Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
August 24, 1993
Board of County Commissioners Okeechobee County August 24, 1993 Mr.2J©hn Drago, Administrator Okeechobee City 55 SE 3rd Avenue Okeechobee, Florida 34973 Dear John: Attached is a copy of a letter sent to me by Jack Crahan of Deighan Appraisal Associates, Inc. I notified them on 8/18/93 that they should proceed with the appraisal services, as per the Contract requirements. There is also a "list of requirements" that detail material required by Jack to begin the appraisal process. Please provide me with the highlighted items for coordination and transmission to Deighan Appraisal Associates. Should you not have some of the requested items or need me to obtain them from another source please let me know. �r✓ vid R�era Finan D' ector cc: Christopher W. Chinault, County Administrator Charles W. Harvey, Chairman James Kirk, Mayor Skip Harvey Jack Crahan Susan B. Hughes Tommy Close Clif Betts, Jr. Stephen Porter Charles W. Harvey Christopher W. Chinault District 1 District 2 District 3 District 4 District 5 County Administrator 'TATt- CRT.OE74 REM JACK CRAHAN, MAI /0000•1,3 DANIEL IC DEICHAN, MAI /00000144 LINDA DOTCDK733, ERA L S(IPI. W IL ON, JR, MAI /8000,113 E. IL ROCKWELL, TREA=, August 23,1993 DEIGHAN APPRAISAL ASSOCIA TES, INC Mr. David J. Rivera, Finance Director Board of County Commissioners Okeechobee County 304 NW 2nd Street Okeechobee, Florida 34972 REAL. ESTAT4. ANALYSTS AND COn:SULTANTS 20001 E. PORT ST. LUCIE ROULEVARD, SUITE A PORT ST. LUCIE, FLORIDA 34952 (407) 335 -1405 FAX 9(40, 335 -1423 REPLY TO: PORT sr. LUCIE Re: Appraisal of City of Okeechobee Utility Systems Our File #93521100 Dear Dave: I received your letter, dated August 18, 1993, directing us to proceed with the appraisal of the Okeechobee City Utility. As indicated in the agreement, Section A.5d, we will need the county to advise us of their representative, with whom we will deal in obtaining the information we need. Over the last year, you have been acting in this capacity and, until we are notified otherwise, we will direct our questions, etc., to you. To assist in this process and facilitate the required flow of communication, please identify the person who will act as our immediate contact at the City Utility. I have enclosed a draft outline of the planned schedule of tasks, as you requested. Along with our monthly invoice, we will update you as to our progress relative to the outline. I am also enclosing our initial list of requirements as identified within the Scope of the Appraisal, which we will need to accomplish the assignment T realize some items are readily available, while others may take some time to either prepare or obtain. Please let me know when the requested material is available to be mailed, picked up, and /or reviewed. Page GMT OCEAN BOULEVARD STUART, FLORIDA 34111 (417) 3U 1410 741NORTH DBRALHICHwAY THE HOST CENTER SUM 134 A NORTH PALM REAUI. EL 7NM (407) 4174117 David J. Rivera August 20, 1993 Page 2 If you anticipate a delay in receiving or obtaining any of the requested information, please indicate the date when you expect it to become available. We will continue to add to this list as the inspection and research processes identify new material. If you have any questions regarding the enclosed list, please contact Linda Fairbanks or me. Sincerely, DEIGHAN APPRAISAL ASSOCIATES, INC. Jack Crahan, MAI cc: Chris Chin ult, County Admnistrator John Drago, City Administrator Charles W. Harvey, Chairman James Kirk, Mayor Skip Harvey Linda B. Fairbanks Enclosure JC \TM308135.DOC 7. Reese Macon Associates A. Utility Atlas Drawings and Maps V23/93 B. "Hydraulic Analysis of the Water System" W23/93 C. "Proposed Water Treatment Plant Construction and Plans" 8/23/93 D. "Capital Improvement Needs" [identified in V Master Plan and City Budget] 8/23/93 E. "Upgrading the Existing Water Treatment Plant" 6fi report 8/23/93 �`M% rl 8. Knepper Willard, Inc. A. Wastewater System Plan 8/23/93 B. Capital Improvement Needs [identified in Master Plan and City Budget 8/23/93 C. Preliminary Engineering Report and /or r Plans for "Expansion of Wastewater Treatment Platt" 8/23/93 D. Various Plana for Wastewater System Exten- sions 8/23/93 9. "PMG Financial Pre-1981 Financial Record Study" 8/23/93 rt 1 ,nZ 10. A. Independent Auditors' Report Hill, Barth Al R King, dated 2/10/92 ]3/93 B. "City of Okeechobee Utility System Financial Analysis" prepared by PMG Assocs. 