l t.. hJ'.].ua Engm._r,,d'r'_r m..;nu;ccp;rola:.lau.iJ UG.r.t Ul:,,;ras
..,.�:ndp.r'.L-.aJhy J?pr;,pr.a:: clundard3 JJIa,:pV-J'tfivk;,ka ..,dl h]411�If1::ItraUW1
LANDFORM 110- HT.)
ACJ•.:, t:aNri Gada ano Hcti, it
(:,::IGfa: On (IST G:.tl_Ia,IJn FIY�IIng)
TRAIL BID LAYER IIJi.PECT(OIJ
(Ccu:N; lu (2ND C:nuaaon Hm;d;l; kL..D
-lines tc•u= cl r
]an°^rigL,2f Inlwair Conta,nment and Flood Control Structura-(Tyycal STA Shand lmp-h-Canol and Rood-mca-na
t\znca) —0,ay-le,oa12a.da xtm cccpa5:'waltaaa'�L'eJEngmcucd' m;eocaa¢cpsratufu Wu.a JJ Ua rLU:. c:n�s
p.r ale mid Pdiulm;n:en_.u). Au,uayui,Prapn.,,v sl,naaua ❑Jto appe:�'au-1.;.4«i.•n n:._,ut rc;lora on
DRAFT
"4
Typical
EcoReservoir
EcoReservoir - Lake Landform
Affordable Phases
Lower and operations
costs
Showing Habitat Restoration -
ti
Carbon Sequestration; Energy Efficiency
Sequestration;
An Economically, soc1311y and ecolog:cally sustamoble solution for
't Habitat Restoration
slormv:akr slcraga and qu3ldg using lakes msla:d of concrae
LANDFORM
r m.nr, ls:..
L '"' a ','
Ecotourism and Social Gains
River of Grass Planning
raservoss• vnlh ecotounsm and recraahona) 6aneLla for commund,_s
'.,`
Eaguat 12.h1)
Agricultural Pollution Mitigation
g g
b
and res.dents. Dr -sign and Corisrrn., Lakes in Affordable Phnces.
Chain of Lakes Alternative
810
High-level Water Quality
TRAIL LAYER
r._, •al
Prepared April 2009 for the
LAKE LITTORAL r
1.
K_.,_•.ua,•
CYPRESS llj£PE:TIAIJ
',rer �,..,, Rear:
South Florida Water Management
9
(Cm''S.qu_ --•j .vNaxy a)"L'%n.
r.'_ u«ncm_L:,_1 iyyvt.rundADD,
-,•.•auk
KECJ
District, Public Participation Process
.F
Landform and Storage Sections
,''1
-
Conceptual for Analysis
I,,-..n�•,,•rT;�<eage -
,,t�.81i1{�ii�
_-___.. _. _�_--.
Fcreat t1•cn.zl, Planaaq antl Ldac,;3p�lach.aciorz
EcoReservoir Lake Storage - pruv,des fi of e,aler Storage In conto3uraton, that mcluda iarga and small ateas
m cnaal larmny.;i:gmal.com
where IocaI infrastructure s-gmants the landscape. Provldas greater than 504� of
the slorzge of larger 15 depth ccncreta
use; lR Ec;Re.:erva r (2357 )?m3raa:
resarvolrs and substanbatly less cost and more tourism banefits mclud rig flood proleUlcn. The des gn ailo.as the containment of
Copynynl. An Rynl_ Rr;aned. 23J7
Copyr t
Ine top 2 feet of polluted agricultural sod wdnm the landfcrm and associated areas.
■ North Features
500,000 ac-ft; series of interconnected above -ground
lakes with 12:1 vegetated side slopes; 6' maximum
depth; 92,000 acres
■ South Features
4831100 ac-ft; series of interconnected above ground
lakes with 12:1 vegetated side slopes; 6' maximum
depth; 99,300 acres; 48,520 ac-ft of additional storage in
an 66Ecosiough", which consists of a shallow, vegetated
area that stores and treats water; 24,259 acres
■ West Features
18,000 ac-ft; above -ground
slopes, 6' maximum depth;
lake with 12:1 vegetated side
3,960 acres
Estuaries -High
reduction)
Lake O-Stage
Score Above)
Discharges (%
Envelope (Std
Everglades- Demand Target (Std
Score)
Everglades- Dry Season
Demand Target (Std Score)
Increased Annual Average Flow
to Everglades (kaf/yr)
Base (Current
Conditions)
NA
(84 months)
79
29
42
(1,380 kaf)
Target
NS
NS
NS
NS
NS
Results
94 %
(6 months)
80
93
91
490
■ Provide system enhancements to benefit the
Everglades while minimizing community
impact.