8/23/93 LIST OF REQUIREMENTS Date Date Requested Received 1. County Contact Person 8/23/93 2. City Contact Person 8/23/93 3. "Resolution 1189 -5 (updated listing) Listing of Utility Rates" $/23/93 8/23/93 4. "Comparison Analysis Water and Sewer Options Okeechobee area Water and Sewer Task Force Final Report 8/1991, "PMG Associates, Inc. 8/23/93 8/23/93 5. "City of Okeechobee Utility Rate Study," dated 12/91, PMG Associates, Inc. 8/23/93 8/23/93 6. Proposed $5,000,000 bond for the. City of Okeechobee, "Water and Sewer Refunding Revenue" Bond Series 1992A. 8/23/93 8/23/93 11. Final Draft "Governance Alternatives to Provide Regional Water and Wastewater Services and Facilities to the Urbanized Areas of Southern Okeechobee County" Nabors, Giblin, et 4 report dated July 8,1992 12. A. 1987 Bond Documents B. 1989 Bond Documents C. 1992 to Present Bond Documents $/23/93 8/23/93 8/23/93 8/23/93 t- 15. 1 cetr 21. 22. Date Requested Miscellaneous inspection reports on the system condi- tions of the City of Okeechobee Water and Sewer Utility (E.G. Hydrant Tests, I/I Studies, Pipeline Samples or Photographs) 8/23/93 A. City Updated Comprehensive Plan [Water and Wastewater Elements] B. County Updated Comprehensive Plan [Water and Wastewater Elem ents] A. Detailed, itemized accounting of funds spent for the proposed water treatment facility. Budgets reflecting unfinished and incomplete work. $/23/93 8/23/93 Time line of costs of any other ongoing projects relative to or within the system. 8/23/93 B. 17. A. Approximate land area and location of the new water treatment site. B. If any new well sites are to be located off -site, where fee simple title is to be retained by the City, then language reflecting the leasehold interest or easement must be furnished. 8/23/93 8/23/93 $/23/93 8/23/93 Decision about the consideration of the abandoned 5 1" °w sewage treatment plant in the valuation; to include i ii m either the pumping station and required supporting land (size agreed upon) only, or existing land site plus salvage value of the abandoned plant components. Determination of the location and dimensions of the site area included with the water towers. Decision regarding the inclusion of the operations center, also known as the water maintenance barn, in this valuation, with identification of the specific dimensions of the site to be included. A. B. C. D. Operation and maintenance reports Repair and rehabilitation studies Agency permit applications /approvals Historical cost summaries Legal Description or Maps of Utility Basements and /or Parcels 8/23/93 8/23/93 8/23/93 8/23/93 8/23/93 8/23/93 X3/93 Date Received Incorporate staff's /consultants' comments into final report and present to County Commission and City Council PRELIMINARY TASK SCHEDULE Request receipt of documents, plans, legal descriptions, etc. 8/19 9/17/93 Develop present utility asset list to city and county for agreement 8/19 10/1/93 Overall system inspection 9/13 11/30/93 City and county agree on utility asset list 10/1 10/15/93 Specific field inspection 10/18 10/29/93 Research and analysis of relevant data for utility valuation 9/1 11/30/93 Develop initial draft of appraisal report 9/13 12/14/93 Meet with city and county staff/ consultants to review draft report 12/15/93 Receipt of staffs /consultants' continents 12/15 12/31/93 1/4 1/15/94 Page 6