■ Enhancements will reduce harmful d9
ischarges
to the estuaries and route additional water to
the Everglades at a more affordable cost that
will allover funding for completion of other CERP
and Northern Everglades projects.
SOUTH FLORIDA WATER MANAGEMENT DISTRICT
■ North Features
500,000 acres distributed storage; 0-29 Operating depth
■ South Features
180,000 ac-ft flow -way; 49 maximum depth; 45,000 acres
* 32,000 acres sTA (Talisman) 0.5-49 depth
■ East Features
• 14,000 acres effective treatment area (L-8) 0.5-4' depth
Base (Current
Target
Results
Conditions)
Estuaries -High Discharges (%
OVA
90%*
76%
reduction)
(84 months)
(20 months)
Lake O-Stage Envelope (Std
79
77*
82
Score Above)
Everglades- Demand Target (Std
29
NS
74
Score)
Everglades- Dry Season
42
NS
73
Demand Target (Std Score)
Increased Annual Average Flow
NA
CIS
349
to Everglades (kaf/yr)
(1,380 kaf)
■ Provide storage and treatment components
that will meet performance targets of 90%-95%
for Lake Okeechobee discharges and
Everglades water delivery while avoiding
interference with the proposed inland port
facilities,
LUKIUA WATER MANAGEMENT DISTRIC T
Conceptual Configuration
Restoration Plus Employment
J . .
North Deep Storage
_.._..:,.. 300,000 ac-ft
sa sa ss sa
.. L.Y.. . ._
as sa as as as r ,.
sa as a� sa as `•;,
s■ as sa are as
-, "s sa as sa to so
i ra to so so so 4-
-� as as as a sa as sa a
a as sa to asTa3Ts
I�
L•3w STA
rasrasTa
Compartment C--
— Gompartment B
STAB-
_ •
■ North Features
• 300,00 ac-ft deep storage; 15' depth; 22,500 acres
■ South Features
• 900,000 ac-ft deep storage; 12' depth, 83,000 acres
18,000 acres STA (Talisman) 0.5-4' depth
SOUTH FLORIDA WATER MANAG EMENT DI STRICT
Base (Current
Target
Results
Conditions)
Estuaries -High Discharges (%
NA
95%
95%
reduction)
(84 months)
(4 months
Lake O-Stage Envelope (Std
79
84
83
Score Above)
Everglades- Demand Target (Std
29
93
96
Score)
Everglades- Dry Season
42
91
96
Demand Target (Std Scope)
Increased Annual Average Flow
NA
370
550
to Everglades (kaf/yr)
(1,380 kat)
■ Establish aflow-way connecting Lake
Okeechobee and Water Conservation Area 3A
maximizing gravity flow and utilizing existing
structures and newly acquired land.
■ Includes significant storage north and south of
the Lake to decrease estuary damaging
discharges and to meet 90% dry season water
demand for the Everglades.
■ Includes a small flow -way and additional
treatment capacity in the S5A Bastin for
treatment of water to be delivered to the Refuge.
0
\
■ North Features
* 650,000 ac-ft storage; 15' max depth; 48,750 acres
■ South Features
589,000 ac-ft storage; 18' max depth; 36,400 acres
Continuous flow -way (includes filled Miami Canal);
108,385 acres
Forested wetland; 14,500 acres
■ East Features
• STA; 14,600 acres
Flow -way; 1,385 acres
SOUTH FLORIDA WATER MANAGEMENT DISTRICT
Base (Current
Target
Results
Conditions)
Estuaries -High Discharges (%
NA
95%
95%
reduction)
(84 months)
(4 months)
Lake O-Stage Envelope (Std
79
NS
79
Score Above)
Everglades- Demand Target (Std
29
NS
91
Score)
Everglades- Dry Season
42
90
89
Demand Target (Std Score)
Increased Annual Average Flow
NA
CIS
395
to Everglades (kaf/yr)
(1,380 kaf)
SOUTH FLORIDA WATER MANAGEMENT DISTRICT
■ Meet the performance targets including Lake
Okeechobee high stage target, reductions of
damaging flows to estuaries, and providing dry
season deliveries to the Everglades.
■ The implementation of dispersed storage north
of Lake Okeechobee is included.
North Deep Storage
fliepo hee f
,:.._. .. _.._. 200,000 ac-ft
$ 27 .
L-3w
Comparkrad C
0 IB
s
1
A STASTA STA 5TA STA ST
A STA 5TA STA 5TA STA STA 5
/ i TA 5TA STA
STA S"f
.STA STA S
ATA LTA L
4-?3
Cor mrtmente
S M 6 L�IL'
w wrw� � wr � w�+w r.wr• wr
704
98
■ North Features
200,000 ac-ft; 15' depth; 15,000 acres
Dispersed Storage
■ South Features
• 1,200, 000 ac-ft; 16' depth; 76,900 acres; STA;
36,500 acres; Talisman Compartment A
■ East Features
STA; 15,600 acres; L-3 Basin
SOUTH FLORIDA WATER MANAGEMENT DISTRICT
Base (Current
Target
Results
Conditions)
Estuaries -High Discharges (%
NA
95%
95%
reduction)
(84 months)
(4 months)
Lake O-Stage Envelope (Std
79
85
84
Score Above)
Everglades- Demand Target (Std
29
NS
95
Score)
Everglades- Dry Season
42
>90
95
Demand Target (Std Score)
Increased Annual Average Flow
NA
NS
533
to Everglades (kaf/yr)
(1,380 kai)
SOUTH FLORIDA WATER MANAGEMENT DISTRICT
In Focused primarily on meeting set performance
standards derived from the performance reaps
that were provided. Utilizing performance maps
centered on roughly 300,000 ac-ft of storage
north of Lake Okeechobee and roughly 550,000
ac-ft south of Lake Okeechobee.
■ The storage south of the Lake is to be divided
between both deep and shallow storage.
■ The configuration also provides water quality
treatment by locating a Stormwater Treatment
Area on Compartment A of Talisman property.
LORIDA WATER MANAGEMENT DISTRICT
■ North Features
v 300,000 ac-ft, 15 feet deep, 22,500 ac
■ South Features
460,000 ac-ft, 17 feet deep, 30,000 ac
• 90,000 ac-ft, 4 feet deep, 25,000 ac
• 36,500 acres Of STA9 Talisman- compartment A
I SOUTH FLORIDA WATER MANAGEMENT DISTRICT
Base (Current
Target
Results
Conditions
Estuaries -High Discharges (%
NA
90%
94%
reduction)
(84 months)
(5 months)
Lake O-Stage Envelope (Std
79
NS
81
Score Above)
Everglades- Demand Target (Std
29
90
92
Score)
Everglades- Dry Season
42
85-90
91
Demand Target (Std Score)
Increased Annual Average Flow
NA
NS
537
to Everglades (kaf/yr)
(1,380 kaf)
■ Construct a reservoir in the northeastern portion of Lake
Okeechobee which will provide 1.2 million ac-ft of storage.
The flows from Kissimmee River
will not
go
into the
reservoir but rather
into
the main
portion
of
the
Lake.
■ Improve conveyance south of Lake Okeechobee to allow
the movement of water from the Lake to a stormwater
treatment area that will be constructed on Talisman -
Compartment A.
■ Construct an STA on USSC lands immediately west of
STA 5/6 which will receive water from the S-4 Basin.
Construct conveyance from the S-4 Basin to the new STA.
■ Implement the Nicodemus Slough management measure
with potential to store 30,000 ac-ft on 13,000 acres.
urur
w� jr owwsrmq � � / rllrlt
/ �. , •, ru
wrururyeraru ,
urisrurasris
1 L09 ' S
4 L■ • ;
rot —
-� .
zoo _
Z99
zrr26 , ..4.
` 96
rot rot i
COL I � �1 .� ' -.,_.. .._ ... � �_.._.....,.. i ...._.._......
l L�! 9CL \ 96 i L f' i
` i r
w w w r�r a
90L aawwwYwa ! i
w w a w w w w w
w w w w w a w w
20L aaawwaaa
�y----T•��I waawwwww
•�� f ! � awwMw I \ �
i
r`� YLL t6L V a a a
41
as
qo ..►0-0)ie-IUlql!M•
S O U T H F L O RIDA WATER MANA G E M E N T D I S T R I C T
Conceptual Configuration
Reservoir Within Lake Okeecho �
North Features
1,200, 000 ac-ft; 3 feet deep; 158,000 acres within
Lake Okeechobee
* Dispersed Storage- Nicodemus Slough; 13,000
acres
■ South Features
53,500 acres; Talisman- Compartment A and west of
STA-5/6
SOUTH FLORIDA WATER MANAGEMENT DISTRICT
Base (Current
Target
Results
Conditions)
Estuaries -High Discharges (%
OVA
>95%
93%
reduction)
(84 months)
(6 months)
Lake O-Stage Envelope (Std
79
100
87
Score Above)
Everglades- Demand Target (Std
29
>90
84
Score)
Everglades- Dry Season
42
>90
86
Demand Target (Std Score)
Increased Annual Average Flow
NA
400
616
to Everglades (kaf/yr)
(1,380 kaf)
■ Complete evaluation of conceptual
configurations
Water quality
Planning level cost estimates
Economic impacts
■ Evaluation of concept e9ernents
■ Formulation of suggested alternatives
■ Periodic summaries to WRAC and Governing
Board
MEMORANDUM
91
To: Mayor & City council
From: Brian Whitehall, City Administrator
India Riedel, Finance Dept.
RE: Public Risk Management of Florida Health Trust
Date: 06/15/10
Pool was established: 4 entities (still participants) in 1988
One member has left the pool since it's inception
Number of entities participating: 34
Number of employees participating: 4500+/-
It is assessable, however:
Specific Excess @ $200,000
Aggregate Excess (reinsurance)
Financials seem adequate with above in place
Rates are Actuarially based each year on the pool collectively and then
based on claims experience of each entity. If a participant's loss ratio has
a 10% difference from the pool's average, an entity's rates can be adjusted
upwards or downwards by 2%-6%.
PRM is taking an active forward approach to claims. In the mist of a
dependent audit, (anticipated savings apprx. $400,000)
Other members are being offered comparable rates that we are being
offered for the PRM Blue Option 1748 plan.
Requires a mandatory 2 year participation in the pool.
2nd year (effective Oct 1 st, 2011) premiums will be based on average pool
rates. 3rd year (effective Oct. 1 st, 2012) premiums will be reviewed and
adjusted upwards/downwards by 2%-6% if the loss ratio is 10%
higher/lower than the pool average.
PRM 8 year renewal history is attached and compares estimated carrier
trend as well.
PRM has provided competitive pricing, for comparable
coverage The base through
the PRM Blue Options 1748 Plan (AETNA buy up plan).
employee premium of $415.87, which is a 3.05% increase from existing
Employer cost. The rate is guaranteed until 09/30/2011, and we will have a
common renewal date effective October 1st thereafter.
City Employee Total
Employee Only
$415.81 $ 0.00 $ 415.81
Employee & Spouse $475.81 $ 562.44
$1,038.2
Employee & Family 5
Employee &children $475.81 $ 848.44 $1,324.25
PRM offers additional benefit options that an entity may select to offer as
follows:
Employee Assistance Program — Included in rates
Dental Plan: High option/Low Option offered on a contributory basis
Vision Plan (2): Two carriers to choose from; either option can be offered
on a contributory or non-contributory basis
Life/AD&D: offered on a contributory basis
Outsourcing of Eligibility and Enrollment services —Included in rates.
City cost for renewal as is with AETNA: $386,091
City cost with PRM-Blue Options 1748: $317,807
Savings of: $ 68,284 ��,
PUBLIC RISK MANAGEMENT OF FLORIDA
8 YEAR RENEWAL HISTORY
2002 - 2003
14.5%
18.0%
2003 - 2004
14.0%
17.7%
2004 - 2005
4.4%
16.2%
2005 - 2006
7.2%
15.0%
2006 - 2007
11.6%
14.4%
2007 - 2008
0.0%
13.2%
2008 - 2009
5.0%
12.6%
2009 - 2010 1
3.3% 1
10.5%
* Includes both medical and prescription drugs
PUBLIC RISK MANAGEMENT OF FLORIDA
Summary of Benefits
Blue Options Plan 1748
Benefits for Covered Services
Member Calendar Year Deductibles
In -Network (Per Individual / Family Aggregate)
Out -of -Network (Per Individual / Family Aggregate)
Coinsurance Percentage Paid by Plan
In -Network Providers
Out -of -Network Providers
Physician Office Services Paid by Plan
In -Network Family Physician
In -Network Specialist (no referral needed)
Allergy Injections per visit
$0 / $0
$500 / $1,500
100%
60%
Hospitalization Paid by Plan
Inpatient Hospital Facility Services Per Admission
Option 1
Option 2
Out -of -Network
Outpatient Hospital Facility Per Visit
Option 1
Option 2
Out -of -Network
Physician Services at Hospital and Emergency Room
• In -Network
Physician Services at Locations other than Office,
Hospital and Emergency Room
In -Network Family Physicians
In -Network Specialist
Emergency Room Facility Services Per visit (waived if admitted)
In -Network
Out -of -Network
100% after $100 Copay
100% after $10 Copay
100% after $20 Copay
100% after $10 Copay
100% after $250 Copay
100% after $500 Copay
100% after $750 Copay
100% after $100 Copay
100% after $200 Copay
100% after $300 Copay
100%
100% after $10 Copay
100% after $20 Copay
100% after $50 Copay
Note: Out -of -Network Physician Services at Hospitals, Emergency Rooms and Locations other than
Office are subject to the Calendar Year Deductible and Coinsurance.
Other Services Paid by Plan
Independent Clinical Laboratory 100%
• In -Network Laboratory 100%
Mammograms (Routine and Diagnostic)
Ambulatory Surgical Center Facility 100%after $50 Copay
• In -Network Facility
Independent Diagnostic Testing Facility Service 100% after $50 Copay
In -Network
24
PUBLIC RISK MANAGEMENT OF FLORIDA
Summary of Benefits
Blue Options Plan 1748
Note: Out -of -Network Providers and Physicians are subject to the Calendar Year Deductible and
Coinsurance.
Member Out -of -Pocket Maximum
(Per Individual / Family)
$1 ,500 / $3,000
In -Network
$3,000 / $6,000
Out -of -Network (Per Family)
Note: Out -of -Pocket Maximum includes talendar Year
Coinsurance and Copayrludes Pharmacy.
Deductibles,
Calendar Year Maximums Per Insured
Mental Health Services Benefit Maximum:
of inpatient and
Inpatient days/visits or combination
30
partial hospitalization days
20
Outpatient visits
$2,500
Home Health Care Benefit Maximum
Facility Days Benefit Maximum60
Skilled Nursing
Outpatient Cardiac Rehabilitation and Occupational,
Combined
Physical, Speech, and Massage Therapies and Spinal
$2 500
Manipulations Benefit Maximum
Benefit Maximum Per Insured
$250
Adult Wellness
Ambulance Service (per person benefit maximum)
$400 per day
Ground Travel
$4,000 per day
Air and Water Travel
Lifetime Maximums Per Insured
$5,000,000
Total Lifetime Maximum Benefit
Substance Dependency Care and Treatment Benefit Maximum
$ ,500
Hospice Benefit Maximum
500
Blue Script Prescription Drug Program
Retail
Generic $10 Copay
Preferred $25 Copay
Non -Preferred $60 Copay
Mail Order
Generic $20 Copay
Brand $50 Copay
Non -Preferred $120 Copay
This is a summary only and is not intended to be a complete Contract/Certificate.
scription of ovared c epancy
More complete information is contained in the Group
arises between this benefit summary and the actual Group Contract/Certificate, the actual
Group Contract/Certificate will prevail in all circumstances.
25
r
Office Visit Copay In Network
(primary/ specialist)
Urgent Care/ ER copay
Prescription Copays
Deductible
(in network/ out)
Coinsurance
(in network/ out)
In Patient Hospital
(in network/ out)
Out Patient Hospital
(in network/ out)
Out of Pocket Limit
(in network/ out)
Rates:
Employee only
Employee/ Spouse
Employee/ Children
Family
Rate Change %
2010 City of Okeechobee Health Insurance Plan/Rates
Custom
$35/ $50
$75/ $200
$15/$ 35/$60
$0/ $1500
80%/ 60%
80%/ 60%
80%/ 60%
$3,000/ $6,000
Enrollmer Present Renewal
19 $403.54 $507.65
0 $964.37 $1213.10
1 $770.50 $969.29
0 $1228.09 $1544.94
25.80%
Annual Employer Cost:
Renewal Base Plan POS O409
Renewal Alternate w/Aetna
PRM-Blue Options 1748
$386, 091
$326, 839
$317,807
Present Bu -U Ian
POS O409
$10/ $20
$50/ $50
$10/$25/$40
$0/ $500
100%/ 60%
$250 copay/ 60%
$250 copay/ 60%
$1,500/ $3,000
nrollme
Present
Renewal
33
$457.52
$575.56
6
$1093.37
$1375.46
3
$873.57
$1098.95
0
$1392.36
$1751.59
25.80%
HMO OA 0109
$30/ $50
$50/ $150
$15/$35/$50
$1,000/ In network only
80%/ In network
80%/ In network only after ded I
80%/ In network only after ded
$2,500/ In network only
Renewal Alternate
$439.30
$1, 049.84
$838.79
$1, 336.92
8.9% vs present base
PRM
Blue Options 1748
$10/$20
$50. In Network
$10/$25/$60
$0
$100%/$100% of Allowance
& Balance Bill
Opt 1-$250 copay InNet Opt
2-$500 copay InNet 60% of
Allowance OutNet
Opt 1-$100 copay InNet Opt
2-$200 copay InNet $750
copay 60% of Allowance
OutNet
$1,500/ $3,000
New Plan
$415.87
$1,038.25
$830.20
$1, 324.25
3.05% over base plan
iVtsw:
-.NDEPENDENT
NEWSPAPERS
01(1 ECI1OBEE NEWS 107S.1% 17th Street, Suite D, Mecchuh_ , FI_ i.1074 (863) 763-3134
STATE OF FLORIDA
COUNTY OF OKEECHOBEE
Before the undersigned authority personally
appeared Judy Kasten, who on oath says she is
Advertising Director of the Okeechobee News, a three
times a week Newspaper published at Okeechobee, in
Okeechobee County, Florida, that the attached copy of
advertisement being a __-$< L,, 6.L.-- -) L �`-U C.:
in the matter of
in the 19th Judicial District of the Circuit Court of
Okeechobee County, Florida, was published in said
newspaper in the issues of
Affiant further says that the said Okeechobee News
is a newspaper published at Okeechobee, in said
Okeechobee County, Florida, and that said newspaper
has heretofore been published continuously in said
Okeechobee County, Florida each week and has been
entered as second class mail matter at the post office in
Okeechobee, in said Okeechobee County, Florida, for a
period of one year next preceding the first publication
of the attached copy of advertisement, and affiant fur-
ther says that she has neither paid nor promised any
person, firm or corporation any discount, rebate, com-
mission or refund for the purpose of securing this
advertisement for publication in the said newspaper.
• Judy Kasten
Sworn to and subscribed before me this
—day of __sue<?-__..• L AD
{
Notary Public, State of Florida at Large
i
NOTARY PUBLIC -STATE OF FLORID
Angie Bridges
s :Commission #Dll779718
Expires: APIi. 20, 201.2
BONDED PIRU ATLANTIC BONDING CO., L'JC.
CITY couNaL MEETING NOTICE
NOTICE IS HEREBY GIVEN that the GGryCouncil of the Gty of Okeecho-
bee will meet in Regular Session on Tuesday, tune 15 2010, 6:00 p.m.,
at CRy Hall, 55 SE 3M Ave, Rm 200, Okeechobee, Flodda. The public is in-
vited and encouraged to attend.
PLEASE TAKE NOTICE AND BE ADVISED that no stenographic record by a
certified court reporter will be made of the foregoing meeting. Accordingly,
any person who may seek to appeal any decision involving the matters no-
ticed herein will be responsible for making a verbatim record of the testimo-
ny and evidence at said meeting upon which arty appeal is to be based.
Please -con taU City Administration at 863-763-33 2, or website www.city-
ofokeechobee.com, to obtain a copy of the agenda.
In accordance with the Americans with Disabilities Act SADA) of 1990 per-
sons needing special accommodation to parbdpate n tlik proceeding
Ishoukl contact the City Clerk's Office at 863-763-3372 for assistance.
by: James E. Kirk,
City Clerk